| event date = 03/09/2017 03:19 CST
| event date = 03/09/2017 03:19 CST
| last update date = 03/09/2017
| last update date = 03/09/2017
| title = Unanalyzed Condition Due To Relay Failure
| title = Unanalyzed Condition Due to Relay Failure
| event text = On March 7, 2017, Division 2 Residual Heat Removal (RHR) system was inoperable due to a scheduled maintenance system outage window. At 2258 [CST], Operations identified a Division 1 Unit Substation Switchgear relay was cycling, which is part of the Division 1 AC Power system. The specific relay could not be identified at the time. Division 1 AC Power systems were protected.
| event text = On March 7, 2017, Division 2 Residual Heat Removal (RHR) system was inoperable due to a scheduled maintenance system outage window. At 2258 [CST], Operations identified a Division 1 Unit Substation Switchgear relay was cycling, which is part of the Division 1 AC Power system. The specific relay could not be identified at the time. Division 1 AC Power systems were protected.
On March 8, 2017 at 1830 hours, Division 2 RHR was restored to operable status.
On March 8, 2017 at 1830 hours, Division 2 RHR was restored to operable status.

Latest revision as of 21:43, 1 March 2018

ENS 52601 +/-
Where
Clinton Constellation icon.png
Illinois (NRC Region 3)
Reporting
10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition
Time - Person (Reporting Time:+1.63 h0.0679 days <br />0.0097 weeks <br />0.00223 months <br />)