SOUTHWEST FABRICATING
SOUTHWEST FABRICATING
                                                      & WELDING CO., INC.
& WELDING CO., INC.
October 25, 1983
October 25, 1983
                                                                                        & hY _-.
& hY _-.
L OCT211983 Director, Office of Inspection & Enforceent                       (                 h, U. S. Nuclear Regulatory Ccamission Region IV                   j\ l       _
OCT211983 L
611 Ryan Plaza Drive, Suite 1000                                 .i.,w p -             J Arlingtm, Texas 76011                                           _"~
Director, Office of Inspection & Enforceent
(
h, U. S. Nuclear Regulatory Ccamission Region IV j\\
l 611 Ryan Plaza Drive, Suite 1000
.i.,w p -
J Arlingtm, Texas 76011
_"~
Attention: Mr. Uldis Potapovs, Q1ief Vendor Inspection Branch
Attention: Mr. Uldis Potapovs, Q1ief Vendor Inspection Branch


Line 34: Line 40:
The referenced Southwest letter reported two piping subassanblies fabricated frcm 3" Schedule 40 material, in lieu of 3" Schedule 160, as required by design specifications.
The referenced Southwest letter reported two piping subassanblies fabricated frcm 3" Schedule 40 material, in lieu of 3" Schedule 160, as required by design specifications.
Southwest's engineering department has conducted a complete investi-gation of nuclear iscretric drawings for this contract and found ne other deviations. We investigation was conducted as follows:
Southwest's engineering department has conducted a complete investi-gation of nuclear iscretric drawings for this contract and found ne other deviations. We investigation was conducted as follows:
: 1. The iscmetric assignment log was used to idmtify nuclear isanetrics.
1.
: 2. Individual nuclear iscmetrics were reviewed to isolate those drawings that cmtained specification breaks and/or piping schedule change.
The iscmetric assignment log was used to idmtify nuclear isanetrics.
: 3. ne isometric assignment log has been trarked to identify all nuclear iscmetrics and assure ccmplete coverage.
2.
: 0 7525 Sherman Street     P.O. Box 9449   Houston, Texas 77261-9449 . (713) 928-3451   TWX: 910 881-1600 8402170279 831025 PDR ADOCK 05000400 0                     PDR
Individual nuclear iscmetrics were reviewed to isolate those drawings that cmtained specification breaks and/or piping schedule change.
3.
ne isometric assignment log has been trarked to identify all nuclear iscmetrics and assure ccmplete coverage.
: 0 7525 Sherman Street P.O. Box 9449 Houston, Texas 77261-9449. (713) 928-3451 TWX: 910 881-1600 8402170279 831025 PDR ADOCK 05000400 0
PDR


r e
r e
p    9 n SOUTHWEST FABRICATING
9 n p SOUTHWEST FABRICATING
      - t WELDWG CO, DC. -
- t WELDWG CO, DC. -
Nuclear Regulatory Ccrimission October 25, 1983 Page 'IWo
Nuclear Regulatory Ccrimission October 25, 1983 Page 'IWo 4.
: 4. Each iscanetric that contrined a piping schedule change was set aside for redew and listed for reference and control.
Each iscanetric that contrined a piping schedule change was set aside for redew and listed for reference and control.
: 5. Shop detail drawings vure ccupared to the respective iso-metrics that containec' a piping schedule change.
5.
: 6. No deviatims were found other than those previously identi-fied on Isometric No.1-CS-265, and Southwest's Shop Drawings Q3302-AK Sheets 21 and 22.
Shop detail drawings vure ccupared to the respective iso-metrics that containec' a piping schedule change.
6.
No deviatims were found other than those previously identi-fied on Isometric No.1-CS-265, and Southwest's Shop Drawings Q3302-AK Sheets 21 and 22.
Since this error was isolated to work performed by specific personnel involved in this contract only, and based upon the fact that no addi-tional deviations were disclosed by our investigation, southwest Fabricating & Welding Co. considers this incident to be closed.
Since this error was isolated to work performed by specific personnel involved in this contract only, and based upon the fact that no addi-tional deviations were disclosed by our investigation, southwest Fabricating & Welding Co. considers this incident to be closed.
You may ccntact the writer if additional information is rquired.
You may ccntact the writer if additional information is rquired.
Yours very truly, h           WY Robert P. Bornes M  ~
Yours very truly, h
B. JfGoodwin,' President anci Quality Assurance Manager                     Chier Executive Officer RPB:dc cc: Carolina Pcuer & Light Ccmpany Attn:   Mr. N. J. 01iangi Post Office Box 101 New Hill, NC 27562
WY
                                                                                                      .}}
~
M Robert P. Bornes B. JfGoodwin,' President anci Quality Assurance Manager Chier Executive Officer RPB:dc cc: Carolina Pcuer & Light Ccmpany Attn:
Mr. N. J. 01iangi Post Office Box 101 New Hill, NC 27562
.}}

Latest revision as of 01:47, 14 December 2024

Part 21 Rept Re Fabrication of Piping Subassemblies W/Wall Thickness Less than Required Design Specs.No Addl Deviations Found.Incident Considered Closed
ML20086N188
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 10/25/1983
From: Bornes R, Goodwin B
SOUTHWEST FABRICATING & WELDING CO. (SUBS. OF IU
To: Potapovs U
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
REF-PT21-84-114-000 PT21-84-114, PT21-84-114-000, NUDOCS 8402170279
Download: ML20086N188 (2)


Text

-

SOUTHWEST FABRICATING

& WELDING CO., INC.

October 25, 1983

& hY _-.

OCT211983 L

Director, Office of Inspection & Enforceent

(

h, U. S. Nuclear Regulatory Ccamission Region IV j\\

l 611 Ryan Plaza Drive, Suite 1000

.i.,w p -

J Arlingtm, Texas 76011

_"~

Attention: Mr. Uldis Potapovs, Q1ief Vendor Inspection Branch

Reference:

SF&WCO Letter dated 10-17-83 10 CFR Part 21 - Reporting of Defects & Nonculpliance C;xolina Light & Power Canpany Shearon Harris Station - Unit #1 Cmstructor: Daniels Construction Co.

Engineer: Ebasco Services

Subject:

Fabrication of Piping Subassenblies having Wall Thickness less than Rcquircd by Design Specifications Gentlemen:

The referenced Southwest letter reported two piping subassanblies fabricated frcm 3" Schedule 40 material, in lieu of 3" Schedule 160, as required by design specifications.

Southwest's engineering department has conducted a complete investi-gation of nuclear iscretric drawings for this contract and found ne other deviations. We investigation was conducted as follows:

1.

The iscmetric assignment log was used to idmtify nuclear isanetrics.

2.

Individual nuclear iscmetrics were reviewed to isolate those drawings that cmtained specification breaks and/or piping schedule change.

3.

ne isometric assignment log has been trarked to identify all nuclear iscmetrics and assure ccmplete coverage.

0 7525 Sherman Street P.O. Box 9449 Houston, Texas 77261-9449. (713) 928-3451 TWX: 910 881-1600 8402170279 831025 PDR ADOCK 05000400 0

PDR

r e

9 n p SOUTHWEST FABRICATING

- t WELDWG CO, DC. -

Nuclear Regulatory Ccrimission October 25, 1983 Page 'IWo 4.

Each iscanetric that contrined a piping schedule change was set aside for redew and listed for reference and control.

5.

Shop detail drawings vure ccupared to the respective iso-metrics that containec' a piping schedule change.

6.

No deviatims were found other than those previously identi-fied on Isometric No.1-CS-265, and Southwest's Shop Drawings Q3302-AK Sheets 21 and 22.

Since this error was isolated to work performed by specific personnel involved in this contract only, and based upon the fact that no addi-tional deviations were disclosed by our investigation, southwest Fabricating & Welding Co. considers this incident to be closed.

You may ccntact the writer if additional information is rquired.

Yours very truly, h

WY

~

M Robert P. Bornes B. JfGoodwin,' President anci Quality Assurance Manager Chier Executive Officer RPB:dc cc: Carolina Pcuer & Light Ccmpany Attn:

Mr. N. J. 01iangi Post Office Box 101 New Hill, NC 27562

.