ENS 46985: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by Mark Hawes) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 16: | Line 16: | ||
| event date = 06/25/2011 07:55 EDT | | event date = 06/25/2011 07:55 EDT | ||
| last update date = 06/25/2011 | | last update date = 06/25/2011 | ||
| title = Unusual Event Declared Due | | title = Unusual Event Declared Due to Fire Lasting Greater than 15 Minutes | ||
| event text = Unit 1 experienced a confirmed fire in power board H12. The fire brigade has responded and the power board has been deenergized. Awaiting confirmation that the fire is out. | | event text = Unit 1 experienced a confirmed fire in power board H12. The fire brigade has responded and the power board has been deenergized. Awaiting confirmation that the fire is out. | ||
At the time of the notification (0815 EDT), the licensee determined that the fire was out. Power board H12 supplies 480V non-safety plant loads. There was no damage to any safety related equipment and no injuries to personnel. Offsite assistance was not requested. | At the time of the notification (0815 EDT), the licensee determined that the fire was out. Power board H12 supplies 480V non-safety plant loads. There was no damage to any safety related equipment and no injuries to personnel. Offsite assistance was not requested. |
Latest revision as of 21:06, 1 March 2018
Where | |
---|---|
Nine Mile Point New York (NRC Region 1) | |
Reporting | |
Emergency class: | Unusual Event |
10 CFR 50.72(a) (1) (i), Emergency Class Declaration | |
Time - Person (Reporting Time:+-3.67 h-0.153 days <br />-0.0218 weeks <br />-0.00503 months <br />) | |
Opened: | Gretchen Carter 08:15 Jun 25, 2011 |
NRC Officer: | Howie Crouch |
Last Updated: | Jun 25, 2011 |
46985 - NRC Website
| |