ML20133G870: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:. -- - - .         - . . . . - - - . - - . - . . . - - - . - .            .  . . . - ._      -.    . -    ---    . . -
{{#Wiki_filter:. -- - -.
[     .
[
                                                                                                      .L'             33
.L' 33
                                                  .s               fu  u
.s
                                                                                                ,y             !b From:                    Larry Nich ison .               I' 1 CSM, ALD1, EMK, WHk' WND2.WNP3.LNO, WND2.WNP3.JFS3...
,y
                                                                                              /              /
!b fu u
Larry Nich ison.
I' 1
/
From:
CSM, ALD1, EMK, WHk' WND2.WNP3.LNO, WND2.WNP3.JFS3...
/
To:
To:
Date:                     9/6/96 3:06pm
Date:
9/6/96 3:06pm


==Subject:==
==Subject:==
Mode reqmts.
Mode reqmts.
Attached is a 1st cut at attaching modes to each of our restart items. please review and provide comments prior to the upcoming SAP mtg on 9/26.
Attached is a 1st cut at attaching modes to each of our restart items. please review and provide comments prior to the upcoming SAP mtg on 9/26.
l               thanks l
l thanks l
l               CC:                       RWC To: CSM (Charles Marshall) R-I ALD1 (Aniello Della Grec) R-I EMK (Eugene Kelly) R-I WHR (William Ruland) R-I LN0 (Leonard 01shan, NRR JFS3 (John Stolz, NRR 1
l CC:
RWC To: CSM (Charles Marshall) R-I ALD1 (Aniello Della Grec) R-I EMK (Eugene Kelly) R-I WHR (William Ruland) R-I LN0 (Leonard 01shan, NRR JFS3 (John Stolz, NRR 1
I l
I l
9701160196 970113 PDR   FOIA O'NEILL96-351 PDR
9701160196 970113 PDR FOIA O'NEILL96-351 PDR


  .      9 ISSUE MUST BE CLOSED PRIOR TO ENTRY INTO THE MODE LISTED.
9 ISSUE MUST BE CLOSED PRIOR TO ENTRY INTO THE MODE LISTED.
MODE 6 = REFUELING MODE 5 = COLD SHUTDOWN (<200)
MODE 6 = REFUELING MODE 5 = COLD SHUTDOWN (<200)
MODE 4 = HOT SHUTDOWN (<350)
MODE 4 = HOT SHUTDOWN (<350)
MODE 3 = HOT STANDBY MODE 2 = STARTUP (< 5%)
MODE 3 = HOT STANDBY MODE 2 = STARTUP (< 5%)
MODE 1 = POWER OPERATIONS l
MODE 1 = POWER OPERATIONS TECHNICAL RESTART ISSUES TECHNICAL ISSUE Reso.
l TECHNICAL RESTART ISSUES                         I TECHNICAL ISSUE                     Reso. Mode
Mode
_QIrg
_QIrg 1.
: 1. Cont. Spray Dsch Viv (CS-2) Operability. Calculations   DRS       4       )
Cont. Spray Dsch Viv (CS-2) Operability. Calculations DRS 4
indicate actual d/p may be greater than design d/p.
indicate actual d/p may be greater than design d/p.
                                                                                              ]
]
: 2. Reliability of Control Air System. Requires operator     DRP       4 action to start backup compressor.
2.
: 3. CW Screen Motor Reliability. No automatic motor         DRP       3 operation, vulnerable to grass intrusion
Reliability of Control Air System. Requires operator DRP 4
: 4. Digital feedwater installation to correct feedwater     DRS       2 control reliability.
action to start backup compressor.
: 5. Moisture in EDG air start system causes reliability     DRP       6 problem with check valves.
3.
: 6. EDG output breakers fail to close when switch taken to DRS       6 close.
CW Screen Motor Reliability. No automatic motor DRP 3
: 7. EDG has minimalload margin.                             DRS       4
operation, vulnerable to grass intrusion 4.
: 8. EDSFI Followup Issues                                   DRS       4
Digital feedwater installation to correct feedwater DRS 2
: 9. Cracked exhaust steam piping could indicate weak       DRS       4 erosion / control program.
control reliability.
: 10. Feedwater nozzle bypass flow introduced error in       DRS       2 calorimetric and power level.                                               ,
5.
: 11. EDG 1 A load fluctuations.                               DRS       6
Moisture in EDG air start system causes reliability DRP 6
: 12. Review adequacy of fuse control program.                 DRS       2
problem with check valves.
: 13. Review gas turbine batteries degrading with loss of one DRS       4 source of offsite power. Turbine referenced in TS basis to support SW outages.
6.
: 14. Hagan module replacement project.                       DRS       4
EDG output breakers fail to close when switch taken to DRS 6
close.
7.
EDG has minimalload margin.
DRS 4
8.
EDSFI Followup Issues DRS 4
9.
Cracked exhaust steam piping could indicate weak DRS 4
erosion / control program.
: 10. Feedwater nozzle bypass flow introduced error in DRS 2
calorimetric and power level.
: 11. EDG 1 A load fluctuations.
DRS 6
: 12. Review adequacy of fuse control program.
DRS 2
: 13. Review gas turbine batteries degrading with loss of one DRS 4
source of offsite power. Turbine referenced in TS basis to support SW outages.
: 14. Hagan module replacement project.
DRS 4


TECHNICAL ISSUE -- -      - - - - -
TECHNICAL ISSUE -- -
R.ig   -  ---- - ' -
R.ig prg
prg
: 15. Procedure contains non-conservative 125V battery DRS 6
: 15. Procedure contains non-conservative 125V battery       DRS 6 acceptance criteria.
acceptance criteria.
: 16. NRC & QA identified numerous IST program                 DRS 4 deficiencies.
: 16. NRC & QA identified numerous IST program DRS 4
: 17. Main condenser steam dumps malfunction, requires         DRP 2 closing MSIVs on trip and prevents use of main condensar.
deficiencies.
: 18. Poor reliability of PDP charging pumps.                 DRP 4
: 17. Main condenser steam dumps malfunction, requires DRP 2
: 19. Poor process for configuration control of pipe supports. DRP 4
closing MSIVs on trip and prevents use of main condensar.
: 20. POPS ability to mitigate overpressure events.           DRS 6
: 18. Poor reliability of PDP charging pumps.
: 21. Wiring separation & redundancy concerns with RG 1.97     DRS 4 instruments & cable separation
DRP 4
: 22. PORV (1PR1) seat leakage, requiring block valve         DRP 6 closure.
: 19. Poor process for configuration control of pipe supports.
: 23. Undersized PORV accumulators.                           DRS 4
DRP 4
: 24. Gate valves identified susceptible to press lock &       DRS 6 thermal binding.
: 20. POPS ability to mitigate overpressure events.
: 25. Pressurizer Spray Prob! ems /Use of Aux Spray           DRP 4
DRS 6
: 26. Radiation monitor problems.                             DRS 4
: 21. Wiring separation & redundancy concerns with RG 1.97 DRS 4
: 27. Rx coolant pump oil collection system deficiencies.     DRS 4
instruments & cable separation
: 28. Understand causes and corrective actions for failures of DRP 5 Rx coolant pump seals.
: 22. PORV (1PR1) seat leakage, requiring block valve DRP 6
: 29. Rx Head Vent Valve Stroke Times.                         DRP 5
closure.
: 30. RHR Min-flow Valve (RH29) Failures on unit 2.           DRP 6
: 23. Undersized PORV accumulators.
: 31. RHR Dsch Valve (21RH10) Banging Noise.                   DRP 6
DRS 4
: 32. Review program for control & inspecting resilient fire   DRS 4 barrier seals.
: 24. Gate valves identified susceptible to press lock &
DRS 6
thermal binding.
: 25. Pressurizer Spray Prob! ems /Use of Aux Spray DRP 4
: 26. Radiation monitor problems.
DRS 4
: 27. Rx coolant pump oil collection system deficiencies.
DRS 4
: 28. Understand causes and corrective actions for failures of DRP 5
Rx coolant pump seals.
: 29. Rx Head Vent Valve Stroke Times.
DRP 5
: 30. RHR Min-flow Valve (RH29) Failures on unit 2.
DRP 6
: 31. RHR Dsch Valve (21RH10) Banging Noise.
DRP 6
: 32. Review program for control & inspecting resilient fire DRS 4
barrier seals.


I.
I.
TECHNICAL ISSUE                       Reso.
TECHNICAL ISSUE Reso.
D19
D19
: 33. Control rods stepping with no temperature error signal. DRS     2     !
: 33. Control rods stepping with no temperature error signal.
DRS 2
l
l
: 34. Numerous SI pump deficiencies.                           DRP     5     !
: 34. Numerous SI pump deficiencies.
DRP 5
l
l
: 35. Verify adequate protection for S1 Pump runout.           DRS     5     l
: 35. Verify adequate protection for S1 Pump runout.
: 36. Si relief valves performance history of leaking and     DRP     6 lifting.
DRS 5
: 37. Review corrective action for service water pipe erosion. DRS     4
: 36. Si relief valves performance history of leaking and DRP 6
: 38. Spurious high steam flow signals causing St.             DRS     4
lifting.
: 39. Review corrective actions to resolve numerous           DRS     4     l switchyard failures.
: 37. Review corrective action for service water pipe erosion.
: 40. Verify adequate correction for overhead annunciator     DRS     4 failures.
DRS 4
: 41. Verify adequate corrective action to ensure steam       DRS     4 generator tube integrity.
: 38. Spurious high steam flow signals causing St.
: 42. Auxiliary Feedwater System Performance and Reliability. DRS     3
DRS 4
: 43. Adequacy of corrective actions from the Salem Unit 2     DRP     2 reactor trip.
: 39. Review corrective actions to resolve numerous DRS 4
switchyard failures.
: 40. Verify adequate correction for overhead annunciator DRS 4
failures.
: 41. Verify adequate corrective action to ensure steam DRS 4
generator tube integrity.
: 42. Auxiliary Feedwater System Performance and Reliability.
DRS 3
: 43. Adequacy of corrective actions from the Salem Unit 2 DRP 2
reactor trip.


1 PROGRAMMATIC RESTART ISSUES RESTARTISSUE                   Resp. Mode (Licensee)                   Org.
1 PROGRAMMATIC RESTART ISSUES RESTARTISSUE Resp.
: 1. Resolve Appendix R jumpers and program     NRR     4 discrepancies, including fire barrier                   l penetrations.
Mode (Licensee)
: 2. Review efforts to maintain configuration DRS   4 control, given examples from Hagan modules and botting. Effort to include setpoint control program and drawing control.
Org.
: 3. Adequacy and use of procedures,         DRP   2 including procedure revision backlog.                   l
1.
: 4. Management of engineering and           DRP/   2 maintenance backlog.                       RATI
Resolve Appendix R jumpers and program NRR 4
: 5. Program for foreign material exclusion. DRP   4
discrepancies, including fire barrier penetrations.
: 6. Operability determinations.                 DRP   6
2.
: 7. Operator performance (Coordination         DRS   2 and Communication)
Review efforts to maintain configuration DRS 4
: 8. Correction of operator workarounds,         DRP   2 including control room deficiencies.
control, given examples from Hagan modules and botting. Effort to include setpoint control program and drawing control.
: 9. Program to utilize operating (industry)     DRP   2 experience feedback.
3.
: 10. Corrective action program, including       DRP   2 adequacy of root causa program.
Adequacy and use of procedures, DRP 2
including procedure revision backlog.
4.
Management of engineering and DRP/
2 maintenance backlog.
RATI 5.
Program for foreign material exclusion.
DRP 4
6.
Operability determinations.
DRP 6
7.
Operator performance (Coordination DRS 2
and Communication) 8.
Correction of operator workarounds, DRP 2
including control room deficiencies.
9.
Program to utilize operating (industry)
DRP 2
experience feedback.
: 10. Corrective action program, including DRP 2
adequacy of root causa program.


j                           lli.e. PROGRAMMATIC RESTART ISSUES
j lli.e. PROGRAMMATIC RESTART ISSUES
                                                                                                  - continued -
- continued -
!                                                                RESTARTISSUE                                                     Resp. Mode I                                                                       (Licensee)                                                   Org.
RESTARTISSUE Resp.
i j-                             11. Engineering contribution to problem resolution,                                                 DRP     4
Mode I
,                                      including safety eve!uations.
(Licensee)
l                               12. Tagging                                                                                         DRP     4 1
Org.
i
i j-
}                             13. Adequacy of Emergency Preparedness                                                               DRS     2 l                             14. Resolution of licensing commitments.                                                             NRR     4
: 11. Engineering contribution to problem resolution, DRP 4
: 15. Adequacy of Emergency Operating Procedures.                                                     DRS     3
including safety eve!uations.
l
: 12. Tagging DRP 4
1 i
}
: 13. Adequacy of Emergency Preparedness DRS 2
l
: 14. Resolution of licensing commitments.
NRR 4
: 15. Adequacy of Emergency Operating Procedures.
DRS 3
?
?
: 16. Adequacy of training.                                                                           DRS     6 l                             17. Adequacy of work control and planning program.                                                   DRS    2
: 16. Adequacy of training.
: 18. Parts availability & accuracy of bill of materials                                              DRS     2
DRS 6
l
: 17. Adequacy of work control and planning program.
DRS 2
{
{
: 18. Parts availability & accuracy of bill of materials DRS 2
i
i
: 19. Adequacy of Licensing Basis Conformance FSAR                                                     DRP     2
: 19. Adequacy of Licensing Basis Conformance FSAR DRP 2
;                                    Discrepancies specifically including Service Water i                                     System design and reliability
Discrepancies specifically including Service Water i
                                                                                                                      ~
System design and reliability l
l                              20. Adequacy of QA program                                                                           DRP     6 (Receptiveness to documented deficiencies)
: 20. Adequacy of QA program DRP 6
: 21. Licensee self assessment capability                                                             DRP     2 (Performance monitoring & trending)
~
: 22. Integrated Test Program                                                                         DRS   All i
(Receptiveness to documented deficiencies)
: 21. Licensee self assessment capability DRP 2
(Performance monitoring & trending)
: 22. Integrated Test Program DRS All i
L
L


    .                                                                        )
)
i     .*
i LICENSEE RESTART PLANS I
* LICENSEE RESTART PLANS I
RESTART PLANS Resp.
RESTART PLANS                   Resp. Mode
Mode (Licensee)
;                                    (Licensee)                 Org.
Org.
1
1
: 1. Conduct of Operations
: 1. Conduct of Operations DRP 2
                                                    .            DRP   2   -
: 2. Reliable Maintenance DRP 2
: 2. Reliable Maintenance                         DRP   2 i               3. Work Control Process improvement             DRP   2
i
;                4. System Engineering and Equipment             DRS   2     !
: 3. Work Control Process improvement DRP 2
Reliability j               5. Engineering Performance                     DRS   2 j               6. Organizational Self Assessment               NRR   2
: 4. System Engineering and Equipment DRS 2
.                7. Corrective Action                           DRP   2     )
Reliability j
f               8. Human Performance Management                 NRR   2
: 5. Engineering Performance DRS 2
: 9. Accredited Training                         DRS   2 l}}
j
: 6. Organizational Self Assessment NRR 2
: 7. Corrective Action DRP 2
)
f
: 8. Human Performance Management NRR 2
: 9. Accredited Training DRS 2
l}}

Latest revision as of 08:12, 12 December 2024

Forwards Modes to Restart Items & Requests Review & Comments Prior to 960926 Upcoming SAP Meeting
ML20133G870
Person / Time
Issue date: 09/06/1996
From: Larry Nicholson
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Dellagrec A, Eugene Kelly, Marshall C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20133F923 List:
References
FOIA-96-351 NUDOCS 9701160196
Download: ML20133G870 (7)


Text

. -- - -.

[

.L' 33

.s

,y

!b fu u

Larry Nich ison.

I' 1

/

From:

CSM, ALD1, EMK, WHk' WND2.WNP3.LNO, WND2.WNP3.JFS3...

/

To:

Date:

9/6/96 3:06pm

Subject:

Mode reqmts.

Attached is a 1st cut at attaching modes to each of our restart items. please review and provide comments prior to the upcoming SAP mtg on 9/26.

l thanks l

l CC:

RWC To: CSM (Charles Marshall) R-I ALD1 (Aniello Della Grec) R-I EMK (Eugene Kelly) R-I WHR (William Ruland) R-I LN0 (Leonard 01shan, NRR JFS3 (John Stolz, NRR 1

I l

9701160196 970113 PDR FOIA O'NEILL96-351 PDR

9 ISSUE MUST BE CLOSED PRIOR TO ENTRY INTO THE MODE LISTED.

MODE 6 = REFUELING MODE 5 = COLD SHUTDOWN (<200)

MODE 4 = HOT SHUTDOWN (<350)

MODE 3 = HOT STANDBY MODE 2 = STARTUP (< 5%)

MODE 1 = POWER OPERATIONS TECHNICAL RESTART ISSUES TECHNICAL ISSUE Reso.

Mode

_QIrg 1.

Cont. Spray Dsch Viv (CS-2) Operability. Calculations DRS 4

indicate actual d/p may be greater than design d/p.

]

2.

Reliability of Control Air System. Requires operator DRP 4

action to start backup compressor.

3.

CW Screen Motor Reliability. No automatic motor DRP 3

operation, vulnerable to grass intrusion 4.

Digital feedwater installation to correct feedwater DRS 2

control reliability.

5.

Moisture in EDG air start system causes reliability DRP 6

problem with check valves.

6.

EDG output breakers fail to close when switch taken to DRS 6

close.

7.

EDG has minimalload margin.

DRS 4

8.

EDSFI Followup Issues DRS 4

9.

Cracked exhaust steam piping could indicate weak DRS 4

erosion / control program.

10. Feedwater nozzle bypass flow introduced error in DRS 2

calorimetric and power level.

11. EDG 1 A load fluctuations.

DRS 6

12. Review adequacy of fuse control program.

DRS 2

13. Review gas turbine batteries degrading with loss of one DRS 4

source of offsite power. Turbine referenced in TS basis to support SW outages.

14. Hagan module replacement project.

DRS 4

TECHNICAL ISSUE -- -

R.ig prg

15. Procedure contains non-conservative 125V battery DRS 6

acceptance criteria.

16. NRC & QA identified numerous IST program DRS 4

deficiencies.

17. Main condenser steam dumps malfunction, requires DRP 2

closing MSIVs on trip and prevents use of main condensar.

18. Poor reliability of PDP charging pumps.

DRP 4

19. Poor process for configuration control of pipe supports.

DRP 4

20. POPS ability to mitigate overpressure events.

DRS 6

21. Wiring separation & redundancy concerns with RG 1.97 DRS 4

instruments & cable separation

22. PORV (1PR1) seat leakage, requiring block valve DRP 6

closure.

23. Undersized PORV accumulators.

DRS 4

24. Gate valves identified susceptible to press lock &

DRS 6

thermal binding.

25. Pressurizer Spray Prob! ems /Use of Aux Spray DRP 4
26. Radiation monitor problems.

DRS 4

27. Rx coolant pump oil collection system deficiencies.

DRS 4

28. Understand causes and corrective actions for failures of DRP 5

Rx coolant pump seals.

29. Rx Head Vent Valve Stroke Times.

DRP 5

30. RHR Min-flow Valve (RH29) Failures on unit 2.

DRP 6

31. RHR Dsch Valve (21RH10) Banging Noise.

DRP 6

32. Review program for control & inspecting resilient fire DRS 4

barrier seals.

I.

TECHNICAL ISSUE Reso.

D19

33. Control rods stepping with no temperature error signal.

DRS 2

l

34. Numerous SI pump deficiencies.

DRP 5

l

35. Verify adequate protection for S1 Pump runout.

DRS 5

36. Si relief valves performance history of leaking and DRP 6

lifting.

37. Review corrective action for service water pipe erosion.

DRS 4

38. Spurious high steam flow signals causing St.

DRS 4

39. Review corrective actions to resolve numerous DRS 4

switchyard failures.

40. Verify adequate correction for overhead annunciator DRS 4

failures.

41. Verify adequate corrective action to ensure steam DRS 4

generator tube integrity.

42. Auxiliary Feedwater System Performance and Reliability.

DRS 3

43. Adequacy of corrective actions from the Salem Unit 2 DRP 2

reactor trip.

1 PROGRAMMATIC RESTART ISSUES RESTARTISSUE Resp.

Mode (Licensee)

Org.

1.

Resolve Appendix R jumpers and program NRR 4

discrepancies, including fire barrier penetrations.

2.

Review efforts to maintain configuration DRS 4

control, given examples from Hagan modules and botting. Effort to include setpoint control program and drawing control.

3.

Adequacy and use of procedures, DRP 2

including procedure revision backlog.

4.

Management of engineering and DRP/

2 maintenance backlog.

RATI 5.

Program for foreign material exclusion.

DRP 4

6.

Operability determinations.

DRP 6

7.

Operator performance (Coordination DRS 2

and Communication) 8.

Correction of operator workarounds, DRP 2

including control room deficiencies.

9.

Program to utilize operating (industry)

DRP 2

experience feedback.

10. Corrective action program, including DRP 2

adequacy of root causa program.

j lli.e. PROGRAMMATIC RESTART ISSUES

- continued -

RESTARTISSUE Resp.

Mode I

(Licensee)

Org.

i j-

11. Engineering contribution to problem resolution, DRP 4

including safety eve!uations.

l

12. Tagging DRP 4

1 i

}

13. Adequacy of Emergency Preparedness DRS 2

l

14. Resolution of licensing commitments.

NRR 4

15. Adequacy of Emergency Operating Procedures.

DRS 3

?

16. Adequacy of training.

DRS 6

l

17. Adequacy of work control and planning program.

DRS 2

{

18. Parts availability & accuracy of bill of materials DRS 2

i

19. Adequacy of Licensing Basis Conformance FSAR DRP 2

Discrepancies specifically including Service Water i

System design and reliability l

20. Adequacy of QA program DRP 6

~

(Receptiveness to documented deficiencies)

21. Licensee self assessment capability DRP 2

(Performance monitoring & trending)

22. Integrated Test Program DRS All i

L

)

i LICENSEE RESTART PLANS I

RESTART PLANS Resp.

Mode (Licensee)

Org.

1

1. Conduct of Operations DRP 2
2. Reliable Maintenance DRP 2

i

3. Work Control Process improvement DRP 2
4. System Engineering and Equipment DRS 2

Reliability j

5. Engineering Performance DRS 2

j

6. Organizational Self Assessment NRR 2
7. Corrective Action DRP 2

)

f

8. Human Performance Management NRR 2
9. Accredited Training DRS 2

l