ENS 50336: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by Mark Hawes) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 16: | Line 16: | ||
| event date = 08/01/2014 CDT | | event date = 08/01/2014 CDT | ||
| last update date = 08/01/2014 | | last update date = 08/01/2014 | ||
| title = Part 21 Report - Safety-Related Valves Assembled | | title = Part 21 Report - Safety-Related Valves Assembled with Non-Safety Related Levers | ||
| event text = Crane did not provide safety related levers, for manual type safety valves, on a recent shipment. Crane was advised by their customer that valves provided for AP1000 PV10 Scopes (VDS 101 and VDS 150) should have had safety-related levers. | | event text = Crane did not provide safety related levers, for manual type safety valves, on a recent shipment. Crane was advised by their customer that valves provided for AP1000 PV10 Scopes (VDS 101 and VDS 150) should have had safety-related levers. | ||
Crane believes the only affected valves are those that have been provided on the AP 1000 project. | Crane believes the only affected valves are those that have been provided on the AP 1000 project. |
Latest revision as of 21:50, 1 March 2018
Where | |
---|---|
Crane Nuclear, Inc. Bolingbrook, Illinois (NRC Region 3) | |
Organization: | Crane Nuclear, Inc. |
Reporting | |
10 CFR 21.21(d)(3)(i), Failure to Comply or Defect | |
Time - Person (Reporting Time:+12 h0.5 days <br />0.0714 weeks <br />0.0164 months <br />) | |
Opened: | Rosalie Nava 17:00 Aug 1, 2014 |
NRC Officer: | John Shoemaker |
Last Updated: | Aug 1, 2014 |
50336 - NRC Website | |