U. S. NUCLEAR REGULATORY COMMISSION
U. S. NUCLEAR REGULATORY COMMISSION


==REGION I==
==REGION I==
Docket No: 50-193   I License No: R-95 Report No: 50-193/97-01 Licensee: Rhode Island Atomic Energy Commissio'n Facility: Rhode Island Nuclear Science Center Location: South Ferry Road Narragansett, Rhode Island Dates: March 11-14,1997 Inspector: Thomas F. Dragoun, Project Scientist Approved by: John R. White, Chief, Radiation Protection Branch Division of Reactor Safety 9704290267 970423 PDR G ADOCK 05000193 PDR l,2
Docket No:
      !
50-193 I
License No:
R-95 Report No:
50-193/97-01 Licensee:
Rhode Island Atomic Energy Commissio'n Facility:
Rhode Island Nuclear Science Center Location:
South Ferry Road Narragansett, Rhode Island Dates:
March 11-14,1997 Inspector:
Thomas F. Dragoun, Project Scientist Approved by:
John R. White, Chief, Radiation Protection Branch Division of Reactor Safety 9704290267 970423 PDR ADOCK 05000193 G
PDR l,2
!


. . _ _ _ _ _ _ . _ _ . . _ . _ . - _ . . . . _ _ - . _ . . _ _ . _ _ _ . _ _ _ _ _ . _ _ _ _ _ . - - _ - _ . _ _ _ . . .
.. _ _ _ _ _ _. _ _.. _. _. - _.... _ _ -. _.. _ _. _ _ _
. _ _ _ _ _. _ _ _ _ _. - - _ - _. _ _ _...
.
.
.
.
EXECUTIVE SUMMARY Major component upgrades for 5 Megawatt operation are in place. Operability tests and drawing updates are in progress. The vacant reactor supervisor position was expeditiously filled. Action on previous inspection findings was goo ?
EXECUTIVE SUMMARY Major component upgrades for 5 Megawatt operation are in place. Operability tests and drawing updates are in progress. The vacant reactor supervisor position was expeditiously filled. Action on previous inspection findings was good.
l l
 
l ii l
?
      -_ .
l ii
-_
.


_ . _ _ _ _ . . _ __ .. _ _ _ _ _ _. _ _ . _ _ _ -   . _ _ . . . _ _ _ . . _ , _ _ . _ _ - - _ - _ _ . _
_. _ _ _ _.. _ __.. _ _ _ _ _ _. _ _. _ _ _ -
. _ _... _ _ _.. _, _ _. _ _ - - _ - _ _. _
j.
j.


Line 44: Line 60:
j..
j..
'
'
Reoort Details i           i l
Reoort Details i
Summary of Plant Status       1
i l
The reactor was operated periodically at 2 Megawatts. The new, second cooling tower j' was placed on line for the'first time. System upgrades to support operation at 5 MW are essentially complete. Documents to request NRC authorization to operate at higher power were in preparation. Weekly surveillance on the emergency power system was conducted, f 01 Conduct of Operations
Summary of Plant Status
 
The reactor was operated periodically at 2 Megawatts. The new, second cooling tower
,
j'
was placed on line for the'first time. System upgrades to support operation at 5 MW are essentially complete. Documents to request NRC authorization to operate at higher power
 
were in preparation. Weekly surveillance on the emergency power system was conducted, f
 
Conduct of Operations
,
,
!
!
01.1 Oraanization and Ooerations and Maintenance Activities j Inspection Scope (Insoection Procedure 39745)
01.1 Oraanization and Ooerations and Maintenance Activities j
a.
 
Inspection Scope (Insoection Procedure 39745)
a
a
!   The inspector reviewed:       j
!
          ;
The inspector reviewed:
)   e organization and staffing, e administrative controls, e the console log, and       I e the annual repor Observations and Findinas The reactor supervisor retired last fall, taking advantage of incentives offered to state employees. An experienced, qualified replacement was hired and is currently preparing to take the SRO license exam in May 1997. The licensee is considering qualifying certain researchers as reactor operators to increase the pool of backup Planned downsizing of various state programs related to the Rhode Island Nuclear Science Center in fiscal year 1998 is not expected to impact reactor operations, but may affect the campus byproduct materials program. The director stated that he has authorization to expedite replacing licensed operator The assistant director for Reactor Operations issues a 6-month schedule of reactor operations, maintenance, and surveillance activities to the staff and monitors completion status. Good administrative control of activities was demonstrate The console log was clear and descriptive. The annual report summarized the required information. Records indicated that the facility was operated within parameters specified in the T Conclusions Staffing and reporting requirements in TS 6.0 were satisfie !
j
_ _ _ _ _ _ .
;
)
e organization and staffing, e administrative controls, e the console log, and e the annual report.
 
b.
 
Observations and Findinas The reactor supervisor retired last fall, taking advantage of incentives offered to state employees. An experienced, qualified replacement was hired and is currently preparing to take the SRO license exam in May 1997. The licensee is considering qualifying certain researchers as reactor operators to increase the pool of backups.
 
Planned downsizing of various state programs related to the Rhode Island Nuclear Science Center in fiscal year 1998 is not expected to impact reactor operations, but may affect the campus byproduct materials program. The director stated that he has authorization to expedite replacing licensed operators.
 
The assistant director for Reactor Operations issues a 6-month schedule of reactor operations, maintenance, and surveillance activities to the staff and monitors completion status. Good administrative control of activities was demonstrated.
 
The console log was clear and descriptive. The annual report summarized the required information. Records indicated that the facility was operated within parameters specified in the TS.
 
c.
 
Conclusions Staffing and reporting requirements in TS 6.0 were satisfied.
 
_ _ _ _
_ _.


_
_
  - - __ - . _- . .- - - -- .
-
, .
-
'
__ -. _-.
l 02 Operational Status of Facilities and Equipment   !
.-
O 2.1 Surveillance Inspection Scope (Insoection Procedure 61745)   l l
-
-
--.
,.
'
 
Operational Status of Facilities and Equipment O 2.1 Surveillance a.
 
Inspection Scope (Insoection Procedure 61745)
The inspector reviewed:
The inspector reviewed:
j * surveillance procedures,
j
* surveillance procedures, e surveillance data, and
.,
.,
'
'
e surveillance data, and e limiting conditions of operatio Observations and Findinas
e limiting conditions of operation.


1
b.
; During inspection 96-01, the inspector noted that checklists for surveillance on the confinement and emergency exhaust systems needed to be expanded. The licensee revised the appropriate checklists (NSC-14b and NSC-37b) to include specific j
 
Observations and Findinas
;
During inspection 96-01, the inspector noted that checklists for surveillance on the confinement and emergency exhaust systems needed to be expanded. The licensee revised the appropriate checklists (NSC-14b and NSC-37b) to include specific j
equipment responses. The checklists are now satisfactory. Inspector followup item
'
'
equipment responses. The checklists are now satisfactory. Inspector followup item 96-01-03 is closed.
96-01-03 is closed.


.
.
During the same inspection, the inspector noted that the licensee was considering a s
During the same inspection, the inspector noted that the licensee was considering a draft change to eliminate the TS 4.6.1(f) limit on dilution air fed to the confinement s
draft change to eliminate the TS 4.6.1(f) limit on dilution air fed to the confinement i exhaust system due to difficulty in minimizing the flow. However, investigation
i exhaust system due to difficulty in minimizing the flow. However, investigation revealed that dilution air is injected downstream of the filters and is, therefore,
, revealed that dilution air is injected downstream of the filters and is, therefore, beneficial in reducing public exposures. The licensee indicated that a TS change I
,
will propose maximizing dilution air. Pending NRC approval, checklist NSC-37b for 4 surveillance on this system will be revised to the amended specification TS amendment No. 22 granted a one-time extension of the annual requirement for testing the safety blades and reactivity calculations because the reactor was not operated during prolonged system modifications in 1996. The licensee committed to complete these surveillances in January 1997. The inspector confirmed that these, and other selected surveillances, were completed and the data was
beneficial in reducing public exposures. The licensee indicated that a TS change I
will propose maximizing dilution air. Pending NRC approval, checklist NSC-37b for surveillance on this system will be revised to the amended specifications.
 
TS amendment No. 22 granted a one-time extension of the annual requirement for testing the safety blades and reactivity calculations because the reactor was not operated during prolonged system modifications in 1996. The licensee committed to complete these surveillances in January 1997. The inspector confirmed that these, and other selected surveillances, were completed and the data was satisfactory.
 
;
;
satisfactor High conductivity in pool water was observed during initial startups in January
High conductivity in pool water was observed during initial startups in January
'
'
1997. This was determined to be due to ionization of entrained microbubbles of ai The source of air was suspected to be unvented pockets in the new coolant pumps, heat exchanger or piping. The phenomenon was observed only when the reactor was critical and the pool water appeared " milky." The condition has cleare A problem was recently reported by North Carolina University research reactor with the manual and automatic range switching feature of nuclear instrumentation channels manufactured by the Gamma Metrics company. The problem is described as erratic switching when reactor power is at the end of a range. The RIAEC facility installed the same equipment. Records indicate that a similar problem occurred at this facility in 1993. One NI drawer was returned to the vendor for modificatio The second drawer was modified on site using electronic parts and instructions
1997. This was determined to be due to ionization of entrained microbubbles of air.
. provided by the manufacturer. As a further precaution, the licensee modified the f high flux scram circuitry so that a scram occurs at 115% (TS limit =120%) of any
 
The source of air was suspected to be unvented pockets in the new coolant pumps, heat exchanger or piping. The phenomenon was observed only when the reactor was critical and the pool water appeared " milky." The condition has cleared.
 
A problem was recently reported by North Carolina University research reactor with the manual and automatic range switching feature of nuclear instrumentation channels manufactured by the Gamma Metrics company. The problem is described as erratic switching when reactor power is at the end of a range. The RIAEC facility installed the same equipment. Records indicate that a similar problem occurred at this facility in 1993. One NI drawer was returned to the vendor for modification.
 
The second drawer was modified on site using electronic parts and instructions provided by the manufacturer. As a further precaution, the licensee modified the
.
f high flux scram circuitry so that a scram occurs at 115% (TS limit =120%) of any
.--


. ._ _ _ ._ __ _ ._ _ __ . _ .
.
.
._
.
_
_._
__ _
._ _ __
. _.
.
.


range, not just the top range. in addition, operators are directed to manually switch ranges. Records and discussions with operators indicate that the modifications to the hardware and operating procedures were sufficient to resolve this proble Records of these changes and system drawing updates were satisfactor c. Conclusions The safety equipment surveillances required by TS Section 4.0 are completed as require , 03 Operations Procedures and Documentation i
range, not just the top range. in addition, operators are directed to manually switch ranges. Records and discussions with operators indicate that the modifications to the hardware and operating procedures were sufficient to resolve this problem.
a. Insoection Scoce (Insoection Procedure 42745)   I j The inspector reviewed:
 
: e operating procedures, and I e document update )
Records of these changes and system drawing updates were satisfactory.
b. Observations and Findinas
 
      ;
c.
 
Conclusions The safety equipment surveillances required by TS Section 4.0 are completed as required.
 
Operations Procedures and Documentation
,
i a.
 
Insoection Scoce (Insoection Procedure 42745)
j The inspector reviewed:
:
e operating procedures, and I
e document updates.
 
)
b.
 
Observations and Findinas
*
*
During inspection 96-01, the inspector noted that records related to system
During inspection 96-01, the inspector noted that records related to system changes as specified in TS 6.9 were not readily available. The licensee provided the
, changes as specified in TS 6.9 were not readily available. The licensee provided the j inspector with a comprehensive quality assurance program that provides the 1 process.to ensure that appropriate documents are updated and adequately maintained. The responsibility to implement the program will be assigned to the new reactor supervisor, who is expected to be licensed in May 1997. Inspector followup item 96-01-02 remains ope During inspection 96-02, the inspector questioned the' licensee's assumptions that
,
, the loss of airborne particulate activity in 170 feet of small bore piping, connecting the probe in the exhaust stack and the sample skid, was negligible. The health physicist provided the results of a March 1997 study that measured these losse Ventilation was secured across a weekend to allow the buildup of naturally occurring radon daughter products (beta-gamma emitting airborne particulate activity). Ventilation was turned on and air samples taken over a 3-hour period inside the reactor room and at the exhaust stack sample skid. A half life
j inspector with a comprehensive quality assurance program that provides the process.to ensure that appropriate documents are updated and adequately
'
determination verified that only radon daughters were present. A second run was made with ventilation secured for 1 day. Data indicated that transmission of particulate activity was approximately 80% and accomodated correctly by the license's procedures. Inspector followup item 96-02-01 is close Use of procedures during reactor operations and equipment surveillances was good.


. c. Conclusions Facility procedures and records satisfied TS 6.0 requirements.
maintained. The responsibility to implement the program will be assigned to the new reactor supervisor, who is expected to be licensed in May 1997. Inspector followup item 96-01-02 remains open.
 
During inspection 96-02, the inspector questioned the' licensee's assumptions that the loss of airborne particulate activity in 170 feet of small bore piping, connecting
,
the probe in the exhaust stack and the sample skid, was negligible. The health physicist provided the results of a March 1997 study that measured these losses.
 
Ventilation was secured across a weekend to allow the buildup of naturally occurring radon daughter products (beta-gamma emitting airborne particulate activity). Ventilation was turned on and air samples taken over a 3-hour period inside the reactor room and at the exhaust stack sample skid. A half life
'
determination verified that only radon daughters were present. A second run was made with ventilation secured for 1 day. Data indicated that transmission of particulate activity was approximately 80% and accomodated correctly by the license's procedures. Inspector followup item 96-02-01 is closed.
 
Use of procedures during reactor operations and equipment surveillances was good.
 
c.
 
Conclusions
.
Facility procedures and records satisfied TS 6.0 requirements.


.
.
"
"
.
, _ _
__
,
.


, _ _  __
05 Operator Training and Qualification a.
,
.


05  Operator Training and Qualification Insoection Scoce (Insocction Procedure 41745)
Insoection Scoce (Insocction Procedure 41745)
The inspector reviewed:
The inspector reviewed:
  * active license status, e records of reactivity manipulations, o medical examinations, and     i
* active license status, e records of reactivity manipulations, o medical examinations, and i
  * written examination ,
* written examinations.
< Gbservations and Findinas No oneruMr licenses had expired. Requa'ification status and medical evaluations J wea ap-to-date. The list of required reading included the TRTR newsletter, recent NRC publications, and memos from the assistant director. The inspector noted that
 
.,  some records of required reactivity manipulations had not been transferred from the l operations logs to the training records. The assistant director stated that l maintaining these records is the responsibility of the reactor supervisor. who retire l Records wili la' updated by ilis replacement after qualificatio Conclusions Requirements of the requalification program were satisfie l l
,
07  Quality Assurance in Operations   l l
<
07.1 Review and Audit and Desian Chanae Functions 1 Insoection Scope (Inspection Procedure 40745)
b.
 
Gbservations and Findinas No oneruMr licenses had expired. Requa'ification status and medical evaluations J
wea ap-to-date. The list of required reading included the TRTR newsletter, recent NRC publications, and memos from the assistant director. The inspector noted that some records of required reactivity manipulations had not been transferred from the l
.,
operations logs to the training records. The assistant director stated that l
maintaining these records is the responsibility of the reactor supervisor. who retired.
 
l Records wili la' updated by ilis replacement after qualification.
 
c.
 
Conclusions Requirements of the requalification program were satisfied.
 
l l
 
Quality Assurance in Operations l
l 07.1 Review and Audit and Desian Chanae Functions
 
a.
 
Insoection Scope (Inspection Procedure 40745)
The in::pector reviewed:
The in::pector reviewed:
e Nuclear and Radiation Safety Committee minutes of meeting, and e Engineering changes under 10 CFR 50.5 Observations and Findinas l
e Nuclear and Radiation Safety Committee minutes of meeting, and e Engineering changes under 10 CFR 50.59.
        {
During inspection 96-01, the inspector noted that the NRSC minutes did not i specifiz ally i,1dicate acceptance of 50.59 evaluations as specified in TS 6.4.2. The !
assistant director pointed out that the TS only requires that the NRSC review 50.59 i evaluations. To record this review, a signature line will be added to the 50.59 evaluation form. This is acceptable. Inspector followup item 96-01-01, regarding the need to reformat NRSC minutes, is closed. Changes to the 50.59 evaluation form will be verified in a futu~ inspection (Inspector Followup Item 97-01-01).


Minutes of NFiSC meetings indic ed that the committee met at the required frequency with a quorum present ai.d provided the required oversigh . ..
b.
. _ _ - _ _ _ _ _ _ _ _


    . - - - . - . . . . .--
Observations and Findinas l
..       !
{
During inspection 96-01, the inspector noted that the NRSC minutes did not i
specifiz ally i,1dicate acceptance of 50.59 evaluations as specified in TS 6.4.2. The
!
assistant director pointed out that the TS only requires that the NRSC review 50.59 i
evaluations. To record this review, a signature line will be added to the 50.59 evaluation form. This is acceptable. Inspector followup item 96-01-01, regarding the need to reformat NRSC minutes, is closed. Changes to the 50.59 evaluation form will be verified in a futu~ inspection (Inspector Followup Item 97-01-01).
 
Minutes of NFiSC meetings indic ed that the committee met at the required frequency with a quorum present ai.d provided the required oversight.
 
.
..
. _ _ - _ _ _ _ _ _ _ _
 
. - - -
. -....
.--
!
..
t
t
..
..
5 Conclusions Review and oversight functions required by TS 6.4 were acceptably complete ! EFit Interview (lnSpection Procedure 30703)
 
The inspector presented the inspection results to members of licensee management at the conclusion of the inspection on March ' *,1997. The licensee acknowledged the findings presente ,
c.
      .
 
Conclusions Review and oversight functions required by TS 6.4 were acceptably completed.
 
!
X.1 EFit Interview (lnSpection Procedure 30703)
The inspector presented the inspection results to members of licensee management at the conclusion of the inspection on March ' *,1997. The licensee acknowledged the findings presented.
 
,
.
__
__


;.     ;
;.
.o     :
;
      ,
:
.o
,
f'
;
,
f
f
      '
 
,
'
l PARTIAL LIST OF PERSONS CONTACTED
;
;
f    6
'
l
,
,
PARTIAL LIST OF PERSONS CONTACTED  ;
,
,
:
: Licensee     .
Licensee
E l D. Johnson, Health Physicist V. Rose, Chairman, RIAEC W. Simoneau, Assistant Director for Reactor Operations l; T. Tehan, Director
.
      ;
E l
D. Johnson, Health Physicist 1.
 
V. Rose, Chairman, RIAEC l
W. Simoneau, Assistant Director for Reactor Operations
;
;
T. Tehan, Director
*
*
      ,
,
i INSPECTION PROCEDURES USED ,
i INSPECTION PROCEDURES USED
      ;
,
i
i
:i I
;
j IP 30703: EXIT AND ENTRANCE INTERVIEWS   i
:i I
!-     j
j IP 30703:
      '
EXIT AND ENTRANCE INTERVIEWS i
, IP 39745: CLASS I NON-POWER REACTORS ORGANIZATION AND OPERATIONS AND
!-
! MAINTENANCE ACTIVITIES
j IP 39745:
CLASS I NON-POWER REACTORS ORGANIZATION AND OPERATIONS AND
'
,
!
MAINTENANCE ACTIVITIES
.
.
4 IP 40745: CLASS 1 NON-POWER REACTOR REVIEW AND AUDIT AND DESIGN
 
; CHANGE FUNCTIONS
IP 40745:
CLASS 1 NON-POWER REACTOR REVIEW AND AUDIT AND DESIGN
;
CHANGE FUNCTIONS
?
?
l lP 41745: CLASS I NON-POWER REACTOR OPERATOR LICENSES, REQUALIFICATION,
l lP 41745:
*
CLASS I NON-POWER REACTOR OPERATOR LICENSES, REQUALIFICATION,
  ' AND MEDICAL ACTIVITIES IP 42745: CLASS I NON-POWER REACTOR PROCEDURES IP 61745: CLASS I NON-POWER REACTOR SURVEILLANCE ITEMS OPENED, CLOSED, AND DISCUSSED Opened 50-193/97-01-01 IFl 50.59 evaluation form to include NRSC review to include equipment responses Qlosed 50-193/96-01-U1 IFl 50-193/96-01-03 IFl 50-193/96-02-01 IFl
*
' AND MEDICAL ACTIVITIES IP 42745:
CLASS I NON-POWER REACTOR PROCEDURES IP 61745:
CLASS I NON-POWER REACTOR SURVEILLANCE ITEMS OPENED, CLOSED, AND DISCUSSED Opened 50-193/97-01-01 IFl 50.59 evaluation form to include NRSC review to include equipment responses Qlosed 50-193/96-01-U1 IFl 50-193/96-01-03 IFl 50-193/96-02-01 IFl


e
e
Line 176: Line 352:
LIST OF ACRONYMS USED NI Nuclear instrumentation NRC Nuclear Regulatory Commission NRSC Nuclear and Radiation Safety Committee RIAEC Rhode Island Atomi. 7.nergy Commission SRO Senior reactor opee 3r TRTR National Organizativ: of Test, Research, and Training Reactors TS Technical Specifications i
LIST OF ACRONYMS USED NI Nuclear instrumentation NRC Nuclear Regulatory Commission NRSC Nuclear and Radiation Safety Committee RIAEC Rhode Island Atomi. 7.nergy Commission SRO Senior reactor opee 3r TRTR National Organizativ: of Test, Research, and Training Reactors TS Technical Specifications i
i
i
    !
-- -
}}
}}

Latest revision as of 16:39, 11 December 2024

Insp Rept 50-193/97-01 on 970311-14.No Violations Noted. Major Areas Inspected:Component Upgrades for 5 Megawatt Operation,Operability Tests & Drawing Updates,Vacant Reactor Supervisor Position & Action on Previous Findings
ML20140E775
Person / Time
Site: Rhode Island Atomic Energy Commission
Issue date: 04/23/1997
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML20140E773 List:
References
50-193-97-01, 50-193-97-1, NUDOCS 9704290267
Download: ML20140E775 (9)


Text

.

-

.

,

U. S. NUCLEAR REGULATORY COMMISSION

REGION I

Docket No:

50-193 I

License No:

R-95 Report No:

50-193/97-01 Licensee:

Rhode Island Atomic Energy Commissio'n Facility:

Rhode Island Nuclear Science Center Location:

South Ferry Road Narragansett, Rhode Island Dates:

March 11-14,1997 Inspector:

Thomas F. Dragoun, Project Scientist Approved by:

John R. White, Chief, Radiation Protection Branch Division of Reactor Safety 9704290267 970423 PDR ADOCK 05000193 G

PDR l,2

!

.. _ _ _ _ _ _. _ _.. _. _. - _.... _ _ -. _.. _ _. _ _ _

. _ _ _ _ _. _ _ _ _ _. - - _ - _. _ _ _...

.

.

EXECUTIVE SUMMARY Major component upgrades for 5 Megawatt operation are in place. Operability tests and drawing updates are in progress. The vacant reactor supervisor position was expeditiously filled. Action on previous inspection findings was good.

?

l ii

-_

.

_. _ _ _ _.. _ __.. _ _ _ _ _ _. _ _. _ _ _ -

. _ _... _ _ _.. _, _ _. _ _ - - _ - _ _. _

j.

,

s

!

j..

'

Reoort Details i

i l

Summary of Plant Status

The reactor was operated periodically at 2 Megawatts. The new, second cooling tower

,

j'

was placed on line for the'first time. System upgrades to support operation at 5 MW are essentially complete. Documents to request NRC authorization to operate at higher power

were in preparation. Weekly surveillance on the emergency power system was conducted, f

Conduct of Operations

,

!

01.1 Oraanization and Ooerations and Maintenance Activities j

a.

Inspection Scope (Insoection Procedure 39745)

a

!

The inspector reviewed:

j

)

e organization and staffing, e administrative controls, e the console log, and e the annual report.

b.

Observations and Findinas The reactor supervisor retired last fall, taking advantage of incentives offered to state employees. An experienced, qualified replacement was hired and is currently preparing to take the SRO license exam in May 1997. The licensee is considering qualifying certain researchers as reactor operators to increase the pool of backups.

Planned downsizing of various state programs related to the Rhode Island Nuclear Science Center in fiscal year 1998 is not expected to impact reactor operations, but may affect the campus byproduct materials program. The director stated that he has authorization to expedite replacing licensed operators.

The assistant director for Reactor Operations issues a 6-month schedule of reactor operations, maintenance, and surveillance activities to the staff and monitors completion status. Good administrative control of activities was demonstrated.

The console log was clear and descriptive. The annual report summarized the required information. Records indicated that the facility was operated within parameters specified in the TS.

c.

Conclusions Staffing and reporting requirements in TS 6.0 were satisfied.

_ _ _ _

_ _.

_

-

-

__ -. _-.

.-

-

-

--.

,.

'

Operational Status of Facilities and Equipment O 2.1 Surveillance a.

Inspection Scope (Insoection Procedure 61745)

The inspector reviewed:

j

  • surveillance procedures, e surveillance data, and

.,

'

e limiting conditions of operation.

b.

Observations and Findinas

During inspection 96-01, the inspector noted that checklists for surveillance on the confinement and emergency exhaust systems needed to be expanded. The licensee revised the appropriate checklists (NSC-14b and NSC-37b) to include specific j

equipment responses. The checklists are now satisfactory. Inspector followup item

'

96-01-03 is closed.

.

During the same inspection, the inspector noted that the licensee was considering a draft change to eliminate the TS 4.6.1(f) limit on dilution air fed to the confinement s

i exhaust system due to difficulty in minimizing the flow. However, investigation revealed that dilution air is injected downstream of the filters and is, therefore,

,

beneficial in reducing public exposures. The licensee indicated that a TS change I

will propose maximizing dilution air. Pending NRC approval, checklist NSC-37b for surveillance on this system will be revised to the amended specifications.

TS amendment No. 22 granted a one-time extension of the annual requirement for testing the safety blades and reactivity calculations because the reactor was not operated during prolonged system modifications in 1996. The licensee committed to complete these surveillances in January 1997. The inspector confirmed that these, and other selected surveillances, were completed and the data was satisfactory.

High conductivity in pool water was observed during initial startups in January

'

1997. This was determined to be due to ionization of entrained microbubbles of air.

The source of air was suspected to be unvented pockets in the new coolant pumps, heat exchanger or piping. The phenomenon was observed only when the reactor was critical and the pool water appeared " milky." The condition has cleared.

A problem was recently reported by North Carolina University research reactor with the manual and automatic range switching feature of nuclear instrumentation channels manufactured by the Gamma Metrics company. The problem is described as erratic switching when reactor power is at the end of a range. The RIAEC facility installed the same equipment. Records indicate that a similar problem occurred at this facility in 1993. One NI drawer was returned to the vendor for modification.

The second drawer was modified on site using electronic parts and instructions provided by the manufacturer. As a further precaution, the licensee modified the

.

f high flux scram circuitry so that a scram occurs at 115% (TS limit =120%) of any

.--

.

._

_

_._

__ _

._ _ __

. _.

.

.

range, not just the top range. in addition, operators are directed to manually switch ranges. Records and discussions with operators indicate that the modifications to the hardware and operating procedures were sufficient to resolve this problem.

Records of these changes and system drawing updates were satisfactory.

c.

Conclusions The safety equipment surveillances required by TS Section 4.0 are completed as required.

Operations Procedures and Documentation

,

i a.

Insoection Scoce (Insoection Procedure 42745)

j The inspector reviewed:

e operating procedures, and I

e document updates.

)

b.

Observations and Findinas

During inspection 96-01, the inspector noted that records related to system changes as specified in TS 6.9 were not readily available. The licensee provided the

,

j inspector with a comprehensive quality assurance program that provides the process.to ensure that appropriate documents are updated and adequately

maintained. The responsibility to implement the program will be assigned to the new reactor supervisor, who is expected to be licensed in May 1997. Inspector followup item 96-01-02 remains open.

During inspection 96-02, the inspector questioned the' licensee's assumptions that the loss of airborne particulate activity in 170 feet of small bore piping, connecting

,

the probe in the exhaust stack and the sample skid, was negligible. The health physicist provided the results of a March 1997 study that measured these losses.

Ventilation was secured across a weekend to allow the buildup of naturally occurring radon daughter products (beta-gamma emitting airborne particulate activity). Ventilation was turned on and air samples taken over a 3-hour period inside the reactor room and at the exhaust stack sample skid. A half life

'

determination verified that only radon daughters were present. A second run was made with ventilation secured for 1 day. Data indicated that transmission of particulate activity was approximately 80% and accomodated correctly by the license's procedures. Inspector followup item 96-02-01 is closed.

Use of procedures during reactor operations and equipment surveillances was good.

c.

Conclusions

.

Facility procedures and records satisfied TS 6.0 requirements.

.

"

.

, _ _

__

,

.

05 Operator Training and Qualification a.

Insoection Scoce (Insocction Procedure 41745)

The inspector reviewed:

  • active license status, e records of reactivity manipulations, o medical examinations, and i
  • written examinations.

,

<

b.

Gbservations and Findinas No oneruMr licenses had expired. Requa'ification status and medical evaluations J

wea ap-to-date. The list of required reading included the TRTR newsletter, recent NRC publications, and memos from the assistant director. The inspector noted that some records of required reactivity manipulations had not been transferred from the l

.,

operations logs to the training records. The assistant director stated that l

maintaining these records is the responsibility of the reactor supervisor. who retired.

l Records wili la' updated by ilis replacement after qualification.

c.

Conclusions Requirements of the requalification program were satisfied.

l l

Quality Assurance in Operations l

l 07.1 Review and Audit and Desian Chanae Functions

a.

Insoection Scope (Inspection Procedure 40745)

The in::pector reviewed:

e Nuclear and Radiation Safety Committee minutes of meeting, and e Engineering changes under 10 CFR 50.59.

b.

Observations and Findinas l

{

During inspection 96-01, the inspector noted that the NRSC minutes did not i

specifiz ally i,1dicate acceptance of 50.59 evaluations as specified in TS 6.4.2. The

!

assistant director pointed out that the TS only requires that the NRSC review 50.59 i

evaluations. To record this review, a signature line will be added to the 50.59 evaluation form. This is acceptable. Inspector followup item 96-01-01, regarding the need to reformat NRSC minutes, is closed. Changes to the 50.59 evaluation form will be verified in a futu~ inspection (Inspector Followup Item 97-01-01).

Minutes of NFiSC meetings indic ed that the committee met at the required frequency with a quorum present ai.d provided the required oversight.

.

..

. _ _ - _ _ _ _ _ _ _ _

. - - -

. -....

.--

!

..

t

..

c.

Conclusions Review and oversight functions required by TS 6.4 were acceptably completed.

!

X.1 EFit Interview (lnSpection Procedure 30703)

The inspector presented the inspection results to members of licensee management at the conclusion of the inspection on March ' *,1997. The licensee acknowledged the findings presented.

,

.

__

.

.o

,

f'

,

f

'

l PARTIAL LIST OF PERSONS CONTACTED

,

,

Licensee

.

E l

D. Johnson, Health Physicist 1.

V. Rose, Chairman, RIAEC l

W. Simoneau, Assistant Director for Reactor Operations

T. Tehan, Director

,

i INSPECTION PROCEDURES USED

,

i

i I

j IP 30703:

EXIT AND ENTRANCE INTERVIEWS i

!-

j IP 39745:

CLASS I NON-POWER REACTORS ORGANIZATION AND OPERATIONS AND

'

,

!

MAINTENANCE ACTIVITIES

.

IP 40745:

CLASS 1 NON-POWER REACTOR REVIEW AND AUDIT AND DESIGN

CHANGE FUNCTIONS

?

l lP 41745:

CLASS I NON-POWER REACTOR OPERATOR LICENSES, REQUALIFICATION,

' AND MEDICAL ACTIVITIES IP 42745:

CLASS I NON-POWER REACTOR PROCEDURES IP 61745:

CLASS I NON-POWER REACTOR SURVEILLANCE ITEMS OPENED, CLOSED, AND DISCUSSED Opened 50-193/97-01-01 IFl 50.59 evaluation form to include NRSC review to include equipment responses Qlosed 50-193/96-01-U1 IFl 50-193/96-01-03 IFl 50-193/96-02-01 IFl

e

.

.

LIST OF ACRONYMS USED NI Nuclear instrumentation NRC Nuclear Regulatory Commission NRSC Nuclear and Radiation Safety Committee RIAEC Rhode Island Atomi. 7.nergy Commission SRO Senior reactor opee 3r TRTR National Organizativ: of Test, Research, and Training Reactors TS Technical Specifications i