ENS 49663: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by Mark Hawes) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 16: | Line 16: | ||
| event date = 12/19/2013 07:52 PST | | event date = 12/19/2013 07:52 PST | ||
| last update date = 12/19/2013 | | last update date = 12/19/2013 | ||
| title = Two | | title = Two of Three Emergencey Diesel Generators Inoperable at the Same Time | ||
| event text = On 12/19/13 Unit 1 Emergency Diesel Generator (EDG) 1-2 was inoperable for scheduled maintenance. | | event text = On 12/19/13 Unit 1 Emergency Diesel Generator (EDG) 1-2 was inoperable for scheduled maintenance. | ||
During an operational walk-down of the Unit 1 EDG 1-3, the associated fuel oil priming pump discharge fitting and pump housing were inadvertently damaged. | During an operational walk-down of the Unit 1 EDG 1-3, the associated fuel oil priming pump discharge fitting and pump housing were inadvertently damaged. |
Latest revision as of 21:52, 1 March 2018
Where | |
---|---|
Diablo Canyon California (NRC Region 4) | |
Reporting | |
10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident | |
Time - Person (Reporting Time:+0.48 h0.02 days <br />0.00286 weeks <br />6.57504e-4 months <br />) | |
Opened: | Russell Cruzen 16:21 Dec 19, 2013 |
NRC Officer: | Donald Norwood |
Last Updated: | Dec 19, 2013 |
49663 - NRC Website
| |