ENS 50540: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by Mark Hawes) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 16: | Line 16: | ||
| event date = 10/15/2014 17:00 EDT | | event date = 10/15/2014 17:00 EDT | ||
| last update date = 10/15/2014 | | last update date = 10/15/2014 | ||
| title = Appendix R Unanalyzed Condition Affecting | | title = Appendix R Unanalyzed Condition Affecting the Turbine Driven Aux Feedwater Pump | ||
| event text = WBN U1 [Watts Bar Nuclear Unit-1] Appendix R (APP R) procedures do not include all the required operator manual actions to ensure manual control of the Unit 1 Turbine Driven Auxiliary Feed (TDAFW) Pump during a fire in room 713-A1A or 737-A1A. The current APP R procedure includes actions to transfer the Unit 1 TDAFW Pump to local control, but does not account for the potential loss of 125 VDC or 120 VAC to the Unit 1 TDAFW pump controls. | | event text = WBN U1 [Watts Bar Nuclear Unit-1] Appendix R (APP R) procedures do not include all the required operator manual actions to ensure manual control of the Unit 1 Turbine Driven Auxiliary Feed (TDAFW) Pump during a fire in room 713-A1A or 737-A1A. The current APP R procedure includes actions to transfer the Unit 1 TDAFW Pump to local control, but does not account for the potential loss of 125 VDC or 120 VAC to the Unit 1 TDAFW pump controls. | ||
Without procedural guidance to transfer the 120 VAC and 125 VDC supplies, the operation of the Unit 1 TDAFW pump may not be completed within the required time. Failure to take all the required actions to control the Unit 1 TDAFW Pump places WBN Unit 1 in an unanalyzed condition. | Without procedural guidance to transfer the 120 VAC and 125 VDC supplies, the operation of the Unit 1 TDAFW pump may not be completed within the required time. Failure to take all the required actions to control the Unit 1 TDAFW Pump places WBN Unit 1 in an unanalyzed condition. |
Latest revision as of 20:49, 1 March 2018
Where | |
---|---|
Watts Bar Tennessee (NRC Region 2) | |
Reporting | |
10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition | |
Time - Person (Reporting Time:+1.38 h0.0575 days <br />0.00821 weeks <br />0.00189 months <br />) | |
Opened: | Damon Fegley 22:23 Oct 15, 2014 |
NRC Officer: | Mark Abramovitz |
Last Updated: | Oct 15, 2014 |
50540 - NRC Website
| |