ML20205D257: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:NRC MONTHLY OPERATING REPORT DOCKET NO. 50-362 UNIT NAME SONGS - 3 DATE   June 12. 1986 COMPLETED BY   E. R. Stacor TELEPHONE (714) 368-6223 OPERATING STATUS
{{#Wiki_filter:NRC MONTHLY OPERATING REPORT DOCKET NO. 50-362 UNIT NAME SONGS - 3 DATE June 12. 1986 COMPLETED BY E. R. Stacor TELEPHONE (714) 368-6223 OPERATING STATUS 1.
: 1. Unit Name:   San Onofre Nuclear Generating Station, Unit 3
Unit Name:
: 2. Reporting Period: May 1986
San Onofre Nuclear Generating Station, Unit 3 2.
: 3. Licensed Thermal Power (MWt):                   3390
Reporting Period:
: 4. Nameplate Rating (Gross MWe):                     1127
May 1986 3.
: 5. Design Electrical Rating (Net MWe):               1080
Licensed Thermal Power (MWt):
: 6. Maximum Dependable Capacity (Gross MWe):         1127
3390 4.
: 7. Maximum Dependable Capacity (Net MWe): __         1080
Nameplate Rating (Gross MWe):
: 8. If Changes Occur In Capacity Ratings (Item 2 Number 3 Through 7)
1127 5.
Design Electrical Rating (Net MWe):
1080 6.
Maximum Dependable Capacity (Gross MWe):
1127 7.
Maximum Dependable Capacity (Net MWe): __
1080 8.
If Changes Occur In Capacity Ratings (Item 2 Number 3 Through 7)
Since Last Report, Give Reasons:
Since Last Report, Give Reasons:
NA
NA 9.
: 9. Power Level To Which Restricted, If Any (Net MWe):             NA
Power Level To Which Restricted, If Any (Net MWe):
: 10. Reasons For Restrictions, If Any:                             NA This Month     Yr.-to-Date   Cumulative
NA 10.
: 11. Hours In Reporting Period                           744.00       3,623.00       18,983.00
Reasons For Restrictions, If Any:
: 12. Number Of Hours Reactor Was Critical               744.00       2,834.59       12,044.68
NA This Month Yr.-to-Date Cumulative
: 13. Reactor Reserve Shutdown Hours                     0.00             0.00           0.00
: 11. Hours In Reporting Period 744.00 3,623.00 18,983.00
: 14. Hours Generator On-Line                           744.00       2,525.26       11,340.71
: 12. Number Of Hours Reactor Was Critical 744.00 2,834.59 12,044.68 13.
: 15. Unit Reserve Shutdown Hours                         0.00             0.00           0.00
Reactor Reserve Shutdown Hours 0.00 0.00 0.00 14.
: 16. Gross Thermal Energy Generated (MWH)       2,503,081.42 7,966,282.65     33,111,469.99
Hours Generator On-Line 744.00 2,525.26 11,340.71 15.
: 17. Gross Electrical Energy Generated (MWH)     860,319.00 2,681,693.50     11,053,098.50
Unit Reserve Shutdown Hours 0.00 0.00 0.00 16.
: 18. Net Electrical Energy Generated (MWH)       817,740.00 2,508,989.00     10,316,334.42
Gross Thermal Energy Generated (MWH) 2,503,081.42 7,966,282.65 33,111,469.99 17.
: 19. Unit Service Factor                             100.00%         69.70%         59.74%
Gross Electrical Energy Generated (MWH) 860,319.00 2,681,693.50 11,053,098.50 18.
: 20. Unit Availability Factor                         100.00%         69.70%         59.74%
Net Electrical Energy Generated (MWH) 817,740.00 2,508,989.00 10,316,334.42 19.
: 21. Unit Capacity Factor (Using MDC Net)             101.77%           64.12%         50.22%
Unit Service Factor 100.00%
: 22. Unit Capacity Factor (Using DER Net)               101.77%         64.12%         50.32%
69.70%
: 23. Unit Forced Outage Rate                           0.00%         23.41%         16.38%
59.74%
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
20.
NA
Unit Availability Factor 100.00%
: 25. If Shut Down At End Of Report Period, Estimated Date of Startup:           NA
69.70%
: 26. Units In Test Status (Prior To Commercial Operation):         Forecast   Achieved INITIAL CRITICALITY                               NA         NA INITIAL ELECTRICITY                               NA         NA COMMERCIAL OPERATION                               NA         NA 7435u
59.74%
                              ~~
: 21. Unit Capacity Factor (Using MDC Net) 101.77%
8608150315 860612 PDR     ADOCK 05000361 R                   PDR
64.12%
50.22%
22.
Unit Capacity Factor (Using DER Net) 101.77%
64.12%
50.32%
23.
Unit Forced Outage Rate 0.00%
23.41%
16.38%
24.
Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
NA 25.
If Shut Down At End Of Report Period, Estimated Date of Startup:
NA 26.
Units In Test Status (Prior To Commercial Operation):
Forecast Achieved INITIAL CRITICALITY NA NA INITIAL ELECTRICITY NA NA COMMERCIAL OPERATION NA NA 7435u 8608150315 860612
~~
PDR ADOCK 05000361 R
PDR


AVERAGE DAILY UNIT POWER LEVEL DOCKET N0. 50-362 UNIT           SONGS - 3 DATE       June 12, 1986 COMPLETED BY   E. R. Siacor TELEPHONE     (714) 368-6223 i
AVERAGE DAILY UNIT POWER LEVEL DOCKET N0.
MONTH   May 1986 DAY AVERAGE DAILY POWER LEVEL         DAY AVERAGE DAILY POWER LEVEL (MWe-Net)                               (MWe-Net) 1     1106.00                       17       1107.13 2     1097.67                       18       1110.08 3     1107.08                       19       1110.67 4     1112.75                       20       1109.33 5     1112.71                       21       1104.92 6     1112.25                       22       1104.79 7     1114.17                       23       1096.88 8       1113.04                       24       1104.50 9       1090.29                       25       1102.83 10       1024.88                       26       1102.88 11       995.58                       27       1102.21 12       1109.17                       28       1102.38 13       1108.13                       29       1099.54 14       1108.71                       30       1095.29 15       1106.75                       31       1097.92           -
50-362 UNIT SONGS - 3 DATE June 12, 1986 COMPLETED BY E. R. Siacor TELEPHONE (714) 368-6223 i
16       1102.00 7435u
MONTH May 1986 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 1106.00 17 1107.13 2
1097.67 18 1110.08 3
1107.08 19 1110.67 4
1112.75 20 1109.33 5
1112.71 21 1104.92 6
1112.25 22 1104.79 7
1114.17 23 1096.88 8
1113.04 24 1104.50 9
1090.29 25 1102.83 10 1024.88 26 1102.88 11 995.58 27 1102.21 12 1109.17 28 1102.38 13 1108.13 29 1099.54 14 1108.71 30 1095.29 15 1106.75 31 1097.92 16 1102.00 7435u


UNIT SHUTDOWNS AND POWER REDUCTIONS                             DOCKET NO. 50-362 UNIT NAME SONGS - 3 REPORT MONTH MAY 1986                                       DATE June IZ. 1y50 COMPLETED BY E. R. Slacor TELEPHONE (714) 368-6223 Method of Shutting Dura tion                 Down       LER System     Component                 Cause & Cormctive 1                         2         3               4         4                     Action to No. Date Type       (Hours) Reason         Reactor     No. Code       Code                     Prevent Recurrence NA       NA   NA         NA             NA       NA         NA     hA         NA                             NA 1                 2                                                     3                     4 F- Fo rced         Reason:                                               Method:               IEEE Std 803-1983 S-Scheduled       A-Equipment Failure (Expla in)                       1-Manual B-Ma intenance or Test                               2-Manual Sc ra m.
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-362 UNIT NAME SONGS - 3 REPORT MONTH MAY 1986 DATE June IZ. 1y50 COMPLETED BY E.
C-Refueling                                           3-Automatic Scram.
R.
D-Regulatory Restriction                             4-Continuation from E-Operator Training & License Examination               Previous Month F-Adm i ni s t ra t i ve                             5-Reduction of 20%
Slacor TELEPHONE (714) 368-6223 Method of Shutting Dura tion Down LER System Component Cause & Cormctive 1
G-Ope ra t iona l Error (Explain)                       or greater in the H-Other (Explain)                                       past 24 hours 6-Other (Explain) 7435u/10
2 3
4 4
Action to No.
Date Type (Hours) Reason Reactor No.
Code Code Prevent Recurrence NA NA NA NA NA NA NA hA NA NA 1
2 3
4 F-Fo rced Reason:
Method:
IEEE Std 803-1983 S-Scheduled A-Equipment Failure (Expla in) 1-Manual B-Ma intenance or Test 2-Manual Sc ra m.
C-Refueling 3-Automatic Scram.
D-Regulatory Restriction 4-Continuation from E-Operator Training & License Examination Previous Month F-Adm i ni s t ra t i ve 5-Reduction of 20%
G-Ope ra t iona l Error (Explain) or greater in the H-Other (Explain) past 24 hours 6-Other (Explain) 7435u/10


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO. 50-362 UNIT         SONGS - 3 DATE     June 12, 1986 COMPLETED BY E. R. Siacor TELEPHONE     (714) 368-6223 Date               Time   Event May 1               0001   Unit is in '4 ode 1 at 100% reactor power.
OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO.
50-362 UNIT SONGS - 3 DATE June 12, 1986 COMPLETED BY E. R. Siacor TELEPHONE (714) 368-6223 Date Time Event May 1 0001 Unit is in '4 ode 1 at 100% reactor power.
Turbine load is 1150 MWe gross.
Turbine load is 1150 MWe gross.
May 10             0940   Commenced power reduction for turbine stop valve testing.
May 10 0940 Commenced power reduction for turbine stop valve testing.
1200   Reactor power at 80%.
1200 Reactor power at 80%.
1305   Commenced turbine stop valve testing.
1305 Commenced turbine stop valve testing.
1610   Commenced reactor power increase following completion of turbine stop valve testing.
1610 Commenced reactor power increase following completion of turbine stop valve testing.
i 1805   Reactor power at 100%. Turbine load is 1154 MWe gross.
i 1805 Reactor power at 100%. Turbine load is 1154 MWe gross.
May 11             1010   Commenced power reduction per Technical Specification 3.1.3.1 Action Statement 'C'     due to Control Element Assembly (CEA) misalignment during monthly CEA exercise.
May 11 1010 Commenced power reduction per Technical Specification 3.1.3.1 Action Statement
1100   Reactor power at 65%. Misaligned CEA declared       !
'C' due to Control Element Assembly (CEA) misalignment during monthly CEA exercise.
inoperable.
1100 Reactor power at 65%. Misaligned CEA declared inoperable.
1152   Misaligned CEA realigned and declared               ;
1152 Misaligned CEA realigned and declared operable.
operable. Exited Technical                         i Specification 3.1.3.1 Action Statement     'C'.
Exited Technical i
1352     Commenced power increase to 100% reactor power.
Specification 3.1.3.1 Action Statement
May 12           0040       Reactor power at 100%. Turbine load at 1154 MWe gross.
'C'.
May 31           2400       Unit is in Mode 1 at 100% reactor power.
1352 Commenced power increase to 100% reactor power.
May 12 0040 Reactor power at 100%. Turbine load at 1154 MWe gross.
May 31 2400 Unit is in Mode 1 at 100% reactor power.
Turbine load is 1154 MWe gross.
Turbine load is 1154 MWe gross.
7435u/11 1
7435u/11
1


REFUELING INFORMATION DOCKET NO. 50-362 UNIT           SONGS - 3 DATE         June 12, 1986 MONTH: May 1986                                     COMPLETED BY E. R. Stacor TELEPHONE     (714) 368-6223
REFUELING INFORMATION DOCKET NO.
: 1. Scheduled date for next refueling shutdown.
50-362 UNIT SONGS - 3 DATE June 12, 1986 MONTH: May 1986 COMPLETED BY E. R. Stacor TELEPHONE (714) 368-6223 1.
December 1986
Scheduled date for next refueling shutdown.
: 2. Scheduled date for restart following refueling.
December 1986 2.
March 1987
Scheduled date for restart following refueling.
: 3. Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?
March 1987 3.
Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?
No. All required Cycle 3 Amendments have been approved.
No. All required Cycle 3 Amendments have been approved.
What will taese be?
What will taese be?
Not Applicable                                                   -
Not Applicable 4.
: 4. Scheduled date for submitting proposed licensing action and supporting information.
Scheduled date for submitting proposed licensing action and supporting information.
Not Applicable
Not Applicable 5.
: 5. Important Licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures.
Important Licensing considerations associated with refueling, e.g.,
None
new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures.
: 6. The number of fuel assemblies, a) In the core.       217 b) In the spent fuel storage pool. 72
None 6.
: 7. Licensed spent fuel storage capacity. 800 Intended change in spent fuel storage capacity.     None
The number of fuel assemblies, a) In the core.
: 8. Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.
217 b) In the spent fuel storage pool.
72 7.
Licensed spent fuel storage capacity.
800 Intended change in spent fuel storage capacity.
None 8.
Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.
Approximately 1997 (refueling only)
Approximately 1997 (refueling only)
Approximately 1993 (Full offload capability) 7435u
Approximately 1993 (Full offload capability) 7435u


NRC MONTHLY OPERATING REPORT DOCKET NO. 50-361 UNIT SONGS - 2 DATE June 12. 1986 COMPLETED BY E. R. Stacor TELEPHONE (714) 368-6223 OPERATING STATUS
NRC MONTHLY OPERATING REPORT DOCKET NO. 50-361 UNIT SONGS - 2 DATE June 12. 1986 COMPLETED BY E. R. Stacor TELEPHONE (714) 368-6223 OPERATING STATUS 1.
: 1. Unit Name: San Onofre Nuclear Generating Station, Unit 2
Unit Name: San Onofre Nuclear Generating Station, Unit 2 2.
: 2. Reporting Period:   May 1986
Reporting Period:
: 3. Licensed Thermal Power (MWt):                   3390
May 1986 3.
: 4. Nameplate Rating (Gross MWe):                   1127
Licensed Thermal Power (MWt):
: 5. Design Electrical Rating (Net MWe):             1070
3390 4.
: 6. Maximum Dependable Capacity (Gross MWe):         1127
Nameplate Rating (Gross MWe):
: 7. Maximum Dependable Capacity (Net MWe):           1070
1127 5.
: 8. If Changes Occur In Capacity Ratings (Items Number 3 Through 7)
Design Electrical Rating (Net MWe):
1070 6.
Maximum Dependable Capacity (Gross MWe):
1127 7.
Maximum Dependable Capacity (Net MWe):
1070 8.
If Changes Occur In Capacity Ratings (Items Number 3 Through 7)
Since Last Report, Give Reasons:
Since Last Report, Give Reasons:
NA 9.
Power Level To Which Restricted, If Any (Net MWe):
NA
NA
: 9. Power Level To Which Restricted, If Any (Net MWe):            NA
: 10. Reasons For Restrictions, If Any:
: 10. Reasons For Restrictions, If Any:                               NA This Month     Yr.-to-Date   Cumulative
NA This Month Yr.-to-Date Cumulative
: 11. Hours In Reporting Period                       744.00         3,623.00     24,432.00                   l
: 11. Hours In Reporting Period 744.00 3,623.00 24,432.00 l
: 12. Number Of Hours Reactor Was Critical               0.00       1,706.55     14,587.47                   1
: 12. Number Of Hours Reactor Was Critical 0.00 1,706.55 14,587.47 1
: 13. Reactor Reserve Shutdown Hours                     0.00             0.00                         0.00
: 13. Reactor Reserve Shutdown Hours 0.00 0.00 0.00
: 14. Hours Generator On-Line                             0.00       1,700.97     14,310.72                   l
: 14. Hours Generator On-Line 0.00 1,700.97 14,310.72
: 15. Unit Reserve Shutdown Hours                         0.00             0.00                         0.00   l
: 15. Unit Reserve Shutdown Hours 0.00 0.00 0.00
: 16. Gross Thermal Energy Generated (MWH)               0.00   5,172,736.27 45,903,122.40                   !
: 16. Gross Thermal Energy Generated (MWH) 0.00 5,172,736.27 45,903,122.40
: 17. Gross Electrical Energy Generated (MWH)             0.00   1,726,949.50 15,421,032.00                   1
: 17. Gross Electrical Energy Generated (MWH) 0.00 1,726,949.50 15,421,032.00 1
: 18. Net Electrical Energy Generated (MWH)         (5,537.12) 1,624,552.56 14,548,057.56
: 18. Net Electrical Energy Generated (MWH)
: 19. Unit Service Factor                                 0.00%         46.95%                       58.57%
(5,537.12) 1,624,552.56 14,548,057.56
: 20. Unit Availability Factor                           0.00%         46.95%                       58.57%
: 19. Unit Service Factor 0.00%
: 21. Unit Capacity Factor (Using MDC Net)               0.00%         41.91%                       55.65%   i
46.95%
: 22. Unit Capacity Factor (Using DER Net)               0.00%         41.91%                       55.65%   l
58.57%
: 23. Unit Forced Outage Rate                             0.00%           3.08%                         5.26%
: 20. Unit Availability Factor 0.00%
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):                               1 Refueling Outage, March 15, 1986, 80 days duration (now in progress)
46.95%
: 25. If Shut Down At End Of Report Period, Estimated Date of Startup: June 12, 1986
58.57%
: 26. Units In Test Status (Prior To Commercial Operation):           Forecast   Achieved INITIAL CRITICALITY                                   NA                     NA INITIAL ELECTRICITY                                   NA                     NA COMMERCIAL OPERATION                                 NA                     NA 7435u
: 21. Unit Capacity Factor (Using MDC Net) 0.00%
41.91%
55.65%
: 22. Unit Capacity Factor (Using DER Net) 0.00%
41.91%
55.65%
: 23. Unit Forced Outage Rate 0.00%
3.08%
5.26%
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Refueling Outage, March 15, 1986, 80 days duration (now in progress) 25.
If Shut Down At End Of Report Period, Estimated Date of Startup: June 12, 1986
: 26. Units In Test Status (Prior To Commercial Operation):
Forecast Achieved INITIAL CRITICALITY NA NA INITIAL ELECTRICITY NA NA COMMERCIAL OPERATION NA NA 7435u


AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-361 UNIT         SONGS - 2 DATE       June 12, 1986 COMPLETED BY E. R. Siacor TELEPHONE     (714) 368-6223 MONTH   May 1986 DAY AVERAGE DAILY POWER LEVEL         DAY AVERAGE DAILY POWER LEVEL (MWe-Net)                               (MWe-Net) 1         0.00                     17         0.00
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
  ~2         0.00                     18         0.00 3         0.00                     19         0.00 4         0.00                     20         0.00 5         0.00                     21         0.00 6         0.00                     22         0.00 7         0.00                     23         0.00 8         0.00                     24         0.00 9         0.00                     25         0.00 10         0.00                     26         0.00 11         0.00                     27         0.00 12         0.00                     28         0.00 13         0.00                     29         0.00 14         0.00                     30         0.00 15         0.00                     31         0.00 16         0.00 7435u
50-361 UNIT SONGS - 2 DATE June 12, 1986 COMPLETED BY E. R. Siacor TELEPHONE (714) 368-6223 MONTH May 1986 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 0.00 17 0.00
~2 0.00 18 0.00 3
0.00 19 0.00 4
0.00 20 0.00 5
0.00 21 0.00 6
0.00 22 0.00 7
0.00 23 0.00 8
0.00 24 0.00 9
0.00 25 0.00 10 0.00 26 0.00 11 0.00 27 0.00 12 0.00 28 0.00 13 0.00 29 0.00 14 0.00 30 0.00 15 0.00 31 0.00 16 0.00 7435u


                ..;          - *;&            ,.yy                                                                           ,
,.yy l
    , ;        ,          ;  &,              l Jj~
Jj~
                                                        ,                                ; .j                                                             :
;.j
                                                          ' UNIT SISTDOWNS AND h In REDUCTION $                               DOCKET NO. 50-361
' UNIT SISTDOWNS AND h In REDUCTION $
                                                        *'                                                                        UNIT NAME _ SONGS - 2
DOCKET NO. 50-361 UNIT NAME _ SONGS - 2
                                                                    .. REPORT MONTH MAY 1986                                             DATE June 12. 1986 COMPLETED BY_Et R. Simcor
.. REPORT MONTH MAY 1986 DATE June 12. 1986 COMPLETED BY_Et R.
_. >                                        TELEPHONE il13 U 68-6223 Method of     ,                                ,                                ,; . y Shutting                                 _ #                                    g Du ra t ion                   Down         LER         System     Component           Cause & Correctivc/
Simcor TELEPHONE il13 U 68-6223 Method of
1                           2           3                         4           ;4                 Action to No.       Dste Type       (Hours)       Reason     Reactor         No.           Code         Code             f reyent Recurrence 25       860315   S       744.00           C           4         NA             NA.         NA               R[ fueling
,;. y Shutting g
                                !                                                                                                      J
Du ra t ion Down LER System Component Cause & Correctivc/
                                                                                                                          't s
1 2
1 1               2                                                           3                         4 i             F-fo rced       Reason:                                                     Method:                   IEEE Std 803-1983 S-Scheduled     A-Equipment Failuro (Explain)                               1-Manual B-Maintenance or Test                                       2-Manual Sc ra m.
3 4
C-Refueling                                                 3-Automatic Scram.
;4 Action to No.
D-Regulatory Restriction                             .      4-Continuation from E-Operator Training & License Examination                     Previous Month F-Adm i n i st ra t ive                                     5-Reduction of 20%
Dste Type (Hours)
C-Ope ra t i ona l Error (Expla in)                           o r g rea te r i n the H-Other (Explain)                                             past 24 hours 6-Other ( Expla in) l
Reason Reactor No.
,        7435u i
Code Code f reyent Recurrence 25 860315 S
744.00 C
4 NA NA.
NA R[ fueling J
't s
1 1
2 3
4 i
F-fo rced Reason:
Method:
IEEE Std 803-1983 S-Scheduled A-Equipment Failuro (Explain) 1-Manual B-Maintenance or Test 2-Manual Sc ra m.
C-Refueling 3-Automatic Scram.
D-Regulatory Restriction 4-Continuation from E-Operator Training & License Examination Previous Month F-Adm i n i st ra t ive 5-Reduction of 20%
C-Ope ra t i ona l Error (Expla in) o r g rea te r i n the H-Other (Explain) past 24 hours 6-Other ( Expla in) l 7435u i


l 1
1


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO.             50-361 UNIT                   SONGS - 2 DATE         June 12,'1986 COMPLETED BY           E. R. Siacor TELEPHONE               (714) 368-6223 Date                   Time       Event May 1                 0001       Unit is in Mode 5, day 48 of Cycle 3 refueling outage.
OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO.
l     May 8                 2056       Commenced Reactor Coolant System (RCS) fill t
50-361 UNIT SONGS - 2 DATE June 12,'1986 COMPLETED BY E. R. Siacor TELEPHONE (714) 368-6223 Date Time Event May 1 0001 Unit is in Mode 5, day 48 of Cycle 3 refueling outage.
l May 8 2056 Commenced Reactor Coolant System (RCS) fill t
and vent.
and vent.
May 9                 0012         Completed RCS fill and vent.
May 9 0012 Completed RCS fill and vent.
May 11                 1645       Commenced integrated Engineered Safety Features (ESF) testing.
May 11 1645 Commenced integrated Engineered Safety Features (ESF) testing.
May 13                 1800       Completed ESF testing and restorations.
May 13 1800 Completed ESF testing and restorations.
May 30                 1308       Entered Mode'4.
May 30 1308 Entered Mode'4.
!    May 31               2400         Unit is in Mode 4, day 77 of Cycle 3 refueling outage. Preparations for Mode 3
May 31 2400 Unit is in Mode 4, day 77 of Cycle 3 refueling outage.
;                                      entry are in progress.
Preparations for Mode 3 entry are in progress.
i 1
i 1
f 7435u
f 7435u


REFUELING INFORMATION DOCKET NO. 50-361         ,
REFUELING INFORMATION DOCKET NO.
UNIT         SONGS - 2 DATE     June 12, 1986 MONTH: May 1986                                                 COMPLETED BY E. R. Siacor TELEPHONE   (714) 368-6223
50-361 UNIT SONGS - 2 DATE June 12, 1986 MONTH: May 1986 COMPLETED BY E. R. Siacor TELEPHONE (714) 368-6223 1.
: 1. Scheouled date for next refueling shutdown.
Scheouled date for next refueling shutdown.
January 1988
January 1988 2.
: 2. Scheduled date for restart following refueling.
Scheduled date for restart following refueling.
April 1988
April 1988 3.
: 3. Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?
Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?
Not yet determined What will these be?
Not yet determined What will these be?
Not yet determined
Not yet determined 4.
: 4. Scheduled date for submitting proposed licensing action and supporting information.
Scheduled date for submitting proposed licensing action and supporting information.
Not Applicable
Not Applicable 5.
: 5. Important Licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures.
Important Licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures.
None
None 6.
: 6. The number of fuel assemblies.
The number of fuel assemblies.
a) In the core. 217 b) In the spent fuel storage pool.                 160
a) In the core.
: 7. Licensed spent fuel storage capacity.               800 Intended change in spent fuel storage capacity.                 None i   8. Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.
217 b) In the spent fuel storage pool.
160 7.
Licensed spent fuel storage capacity.
800 Intended change in spent fuel storage capacity.
None i
8.
Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.
Approximately 1997 (refueling only)
Approximately 1997 (refueling only)
Approximately 1993 (full offload capability) 7435u
Approximately 1993 (full offload capability) 7435u
                                                - . . _ - . - .        ..    .-    -  -}}
-}}

Latest revision as of 19:00, 7 December 2024

Monthly Operating Repts for May 1986
ML20205D257
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 05/31/1986
From: Siacor E
SOUTHERN CALIFORNIA EDISON CO.
To:
Shared Package
ML20205D247 List:
References
7435U, NUDOCS 8608150315
Download: ML20205D257 (10)


Text

NRC MONTHLY OPERATING REPORT DOCKET NO. 50-362 UNIT NAME SONGS - 3 DATE June 12. 1986 COMPLETED BY E. R. Stacor TELEPHONE (714) 368-6223 OPERATING STATUS 1.

Unit Name:

San Onofre Nuclear Generating Station, Unit 3 2.

Reporting Period:

May 1986 3.

Licensed Thermal Power (MWt):

3390 4.

Nameplate Rating (Gross MWe):

1127 5.

Design Electrical Rating (Net MWe):

1080 6.

Maximum Dependable Capacity (Gross MWe):

1127 7.

Maximum Dependable Capacity (Net MWe): __

1080 8.

If Changes Occur In Capacity Ratings (Item 2 Number 3 Through 7)

Since Last Report, Give Reasons:

NA 9.

Power Level To Which Restricted, If Any (Net MWe):

NA 10.

Reasons For Restrictions, If Any:

NA This Month Yr.-to-Date Cumulative

11. Hours In Reporting Period 744.00 3,623.00 18,983.00
12. Number Of Hours Reactor Was Critical 744.00 2,834.59 12,044.68 13.

Reactor Reserve Shutdown Hours 0.00 0.00 0.00 14.

Hours Generator On-Line 744.00 2,525.26 11,340.71 15.

Unit Reserve Shutdown Hours 0.00 0.00 0.00 16.

Gross Thermal Energy Generated (MWH) 2,503,081.42 7,966,282.65 33,111,469.99 17.

Gross Electrical Energy Generated (MWH) 860,319.00 2,681,693.50 11,053,098.50 18.

Net Electrical Energy Generated (MWH) 817,740.00 2,508,989.00 10,316,334.42 19.

Unit Service Factor 100.00%

69.70%

59.74%

20.

Unit Availability Factor 100.00%

69.70%

59.74%

21. Unit Capacity Factor (Using MDC Net) 101.77%

64.12%

50.22%

22.

Unit Capacity Factor (Using DER Net) 101.77%

64.12%

50.32%

23.

Unit Forced Outage Rate 0.00%

23.41%

16.38%

24.

Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

NA 25.

If Shut Down At End Of Report Period, Estimated Date of Startup:

NA 26.

Units In Test Status (Prior To Commercial Operation):

Forecast Achieved INITIAL CRITICALITY NA NA INITIAL ELECTRICITY NA NA COMMERCIAL OPERATION NA NA 7435u 8608150315 860612

~~

PDR ADOCK 05000361 R

PDR

AVERAGE DAILY UNIT POWER LEVEL DOCKET N0.

50-362 UNIT SONGS - 3 DATE June 12, 1986 COMPLETED BY E. R. Siacor TELEPHONE (714) 368-6223 i

MONTH May 1986 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1 1106.00 17 1107.13 2

1097.67 18 1110.08 3

1107.08 19 1110.67 4

1112.75 20 1109.33 5

1112.71 21 1104.92 6

1112.25 22 1104.79 7

1114.17 23 1096.88 8

1113.04 24 1104.50 9

1090.29 25 1102.83 10 1024.88 26 1102.88 11 995.58 27 1102.21 12 1109.17 28 1102.38 13 1108.13 29 1099.54 14 1108.71 30 1095.29 15 1106.75 31 1097.92 16 1102.00 7435u

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-362 UNIT NAME SONGS - 3 REPORT MONTH MAY 1986 DATE June IZ. 1y50 COMPLETED BY E.

R.

Slacor TELEPHONE (714) 368-6223 Method of Shutting Dura tion Down LER System Component Cause & Cormctive 1

2 3

4 4

Action to No.

Date Type (Hours) Reason Reactor No.

Code Code Prevent Recurrence NA NA NA NA NA NA NA hA NA NA 1

2 3

4 F-Fo rced Reason:

Method:

IEEE Std 803-1983 S-Scheduled A-Equipment Failure (Expla in) 1-Manual B-Ma intenance or Test 2-Manual Sc ra m.

C-Refueling 3-Automatic Scram.

D-Regulatory Restriction 4-Continuation from E-Operator Training & License Examination Previous Month F-Adm i ni s t ra t i ve 5-Reduction of 20%

G-Ope ra t iona l Error (Explain) or greater in the H-Other (Explain) past 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> 6-Other (Explain) 7435u/10

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO.

50-362 UNIT SONGS - 3 DATE June 12, 1986 COMPLETED BY E. R. Siacor TELEPHONE (714) 368-6223 Date Time Event May 1 0001 Unit is in '4 ode 1 at 100% reactor power.

Turbine load is 1150 MWe gross.

May 10 0940 Commenced power reduction for turbine stop valve testing.

1200 Reactor power at 80%.

1305 Commenced turbine stop valve testing.

1610 Commenced reactor power increase following completion of turbine stop valve testing.

i 1805 Reactor power at 100%. Turbine load is 1154 MWe gross.

May 11 1010 Commenced power reduction per Technical Specification 3.1.3.1 Action Statement

'C' due to Control Element Assembly (CEA) misalignment during monthly CEA exercise.

1100 Reactor power at 65%. Misaligned CEA declared inoperable.

1152 Misaligned CEA realigned and declared operable.

Exited Technical i

Specification 3.1.3.1 Action Statement

'C'.

1352 Commenced power increase to 100% reactor power.

May 12 0040 Reactor power at 100%. Turbine load at 1154 MWe gross.

May 31 2400 Unit is in Mode 1 at 100% reactor power.

Turbine load is 1154 MWe gross.

7435u/11

REFUELING INFORMATION DOCKET NO.

50-362 UNIT SONGS - 3 DATE June 12, 1986 MONTH: May 1986 COMPLETED BY E. R. Stacor TELEPHONE (714) 368-6223 1.

Scheduled date for next refueling shutdown.

December 1986 2.

Scheduled date for restart following refueling.

March 1987 3.

Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?

No. All required Cycle 3 Amendments have been approved.

What will taese be?

Not Applicable 4.

Scheduled date for submitting proposed licensing action and supporting information.

Not Applicable 5.

Important Licensing considerations associated with refueling, e.g.,

new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures.

None 6.

The number of fuel assemblies, a) In the core.

217 b) In the spent fuel storage pool.

72 7.

Licensed spent fuel storage capacity.

800 Intended change in spent fuel storage capacity.

None 8.

Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.

Approximately 1997 (refueling only)

Approximately 1993 (Full offload capability) 7435u

NRC MONTHLY OPERATING REPORT DOCKET NO. 50-361 UNIT SONGS - 2 DATE June 12. 1986 COMPLETED BY E. R. Stacor TELEPHONE (714) 368-6223 OPERATING STATUS 1.

Unit Name: San Onofre Nuclear Generating Station, Unit 2 2.

Reporting Period:

May 1986 3.

Licensed Thermal Power (MWt):

3390 4.

Nameplate Rating (Gross MWe):

1127 5.

Design Electrical Rating (Net MWe):

1070 6.

Maximum Dependable Capacity (Gross MWe):

1127 7.

Maximum Dependable Capacity (Net MWe):

1070 8.

If Changes Occur In Capacity Ratings (Items Number 3 Through 7)

Since Last Report, Give Reasons:

NA 9.

Power Level To Which Restricted, If Any (Net MWe):

NA

10. Reasons For Restrictions, If Any:

NA This Month Yr.-to-Date Cumulative

11. Hours In Reporting Period 744.00 3,623.00 24,432.00 l
12. Number Of Hours Reactor Was Critical 0.00 1,706.55 14,587.47 1
13. Reactor Reserve Shutdown Hours 0.00 0.00 0.00
14. Hours Generator On-Line 0.00 1,700.97 14,310.72
15. Unit Reserve Shutdown Hours 0.00 0.00 0.00
16. Gross Thermal Energy Generated (MWH) 0.00 5,172,736.27 45,903,122.40
17. Gross Electrical Energy Generated (MWH) 0.00 1,726,949.50 15,421,032.00 1
18. Net Electrical Energy Generated (MWH)

(5,537.12) 1,624,552.56 14,548,057.56

19. Unit Service Factor 0.00%

46.95%

58.57%

20. Unit Availability Factor 0.00%

46.95%

58.57%

21. Unit Capacity Factor (Using MDC Net) 0.00%

41.91%

55.65%

22. Unit Capacity Factor (Using DER Net) 0.00%

41.91%

55.65%

23. Unit Forced Outage Rate 0.00%

3.08%

5.26%

24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Refueling Outage, March 15, 1986, 80 days duration (now in progress) 25.

If Shut Down At End Of Report Period, Estimated Date of Startup: June 12, 1986

26. Units In Test Status (Prior To Commercial Operation):

Forecast Achieved INITIAL CRITICALITY NA NA INITIAL ELECTRICITY NA NA COMMERCIAL OPERATION NA NA 7435u

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-361 UNIT SONGS - 2 DATE June 12, 1986 COMPLETED BY E. R. Siacor TELEPHONE (714) 368-6223 MONTH May 1986 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1 0.00 17 0.00

~2 0.00 18 0.00 3

0.00 19 0.00 4

0.00 20 0.00 5

0.00 21 0.00 6

0.00 22 0.00 7

0.00 23 0.00 8

0.00 24 0.00 9

0.00 25 0.00 10 0.00 26 0.00 11 0.00 27 0.00 12 0.00 28 0.00 13 0.00 29 0.00 14 0.00 30 0.00 15 0.00 31 0.00 16 0.00 7435u

,.yy l

Jj~

.j

' UNIT SISTDOWNS AND h In REDUCTION $

DOCKET NO. 50-361 UNIT NAME _ SONGS - 2

.. REPORT MONTH MAY 1986 DATE June 12. 1986 COMPLETED BY_Et R.

Simcor TELEPHONE il13 U 68-6223 Method of

,;. y Shutting g

Du ra t ion Down LER System Component Cause & Correctivc/

1 2

3 4

4 Action to No.

Dste Type (Hours)

Reason Reactor No.

Code Code f reyent Recurrence 25 860315 S

744.00 C

4 NA NA.

NA R[ fueling J

't s

1 1

2 3

4 i

F-fo rced Reason:

Method:

IEEE Std 803-1983 S-Scheduled A-Equipment Failuro (Explain) 1-Manual B-Maintenance or Test 2-Manual Sc ra m.

C-Refueling 3-Automatic Scram.

D-Regulatory Restriction 4-Continuation from E-Operator Training & License Examination Previous Month F-Adm i n i st ra t ive 5-Reduction of 20%

C-Ope ra t i ona l Error (Expla in) o r g rea te r i n the H-Other (Explain) past 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> 6-Other ( Expla in) l 7435u i

1

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO.

50-361 UNIT SONGS - 2 DATE June 12,'1986 COMPLETED BY E. R. Siacor TELEPHONE (714) 368-6223 Date Time Event May 1 0001 Unit is in Mode 5, day 48 of Cycle 3 refueling outage.

l May 8 2056 Commenced Reactor Coolant System (RCS) fill t

and vent.

May 9 0012 Completed RCS fill and vent.

May 11 1645 Commenced integrated Engineered Safety Features (ESF) testing.

May 13 1800 Completed ESF testing and restorations.

May 30 1308 Entered Mode'4.

May 31 2400 Unit is in Mode 4, day 77 of Cycle 3 refueling outage.

Preparations for Mode 3 entry are in progress.

i 1

f 7435u

REFUELING INFORMATION DOCKET NO.

50-361 UNIT SONGS - 2 DATE June 12, 1986 MONTH: May 1986 COMPLETED BY E. R. Siacor TELEPHONE (714) 368-6223 1.

Scheouled date for next refueling shutdown.

January 1988 2.

Scheduled date for restart following refueling.

April 1988 3.

Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?

Not yet determined What will these be?

Not yet determined 4.

Scheduled date for submitting proposed licensing action and supporting information.

Not Applicable 5.

Important Licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures.

None 6.

The number of fuel assemblies.

a) In the core.

217 b) In the spent fuel storage pool.

160 7.

Licensed spent fuel storage capacity.

800 Intended change in spent fuel storage capacity.

None i

8.

Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.

Approximately 1997 (refueling only)

Approximately 1993 (full offload capability) 7435u

-