ML20086N188: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 19: | Line 19: | ||
{{#Wiki_filter:- | {{#Wiki_filter:- | ||
SOUTHWEST FABRICATING | SOUTHWEST FABRICATING | ||
& WELDING CO., INC. | |||
October 25, 1983 | October 25, 1983 | ||
& hY _-. | |||
L | OCT211983 L | ||
611 Ryan Plaza Drive, Suite 1000 | Director, Office of Inspection & Enforceent | ||
( | |||
h, U. S. Nuclear Regulatory Ccamission Region IV j\\ | |||
l 611 Ryan Plaza Drive, Suite 1000 | |||
.i.,w p - | |||
J Arlingtm, Texas 76011 | |||
_"~ | |||
Attention: Mr. Uldis Potapovs, Q1ief Vendor Inspection Branch | Attention: Mr. Uldis Potapovs, Q1ief Vendor Inspection Branch | ||
| Line 34: | Line 40: | ||
The referenced Southwest letter reported two piping subassanblies fabricated frcm 3" Schedule 40 material, in lieu of 3" Schedule 160, as required by design specifications. | The referenced Southwest letter reported two piping subassanblies fabricated frcm 3" Schedule 40 material, in lieu of 3" Schedule 160, as required by design specifications. | ||
Southwest's engineering department has conducted a complete investi-gation of nuclear iscretric drawings for this contract and found ne other deviations. We investigation was conducted as follows: | Southwest's engineering department has conducted a complete investi-gation of nuclear iscretric drawings for this contract and found ne other deviations. We investigation was conducted as follows: | ||
1. | |||
The iscmetric assignment log was used to idmtify nuclear isanetrics. | |||
2. | |||
: 0 7525 Sherman Street | Individual nuclear iscmetrics were reviewed to isolate those drawings that cmtained specification breaks and/or piping schedule change. | ||
3. | |||
ne isometric assignment log has been trarked to identify all nuclear iscmetrics and assure ccmplete coverage. | |||
: 0 7525 Sherman Street P.O. Box 9449 Houston, Texas 77261-9449. (713) 928-3451 TWX: 910 881-1600 8402170279 831025 PDR ADOCK 05000400 0 | |||
PDR | |||
r e | r e | ||
9 n p SOUTHWEST FABRICATING | |||
- t WELDWG CO, DC. - | |||
Nuclear Regulatory Ccrimission October 25, 1983 Page 'IWo | Nuclear Regulatory Ccrimission October 25, 1983 Page 'IWo 4. | ||
Each iscanetric that contrined a piping schedule change was set aside for redew and listed for reference and control. | |||
5. | |||
Shop detail drawings vure ccupared to the respective iso-metrics that containec' a piping schedule change. | |||
6. | |||
No deviatims were found other than those previously identi-fied on Isometric No.1-CS-265, and Southwest's Shop Drawings Q3302-AK Sheets 21 and 22. | |||
Since this error was isolated to work performed by specific personnel involved in this contract only, and based upon the fact that no addi-tional deviations were disclosed by our investigation, southwest Fabricating & Welding Co. considers this incident to be closed. | Since this error was isolated to work performed by specific personnel involved in this contract only, and based upon the fact that no addi-tional deviations were disclosed by our investigation, southwest Fabricating & Welding Co. considers this incident to be closed. | ||
You may ccntact the writer if additional information is rquired. | You may ccntact the writer if additional information is rquired. | ||
Yours very truly, h | Yours very truly, h | ||
B. JfGoodwin,' President anci Quality Assurance Manager | WY | ||
~ | |||
M Robert P. Bornes B. JfGoodwin,' President anci Quality Assurance Manager Chier Executive Officer RPB:dc cc: Carolina Pcuer & Light Ccmpany Attn: | |||
Mr. N. J. 01iangi Post Office Box 101 New Hill, NC 27562 | |||
.}} | |||
Latest revision as of 01:47, 14 December 2024
| ML20086N188 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 10/25/1983 |
| From: | Bornes R, Goodwin B SOUTHWEST FABRICATING & WELDING CO. (SUBS. OF IU |
| To: | Potapovs U NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| REF-PT21-84-114-000 PT21-84-114, PT21-84-114-000, NUDOCS 8402170279 | |
| Download: ML20086N188 (2) | |
Text
-
SOUTHWEST FABRICATING
& WELDING CO., INC.
October 25, 1983
& hY _-.
OCT211983 L
Director, Office of Inspection & Enforceent
(
h, U. S. Nuclear Regulatory Ccamission Region IV j\\
l 611 Ryan Plaza Drive, Suite 1000
.i.,w p -
J Arlingtm, Texas 76011
_"~
Attention: Mr. Uldis Potapovs, Q1ief Vendor Inspection Branch
Reference:
SF&WCO Letter dated 10-17-83 10 CFR Part 21 - Reporting of Defects & Nonculpliance C;xolina Light & Power Canpany Shearon Harris Station - Unit #1 Cmstructor: Daniels Construction Co.
Engineer: Ebasco Services
Subject:
Fabrication of Piping Subassenblies having Wall Thickness less than Rcquircd by Design Specifications Gentlemen:
The referenced Southwest letter reported two piping subassanblies fabricated frcm 3" Schedule 40 material, in lieu of 3" Schedule 160, as required by design specifications.
Southwest's engineering department has conducted a complete investi-gation of nuclear iscretric drawings for this contract and found ne other deviations. We investigation was conducted as follows:
1.
The iscmetric assignment log was used to idmtify nuclear isanetrics.
2.
Individual nuclear iscmetrics were reviewed to isolate those drawings that cmtained specification breaks and/or piping schedule change.
3.
ne isometric assignment log has been trarked to identify all nuclear iscmetrics and assure ccmplete coverage.
- 0 7525 Sherman Street P.O. Box 9449 Houston, Texas 77261-9449. (713) 928-3451 TWX: 910 881-1600 8402170279 831025 PDR ADOCK 05000400 0
r e
9 n p SOUTHWEST FABRICATING
- t WELDWG CO, DC. -
Nuclear Regulatory Ccrimission October 25, 1983 Page 'IWo 4.
Each iscanetric that contrined a piping schedule change was set aside for redew and listed for reference and control.
5.
Shop detail drawings vure ccupared to the respective iso-metrics that containec' a piping schedule change.
6.
No deviatims were found other than those previously identi-fied on Isometric No.1-CS-265, and Southwest's Shop Drawings Q3302-AK Sheets 21 and 22.
Since this error was isolated to work performed by specific personnel involved in this contract only, and based upon the fact that no addi-tional deviations were disclosed by our investigation, southwest Fabricating & Welding Co. considers this incident to be closed.
You may ccntact the writer if additional information is rquired.
Yours very truly, h
WY
~
M Robert P. Bornes B. JfGoodwin,' President anci Quality Assurance Manager Chier Executive Officer RPB:dc cc: Carolina Pcuer & Light Ccmpany Attn:
Mr. N. J. 01iangi Post Office Box 101 New Hill, NC 27562
.