At 1320
ET on December 19, 2013,
Florida Power and Light identified that atmospheric conditions that had sustained
high winds exceeding approximately 50 miles per hour from the ENE direction could result in inadequate heat removal to support continuous operation of the Unit 2
emergency diesel generators. Upon identification of this condition, an adverse condition monitoring plan was issued requiring implementation of compensatory measures to assure adequate
emergency diesel generator cooling to support continuous operation of the U2
emergency diesel generators, should weather forecasts identify conditions that would likely result in this condition.
This condition is reportable pursuant to 10 CFR 50.72(b)(3)(ii)(B).
The NRC Resident Inspector has been notified of this condition.