{{#Wiki_filter:l October 22, 1985
{{#Wiki_filter:[$
[$
October 22, 1985 Docket Nos. 50-266 C
Docket Nos. 50-266                                                             C and 50-301 Mr. C. W. Fay, Vice President Nuclear Power Department Wisconsin Electric Power Company                                                     j 231 West Michigan Street, Room 308                                                   i Milwaukee, Wisconsin 53201
and 50-301 Mr. C. W. Fay, Vice President Nuclear Power Department Wisconsin Electric Power Company j
231 West Michigan Street, Room 308 i
Milwaukee, Wisconsin 53201


==Dear Mr. Fay:==
==Dear Mr. Fay:==
==SUBJECT:==
==SUBJECT:==
GENERIC LETTER 83-28, ITEM 1.2 " POST TRIP REVIEW: DATA AND INFORMATION CAPABILITIES" FOR THE P0 INT BEACH NUCLEAR PLANT, UNITS 1 AND 2 The staff has completed a preliminary review to assess the completeness and adequacy of licensee responses to Generic Letter 83-28 Item 1.2. For the Point Beach Nuclear Plant, Units 1 and 2, your response was found to be incomplete in four of the areas evaluated.
GENERIC LETTER 83-28, ITEM 1.2 " POST TRIP REVIEW: DATA AND INFORMATION CAPABILITIES" FOR THE P0 INT BEACH NUCLEAR PLANT, UNITS 1 AND 2 The staff has completed a preliminary review to assess the completeness and adequacy of licensee responses to Generic Letter 83-28 Item 1.2.
For the Point Beach Nuclear Plant, Units 1 and 2, your response was found to be incomplete in four of the areas evaluated.
The enclosed TER provides a technical evaluation representing the staff's initial judgment of the areas evaluated.
The enclosed TER provides a technical evaluation representing the staff's initial judgment of the areas evaluated.
In order to preserve our present review schedule, we would appreciate your cooperation in obtaining additional information that will permit us to complete our review. It would appear that the needed information on your facility could be obtained by telephone conference within one week of your receipt of the TER. Your project manager will be workir) with you to arrange an acceptable time to conduct the necessary conference calls.
In order to preserve our present review schedule, we would appreciate your cooperation in obtaining additional information that will permit us to complete our review.
Enclosure 2 contains supporting information in preparation for the telecon.
It would appear that the needed information on your facility could be obtained by telephone conference within one week of your receipt of the TER.
Your project manager will be workir) with you to arrange an acceptable time to conduct the necessary conference calls. contains supporting information in preparation for the telecon.
The reporting and/or recordkeeping requirements contained in this letter affect fewer than ten respondents; therefore, OMB clearance is not required under P.L. 96-511.
The reporting and/or recordkeeping requirements contained in this letter affect fewer than ten respondents; therefore, OMB clearance is not required under P.L. 96-511.
Sincerely, 6/
Sincerely, 6/
Line 35: Line 38:


==Enclosure:==
==Enclosure:==
: 1. TER on Salem ATWS Item 1.2
1.
: 2. Supporting information for telecon 8511010379 851022 cc w/ enclosure:                     ADOCK 050       6 See next page                 fDR Distribution:
TER on Salem ATWS Item 1.2 2.
Docket File             BGrimes NRC & L PDRs           EJordan HThompson DLasher OELD                   FRosa     ACRS 10             RWHouston PKreutzer Branch Files           TColburn ORB #3:DL (pC       ORB #3:DLyg             OREHr3[J TColburn;ef             EBdtcuer PKreutzer {
Supporting information for telecon 8511010379 851022 cc w/ enclosure:
p/g/85               /o /p//85               jo /J /85 i~,                                 - ~
fDR ADOCK 050 6
See next page Distribution:
Docket File BGrimes NRC & L PDRs EJordan HThompson DLasher OELD FRosa ACRS 10 RWHouston PKreutzer Branch Files TColburn ORB #3:DL (pC ORB #3:DLyg OREHr3[J PKreutzer {
TColburn;ef EBdtcuer p/g/85
/o /p//85 jo /J /85 i~,
- ~


Mr. C. W. Fay                       Point Beach Nuclear Plant Wisconsin Electric Power Company   Units 1 and 2 cc:
Mr. C. W. Fay Point Beach Nuclear Plant Wisconsin Electric Power Company Units 1 and 2 cc:
Mr. Bruce Churchill, Esq.
Mr. Bruce Churchill, Esq.
Shaw, Pittman, Potts and Trowbridge 1800 M Street, N.W.                                     '
Shaw, Pittman, Potts and Trowbridge 1800 M Street, N.W.
Washington, DC 20036 Mr. James J. Zach, Manager Point Beach Nuclear Plant                                     ,
Washington, DC 20036 Mr. James J. Zach, Manager Point Beach Nuclear Plant Wisconsin Electric Power Company 6610 Nuclear Road Two Rivers, Wisconsin 54241 Mr. Gordon Blaha Town Chairman Town of Two Creeks Route 3 Two Rivers, Wisconsin 54241 l
Wisconsin Electric Power Company 6610 Nuclear Road Two Rivers, Wisconsin 54241 Mr. Gordon Blaha Town Chairman Town of Two Creeks Route 3 Two Rivers, Wisconsin 54241                                   l Chairman Public Service Commission of Wisconsin Hills Farms State Office Building Madison, Wisconsin 53702 Regional Administrator, Region III U.S. Nuclear Regulatory Commission Office of Executive Director for Operations 799 Roosevelt Road Glen Ellyn, Illinois 60137 Resident Inspector's Office U.S. Nuclear Regulatory Commission 6612 Nuclear Road Two Rivers, Wisconsin 54241 l
Chairman Public Service Commission of Wisconsin Hills Farms State Office Building Madison, Wisconsin 53702 Regional Administrator, Region III U.S. Nuclear Regulatory Commission Office of Executive Director for Operations 799 Roosevelt Road Glen Ellyn, Illinois 60137 Resident Inspector's Office U.S. Nuclear Regulatory Commission 6612 Nuclear Road Two Rivers, Wisconsin 54241 l
l S}}
l S}}

Latest revision as of 07:06, 12 December 2024

Forwards Review of Licensee Responses to NRC Generic Ltr 83-28...for Point Beach Nuclear Plant Units 1 & 2.... Util Response Incomplete.Supporting Info for Preparation of Addl Info Required Also Encl
ML20133Q091
Person / Time
Site: Point Beach  
Issue date: 10/22/1985
From: Butcher E
Office of Nuclear Reactor Regulation
To: Fay C
WISCONSIN ELECTRIC POWER CO.
Shared Package
ML20133Q093 List:
References
GL-83-28, TAC-52786, TAC-52787, NUDOCS 8511010379
Download: ML20133Q091 (2)


Text

[$

October 22, 1985 Docket Nos. 50-266 C

and 50-301 Mr. C. W. Fay, Vice President Nuclear Power Department Wisconsin Electric Power Company j

231 West Michigan Street, Room 308 i

Milwaukee, Wisconsin 53201

Dear Mr. Fay:

SUBJECT:

GENERIC LETTER 83-28, ITEM 1.2 " POST TRIP REVIEW: DATA AND INFORMATION CAPABILITIES" FOR THE P0 INT BEACH NUCLEAR PLANT, UNITS 1 AND 2 The staff has completed a preliminary review to assess the completeness and adequacy of licensee responses to Generic Letter 83-28 Item 1.2.

For the Point Beach Nuclear Plant, Units 1 and 2, your response was found to be incomplete in four of the areas evaluated.

The enclosed TER provides a technical evaluation representing the staff's initial judgment of the areas evaluated.

In order to preserve our present review schedule, we would appreciate your cooperation in obtaining additional information that will permit us to complete our review.

It would appear that the needed information on your facility could be obtained by telephone conference within one week of your receipt of the TER.

Your project manager will be workir) with you to arrange an acceptable time to conduct the necessary conference calls. contains supporting information in preparation for the telecon.

The reporting and/or recordkeeping requirements contained in this letter affect fewer than ten respondents; therefore, OMB clearance is not required under P.L.96-511.

Sincerely, 6/

Edward J. Butcher, Acting Chief Operating Reactors Branch No. 3 Division of Licensing

Enclosure:

1.

TER on Salem ATWS Item 1.2 2.

Supporting information for telecon 8511010379 851022 cc w/ enclosure:

fDR ADOCK 050 6

See next page Distribution:

Docket File BGrimes NRC & L PDRs EJordan HThompson DLasher OELD FRosa ACRS 10 RWHouston PKreutzer Branch Files TColburn ORB #3:DL (pC ORB #3:DLyg OREHr3[J PKreutzer {

TColburn;ef EBdtcuer p/g/85

/o /p//85 jo /J /85 i~,

- ~

Mr. C. W. Fay Point Beach Nuclear Plant Wisconsin Electric Power Company Units 1 and 2 cc:

Mr. Bruce Churchill, Esq.

Shaw, Pittman, Potts and Trowbridge 1800 M Street, N.W.

Washington, DC 20036 Mr. James J. Zach, Manager Point Beach Nuclear Plant Wisconsin Electric Power Company 6610 Nuclear Road Two Rivers, Wisconsin 54241 Mr. Gordon Blaha Town Chairman Town of Two Creeks Route 3 Two Rivers, Wisconsin 54241 l

Chairman Public Service Commission of Wisconsin Hills Farms State Office Building Madison, Wisconsin 53702 Regional Administrator, Region III U.S. Nuclear Regulatory Commission Office of Executive Director for Operations 799 Roosevelt Road Glen Ellyn, Illinois 60137 Resident Inspector's Office U.S. Nuclear Regulatory Commission 6612 Nuclear Road Two Rivers, Wisconsin 54241 l

l S