ML20070W197: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 19: Line 19:
{{#Wiki_filter:'
{{#Wiki_filter:'
l i
l i
l OPERATING DATA REPORT.
OPERATING DATA REPORT.
DOCKET NO.     50-302 DATE     2/2/81 COMPLETED BY       D. Bogart TELEPHONE (904) 795-6486 4
DOCKET NO.
OPERATING STATUS j
50-302 DATE 2/2/81 COMPLETED BY D. Bogart TELEPHONE (904) 795-6486 OPERATING STATUS 4
Crystal River Unit #3                              Notes
: 1. Unit Name:
: 1. Unit Name:
Crystal River Unit #3 Notes j
: 2. Reporting Period:
1/1/83 - 1/31/83
1/1/83 - 1/31/83
: 2. Reporting Period:                                                                                                    l
: 3. Licensed Thermal Power (MWt):
: 3. Licensed Thermal Power (MWt):
2544 l
2544 890
: 4. Nameplate Rating (Gross MWe):           890
: 4. Nameplate Rating (Gross MWe):
: 5. Desagn E!ectrical Rating (Net MWe):       825
825
: 6. Maximum Dependable Capacity (Gross MWe).         850                                                                1
: 5. Desagn E!ectrical Rating (Net MWe):
: 7. Maximum Dependable Capacity (Net MWe):           811
850
: 6. Maximum Dependable Capacity (Gross MWe).
811
: 7. Maximum Dependable Capacity (Net MWe):
: 8. It' Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
: 8. It' Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
Revised MDC ratinns based on operating history.
Revised MDC ratinns based on operating history.
1
: 9. Power Level To Which Restricted,if Any (Net MWe):
: 9. Power Level To Which Restricted,if Any (Net MWe):         2475 MW thermal                                           ,
2475 MW thermal
: 10. Reasons For Restrictions,if Any:     Pnmn Pnune Mnnienra in hvnnnm.                                                 '
: 10. Reasons For Restrictions,if Any:
O                                                               This Month           Yr to.Date         Cumulative       j I
Pnmn Pnune Mnnienra in hvnnnm.
: 11. Hours In Reporting Period                                   744                   744             51624         '
O This Month Yr to.Date Cumulative j
: 12. Number Of Hours Reactor Was Critical                       744                   744           32951.2
I
: 13. Reactor Reserve Shutdown Hours                                 0                     0           1280.3
: 11. Hours In Reporting Period 744 744 51624
: 14. Hours Generator On-Line                                     744                   744           32210.9
: 12. Number Of Hours Reactor Was Critical 744 744 32951.2
: 15. Unit Reserve Shutdown Hours                                   0                     0               0 1777945
: 13. Reactor Reserve Shutdown Hours 0
: 16. Gross Thermal Energy Generated (MWH)                                       1777945           72302900           .
0 1280.3
: 17. Gross Electrical Energy Generated (MWH)                 622985   _,
: 14. Hours Generator On-Line 744 744 32210.9
622985           24589602
: 15. Unit Reserve Shutdown Hours 0
: 18. Net Electrical Energy Generated (MWH)                   594578               594578           23339458           ,
0 0
: 19. Unit Service Factor                                       100%                 100%               62.4%
: 16. Gross Thermal Energy Generated (MWH) 1777945 1777945 72302900
: 20. Unit Availability Factor                                   100%                 100%               62.4%
: 17. Gross Electrical Energy Generated (MWH) 622985 622985 24589602
: 21. Unit Capacity Factor (Using MDC Net)                     98.5%                 98.5%               57.4%
: 18. Net Electrical Energy Generated (MWH) 594578 594578 23339458
: 22. Unit Capacity Factor (Using DER Net)                     96.9%                 96.9%               54.8%
: 19. Unit Service Factor 100%
: 23. Unit Forced Outage Rate                                     0%                   0%               25.6%
100%
62.4%
: 20. Unit Availability Factor 100%
100%
62.4%
: 21. Unit Capacity Factor (Using MDC Net) 98.5%
98.5%
57.4%
: 22. Unit Capacity Factor (Using DER Net) 96.9%
96.9%
54.8%
: 23. Unit Forced Outage Rate 0%
0%
25.6%
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
                                                                  ~
Refuel outace becinninn 3/19/83, scheduled to last 16 weeks.
Refuel outace becinninn 3/19/83, scheduled to last 16 weeks.
: 25. If Shut Down At End Of Report Period. Ef.timated Date of Startup: N/A                                           e
~
: 26. Units In Test Status (Prior to Commercial Operation):                       Forecast             Achieved INITIAL CRITICALITY                                                             1/14/77.
: 25. If Shut Down At End Of Report Period. Ef.timated Date of Startup: N/A e
INITIAL ELECTRICITY                                                             1/30/77-COMMERCIAL OPERATION                                                           3/13/77 8302180332 830215 PDR ADOCK 05000302                                                                                               (9/77)
: 26. Units In Test Status (Prior to Commercial Operation):
R                         PDR
Forecast Achieved INITIAL CRITICALITY 1/14/77.
INITIAL ELECTRICITY 1/30/77-COMMERCIAL OPERATION 3/13/77 8302180332 830215 PDR ADOCK 05000302 (9/77)
R PDR


AVERAGE DAILY UNITPOWER LEVEL O
AVERAGE DAILY UNITPOWER LEVEL O
                                                                                                                                                              .oocxErso.          so->o2 UNIT        FLCRP-3
[
[
DATE _2/_2/83           _
.oocxErso.
COMPLETED BY           D. B gart TELEPHONE 1904) 795-64__86 MONTH                             January 1983 DAY AVERAGE DAILYPOWER LEVEL (MWe-Net)                                           DAY 1                       -
so->o2 UNIT FLCRP-3 DATE _2/_2/83 COMPLETED BY D. B gart TELEPHONE 1904) 795-64__86 MONTH January 1983 DAY AVERAGE DAILYPOWER LEVEL (MWe-Net)
AVERAGE     DAILYPOWER LEVEL (MWe-Net) 2                                                                                               17 824                                                                                 _
DAY 1
839 3                       -
AVERAGE DAILYPOWER LEVEL (MWe-Net) 17 2
831                                                 18                             _
824 839 3
820 4                                                                                             39 825                                                                             _
831 18 820 39 4
g9o S
825 g9o S
825                                             20 829 6                                                                                         21                                               827 772 O           >
825 20 829 6
738 22                                   -
21 O
R14 8                                           781                                         23 82s 9                                                                                     24                                                    830 829 10                                                                                    25 829                                                                      _
772 827 22 R14 738 8
636 11 26                             _
781 23 82s 24 9
686 12                                                                                   27                                                      622 836                                                                  _
829 830 10 829 25 636 11 26 686 27 12 836 622 I
13 824
824
                                                                                                ;g 676 I          14                                             837                                   29 816 15                                                                                   30 820                                                              -
;g 676 13 14 837 29 816 15 820 30 16 834 3j 831 INSTRUCTIONS the nearest whole megawatt.On this format, list the average daily unit power leve e Net for each day in the reporting month. Compute t n
16                                                                                   3j 834                                                              _.
I o
831 INSTRUCTIONS the nearest whole megawatt.On                                                   n  this format, list the average daily unit power leve e Net for each day in the reportingo month. Compute t I
(9/77)
(9/77)


O                                                             O                                                           O DOCKET NO.         50-302 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME         FLCRP-3 DATE       2/4/83 COMPLETED BY           M u culvor REPORT MONTH     1/83                                             (904) 795-6486 TELEPHONE
O O
                                                      %                              ~
O DOCKET NO.
50-302 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME FLCRP-3 DATE 2/4/83 COMPLETED BY M u culvor REPORT MONTH 1/83 TELEPHONE (904) 795-6486
~
S*
c n
s==
s==
                        -o c
.2 _e s
                                .2 _e n
7.s X Licensee g *,
s Licensee g *,       S*
g'.
g'.               Cause & Corrective 7 .s X g                      jg5 l
Cause & Corrective
No.         Date             3g         g                 Event     u?         o8                       Action to H                 5                            #0            o
-o No.
                                $5               j@g         Report #                                   Prevent Recurrence 6
Date g
83-01     830106       F       --
3g g
A     N/A             N/A   HC     HTEXCH     Reduced power to find a saltwater leak in condenser waterbox C.
jg5 Event u?
83-02     830125       F       --
o8 Action to l
H     N/A             N/A   CB     MOTORX     Reduced power due to what appeared to be an increasing motor bearing oil                   .
H
level. Continued observation while at low power showed there was no problem. The unit returned to full power.
$5 5
83-03     830126       S       --
j@g Report #
B     N/A             N/A   HC     iffEXCH   Reduced power to clean waterboxes.
#0 o
I                   2                                               3                             4 F: Forced           Reason:                                         Method:                         Exhibit G -Instructions S: Scheduled       A Equipment Failure (Explain)                   1-Manual                         for Preparatian of Data B Maintenance of Test                           2-Manual Scram.                 Entry Sheets for Licensee C-Refueling                                     3-Automatic Scram.               Event Report (LER) File (NUREG-D Regulatory Restriction                         4-04.cr (Explain)               0161)
Prevent Recurrence 6
E-Operator Training & License Examination F-Administrative                                                             5 G-Operational Error (Explain)                                                     Exhibit I - Same Source (9/77)                 Il-Other (Explain)
83-01 830106 F
A N/A N/A HC HTEXCH Reduced power to find a saltwater leak in condenser waterbox C.
83-02 830125 F
H N/A N/A CB MOTORX Reduced power due to what appeared to be an increasing motor bearing oil level. Continued observation while at low power showed there was no problem. The unit returned to full power.
83-03 830126 S
B N/A N/A HC iffEXCH Reduced power to clean waterboxes.
I 2
3 4
F: Forced Reason:
Method:
Exhibit G -Instructions S: Scheduled A Equipment Failure (Explain) 1-Manual for Preparatian of Data B Maintenance of Test 2-Manual Scram.
Entry Sheets for Licensee C-Refueling 3-Automatic Scram.
Event Report (LER) File (NUREG-D Regulatory Restriction 4-04.cr (Explain) 0161)
E-Operator Training & License Examination F-Administrative 5
G-Operational Error (Explain)
Exhibit I - Same Source (9/77)
Il-Other (Explain)
D e..
D e..


l       .    .
l MONTHLY OPERATIONAL  
MONTHLY OPERATIONAL  


==SUMMARY==
==SUMMARY==
STATEMENT O                                                                             DOCKET NO. 50-302 UNIT FLCRP-3 DATE 2/4/83 COMPLETED BY   M.W. Culver TELEPHONE (904) 795-6486 l
STATEMENT O
MONTH January 1983 l
DOCKET NO.
50-302 UNIT FLCRP-3 DATE 2/4/83 COMPLETED BY M.W. Culver TELEPHONE (904) 795-6486 l
MONTH January 1983 l


==SUMMARY==
==SUMMARY==
Line 115: Line 151:
l
l


j
j OPERATING DATA REPORT
                                                                                            ~                                          i OPERATING DATA REPORT                     .                                    ,)
~
DOCKET NO.     50-302                   l
,)
  /]V                                                                                                 DATE. 1/1/R1 COMPLETED BY D. Bocart.
DOCKET NO.
TELEPHONE     (904) 795-6486 OPERATING STATUS
50-302
: 1. Uni Name:         Crystal River Unit #3                             Notes (2/1/83) Revise 3" 12/1/82 - 12/31/82                          average daily power levels
/]V DATE. 1/1/R1 COMPLETED BY D. Bocart.
TELEPHONE (904) 795-6486 OPERATING STATUS
: 1. Uni Name:
Crystal River Unit #3 Notes (2/1/83) Revise 3"
: 2. Reporting Period:
: 2. Reporting Period:
2544                           (29th, 30th, and 31st) due to
12/1/82 - 12/31/82 average daily power levels
: 3. Licensed Thermal Power (MWt):                                        previously inaccurate meter
: 3. Licensed Thermal Power (MWt):
: 4. Narr eplate Rating (Gross MWe):       890                           readings.       Changes circled on
2544 (29th, 30th, and 31st) due to previously inaccurate meter
: 5. Design Electrical Rating (Net MWe):       825                       attached page.
: 4. Narr eplate Rating (Gross MWe):
: 6. Maximum Dependable Capacity (Gross MWe):         845
890 readings.
: 7. Maximum Dependable Capacity (Net MWe):           806
Changes circled on
: 5. Design Electrical Rating (Net MWe):
825 attached page.
: 6. Maximum Dependable Capacity (Gross MWe):
845
: 7. Maximum Dependable Capacity (Net MWe):
806
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
N/A
N/A
: 9. Power Level To Which Restricted,If Any (Net MWe):         2475 MW thermal
: 9. Power Level To Which Restricted,If Any (Net MWe):
: 10. Reasons For Restrictions,If Any:       Pump Power Monitors in bypass.
2475 MW thermal
This Month           Yr..to Date         Cumulative             ,
: 10. Reasons For Restrictions,If Any:
v 744                                                        I
Pump Power Monitors in bypass.
: 11. Hours in Reporting Period                 .                                    8760                 50880
This Month Yr..to Date Cumulative v
: 12. Number Of Hours Reactor Was Critical                   251.3               6757.8               32207.2
I
: 13. Reactor Re:erve Shutdown Hours                             0                   71.I               1280.3
: 11. Hours in Reporting Period 744 8760 50880
: 14. Hours Generator On.Line                                 243.2               6654.7             31466.9                   .
: 12. Number Of Hours Reactor Was Critical 251.3 6757.8 32207.2
: 15. Unit Reserve Shutdown Hours                               0                     0                     0
: 13. Reactor Re:erve Shutdown Hours 0
: 16. Gross Thermal Energy Generated (MWH)                   561306             15158014             70524955                 .
71.I 1280.3
: 17. Gross Electrical Energy Generated (MWH)               194455     ..        5167026             23966617
: 14. Hours Generator On.Line 243.2 6654.7 31466.9
: 18. Net Electrical Energy Generated (MWH)                 185224             4915582             22744880
: 15. Unit Reserve Shutdown Hours 0
: 19. Unit Serece Factor 32.7%                 76.0%                 61.8%.
0 0
: 20. Unit Availability Factor                                 32.7%                 76.0%                 61.8%
: 16. Gross Thermal Energy Generated (MWH) 561306 15158014 70524955
: 21. Unit Capacity Factor (Using MDC Net) -                   30.9%                 69.6%                 56.9%
: 17. Gross Electrical Energy Generated (MWH) 194455 5167026 23966617
: 22. Unit Capacity Factor (Using DER Net)                     30.2%                 68.0%                 54.2%
: 18. Net Electrical Energy Generated (MWH) 185224 4915582 22744880
: 23. Unit Forced Outage Rate                                 67.3%                 24.0%                 26.1%
: 19. Unit Serece Factor 32.7%
: 24. Shutdowns Scheduled Over Next 6 Months (Type.Date,and Duration of Each):                                         .
76.0%
61.8%.
: 20. Unit Availability Factor 32.7%
76.0%
61.8%
: 21. Unit Capacity Factor (Using MDC Net) -
30.9%
69.6%
56.9%
: 22. Unit Capacity Factor (Using DER Net) 30.2%
68.0%
54.2%
: 23. Unit Forced Outage Rate 67.3%
24.0%
26.1%
: 24. Shutdowns Scheduled Over Next 6 Months (Type.Date,and Duration of Each):
Refuel outane beginning 3/19/83,. sclieduled to last 16 weeks.
Refuel outane beginning 3/19/83,. sclieduled to last 16 weeks.
                                              . y
y
                                                                                              ~
: 25. If Shut Down At End Of Report Period, Estimated Date of Startup:
: 25. If Shut Down At End Of Report Period, Estimated Date of Startup:                                               '
: 26. Units in Test Status (Prior to Commercial Operation):                      Forecast            Achiehed..
INITIA L CRITICALITY                                                          1114/77.
~
~
INITIA L ELECTRICITY                                                           1/30/77-COMMERCIAL OPER ATION                                                         3/11/77 (9/77)
: 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achiehed..
INITIA L CRITICALITY 1114/77.
INITIA L ELECTRICITY 1/30/77-
~
COMMERCIAL OPER ATION 3/11/77 (9/77)
 
==
wr


AVEkIGE DAILY UNIT POWER LEVEL DOCKET NO. 50-302 UNIT FLCRP-3 DATE     1/3/83 COMPLETED BY         D. Bogart TELEPHONE     (904) 795-6486 MON 111     December 1982 DAY       AVERAGE DAILY POWER LEVEL                           DAY       AVERAGE DAILY POWER LEVEL (MWe-Net)                                                   (MWe-Net) 1                       0                                   g7                       o-2 0                                  gg                         0 0
AVEkIGE DAILY UNIT POWER LEVEL DOCKET NO.
3                                                             19                         0 4                       0                                   20                         0 5
50-302 UNIT FLCRP-3 DATE 1/3/83 COMPLETED BY D. Bogart TELEPHONE (904) 795-6486 MON 111 December 1982 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
0                                                             156 21 0
(MWe-Net) 1 0
6                                                             22                       650 7                       0                                   23                       802 8
g7 o-0 0
0                                                            pn 24 9                                                             25                       821 10                       0                                   26                       822 0
2 gg 0
II                                                             27                       821 12                                                             28                       819
3 19 0
    ^
4 0
20 0
0 156 5
21 0
6 22 650 7
0 23 802 0
8 24 pn 9
25 821 10 0
822 26 0
II 27 821 819 12 28
^
13 0
13 0
29 0
29 0
14                                                             30 15                       0                                   3, 0
14 30 15 0
16 INSTRUCTIONS                                                                           -
3, 0
On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to     I the nearest whole megawatt.
16 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to I
the nearest whole megawatt.
1 (9/77 )
1 (9/77 )
l
l
                                                                                              -                _  _}}
_}}

Latest revision as of 08:54, 16 December 2024

Monthly Operating Rept for Jan 1983
ML20070W197
Person / Time
Site: Crystal River 
Issue date: 02/02/1983
From: Bogart D
FLORIDA POWER CORP.
To:
Shared Package
ML20070W190 List:
References
NUDOCS 8302180332
Download: ML20070W197 (6)


Text

'

l i

OPERATING DATA REPORT.

DOCKET NO.

50-302 DATE 2/2/81 COMPLETED BY D. Bogart TELEPHONE (904) 795-6486 OPERATING STATUS 4

1. Unit Name:

Crystal River Unit #3 Notes j

2. Reporting Period:

1/1/83 - 1/31/83

3. Licensed Thermal Power (MWt):

2544 890

4. Nameplate Rating (Gross MWe):

825

5. Desagn E!ectrical Rating (Net MWe):

850

6. Maximum Dependable Capacity (Gross MWe).

811

7. Maximum Dependable Capacity (Net MWe):
8. It' Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

Revised MDC ratinns based on operating history.

9. Power Level To Which Restricted,if Any (Net MWe):

2475 MW thermal

10. Reasons For Restrictions,if Any:

Pnmn Pnune Mnnienra in hvnnnm.

O This Month Yr to.Date Cumulative j

I

11. Hours In Reporting Period 744 744 51624
12. Number Of Hours Reactor Was Critical 744 744 32951.2
13. Reactor Reserve Shutdown Hours 0

0 1280.3

14. Hours Generator On-Line 744 744 32210.9
15. Unit Reserve Shutdown Hours 0

0 0

16. Gross Thermal Energy Generated (MWH) 1777945 1777945 72302900
17. Gross Electrical Energy Generated (MWH) 622985 622985 24589602
18. Net Electrical Energy Generated (MWH) 594578 594578 23339458
19. Unit Service Factor 100%

100%

62.4%

20. Unit Availability Factor 100%

100%

62.4%

21. Unit Capacity Factor (Using MDC Net) 98.5%

98.5%

57.4%

22. Unit Capacity Factor (Using DER Net) 96.9%

96.9%

54.8%

23. Unit Forced Outage Rate 0%

0%

25.6%

24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Refuel outace becinninn 3/19/83, scheduled to last 16 weeks.

~

25. If Shut Down At End Of Report Period. Ef.timated Date of Startup: N/A e
26. Units In Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY 1/14/77.

INITIAL ELECTRICITY 1/30/77-COMMERCIAL OPERATION 3/13/77 8302180332 830215 PDR ADOCK 05000302 (9/77)

R PDR

AVERAGE DAILY UNITPOWER LEVEL O

[

.oocxErso.

so->o2 UNIT FLCRP-3 DATE _2/_2/83 COMPLETED BY D. B gart TELEPHONE 1904) 795-64__86 MONTH January 1983 DAY AVERAGE DAILYPOWER LEVEL (MWe-Net)

DAY 1

AVERAGE DAILYPOWER LEVEL (MWe-Net) 17 2

824 839 3

831 18 820 39 4

825 g9o S

825 20 829 6

21 O

772 827 22 R14 738 8

781 23 82s 24 9

829 830 10 829 25 636 11 26 686 27 12 836 622 I

824

g 676 13 14 837 29 816 15 820 30 16 834 3j 831 INSTRUCTIONS the nearest whole megawatt.On this format, list the average daily unit power leve e Net for each day in the reporting month. Compute t n

I o

(9/77)

O O

O DOCKET NO.

50-302 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME FLCRP-3 DATE 2/4/83 COMPLETED BY M u culvor REPORT MONTH 1/83 TELEPHONE (904) 795-6486

~

S*

c n

s==

.2 _e s

7.s X Licensee g *,

g'.

Cause & Corrective

-o No.

Date g

3g g

jg5 Event u?

o8 Action to l

H

$5 5

j@g Report #

  1. 0 o

Prevent Recurrence 6

83-01 830106 F

A N/A N/A HC HTEXCH Reduced power to find a saltwater leak in condenser waterbox C.

83-02 830125 F

H N/A N/A CB MOTORX Reduced power due to what appeared to be an increasing motor bearing oil level. Continued observation while at low power showed there was no problem. The unit returned to full power.

83-03 830126 S

B N/A N/A HC iffEXCH Reduced power to clean waterboxes.

I 2

3 4

F: Forced Reason:

Method:

Exhibit G -Instructions S: Scheduled A Equipment Failure (Explain) 1-Manual for Preparatian of Data B Maintenance of Test 2-Manual Scram.

Entry Sheets for Licensee C-Refueling 3-Automatic Scram.

Event Report (LER) File (NUREG-D Regulatory Restriction 4-04.cr (Explain) 0161)

E-Operator Training & License Examination F-Administrative 5

G-Operational Error (Explain)

Exhibit I - Same Source (9/77)

Il-Other (Explain)

D e..

l MONTHLY OPERATIONAL

SUMMARY

STATEMENT O

DOCKET NO.

50-302 UNIT FLCRP-3 DATE 2/4/83 COMPLETED BY M.W. Culver TELEPHONE (904) 795-6486 l

MONTH January 1983 l

SUMMARY

STATEMENT: The unit experienced three power reductions this month.

f I

O I

i l

l

j OPERATING DATA REPORT

~

,)

DOCKET NO.

50-302

/]V DATE. 1/1/R1 COMPLETED BY D. Bocart.

TELEPHONE (904) 795-6486 OPERATING STATUS

1. Uni Name:

Crystal River Unit #3 Notes (2/1/83) Revise 3"

2. Reporting Period:

12/1/82 - 12/31/82 average daily power levels

3. Licensed Thermal Power (MWt):

2544 (29th, 30th, and 31st) due to previously inaccurate meter

4. Narr eplate Rating (Gross MWe):

890 readings.

Changes circled on

5. Design Electrical Rating (Net MWe):

825 attached page.

6. Maximum Dependable Capacity (Gross MWe):

845

7. Maximum Dependable Capacity (Net MWe):

806

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

N/A

9. Power Level To Which Restricted,If Any (Net MWe):

2475 MW thermal

10. Reasons For Restrictions,If Any:

Pump Power Monitors in bypass.

This Month Yr..to Date Cumulative v

I

11. Hours in Reporting Period 744 8760 50880
12. Number Of Hours Reactor Was Critical 251.3 6757.8 32207.2
13. Reactor Re:erve Shutdown Hours 0

71.I 1280.3

14. Hours Generator On.Line 243.2 6654.7 31466.9
15. Unit Reserve Shutdown Hours 0

0 0

16. Gross Thermal Energy Generated (MWH) 561306 15158014 70524955
17. Gross Electrical Energy Generated (MWH) 194455 5167026 23966617
18. Net Electrical Energy Generated (MWH) 185224 4915582 22744880
19. Unit Serece Factor 32.7%

76.0%

61.8%.

20. Unit Availability Factor 32.7%

76.0%

61.8%

21. Unit Capacity Factor (Using MDC Net) -

30.9%

69.6%

56.9%

22. Unit Capacity Factor (Using DER Net) 30.2%

68.0%

54.2%

23. Unit Forced Outage Rate 67.3%

24.0%

26.1%

24. Shutdowns Scheduled Over Next 6 Months (Type.Date,and Duration of Each):

Refuel outane beginning 3/19/83,. sclieduled to last 16 weeks.

y

25. If Shut Down At End Of Report Period, Estimated Date of Startup:

~

26. Units in Test Status (Prior to Commercial Operation):

Forecast Achiehed..

INITIA L CRITICALITY 1114/77.

INITIA L ELECTRICITY 1/30/77-

~

COMMERCIAL OPER ATION 3/11/77 (9/77)

==

wr

AVEkIGE DAILY UNIT POWER LEVEL DOCKET NO.

50-302 UNIT FLCRP-3 DATE 1/3/83 COMPLETED BY D. Bogart TELEPHONE (904) 795-6486 MON 111 December 1982 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1 0

g7 o-0 0

2 gg 0

3 19 0

4 0

20 0

0 156 5

21 0

6 22 650 7

0 23 802 0

8 24 pn 9

25 821 10 0

822 26 0

II 27 821 819 12 28

^

13 0

29 0

14 30 15 0

3, 0

16 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to I

the nearest whole megawatt.

1 (9/77 )

l

_