MONTHYEARML20217E3381999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Songs,Units 2 & 3 ML20211Q8201999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Songs,Units 2 & 3. with ML20210Q6521999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Songs,Units 2 & 3 ML20209C9281999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Songs,Units 2 & 3. with ML20195H5491999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Songs,Units 2 & 3 ML20206S7281999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Songs,Units 2 & 3 ML20205Q0981999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Songs,Units 2 & 3 ML20204F8101999-02-28028 February 1999 Monthly Operating Repts for Songs,Units 2 & 3.With ML20199F0771998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Songs,Units 2 & 3 ML20198C3471998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Songs,Units 2 & 3 ML20195H2471998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Songs,Units 2 & 3 ML20154M7921998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Songs,Units 2 & 3 ML20151Z9851998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Songs,Units 2 & 3 ML20237B8571998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Songs,Units 2 & 3 ML20236R1031998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Songs,Units 2 & 3 ML20249A9431998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Songs,Units 2 & 3 ML20247L5181998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Songs,Units 2 & 3 ML20217A0141998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Songs,Units 2 & 3 ML20216J3551998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Songs,Units 2 & 3 ML20202F9731998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Songs,Units 2 & 3 ML20198Q6701997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for San Onofre Nuclear Generating Station Units 2 & 3 ML20203F3361997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Songs,Units 1 & 2 ML20199A5011997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for San Onofre Nuclear Generation Station Units 2 & 3 ML20211N6981997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for San Onofre Nuclear Generating Station Units 2 & 3 ML20210V0721997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for SONGS ML20210V0771997-07-31031 July 1997 Revised MORs for July 1997 for SONGS ML18040A0051997-07-31031 July 1997 Monthly Operating Repts for Jul 1997 for San Onofre Nuclear Generating Station.W/970813 Ltr ML20149E3331997-06-30030 June 1997 Monthly Operating Repts for June 1997 for SONGS ML20148L8261997-05-31031 May 1997 Monthly Operating Repts for May 1997 for San Onofre Nuclear Generating Station Units 1 & 2 ML20141E3451997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for SONGS Units 2 & 3 ML20137X8181997-03-31031 March 1997 Monthly Operating Repts for Mar 1997 for San Onofre Nuclear Generation Station,Units 2 & 3 ML20137C1991997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for San Onofre Nuclear Generating Station,Units 2 & 3 ML20138M3761997-01-31031 January 1997 Monthly Operating Rept for Jan 1997 for San Onofre Nuclear Generating Station,Unit 2 ML20138M4171996-12-31031 December 1996 Monthly Operating Rept for Dec 1996 for Songs,Unit 3 ML20133M4151996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for SONGS Units 2 & 3 ML20138M4121996-11-30030 November 1996 Monthly Operating Rept for Nov 1996 for Songs,Unit 3 ML20132D8901996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for San Onofre Nuclear Generating Station,Units 2 & 3 ML20134K7371996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for Songs,Units 2 & 3 ML20138M3881996-10-31031 October 1996 Monthly Operating Rept for Oct 1996 for Songs,Unit 3 ML20133M4451996-10-31031 October 1996 Revised MOR for Oct 1996 for SONGS Unit 3 ML20133M4361996-09-30030 September 1996 Revised MOR for Sept 1996 for SONGS Unit 3 ML20128Q0931996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for Songs,Units 2 & 3 ML20117M9751996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for San Onofre Nuclear Generating Station Units 2 & 3 ML20133M4261996-08-31031 August 1996 Revised MOR for Aug 1996 for SONGS Units 2 & 3 ML20116M8711996-07-31031 July 1996 Monthly Operating Repts for July 1996 for Songs,Units 2 & 3 ML20115H0451996-06-30030 June 1996 Monthly Operating Repts for June 1996 for SONGS ML20117M6911996-05-31031 May 1996 Monthly Operating Repts for May 1996 for Songs,Units 2 & 3 ML20117G2001996-04-30030 April 1996 Monthly Operating Rept for Apr 1996 for SONGS Units 2 & 3 ML20107G0121996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for San Onofre Nuclear Generating Station,Units 2 & 3 ML20106H2221996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for SONGS Units 2 & 3 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217E3381999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Songs,Units 2 & 3 ML20212A1471999-09-13013 September 1999 Special Rept:On 990904,condenser Monitor Was Declared Inoperable.Difficulties Encountered During Component Replacement Precluded SCE from Restoring Monitor to Service within 72 H.Alternate Method of Monitoring Was Established ML20211N0511999-09-0303 September 1999 SER Approving Exemption from Certain Requirements of 10CFR50.44 & 10CFR50 App A,General Design Criterion 41 to Remove Requirements from Hydrogen Control Systems from SONGS Units 2 & 3 Design Basis ML20211Q8201999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Songs,Units 2 & 3. with ML20211H8621999-08-23023 August 1999 Safety Evaluation Accepting Licensee Requests for Relief RR-E-2-03 - RR-E-2-08 from Exam Requirements of Applicable ASME Code,Section Xi,For First Containment ISI Interval ML20210P4791999-08-11011 August 1999 COLR Cycle 10 Songs,Unit 3 ML20210P4731999-08-11011 August 1999 COLR Cycle 10 Songs,Unit 2 ML20210Q6521999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Songs,Units 2 & 3 ML20210L2771999-07-30030 July 1999 SONGS Unit 3 ISI Summary Rept 2nd Interval,2nd Period Cycle 10 Refueling Outage U3C10 Site Technical Services ML20209C9281999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Songs,Units 2 & 3. with ML20195D3061999-06-0202 June 1999 Safety Evaluation of TR SCE-9801-P, Reload Analysis Methodology for San Onofre Nuclear Generating Station,Units 2 & 3. Rept Acceptable ML20195H5491999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Songs,Units 2 & 3 ML20196L3221999-05-11011 May 1999 SONGS Unit 2 ISI Summary Rept 2nd Interval,2nd Period Cycle-10 Refueling Outage ML20206H2611999-05-0505 May 1999 Part 21 Rept Re Defect Found in Potter & Brumfield Relays. Sixteen Relays Supplied in Lot 913501 by Vendor as Commercial Grade Items.Caused by Insufficient Contact Pad Welding.Relays Replaced with New Relays ML20206S7281999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Songs,Units 2 & 3 ML20205Q6221999-04-19019 April 1999 Safety Evaluation Authorizing Proposed Alternative to Use Wire Penetrameters for ISI Radiography in Place of ASME Code Requirement ML20205R0371999-04-16016 April 1999 SER Approving Proposed Deviation from Approved Fire Protection Program Incorporating Technical Requirements of 10CFR50,App R,Section III.0 That Applies to RCP Oil Fill Piping ML20205G2611999-04-0101 April 1999 Special Rept:On 990328,3RT-7865 Was Removed from Service. Monitor Is Scheduled to Be Returned to Service Prior to Mode 4 Entry (Early May 1999) Which Will Exceed 72 H Allowed by LCS 3.3.102.Alternate Method of Monitoring Will Be Used ML20205Q0981999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Songs,Units 2 & 3 ML20204F8101999-02-28028 February 1999 Monthly Operating Repts for Songs,Units 2 & 3.With ML20203J1981999-02-12012 February 1999 Safety Evaluation Supporting Amends 149 & 141 to Licenses NPF-10 & NPF-15,respectively ML20202F7041999-01-21021 January 1999 Special Rept:On 990106,SCE Began to Modify 2RT-7865.2RT-7865 to Allow Monitor to Provide Input to New Radiation Monitoring Data Acquisition Sys.Monitor Found to Exceeds 72 H Allowed Bt LCS 3.3.102.Alternate Monitoring Established ML20199F0771998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Songs,Units 2 & 3 ML20206H2101998-12-31031 December 1998 SCE 1998 Annual Rept ML20198A6731998-12-11011 December 1998 Special Rept:On 981124,meteorological Sys Wind Direction Sensor Was Observed to Be Inoperable.Caused by Loss of Communication from Tower to Cr.Sensor Was Replaced & Sys Was Declared Operable on 981204 ML20196D8901998-11-30030 November 1998 Non-proprietary Reload Analysis Methodology for Songs,Units 2 & 3 ML20198C3471998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Songs,Units 2 & 3 ML20195H2471998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Songs,Units 2 & 3 ML20154B7211998-10-0101 October 1998 Safety Evaluation Approving Licensee Request to Implement Alternatives Contained in Code Case N-546 for Current Interval at Songs,Units 2 & 3 Until Code Case Approved by Ref in Reg Guide 1.147 ML20154M7921998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Songs,Units 2 & 3 ML20155F6081998-09-17017 September 1998 Non-proprietary Version of San Onofre 2 & 3 Replacement LP Rotors ML20151Z9851998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Songs,Units 2 & 3 ML20151Q1211998-08-14014 August 1998 Rev 0 to Control of Hazard Barriers ML18066A2771998-08-13013 August 1998 Part 21 Rept Re Deficiency in CE Current Screening Methodology for Determining Limiting Fuel Assembly for Detailed PWR thermal-hydraulic Sa.Evaluations Were Performed for Affected Plants to Determine Effect of Deficiency ML20198G4491998-07-31031 July 1998 Rev 1 to WCAP-15015, Specific Application of Laser Welded Sleeves for SCE San Onofre Units 2 & 3 Sgs ML20237B8571998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Songs,Units 2 & 3 ML20236N3871998-07-0909 July 1998 Part 21 Rept Re Deficiency Identified in Event 32725, Corrected by Mgp Instruments Inc.Licensee Verified,Affected Equipment Has Been Reworked & Tested at Sce.Design Mod Completed ML20236R1031998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Songs,Units 2 & 3 ML20249A9431998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Songs,Units 2 & 3 ML20248B8981998-05-26026 May 1998 Updated SG Run Time Analysis Cycle 9 ML20248B9221998-04-30030 April 1998 Rev 0 to AES 98033327-1-1, Updated Probabilistic Operational Assessment for SONGS Unit 2,Second Mid Cycle Operating Period,Cycle 9 ML20247L5181998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Songs,Units 2 & 3 05000361/LER-1998-003, LOCA Evaluation of Safety Significance of Failure of Emergency Sump Valve Linestarter (LER 1998-003)1998-04-0606 April 1998 LOCA Evaluation of Safety Significance of Failure of Emergency Sump Valve Linestarter (LER 1998-003) ML20217Q6161998-04-0505 April 1998 Failure Analysis Rept 98-005,Failure Analysis of 2HV9305 Motor Starter ML20217A0141998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Songs,Units 2 & 3 ML20217D4701998-03-0202 March 1998 Rev 1 to 90459, Failure Modes & Effects Analysis DG Cross- Tie,DCP7048.00SE ML20216J3551998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Songs,Units 2 & 3 ML20203E7301998-02-17017 February 1998 SER Accepting 980105 Request to Use Mechanical Nozzle Seal Assembly as Alternate Repair Method,Per 10CFR50.55a(a)(3)(1) for Plant,Units 2 & 3 ML20203K9141998-02-0303 February 1998 Rev 0 to ESFAS Radiation Monitor Single Failure Analysis. W/96 Foldout Drawings ML20202F9731998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Songs,Units 2 & 3 1999-09-30
[Table view] |
Text
NRC MONTHLY OPERATING REPORT DOCKET NO. 50-362 UNIT NAME SONGS - 3 DATE June 12. 1986 COMPLETED BY E. R. Stacor TELEPHONE (714) 368-6223 OPERATING STATUS
- 1. Unit Name: San Onofre Nuclear Generating Station, Unit 3
- 2. Reporting Period: May 1986
- 3. Licensed Thermal Power (MWt): 3390
- 4. Nameplate Rating (Gross MWe): 1127
- 5. Design Electrical Rating (Net MWe): 1080
- 6. Maximum Dependable Capacity (Gross MWe): 1127
- 7. Maximum Dependable Capacity (Net MWe): __ 1080
- 8. If Changes Occur In Capacity Ratings (Item 2 Number 3 Through 7)
Since Last Report, Give Reasons:
NA
- 9. Power Level To Which Restricted, If Any (Net MWe): NA
- 10. Reasons For Restrictions, If Any: NA This Month Yr.-to-Date Cumulative
- 11. Hours In Reporting Period 744.00 3,623.00 18,983.00
- 12. Number Of Hours Reactor Was Critical 744.00 2,834.59 12,044.68
- 13. Reactor Reserve Shutdown Hours 0.00 0.00 0.00
- 14. Hours Generator On-Line 744.00 2,525.26 11,340.71
- 15. Unit Reserve Shutdown Hours 0.00 0.00 0.00
- 16. Gross Thermal Energy Generated (MWH) 2,503,081.42 7,966,282.65 33,111,469.99
- 17. Gross Electrical Energy Generated (MWH) 860,319.00 2,681,693.50 11,053,098.50
- 18. Net Electrical Energy Generated (MWH) 817,740.00 2,508,989.00 10,316,334.42
- 19. Unit Service Factor 100.00% 69.70% 59.74%
- 20. Unit Availability Factor 100.00% 69.70% 59.74%
- 21. Unit Capacity Factor (Using MDC Net) 101.77% 64.12% 50.22%
- 22. Unit Capacity Factor (Using DER Net) 101.77% 64.12% 50.32%
- 23. Unit Forced Outage Rate 0.00% 23.41% 16.38%
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
NA
- 25. If Shut Down At End Of Report Period, Estimated Date of Startup: NA
- 26. Units In Test Status (Prior To Commercial Operation): Forecast Achieved INITIAL CRITICALITY NA NA INITIAL ELECTRICITY NA NA COMMERCIAL OPERATION NA NA 7435u
~~
8608150315 860612 PDR ADOCK 05000361 R PDR
AVERAGE DAILY UNIT POWER LEVEL DOCKET N0. 50-362 UNIT SONGS - 3 DATE June 12, 1986 COMPLETED BY E. R. Siacor TELEPHONE (714) 368-6223 i
MONTH May 1986 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 1106.00 17 1107.13 2 1097.67 18 1110.08 3 1107.08 19 1110.67 4 1112.75 20 1109.33 5 1112.71 21 1104.92 6 1112.25 22 1104.79 7 1114.17 23 1096.88 8 1113.04 24 1104.50 9 1090.29 25 1102.83 10 1024.88 26 1102.88 11 995.58 27 1102.21 12 1109.17 28 1102.38 13 1108.13 29 1099.54 14 1108.71 30 1095.29 15 1106.75 31 1097.92 -
16 1102.00 7435u
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-362 UNIT NAME SONGS - 3 REPORT MONTH MAY 1986 DATE June IZ. 1y50 COMPLETED BY E. R. Slacor TELEPHONE (714) 368-6223 Method of Shutting Dura tion Down LER System Component Cause & Cormctive 1 2 3 4 4 Action to No. Date Type (Hours) Reason Reactor No. Code Code Prevent Recurrence NA NA NA NA NA NA NA hA NA NA 1 2 3 4 F- Fo rced Reason: Method: IEEE Std 803-1983 S-Scheduled A-Equipment Failure (Expla in) 1-Manual B-Ma intenance or Test 2-Manual Sc ra m.
C-Refueling 3-Automatic Scram.
D-Regulatory Restriction 4-Continuation from E-Operator Training & License Examination Previous Month F-Adm i ni s t ra t i ve 5-Reduction of 20%
G-Ope ra t iona l Error (Explain) or greater in the H-Other (Explain) past 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> 6-Other (Explain) 7435u/10
SUMMARY
OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO. 50-362 UNIT SONGS - 3 DATE June 12, 1986 COMPLETED BY E. R. Siacor TELEPHONE (714) 368-6223 Date Time Event May 1 0001 Unit is in '4 ode 1 at 100% reactor power.
Turbine load is 1150 MWe gross.
May 10 0940 Commenced power reduction for turbine stop valve testing.
1200 Reactor power at 80%.
1305 Commenced turbine stop valve testing.
1610 Commenced reactor power increase following completion of turbine stop valve testing.
i 1805 Reactor power at 100%. Turbine load is 1154 MWe gross.
May 11 1010 Commenced power reduction per Technical Specification 3.1.3.1 Action Statement 'C' due to Control Element Assembly (CEA) misalignment during monthly CEA exercise.
1100 Reactor power at 65%. Misaligned CEA declared !
inoperable.
1152 Misaligned CEA realigned and declared ;
operable. Exited Technical i Specification 3.1.3.1 Action Statement 'C'.
1352 Commenced power increase to 100% reactor power.
May 12 0040 Reactor power at 100%. Turbine load at 1154 MWe gross.
May 31 2400 Unit is in Mode 1 at 100% reactor power.
Turbine load is 1154 MWe gross.
7435u/11 1
1
REFUELING INFORMATION DOCKET NO. 50-362 UNIT SONGS - 3 DATE June 12, 1986 MONTH: May 1986 COMPLETED BY E. R. Stacor TELEPHONE (714) 368-6223
- 1. Scheduled date for next refueling shutdown.
December 1986
- 2. Scheduled date for restart following refueling.
March 1987
- 3. Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?
No. All required Cycle 3 Amendments have been approved.
What will taese be?
Not Applicable -
- 4. Scheduled date for submitting proposed licensing action and supporting information.
Not Applicable
- 5. Important Licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures.
None
- 6. The number of fuel assemblies, a) In the core. 217 b) In the spent fuel storage pool. 72
- 7. Licensed spent fuel storage capacity. 800 Intended change in spent fuel storage capacity. None
- 8. Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.
Approximately 1997 (refueling only)
Approximately 1993 (Full offload capability) 7435u
NRC MONTHLY OPERATING REPORT DOCKET NO. 50-361 UNIT SONGS - 2 DATE June 12. 1986 COMPLETED BY E. R. Stacor TELEPHONE (714) 368-6223 OPERATING STATUS
- 1. Unit Name: San Onofre Nuclear Generating Station, Unit 2
- 2. Reporting Period: May 1986
- 3. Licensed Thermal Power (MWt): 3390
- 4. Nameplate Rating (Gross MWe): 1127
- 5. Design Electrical Rating (Net MWe): 1070
- 6. Maximum Dependable Capacity (Gross MWe): 1127
- 7. Maximum Dependable Capacity (Net MWe): 1070
- 8. If Changes Occur In Capacity Ratings (Items Number 3 Through 7)
Since Last Report, Give Reasons:
NA
- 9. Power Level To Which Restricted, If Any (Net MWe): NA
- 10. Reasons For Restrictions, If Any: NA This Month Yr.-to-Date Cumulative
- 11. Hours In Reporting Period 744.00 3,623.00 24,432.00 l
- 12. Number Of Hours Reactor Was Critical 0.00 1,706.55 14,587.47 1
- 13. Reactor Reserve Shutdown Hours 0.00 0.00 0.00
- 14. Hours Generator On-Line 0.00 1,700.97 14,310.72 l
- 15. Unit Reserve Shutdown Hours 0.00 0.00 0.00 l
- 16. Gross Thermal Energy Generated (MWH) 0.00 5,172,736.27 45,903,122.40 !
- 17. Gross Electrical Energy Generated (MWH) 0.00 1,726,949.50 15,421,032.00 1
- 18. Net Electrical Energy Generated (MWH) (5,537.12) 1,624,552.56 14,548,057.56
- 19. Unit Service Factor 0.00% 46.95% 58.57%
- 20. Unit Availability Factor 0.00% 46.95% 58.57%
- 21. Unit Capacity Factor (Using MDC Net) 0.00% 41.91% 55.65% i
- 22. Unit Capacity Factor (Using DER Net) 0.00% 41.91% 55.65% l
- 23. Unit Forced Outage Rate 0.00% 3.08% 5.26%
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): 1 Refueling Outage, March 15, 1986, 80 days duration (now in progress)
- 25. If Shut Down At End Of Report Period, Estimated Date of Startup: June 12, 1986
- 26. Units In Test Status (Prior To Commercial Operation): Forecast Achieved INITIAL CRITICALITY NA NA INITIAL ELECTRICITY NA NA COMMERCIAL OPERATION NA NA 7435u
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-361 UNIT SONGS - 2 DATE June 12, 1986 COMPLETED BY E. R. Siacor TELEPHONE (714) 368-6223 MONTH May 1986 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 0.00 17 0.00
~2 0.00 18 0.00 3 0.00 19 0.00 4 0.00 20 0.00 5 0.00 21 0.00 6 0.00 22 0.00 7 0.00 23 0.00 8 0.00 24 0.00 9 0.00 25 0.00 10 0.00 26 0.00 11 0.00 27 0.00 12 0.00 28 0.00 13 0.00 29 0.00 14 0.00 30 0.00 15 0.00 31 0.00 16 0.00 7435u
..; - *;& ,.yy ,
, ; , ; &, l Jj~
, ; .j :
' UNIT SISTDOWNS AND h In REDUCTION $ DOCKET NO. 50-361
.. REPORT MONTH MAY 1986 DATE June 12. 1986 COMPLETED BY_Et R. Simcor
_. > TELEPHONE il13 U 68-6223 Method of , , ,; . y Shutting _ # g Du ra t ion Down LER System Component Cause & Correctivc/
1 2 3 4 ;4 Action to No. Dste Type (Hours) Reason Reactor No. Code Code f reyent Recurrence 25 860315 S 744.00 C 4 NA NA. NA R[ fueling
! J
't s
1 1 2 3 4 i F-fo rced Reason: Method: IEEE Std 803-1983 S-Scheduled A-Equipment Failuro (Explain) 1-Manual B-Maintenance or Test 2-Manual Sc ra m.
C-Refueling 3-Automatic Scram.
D-Regulatory Restriction . 4-Continuation from E-Operator Training & License Examination Previous Month F-Adm i n i st ra t ive 5-Reduction of 20%
C-Ope ra t i ona l Error (Expla in) o r g rea te r i n the H-Other (Explain) past 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> 6-Other ( Expla in) l
, 7435u i
l 1
SUMMARY
OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO. 50-361 UNIT SONGS - 2 DATE June 12,'1986 COMPLETED BY E. R. Siacor TELEPHONE (714) 368-6223 Date Time Event May 1 0001 Unit is in Mode 5, day 48 of Cycle 3 refueling outage.
l May 8 2056 Commenced Reactor Coolant System (RCS) fill t
and vent.
May 9 0012 Completed RCS fill and vent.
May 11 1645 Commenced integrated Engineered Safety Features (ESF) testing.
May 13 1800 Completed ESF testing and restorations.
May 30 1308 Entered Mode'4.
! May 31 2400 Unit is in Mode 4, day 77 of Cycle 3 refueling outage. Preparations for Mode 3
- entry are in progress.
i 1
f 7435u
REFUELING INFORMATION DOCKET NO. 50-361 ,
UNIT SONGS - 2 DATE June 12, 1986 MONTH: May 1986 COMPLETED BY E. R. Siacor TELEPHONE (714) 368-6223
- 1. Scheouled date for next refueling shutdown.
January 1988
- 2. Scheduled date for restart following refueling.
April 1988
- 3. Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?
Not yet determined What will these be?
Not yet determined
- 4. Scheduled date for submitting proposed licensing action and supporting information.
Not Applicable
- 5. Important Licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures.
None
- 6. The number of fuel assemblies.
a) In the core. 217 b) In the spent fuel storage pool. 160
- 7. Licensed spent fuel storage capacity. 800 Intended change in spent fuel storage capacity. None i 8. Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.
Approximately 1997 (refueling only)
Approximately 1993 (full offload capability) 7435u