ML20070W188
| ML20070W188 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 02/15/1983 |
| From: | Baynard P FLORIDA POWER CORP. |
| To: | Deyoung R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
| Shared Package | |
| ML20070W190 | List: |
| References | |
| 3F-0283-18, 3F-283-18, NUDOCS 8302180327 | |
| Download: ML20070W188 (1) | |
Text
'
wV i
i Power C O m P O m a f e O se February 15, 1983 3F-0283-18 Mr. Richard C. DeYoung, Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.
20555
Subject:
Crystal River Unit 3 Docket No. 50-302 Operating License No. DPR-72 Monthly Operating Report
Dear Mr. DeYoung:
Attached are twelve (12) copies of the Crystal River Unit 3, January, 1983, Monthly Operating Report.
This report is submitted in accordance with Technical Specification 6.9.1.6.
Attached, also, are twelve (12) copies of a revision to the Crystal River Unit 3, December,1982, Monthly Operating Report.
Sincerely, Jb "
k y&d y
Dr. Patsy Y. Baynard Assistant to Vice President Nuclear Operations Ha rpe r(M01)C2-3 cc: Mr. J. P. O'Reilly, Regional Administrator Office of Inspection & Enforcement U.S. Nuclear Regulatory Commission 101 Marietta Street N.W., Suite 3100 hg Atlanta, GA 30303 f?302180327 830215 PDR ADOCX 05000302 R
PDR General Office 3201 Thirty-fourth Street South e P O. Box 14042, St. Petersburg, Flonda 33733 813-866-5151 J