Text
'
l i
OPERATING DATA REPORT.
DOCKET NO.
50-302 DATE 2/2/81 COMPLETED BY D. Bogart TELEPHONE (904) 795-6486 OPERATING STATUS 4
- 1. Unit Name:
Crystal River Unit #3 Notes j
- 2. Reporting Period:
1/1/83 - 1/31/83
- 3. Licensed Thermal Power (MWt):
2544 890
- 4. Nameplate Rating (Gross MWe):
825
- 5. Desagn E!ectrical Rating (Net MWe):
850
- 6. Maximum Dependable Capacity (Gross MWe).
811
- 7. Maximum Dependable Capacity (Net MWe):
- 8. It' Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
Revised MDC ratinns based on operating history.
- 9. Power Level To Which Restricted,if Any (Net MWe):
2475 MW thermal
- 10. Reasons For Restrictions,if Any:
Pnmn Pnune Mnnienra in hvnnnm.
O This Month Yr to.Date Cumulative j
I
- 11. Hours In Reporting Period 744 744 51624
- 12. Number Of Hours Reactor Was Critical 744 744 32951.2
- 13. Reactor Reserve Shutdown Hours 0
0 1280.3
- 14. Hours Generator On-Line 744 744 32210.9
- 15. Unit Reserve Shutdown Hours 0
0 0
- 16. Gross Thermal Energy Generated (MWH) 1777945 1777945 72302900
- 17. Gross Electrical Energy Generated (MWH) 622985 622985 24589602
- 18. Net Electrical Energy Generated (MWH) 594578 594578 23339458
- 19. Unit Service Factor 100%
100%
62.4%
- 20. Unit Availability Factor 100%
100%
62.4%
- 21. Unit Capacity Factor (Using MDC Net) 98.5%
98.5%
57.4%
- 22. Unit Capacity Factor (Using DER Net) 96.9%
96.9%
54.8%
- 23. Unit Forced Outage Rate 0%
0%
25.6%
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Refuel outace becinninn 3/19/83, scheduled to last 16 weeks.
~
- 25. If Shut Down At End Of Report Period. Ef.timated Date of Startup: N/A e
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY 1/14/77.
INITIAL ELECTRICITY 1/30/77-COMMERCIAL OPERATION 3/13/77 8302180332 830215 PDR ADOCK 05000302 (9/77)
R PDR
AVERAGE DAILY UNITPOWER LEVEL O
[
.oocxErso.
so->o2 UNIT FLCRP-3 DATE _2/_2/83 COMPLETED BY D. B gart TELEPHONE 1904) 795-64__86 MONTH January 1983 DAY AVERAGE DAILYPOWER LEVEL (MWe-Net)
DAY 1
AVERAGE DAILYPOWER LEVEL (MWe-Net) 17 2
824 839 3
831 18 820 39 4
825 g9o S
825 20 829 6
21 O
772 827 22 R14 738 8
781 23 82s 24 9
829 830 10 829 25 636 11 26 686 27 12 836 622 I
824
- g 676 13 14 837 29 816 15 820 30 16 834 3j 831 INSTRUCTIONS the nearest whole megawatt.On this format, list the average daily unit power leve e Net for each day in the reporting month. Compute t n
I o
(9/77)
O O
O DOCKET NO.
50-302 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME FLCRP-3 DATE 2/4/83 COMPLETED BY M u culvor REPORT MONTH 1/83 TELEPHONE (904) 795-6486
~
S*
c n
s==
.2 _e s
7.s X Licensee g *,
g'.
Cause & Corrective
-o No.
Date g
3g g
jg5 Event u?
o8 Action to l
H
$5 5
j@g Report #
- 0 o
Prevent Recurrence 6
83-01 830106 F
A N/A N/A HC HTEXCH Reduced power to find a saltwater leak in condenser waterbox C.
83-02 830125 F
H N/A N/A CB MOTORX Reduced power due to what appeared to be an increasing motor bearing oil level. Continued observation while at low power showed there was no problem. The unit returned to full power.
83-03 830126 S
B N/A N/A HC iffEXCH Reduced power to clean waterboxes.
I 2
3 4
F: Forced Reason:
Method:
Exhibit G -Instructions S: Scheduled A Equipment Failure (Explain) 1-Manual for Preparatian of Data B Maintenance of Test 2-Manual Scram.
Entry Sheets for Licensee C-Refueling 3-Automatic Scram.
Event Report (LER) File (NUREG-D Regulatory Restriction 4-04.cr (Explain) 0161)
E-Operator Training & License Examination F-Administrative 5
G-Operational Error (Explain)
Exhibit I - Same Source (9/77)
Il-Other (Explain)
D e..
l MONTHLY OPERATIONAL
SUMMARY
STATEMENT O
DOCKET NO.
50-302 UNIT FLCRP-3 DATE 2/4/83 COMPLETED BY M.W. Culver TELEPHONE (904) 795-6486 l
MONTH January 1983 l
SUMMARY
STATEMENT: The unit experienced three power reductions this month.
f I
O I
i l
l
j OPERATING DATA REPORT
~
,)
DOCKET NO.
50-302
/]V DATE. 1/1/R1 COMPLETED BY D. Bocart.
TELEPHONE (904) 795-6486 OPERATING STATUS
- 1. Uni Name:
Crystal River Unit #3 Notes (2/1/83) Revise 3"
- 2. Reporting Period:
12/1/82 - 12/31/82 average daily power levels
- 3. Licensed Thermal Power (MWt):
2544 (29th, 30th, and 31st) due to previously inaccurate meter
- 4. Narr eplate Rating (Gross MWe):
890 readings.
Changes circled on
- 5. Design Electrical Rating (Net MWe):
825 attached page.
- 6. Maximum Dependable Capacity (Gross MWe):
845
- 7. Maximum Dependable Capacity (Net MWe):
806
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
N/A
- 9. Power Level To Which Restricted,If Any (Net MWe):
2475 MW thermal
- 10. Reasons For Restrictions,If Any:
Pump Power Monitors in bypass.
This Month Yr..to Date Cumulative v
I
- 11. Hours in Reporting Period 744 8760 50880
- 12. Number Of Hours Reactor Was Critical 251.3 6757.8 32207.2
- 13. Reactor Re:erve Shutdown Hours 0
71.I 1280.3
- 14. Hours Generator On.Line 243.2 6654.7 31466.9
- 15. Unit Reserve Shutdown Hours 0
0 0
- 16. Gross Thermal Energy Generated (MWH) 561306 15158014 70524955
- 17. Gross Electrical Energy Generated (MWH) 194455 5167026 23966617
- 18. Net Electrical Energy Generated (MWH) 185224 4915582 22744880
- 19. Unit Serece Factor 32.7%
76.0%
61.8%.
- 20. Unit Availability Factor 32.7%
76.0%
61.8%
- 21. Unit Capacity Factor (Using MDC Net) -
30.9%
69.6%
56.9%
- 22. Unit Capacity Factor (Using DER Net) 30.2%
68.0%
54.2%
- 23. Unit Forced Outage Rate 67.3%
24.0%
26.1%
- 24. Shutdowns Scheduled Over Next 6 Months (Type.Date,and Duration of Each):
Refuel outane beginning 3/19/83,. sclieduled to last 16 weeks.
y
- 25. If Shut Down At End Of Report Period, Estimated Date of Startup:
~
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achiehed..
INITIA L CRITICALITY 1114/77.
INITIA L ELECTRICITY 1/30/77-
~
COMMERCIAL OPER ATION 3/11/77 (9/77)
==
wr
AVEkIGE DAILY UNIT POWER LEVEL DOCKET NO.
50-302 UNIT FLCRP-3 DATE 1/3/83 COMPLETED BY D. Bogart TELEPHONE (904) 795-6486 MON 111 December 1982 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 0
g7 o-0 0
2 gg 0
3 19 0
4 0
20 0
0 156 5
21 0
6 22 650 7
0 23 802 0
8 24 pn 9
25 821 10 0
822 26 0
II 27 821 819 12 28
^
13 0
29 0
14 30 15 0
3, 0
16 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to I
the nearest whole megawatt.
1 (9/77 )
l
_