ML20133G870: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter:. -- - - . | {{#Wiki_filter:. -- - -. | ||
[ | [ | ||
.L' 33 | |||
.s | |||
,y | |||
!b fu u | |||
Larry Nich ison. | |||
I' 1 | |||
/ | |||
From: | |||
CSM, ALD1, EMK, WHk' WND2.WNP3.LNO, WND2.WNP3.JFS3... | |||
/ | |||
To: | To: | ||
Date: | Date: | ||
9/6/96 3:06pm | |||
==Subject:== | ==Subject:== | ||
Mode reqmts. | Mode reqmts. | ||
Attached is a 1st cut at attaching modes to each of our restart items. please review and provide comments prior to the upcoming SAP mtg on 9/26. | Attached is a 1st cut at attaching modes to each of our restart items. please review and provide comments prior to the upcoming SAP mtg on 9/26. | ||
l | l thanks l | ||
l | l CC: | ||
RWC To: CSM (Charles Marshall) R-I ALD1 (Aniello Della Grec) R-I EMK (Eugene Kelly) R-I WHR (William Ruland) R-I LN0 (Leonard 01shan, NRR JFS3 (John Stolz, NRR 1 | |||
I l | I l | ||
9701160196 970113 PDR | 9701160196 970113 PDR FOIA O'NEILL96-351 PDR | ||
9 ISSUE MUST BE CLOSED PRIOR TO ENTRY INTO THE MODE LISTED. | |||
MODE 6 = REFUELING MODE 5 = COLD SHUTDOWN (<200) | MODE 6 = REFUELING MODE 5 = COLD SHUTDOWN (<200) | ||
MODE 4 = HOT SHUTDOWN (<350) | MODE 4 = HOT SHUTDOWN (<350) | ||
MODE 3 = HOT STANDBY MODE 2 = STARTUP (< 5%) | MODE 3 = HOT STANDBY MODE 2 = STARTUP (< 5%) | ||
MODE 1 = POWER OPERATIONS | MODE 1 = POWER OPERATIONS TECHNICAL RESTART ISSUES TECHNICAL ISSUE Reso. | ||
Mode | |||
_QIrg | _QIrg 1. | ||
Cont. Spray Dsch Viv (CS-2) Operability. Calculations DRS 4 | |||
indicate actual d/p may be greater than design d/p. | indicate actual d/p may be greater than design d/p. | ||
] | |||
2. | |||
Reliability of Control Air System. Requires operator DRP 4 | |||
action to start backup compressor. | |||
3. | |||
CW Screen Motor Reliability. No automatic motor DRP 3 | |||
operation, vulnerable to grass intrusion 4. | |||
Digital feedwater installation to correct feedwater DRS 2 | |||
control reliability. | |||
: 10. Feedwater nozzle bypass flow introduced error in | 5. | ||
: 11. EDG 1 A load fluctuations. | Moisture in EDG air start system causes reliability DRP 6 | ||
: 12. Review adequacy of fuse control program. | problem with check valves. | ||
: 13. Review gas turbine batteries degrading with loss of one | 6. | ||
: 14. Hagan module replacement project. | EDG output breakers fail to close when switch taken to DRS 6 | ||
close. | |||
7. | |||
EDG has minimalload margin. | |||
DRS 4 | |||
8. | |||
EDSFI Followup Issues DRS 4 | |||
9. | |||
Cracked exhaust steam piping could indicate weak DRS 4 | |||
erosion / control program. | |||
: 10. Feedwater nozzle bypass flow introduced error in DRS 2 | |||
calorimetric and power level. | |||
: 11. EDG 1 A load fluctuations. | |||
DRS 6 | |||
: 12. Review adequacy of fuse control program. | |||
DRS 2 | |||
: 13. Review gas turbine batteries degrading with loss of one DRS 4 | |||
source of offsite power. Turbine referenced in TS basis to support SW outages. | |||
: 14. Hagan module replacement project. | |||
DRS 4 | |||
TECHNICAL ISSUE | TECHNICAL ISSUE -- - | ||
R.ig | R.ig prg | ||
prg | : 15. Procedure contains non-conservative 125V battery DRS 6 | ||
: 15. Procedure contains non-conservative 125V battery | acceptance criteria. | ||
: 16. NRC & QA identified numerous IST program | : 16. NRC & QA identified numerous IST program DRS 4 | ||
: 17. Main condenser steam dumps malfunction, requires | deficiencies. | ||
: 18. Poor reliability of PDP charging pumps. | : 17. Main condenser steam dumps malfunction, requires DRP 2 | ||
: 19. Poor process for configuration control of pipe supports. DRP | closing MSIVs on trip and prevents use of main condensar. | ||
: 20. POPS ability to mitigate overpressure events. | : 18. Poor reliability of PDP charging pumps. | ||
: 21. Wiring separation & redundancy concerns with RG 1.97 | DRP 4 | ||
: 22. PORV (1PR1) seat leakage, requiring block valve | : 19. Poor process for configuration control of pipe supports. | ||
: 23. Undersized PORV accumulators. | DRP 4 | ||
: 24. Gate valves identified susceptible to press lock & | : 20. POPS ability to mitigate overpressure events. | ||
: 25. Pressurizer Spray Prob! ems /Use of Aux Spray | DRS 6 | ||
: 26. Radiation monitor problems. | : 21. Wiring separation & redundancy concerns with RG 1.97 DRS 4 | ||
: 27. Rx coolant pump oil collection system deficiencies. | instruments & cable separation | ||
: 28. Understand causes and corrective actions for failures of DRP | : 22. PORV (1PR1) seat leakage, requiring block valve DRP 6 | ||
: 29. Rx Head Vent Valve Stroke Times. | closure. | ||
: 30. RHR Min-flow Valve (RH29) Failures on unit 2. | : 23. Undersized PORV accumulators. | ||
: 31. RHR Dsch Valve (21RH10) Banging Noise. | DRS 4 | ||
: 32. Review program for control & inspecting resilient fire | : 24. Gate valves identified susceptible to press lock & | ||
DRS 6 | |||
thermal binding. | |||
: 25. Pressurizer Spray Prob! ems /Use of Aux Spray DRP 4 | |||
: 26. Radiation monitor problems. | |||
DRS 4 | |||
: 27. Rx coolant pump oil collection system deficiencies. | |||
DRS 4 | |||
: 28. Understand causes and corrective actions for failures of DRP 5 | |||
Rx coolant pump seals. | |||
: 29. Rx Head Vent Valve Stroke Times. | |||
DRP 5 | |||
: 30. RHR Min-flow Valve (RH29) Failures on unit 2. | |||
DRP 6 | |||
: 31. RHR Dsch Valve (21RH10) Banging Noise. | |||
DRP 6 | |||
: 32. Review program for control & inspecting resilient fire DRS 4 | |||
barrier seals. | |||
I. | I. | ||
TECHNICAL ISSUE | TECHNICAL ISSUE Reso. | ||
D19 | D19 | ||
: 33. Control rods stepping with no temperature error signal. DRS | : 33. Control rods stepping with no temperature error signal. | ||
DRS 2 | |||
l | l | ||
: 34. Numerous SI pump deficiencies. | : 34. Numerous SI pump deficiencies. | ||
DRP 5 | |||
l | l | ||
: 35. Verify adequate protection for S1 Pump runout. | : 35. Verify adequate protection for S1 Pump runout. | ||
: 36. Si relief valves performance history of leaking and | DRS 5 | ||
: 37. Review corrective action for service water pipe erosion. DRS | : 36. Si relief valves performance history of leaking and DRP 6 | ||
: 38. Spurious high steam flow signals causing St. | lifting. | ||
: 39. Review corrective actions to resolve numerous | : 37. Review corrective action for service water pipe erosion. | ||
: 40. Verify adequate correction for overhead annunciator | DRS 4 | ||
: 41. Verify adequate corrective action to ensure steam | : 38. Spurious high steam flow signals causing St. | ||
: 42. Auxiliary Feedwater System Performance and Reliability. DRS | DRS 4 | ||
: 43. Adequacy of corrective actions from the Salem Unit 2 | : 39. Review corrective actions to resolve numerous DRS 4 | ||
switchyard failures. | |||
: 40. Verify adequate correction for overhead annunciator DRS 4 | |||
failures. | |||
: 41. Verify adequate corrective action to ensure steam DRS 4 | |||
generator tube integrity. | |||
: 42. Auxiliary Feedwater System Performance and Reliability. | |||
DRS 3 | |||
: 43. Adequacy of corrective actions from the Salem Unit 2 DRP 2 | |||
reactor trip. | |||
1 PROGRAMMATIC RESTART ISSUES RESTARTISSUE | 1 PROGRAMMATIC RESTART ISSUES RESTARTISSUE Resp. | ||
Mode (Licensee) | |||
Org. | |||
1. | |||
Resolve Appendix R jumpers and program NRR 4 | |||
discrepancies, including fire barrier penetrations. | |||
2. | |||
Review efforts to maintain configuration DRS 4 | |||
control, given examples from Hagan modules and botting. Effort to include setpoint control program and drawing control. | |||
3. | |||
: 10. Corrective action program, including | Adequacy and use of procedures, DRP 2 | ||
including procedure revision backlog. | |||
4. | |||
Management of engineering and DRP/ | |||
2 maintenance backlog. | |||
RATI 5. | |||
Program for foreign material exclusion. | |||
DRP 4 | |||
6. | |||
Operability determinations. | |||
DRP 6 | |||
7. | |||
Operator performance (Coordination DRS 2 | |||
and Communication) 8. | |||
Correction of operator workarounds, DRP 2 | |||
including control room deficiencies. | |||
9. | |||
Program to utilize operating (industry) | |||
DRP 2 | |||
experience feedback. | |||
: 10. Corrective action program, including DRP 2 | |||
adequacy of root causa program. | |||
j | j lli.e. PROGRAMMATIC RESTART ISSUES | ||
- continued - | |||
RESTARTISSUE Resp. | |||
i j- | Mode I | ||
(Licensee) | |||
l | Org. | ||
i | i j- | ||
} | : 11. Engineering contribution to problem resolution, DRP 4 | ||
: 15. Adequacy of Emergency Operating Procedures. | including safety eve!uations. | ||
l | |||
: 12. Tagging DRP 4 | |||
1 i | |||
} | |||
: 13. Adequacy of Emergency Preparedness DRS 2 | |||
l | |||
: 14. Resolution of licensing commitments. | |||
NRR 4 | |||
: 15. Adequacy of Emergency Operating Procedures. | |||
DRS 3 | |||
? | ? | ||
: 16. Adequacy of training. | : 16. Adequacy of training. | ||
DRS 6 | |||
l | |||
: 17. Adequacy of work control and planning program. | |||
DRS 2 | |||
{ | { | ||
: 18. Parts availability & accuracy of bill of materials DRS 2 | |||
i | i | ||
: 19. Adequacy of Licensing Basis Conformance FSAR | : 19. Adequacy of Licensing Basis Conformance FSAR DRP 2 | ||
Discrepancies specifically including Service Water i | |||
System design and reliability l | |||
: 20. Adequacy of QA program DRP 6 | |||
: 21. Licensee self assessment capability | ~ | ||
: 22. Integrated Test Program | (Receptiveness to documented deficiencies) | ||
: 21. Licensee self assessment capability DRP 2 | |||
(Performance monitoring & trending) | |||
: 22. Integrated Test Program DRS All i | |||
L | L | ||
) | |||
i | i LICENSEE RESTART PLANS I | ||
RESTART PLANS Resp. | |||
RESTART PLANS | Mode (Licensee) | ||
Org. | |||
1 | 1 | ||
: 1. Conduct of Operations | : 1. Conduct of Operations DRP 2 | ||
: 2. Reliable Maintenance DRP 2 | |||
: 2. Reliable Maintenance | i | ||
: 3. Work Control Process improvement DRP 2 | |||
Reliability j | : 4. System Engineering and Equipment DRS 2 | ||
Reliability j | |||
f | : 5. Engineering Performance DRS 2 | ||
: 9. Accredited Training | j | ||
: 6. Organizational Self Assessment NRR 2 | |||
: 7. Corrective Action DRP 2 | |||
) | |||
f | |||
: 8. Human Performance Management NRR 2 | |||
: 9. Accredited Training DRS 2 | |||
l}} |
Latest revision as of 08:12, 12 December 2024
ML20133G870 | |
Person / Time | |
---|---|
Issue date: | 09/06/1996 |
From: | Larry Nicholson NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
To: | Dellagrec A, Eugene Kelly, Marshall C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
Shared Package | |
ML20133F923 | List:
|
References | |
FOIA-96-351 NUDOCS 9701160196 | |
Download: ML20133G870 (7) | |
Text
. -- - -.
[
.L' 33
.s
,y
!b fu u
Larry Nich ison.
I' 1
/
From:
CSM, ALD1, EMK, WHk' WND2.WNP3.LNO, WND2.WNP3.JFS3...
/
To:
Date:
9/6/96 3:06pm
Subject:
Mode reqmts.
Attached is a 1st cut at attaching modes to each of our restart items. please review and provide comments prior to the upcoming SAP mtg on 9/26.
l thanks l
l CC:
RWC To: CSM (Charles Marshall) R-I ALD1 (Aniello Della Grec) R-I EMK (Eugene Kelly) R-I WHR (William Ruland) R-I LN0 (Leonard 01shan, NRR JFS3 (John Stolz, NRR 1
I l
9701160196 970113 PDR FOIA O'NEILL96-351 PDR
9 ISSUE MUST BE CLOSED PRIOR TO ENTRY INTO THE MODE LISTED.
MODE 6 = REFUELING MODE 5 = COLD SHUTDOWN (<200)
MODE 4 = HOT SHUTDOWN (<350)
MODE 3 = HOT STANDBY MODE 2 = STARTUP (< 5%)
MODE 1 = POWER OPERATIONS TECHNICAL RESTART ISSUES TECHNICAL ISSUE Reso.
Mode
_QIrg 1.
Cont. Spray Dsch Viv (CS-2) Operability. Calculations DRS 4
indicate actual d/p may be greater than design d/p.
]
2.
Reliability of Control Air System. Requires operator DRP 4
action to start backup compressor.
3.
CW Screen Motor Reliability. No automatic motor DRP 3
operation, vulnerable to grass intrusion 4.
Digital feedwater installation to correct feedwater DRS 2
control reliability.
5.
Moisture in EDG air start system causes reliability DRP 6
problem with check valves.
6.
EDG output breakers fail to close when switch taken to DRS 6
close.
7.
EDG has minimalload margin.
DRS 4
8.
EDSFI Followup Issues DRS 4
9.
Cracked exhaust steam piping could indicate weak DRS 4
erosion / control program.
calorimetric and power level.
- 11. EDG 1 A load fluctuations.
DRS 6
- 12. Review adequacy of fuse control program.
DRS 2
- 13. Review gas turbine batteries degrading with loss of one DRS 4
source of offsite power. Turbine referenced in TS basis to support SW outages.
- 14. Hagan module replacement project.
DRS 4
TECHNICAL ISSUE -- -
R.ig prg
- 15. Procedure contains non-conservative 125V battery DRS 6
acceptance criteria.
deficiencies.
- 17. Main condenser steam dumps malfunction, requires DRP 2
closing MSIVs on trip and prevents use of main condensar.
- 18. Poor reliability of PDP charging pumps.
DRP 4
- 19. Poor process for configuration control of pipe supports.
DRP 4
- 20. POPS ability to mitigate overpressure events.
DRS 6
instruments & cable separation
closure.
- 23. Undersized PORV accumulators.
DRS 4
- 24. Gate valves identified susceptible to press lock &
DRS 6
thermal binding.
- 25. Pressurizer Spray Prob! ems /Use of Aux Spray DRP 4
- 26. Radiation monitor problems.
DRS 4
- 27. Rx coolant pump oil collection system deficiencies.
DRS 4
- 28. Understand causes and corrective actions for failures of DRP 5
Rx coolant pump seals.
- 29. Rx Head Vent Valve Stroke Times.
DRP 5
- 30. RHR Min-flow Valve (RH29) Failures on unit 2.
DRP 6
- 31. RHR Dsch Valve (21RH10) Banging Noise.
DRP 6
- 32. Review program for control & inspecting resilient fire DRS 4
barrier seals.
I.
TECHNICAL ISSUE Reso.
D19
- 33. Control rods stepping with no temperature error signal.
DRS 2
l
- 34. Numerous SI pump deficiencies.
DRP 5
l
- 35. Verify adequate protection for S1 Pump runout.
DRS 5
- 36. Si relief valves performance history of leaking and DRP 6
lifting.
- 37. Review corrective action for service water pipe erosion.
DRS 4
- 38. Spurious high steam flow signals causing St.
DRS 4
- 39. Review corrective actions to resolve numerous DRS 4
switchyard failures.
- 40. Verify adequate correction for overhead annunciator DRS 4
failures.
- 41. Verify adequate corrective action to ensure steam DRS 4
generator tube integrity.
- 42. Auxiliary Feedwater System Performance and Reliability.
DRS 3
- 43. Adequacy of corrective actions from the Salem Unit 2 DRP 2
1 PROGRAMMATIC RESTART ISSUES RESTARTISSUE Resp.
Mode (Licensee)
Org.
1.
Resolve Appendix R jumpers and program NRR 4
discrepancies, including fire barrier penetrations.
2.
Review efforts to maintain configuration DRS 4
control, given examples from Hagan modules and botting. Effort to include setpoint control program and drawing control.
3.
Adequacy and use of procedures, DRP 2
including procedure revision backlog.
4.
Management of engineering and DRP/
2 maintenance backlog.
RATI 5.
Program for foreign material exclusion.
DRP 4
6.
DRP 6
7.
Operator performance (Coordination DRS 2
and Communication) 8.
Correction of operator workarounds, DRP 2
including control room deficiencies.
9.
Program to utilize operating (industry)
DRP 2
experience feedback.
- 10. Corrective action program, including DRP 2
adequacy of root causa program.
j lli.e. PROGRAMMATIC RESTART ISSUES
- continued -
RESTARTISSUE Resp.
Mode I
(Licensee)
Org.
i j-
- 11. Engineering contribution to problem resolution, DRP 4
including safety eve!uations.
l
- 12. Tagging DRP 4
1 i
}
- 13. Adequacy of Emergency Preparedness DRS 2
l
- 14. Resolution of licensing commitments.
NRR 4
- 15. Adequacy of Emergency Operating Procedures.
DRS 3
?
- 16. Adequacy of training.
DRS 6
l
- 17. Adequacy of work control and planning program.
DRS 2
{
- 18. Parts availability & accuracy of bill of materials DRS 2
i
Discrepancies specifically including Service Water i
System design and reliability l
~
(Receptiveness to documented deficiencies)
- 21. Licensee self assessment capability DRP 2
(Performance monitoring & trending)
- 22. Integrated Test Program DRS All i
L
)
i LICENSEE RESTART PLANS I
RESTART PLANS Resp.
Mode (Licensee)
Org.
1
- 1. Conduct of Operations DRP 2
- 2. Reliable Maintenance DRP 2
i
- 3. Work Control Process improvement DRP 2
- 4. System Engineering and Equipment DRS 2
Reliability j
- 5. Engineering Performance DRS 2
j
- 6. Organizational Self Assessment NRR 2
- 7. Corrective Action DRP 2
)
f
- 8. Human Performance Management NRR 2
- 9. Accredited Training DRS 2
l