ENS 53037: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 16: Line 16:
| event date = 10/25/2017 EDT
| event date = 10/25/2017 EDT
| last update date = 10/26/2017
| last update date = 10/26/2017
| title = Part 21 -  Speed Switch Issue Results In Emergency Diesel Generator Failure To Start
| title = Part 21 -  Speed Switch Issue Results in Emergency Diesel Generator Failure to Start
| event text = The following information was received by facsimile from the vendor:
| event text = The following information was received by facsimile from the vendor:
Component: Speed switch P/Ns ESl50267C, ESl50267E, ESl50267H, and ESl50267K.
Component: Speed switch P/Ns ESl50267C, ESl50267E, ESl50267H, and ESl50267K.

Latest revision as of 21:41, 1 March 2018

ENS 53037 +/-
Where
Engine Systems, Inc.
Rocky Mount, North Carolina (NRC Region 1)
Organization: Engine Systems, Inc
Reporting
10 CFR 21.21(d)(3)(i), Failure to Comply or Defect
Time - Person (Reporting Time:+37 h1.542 days <br />0.22 weeks <br />0.0507 months <br />)
Opened: Tom Horner
17:00 Oct 26, 2017
NRC Officer: Vince Klco
Last Updated: Oct 26, 2017
53037 - NRC Website