ML20102C282: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:. ..    . .  .    ..
{{#Wiki_filter:...
TABLE 3.6-1 (continued)
TABLE 3.6-1 (continued)
CONTAINMENT ISOLATION VALVES VALVE NUMBER                                             FUNCTION                                                                         ISOLATION TIME (seconds)
CONTAINMENT ISOLATION VALVES VALVE NUMBER FUNCTION ISOLATION TIME (seconds) 4.
: 4. CIV-41*                                     iso. CI sys. fr. RB                                                                               60 CIV-40
CIV-41*
iso. CI sys. fr. RB 60 CIV-40
* 60 CIV-34
* 60 CIV-34
* 60 CIV-35*                                                                                                                                       60
* 60 CIV-35*
: 5. DHV-93 check                               iso. DH system fr. pzr.                                                                           NA DHV-91
60 5.
* 60 DHV-43 #                                   iso. DH sys. fr. RB sump                                                                       120 DHV-42 #                                                                                                                                   120 DHV-4# & 41#                               iso. DH sys. fr. RC                                                                             120 DHV-6 #                                     iso. DH system from Reactor Vessel                                                                 60 DHV-5 #                                                                                                                                       60
DHV-93 check iso. DH system fr. pzr.
: 6. DWV-162 check                               iso. DW system fr. RB                                                                             NA DWV-160 (A/B)*                                                                                                                                 60
NA DHV-91
: 7. FWV-44 check #                             iso. feedwater from RCSG-1A                                                                       NA FWV-45 check #                                                                                                                                 NA FWV-43 check #                             iso. feedwater from RCSG-1B                                                                       NA FWV-46 check #                                                                                                                                 NA l                 8. LRV 87 & 88*                               iso. H2 recombiner ports from RB                                                                   NA l                       LRV 89 & 90*                                                                                                                                   NA
* 60 DHV-43 #
[                      LRV 91 & 92*                                                                                      "
iso. DH sys. fr. RB sump 120 120 DHV-42 #
NA LRV 93 & 94*                                                                                                                                  NA
DHV-4# & 41#
: 9. MSV-130 #(A/B)*                            iso. MDT-1 from RCSG-1 A                                                                          60                            l
iso. DH sys. fr. RC 120 DHV-6 #
iso. DH system from Reactor Vessel 60 DHV-5 #
60 6.
DWV-162 check iso. DW system fr. RB NA DWV-160 (A/B)*
60 7.
FWV-44 check #
iso. feedwater from RCSG-1A NA FWV-45 check #
NA FWV-43 check #
iso. feedwater from RCSG-1B NA FWV-46 check #
NA l
8.
LRV 87 & 88*
iso. H2 recombiner ports from RB NA NA l
LRV 89 & 90*
[
[
l MSV-148 #(A/B)*                             iso. MDT-1 from RCSG-1B                                                                           60 MSV-411 #
LRV 91 & 92*
NA LRV 93 & 94*
NA 9.
MSV-130 #(A/B)*
iso. MDT-1 from RCSG-1 A 60 l
[
l MSV-148 #(A/B)*
iso. MDT-1 from RCSG-1B 60 MSV-411 #
* iso, main steam lines from RCSG-1 A 60 MSV-412 #
* iso, main steam lines from RCSG-1 A 60 MSV-412 #
* iso. main steam lines from RCSG-1 A 60 MSV-413 #
* iso. main steam lines from RCSG-1 A 60 MSV-413 #
* iso. main steam lines from RCSG-1B 60 MSV-414 #
* iso. main steam lines from RCSG-1B 60 MSV-414 #
* iso. main steam lines from RCSG-1B 60
* iso. main steam lines from RCSG-1B 60
                        $g[0{D                                           2 P
$g[0{D 2
CRYSTAL RIVER - UNIT 3                                                         3/46-18
P CRYSTAL RIVER - UNIT 3 3/46-18


TACLE 3.6-1 (continued)
TACLE 3.6-1 (continued)
CONTAINMENT ISOLATION VALVES VALVE NUMBER                 FUNCTION               ISOLATION TIME (seconds)
CONTAINMENT ISOLATION VALVES VALVE NUMBER FUNCTION ISOLATION TIME (seconds) l 10.
: 10. MUV-40 (A)*       iso. MU system from RC               60     l MUV-41 (A)*                                             60 MUV-49 (B)                                               60 MUV-261           iso. MU system from                   60 control bleed-off MUV-260                                                 60 MUV-259                                                 60 MUV-258                                                 60 MUV-253                                                 60 MUV-163 check #   open during HPI and closed dur.       NA nor. operation MUV-25                                                 60 MUV-164 check #                                         NA MUV-26 #                                               60 MUV-160 check #                                         NA MUV-23 #                                               60 MUV-161 check #                                         NA MUV-24 #                                               60 MUV-27 #         open dur nor, operation and closed during RB Isolation                   60
MUV-40 (A)*
: 11. SWV-39 #         iso. NSCCC from AHF-IC               60 l
iso. MU system from RC 60 MUV-41 (A)*
SWV-45 #                                                 60 SWV-35 #           iso. NSCCC from AHF-1 A               60 SWV-41 #                                                 60 SWV-37 #           iso. NSCCC from AHF-1B               60 SWV-43 #                                                 60 SWV-48 #
60 MUV-49 (B) 60 MUV-261 iso. MU system from 60 control bleed-off MUV-260 60 MUV-259 60 MUV-258 60 MUV-253 60 MUV-163 check #
* iso. NSCCC from MUHE-1A & IB and WDT-5                             60 SWV-47 #
open during HPI and closed dur.
NA nor. operation MUV-25 60 MUV-164 check #
NA MUV-26 #
60 MUV-160 check #
NA MUV-23 #
60 MUV-161 check #
NA MUV-24 #
60 MUV-27 #
open dur nor, operation and closed during RB Isolation 60 11.
SWV-39 #
iso. NSCCC from AHF-IC 60 l
SWV-45 #
60 SWV-35 #
iso. NSCCC from AHF-1 A 60 SWV-41 #
60 SWV-37 #
iso. NSCCC from AHF-1B 60 SWV-43 #
60 SWV-48 #
* iso. NSCCC from MUHE-1A & IB and WDT-5 60 SWV-47 #
* 60 SWV-49 #
* 60 SWV-49 #
* 60 SWV-50 #
* 60 SWV-50 #
* 60 SWV-80 #         iso. NSCCC from RCP-1A                 60 SWV-84 #                                                 60 SWV-82 #         iso. NSCCC from RCP-lC                 60 SWV-86 #                                                 60 SWV-81 #         iso. NSCCC from RCP-ID                 60 SWV-85 #                                                 60 SWV-79 #         iso. NSCCC from RCP-1B                 60 SWV-83 #                                                 60 SWV-109 #         iso. NSCCC from DRRD-1                 60 SWV-Il0 #                                               60 CRYSTAL RIVER - UNIT 3             3/46-19
* 60 SWV-80 #
iso. NSCCC from RCP-1A 60 SWV-84 #
60 SWV-82 #
iso. NSCCC from RCP-lC 60 SWV-86 #
60 SWV-81 #
iso. NSCCC from RCP-ID 60 SWV-85 #
60 SWV-79 #
iso. NSCCC from RCP-1B 60 SWV-83 #
60 SWV-109 #
iso. NSCCC from DRRD-1 60 SWV-Il0 #
60 CRYSTAL RIVER - UNIT 3 3/46-19


TABLE 3.6-1 (continued)
TABLE 3.6-1 (continued)
CONTAINMENT ISOLATION VALVES VALVE NUMBER               FUNCTION                 ISOLATION TIME (seconds)
CONTAINMENT ISOLATION VALVES VALVE NUMBER FUNCTION ISOLATION TIME (seconds) 12.
: 12. WDV-4 (B)       iso. WDT-4 from RB sump               60 WDV-3 (A)                     "
WDV-4 (B) iso. WDT-4 from RB sump 60 WDV-3 (A) 60 WDV-60 (A)*
60 WDV-60 (A)*     iso. WDT-4 from WDT-5                 60 WDV-61 (B)*                                             60 WDV-94 (A)       iso. WDT-4 from WDP-8                 60 WDV-62 (B)                                             60 WDV-406 (A)*     iso. waste gas disposal from           60 vents in RC system WDV-405 (B)*                 "
iso. WDT-4 from WDT-5 60 WDV-61 (B)*
60
60 WDV-94 (A) iso. WDT-4 from WDP-8 60 WDV-62 (B) 60 WDV-406 (A)*
: 13. WSV-3           iso. containment monitoring           60 system from RB                               l WSV-4                         "
iso. waste gas disposal from 60 vents in RC system WDV-405 (B)*
60 WSV-5                         "
60 13.
60 WSV-6                         "
WSV-3 iso. containment monitoring 60 l
60 B. CONTAINMENT PURGE AND EXHAUST
system from RB WSV-4 60 WSV-5 60 WSV-6 60 B.
: 1. AHV-IC (A)     iso. pur. sup. system fr. RB           60 AHV-ID (B)                                             60 AHV-1B (A)       iso. pur. exhaust system fr. RB       60 AHV-1 A (B)                                             60 C. MANUAL
CONTAINMENT PURGE AND EXHAUST 1.
: 1. IAV-28           iso. IA from RB                       NA IAV-29                       "
AHV-IC (A) iso. pur. sup. system fr. RB 60 AHV-ID (B) 60 AHV-1B (A) iso. pur. exhaust system fr. RB 60 AHV-1 A (B) 60 C.
NA
MANUAL 1.
: 2. LRV-50           iso. leak rate test system fr. RB     NA LRV-36                                                 NA CRYSTAL RIVER - UNIT 3             3/4 6-20
IAV-28 iso. IA from RB NA IAV-29 NA 2.
LRV-50 iso. leak rate test system fr. RB NA LRV-36 NA CRYSTAL RIVER - UNIT 3 3/4 6-20


TABLE 3.6-1 (continued)
TABLE 3.6-1 (continued)
CONTAINMENT ISOLATION VALVES VALVE NUMBER                 FUNCTION               ISOLATION TIME (seconds)
CONTAINMENT ISOLATION VALVES VALVE NUMBER FUNCTION ISOLATION TIME (seconds)
LRV-45             iso. LR test panel from RB           NA LRV-44                                                   NA LRV-46                                                   NA
LRV-45 iso. LR test panel from RB NA NA LRV-44 NA LRV-46 3.
: 3. MSV-146 #         iso, misc. waste storage             NA tank from RCSG-1B MSV-128 #                                               NA     l
MSV-146 #
: 4. NGV-62             iso. NG system from steam             NA generators NGV-81 #                                                 NA NGV-82             iso. NG system from pzr.             NA
iso, misc. waste storage NA tank from RCSG-1B MSV-128 #
: 5. SAV-24             iso. SA from RB                       NA SAV-23 & 122                                             NA
NA l
: 6. SFV-18             iso SF system                         NA SFV-19                                                   NA SFV-Il9 #         iso. Fuel Transfer tubes from         NA F.T. Canal SFV-120 #                                               NA 7   WSV-1             iso. containment monitoring           NA system from RB WSV-2                                                   NA D. PENETRATIONS REQUIRING TYI Z B TESTS Blind Flange 119                   iso. RB               NA Blind Flange 120                                         NA Blind Flange 202                                         NA CRYSTAL RIVER - UNIT 3               3/4 6-21}}
4.
NGV-62 iso. NG system from steam NA generators NGV-81 #
NA NGV-82 iso. NG system from pzr.
NA 5.
SAV-24 iso. SA from RB NA SAV-23 & 122 NA 6.
SFV-18 iso SF system NA NA SFV-19 SFV-Il9 #
iso. Fuel Transfer tubes from NA F.T. Canal SFV-120 #
NA 7
WSV-1 iso. containment monitoring NA system from RB NA WSV-2 D. PENETRATIONS REQUIRING TYI Z B TESTS Blind Flange 119 iso. RB NA Blind Flange 120 NA Blind Flange 202 NA CRYSTAL RIVER - UNIT 3 3/4 6-21
.}}

Latest revision as of 03:40, 13 December 2024

Proposed Tech Specs Replacing Six Manual Valves W/Eight Solenoid Operated Valves to Provide Capability to Install Hydrogen Recombiner
ML20102C282
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 02/27/1985
From:
FLORIDA POWER CORP.
To:
Shared Package
ML20102C276 List:
References
NUDOCS 8503050448
Download: ML20102C282 (4)


Text

...

TABLE 3.6-1 (continued)

CONTAINMENT ISOLATION VALVES VALVE NUMBER FUNCTION ISOLATION TIME (seconds) 4.

CIV-41*

iso. CI sys. fr. RB 60 CIV-40

  • 60 CIV-34
  • 60 CIV-35*

60 5.

DHV-93 check iso. DH system fr. pzr.

NA DHV-91

  • 60 DHV-43 #

iso. DH sys. fr. RB sump 120 120 DHV-42 #

DHV-4# & 41#

iso. DH sys. fr. RC 120 DHV-6 #

iso. DH system from Reactor Vessel 60 DHV-5 #

60 6.

DWV-162 check iso. DW system fr. RB NA DWV-160 (A/B)*

60 7.

FWV-44 check #

iso. feedwater from RCSG-1A NA FWV-45 check #

NA FWV-43 check #

iso. feedwater from RCSG-1B NA FWV-46 check #

NA l

8.

LRV 87 & 88*

iso. H2 recombiner ports from RB NA NA l

LRV 89 & 90*

[

LRV 91 & 92*

NA LRV 93 & 94*

NA 9.

MSV-130 #(A/B)*

iso. MDT-1 from RCSG-1 A 60 l

[

l MSV-148 #(A/B)*

iso. MDT-1 from RCSG-1B 60 MSV-411 #

$g[0{D 2

P CRYSTAL RIVER - UNIT 3 3/46-18

TACLE 3.6-1 (continued)

CONTAINMENT ISOLATION VALVES VALVE NUMBER FUNCTION ISOLATION TIME (seconds) l 10.

MUV-40 (A)*

iso. MU system from RC 60 MUV-41 (A)*

60 MUV-49 (B) 60 MUV-261 iso. MU system from 60 control bleed-off MUV-260 60 MUV-259 60 MUV-258 60 MUV-253 60 MUV-163 check #

open during HPI and closed dur.

NA nor. operation MUV-25 60 MUV-164 check #

NA MUV-26 #

60 MUV-160 check #

NA MUV-23 #

60 MUV-161 check #

NA MUV-24 #

60 MUV-27 #

open dur nor, operation and closed during RB Isolation 60 11.

SWV-39 #

iso. NSCCC from AHF-IC 60 l

SWV-45 #

60 SWV-35 #

iso. NSCCC from AHF-1 A 60 SWV-41 #

60 SWV-37 #

iso. NSCCC from AHF-1B 60 SWV-43 #

60 SWV-48 #

  • iso. NSCCC from MUHE-1A & IB and WDT-5 60 SWV-47 #
  • 60 SWV-49 #
  • 60 SWV-50 #
  • 60 SWV-80 #

iso. NSCCC from RCP-1A 60 SWV-84 #

60 SWV-82 #

iso. NSCCC from RCP-lC 60 SWV-86 #

60 SWV-81 #

iso. NSCCC from RCP-ID 60 SWV-85 #

60 SWV-79 #

iso. NSCCC from RCP-1B 60 SWV-83 #

60 SWV-109 #

iso. NSCCC from DRRD-1 60 SWV-Il0 #

60 CRYSTAL RIVER - UNIT 3 3/46-19

TABLE 3.6-1 (continued)

CONTAINMENT ISOLATION VALVES VALVE NUMBER FUNCTION ISOLATION TIME (seconds) 12.

WDV-4 (B) iso. WDT-4 from RB sump 60 WDV-3 (A) 60 WDV-60 (A)*

iso. WDT-4 from WDT-5 60 WDV-61 (B)*

60 WDV-94 (A) iso. WDT-4 from WDP-8 60 WDV-62 (B) 60 WDV-406 (A)*

iso. waste gas disposal from 60 vents in RC system WDV-405 (B)*

60 13.

WSV-3 iso. containment monitoring 60 l

system from RB WSV-4 60 WSV-5 60 WSV-6 60 B.

CONTAINMENT PURGE AND EXHAUST 1.

AHV-IC (A) iso. pur. sup. system fr. RB 60 AHV-ID (B) 60 AHV-1B (A) iso. pur. exhaust system fr. RB 60 AHV-1 A (B) 60 C.

MANUAL 1.

IAV-28 iso. IA from RB NA IAV-29 NA 2.

LRV-50 iso. leak rate test system fr. RB NA LRV-36 NA CRYSTAL RIVER - UNIT 3 3/4 6-20

TABLE 3.6-1 (continued)

CONTAINMENT ISOLATION VALVES VALVE NUMBER FUNCTION ISOLATION TIME (seconds)

LRV-45 iso. LR test panel from RB NA NA LRV-44 NA LRV-46 3.

MSV-146 #

iso, misc. waste storage NA tank from RCSG-1B MSV-128 #

NA l

4.

NGV-62 iso. NG system from steam NA generators NGV-81 #

NA NGV-82 iso. NG system from pzr.

NA 5.

SAV-24 iso. SA from RB NA SAV-23 & 122 NA 6.

SFV-18 iso SF system NA NA SFV-19 SFV-Il9 #

iso. Fuel Transfer tubes from NA F.T. Canal SFV-120 #

NA 7

WSV-1 iso. containment monitoring NA system from RB NA WSV-2 D. PENETRATIONS REQUIRING TYI Z B TESTS Blind Flange 119 iso. RB NA Blind Flange 120 NA Blind Flange 202 NA CRYSTAL RIVER - UNIT 3 3/4 6-21

.