ML20237J828: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:_ _ _ _ _ _ _                      ___ _
{{#Wiki_filter:_ _ _ _ _ _ _
l g                                                                                                                                                 March 7, 1980                                         .
l g
          .                      HEMORAN00M FOR:                   W. R. Rutherford, RCI                                                                                 ~
March 7, 1980 HEMORAN00M FOR:
                                                                                                                                                                                  ~
W. R. Rutherford, RCI
THRU:                             W. C.               Se' idle, Chief, RC&ES Branch                                                                                                         '                  '
~
s                       .s f'          .
~
FRO.'4:                                                                                                                                                                                           .
THRU:
3                ,.            ;                                W. A. Crossman, Chief, Projects Section w               .              .
W. C. Se' idle, Chief, RC&ES Branch f'
s
.s FRO.'4:
W. A. Crossman, Chief, Projects Section 3
w


==SUBJECT:==
==SUBJECT:==
TI 2512/3, INSPECTION REQUIREMENTS TO VERITY
TI 2512/3, INSPECTION REQUIREMENTS TO VERITY
                                                                                                                                                                                                                ~
' COMPLIANCE WITH ASME CERTIFICATION SYSTEM
4-                              ' COMPLIANCE WITH ASME CERTIFICATION SYSTEM                                                                                                                           '              -
~
                                                      ;      ., REQUIREMENTS                                                                                           -                                          ;. .
4-
                                                                                                            ~                                                                                                         .                              ,
., REQUIREMENTS
                                                                                                                                                                                                ~
~
Region IV RC&ES Branch inspectors have verified that the licensees'for.                                                                                                                                                    '.
~
the following facilities have established an organization for constructiori
Region IV RC&ES Branch inspectors have verified that the licensees'for.
                -                of   the nuclear plant that satisfies ASME Section III, Arti,cle NA-3000 requirements:
the following facilities have established an organization for constructiori of the nuclear plant that satisfies ASME Section III, Arti,cle NA-3000 requirements:
                                                                                                                                                                                                                                                                                    .I
. Wolf Creek, Unit No. -1, IE Inspection Report No. 50-482/79-18 '
                                          . Wolf Creek, Unit No. -1, IE Inspection Report No. 50-482/79-18 '
.(10/22-25/79)
                                            .(10/22-25/79)                                                                                                         .
South Texas Project, Units No.' 1 & 2, IE Inspection Report No.
South Texas Project, Units No.' 1 & 2, IE Inspection Report No.                                                                                                                             '
50 498/79-22;~50-499/79-22 (12/11-14/79)
50 498/79-22;~50-499/79-22 (12/11-14/79)
Comanche' Peak, Units No. 1 & 2, IE Inspection Report No.''
Comanche' Peak, Units No. 1 & 2, IE Inspection Report No.''
                                              $0-445/79,-18; 50-446/79-18 (August and September 1979)
$0-445/79,-18; 50-446/79-18 (August and September 1979)
Waterford, Unit No. 3, IE Inspection Report No.. 50-382/79-10 (8/15-17&,21-24/79)                                                                                                                                                           .                                  .
Waterford, Unit No. 3, IE Inspection Report No.. 50-382/79-10 (8/15-17&,21-24/79)
                                                                                                                                                                                                                                                                                  ' l' River Bend, Units No.1 & 2 IE Inspection Report No. 50-458/80-02; 50-459/80-02 (1/30 & 2/12-15/80                           .
' l' River Bend, Units No.1 & 2 IE Inspection Report No. 50-458/80-02; 50-459/80-02 (1/30 & 2/12-15/80 The above facilities include all those in Region IV for which a construction I
The above facilities include all those in Region IV for which a construction                                                                                                                                                                           I pennit has been issued.
pennit has been issued.
                                        ~
~
                                                                                                                                                                                                            . .                                                                  1 If you have any questions _ in regard to our findings, please contact us.                                                                                                                                                                           >
1 If you have any questions _ in regard to our findings, please contact us.
i W. A. Crossman, Chief                                                                                                     -
i W. A. Crossman, Chief prn p -+e m.%
prn p -+e m.%
... bYV..........
                      *maa n      . . . bYV. . . . . . . . . .
*maa n
                                                            . . . . . . . . . . . . . . . . . . . . .          . . . . . . . . . . . . . . . . . . . . . . .  ..............a;.....
..............a;.....
gC;g.ggn.t.1                 . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . .  ........................    ........................
gC;g.ggn.t.1
                                    ..............................................................................................c . . . . . . . . . . . . . . . . . . . . . .                                                           ..... . . . . . . . . . . . . ,
..............................................................................................c......................
nac scr.u m mn mtcu o:n                                                               * ~.=~ ~~== ~~>~=c""='*"                                                         c" "'                                                                                            i.
nac scr.u m mn mtcu o:n
                                                    ~"
* ~.=~ ~~== ~~>~=c""='*"
8708180365 870814 PDR             FOIA WILLIAM 87-428                         PDR
c" i.
~"
8708180365 870814 PDR FOIA WILLIAM 87-428 PDR


Y                                                                                         .
@l Y
                                                                                                                                                                                                      @l t         .
t e
e                                                                ?
?
j'! f                                            September 18, 1979                                                                           l Docket No. 50-446 l
f j'!
Texas Utilities Generating Company ATTN: Mr. R. J. Gary, Executive Vice President and General Manager 2001 Bryan Tower Dallas, Texas                     75201 Gentlemen:                                                                                                                                                                         '
September 18, 1979 l
Docket No. 50-446 l
Texas Utilities Generating Company ATTN:
Mr. R. J. Gary, Executive Vice President and General Manager 2001 Bryan Tower Dallas, Texas 75201 Gentlemen:
This refers to the telephone conversations between Mr. L. F. Pikar and me on September 17, 1979, and between Mr. Pikar and Mr. W. C. Seidle of my staff on September 18, 1979, concerning your plans to resume the placement of concrete in the Reactor Containment Building exterior wall and dome on September 18, 1979.
This refers to the telephone conversations between Mr. L. F. Pikar and me on September 17, 1979, and between Mr. Pikar and Mr. W. C. Seidle of my staff on September 18, 1979, concerning your plans to resume the placement of concrete in the Reactor Containment Building exterior wall and dome on September 18, 1979.
Fellowing the detection of the inadvertent omission of shear tie reinforcing steel in the 32nd lift of the Unit No. 2 Raactor Containment Building (RCB) exterior wall, placement of additional concrete in the RCB was stopped by a TUGC0 stop work order issued on September 7,1979. This action was confirmed by a Region IV Immediate Action Letter, dated September 7,1979.
Fellowing the detection of the inadvertent omission of shear tie reinforcing steel in the 32nd lift of the Unit No. 2 Raactor Containment Building (RCB) exterior wall, placement of additional concrete in the RCB was stopped by a TUGC0 stop work order issued on September 7,1979. This action was confirmed by a Region IV Immediate Action Letter, dated September 7,1979.
On September 18, 1979, our on-site Resident Raaetor Inspector completed the NRC review of the actions identified in the RIV Immediate Action Letter to correct concrete placement problems which resulted in the omission of shear tie reinforcing steel. Based on the results of the NRC review, we have no                                                                                                         f objection to your plan to resume concrete placement in the shield wall and dome. We will continue to monitor closely your work activities, management controls and implementation of your Quality Assurance program during subsequent inspections.
On September 18, 1979, our on-site Resident Raaetor Inspector completed the NRC review of the actions identified in the RIV Immediate Action Letter to correct concrete placement problems which resulted in the omission of shear tie reinforcing steel. Based on the results of the NRC review, we have no f
objection to your plan to resume concrete placement in the shield wall and dome. We will continue to monitor closely your work activities, management controls and implementation of your Quality Assurance program during subsequent inspections.
If you have any questions regarding this matter, please contact this office.
If you have any questions regarding this matter, please contact this office.
Sincerely, Original Signed by KMl V. Seyfrit
Sincerely, Original Signed by
    *) Q A.)                     ' ~
*) Q )
                                                ~ ~ ' ' "
}}
                                                          }}                                                                                     bec to DAC:ADM for dist.
KMl V. Seyfrit bec to DAC:ADM for dist.
I f                                                                                                                                           Central Files
{[
{[                        K. V. Seyfrit Director                       PDR                         dist. by RIV bec to Reproduction Unit for dist. 9/18/79                                                                         LPDR                       Tex. Dpt. of H.1
I f A.
                              . Central IE Files. ELD. NRR. MIPC.                                                 /                               TTC                       n AD/F               Standards Develpment NSIC               @
' ~
                          *"
~ ~ ' ' "
* Y"RGTaylor/1 h-~~WA0rossa m-                                             idie4 " -WEVet er-.< ~~ ~.4VSeyfri c-~~.-~~~
K. V. Seyfrit Central Files Director PDR dist. by RIV bec to Reproduction Unit for dist. 9/18/79 LPDR Tex. Dpt. of H.1
                                                                    . . SM..I                       7g.........                                             ...~.........g.           ....................
. Central IE Files. ELD. NRR. MIPC.
                        -}
/
                                                              .g.j.                                                                                 .g.
TTC n
                                          ......................... ...........................       .........................m..../.
AD/F Standards Develpment NSIC Y"RGTaylor/1 h-~~WA0rossa m-idie4 " -WEVet er-.< ~~ ~.4VSeyfri c-~~.-~~~
                            ,,s
.. SM..I
                                                                                                                                                                                    -_ p' x
-}
                                      ,,,s,   ,        .s.                                                           . _ _ . . . . . . . . . . . .}}
.g.j.
7g.........
.../..
.g.
....~.........g.
.........................m..................................................
,,s
,,,s,
.s.
-_ p' x}}

Latest revision as of 07:03, 2 December 2024

Provides List of Licensees That Have Established Organization for Const of Nuclear Power Plants That Satisfies ASME Section Iii,Article NA-3000 Requirements.Cps Have Been Issued
ML20237J828
Person / Time
Site: Wolf Creek, River Bend, Waterford, South Texas, Comanche Peak, 05000000
Issue date: 03/07/1980
From: Crossman W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Rutherford W
NRC
Shared Package
ML20237J513 List:
References
FOIA-87-428 NUDOCS 8708180365
Download: ML20237J828 (1)


Text

_ _ _ _ _ _ _

l g

March 7, 1980 HEMORAN00M FOR:

W. R. Rutherford, RCI

~

~

THRU:

W. C. Se' idle, Chief, RC&ES Branch f'

s

.s FRO.'4:

W. A. Crossman, Chief, Projects Section 3

w

SUBJECT:

TI 2512/3, INSPECTION REQUIREMENTS TO VERITY

' COMPLIANCE WITH ASME CERTIFICATION SYSTEM

~

4-

., REQUIREMENTS

~

~

Region IV RC&ES Branch inspectors have verified that the licensees'for.

the following facilities have established an organization for constructiori of the nuclear plant that satisfies ASME Section III, Arti,cle NA-3000 requirements:

. Wolf Creek, Unit No. -1, IE Inspection Report No. 50-482/79-18 '

.(10/22-25/79)

South Texas Project, Units No.' 1 & 2, IE Inspection Report No.

50 498/79-22;~50-499/79-22 (12/11-14/79)

Comanche' Peak, Units No. 1 & 2, IE Inspection Report No.

$0-445/79,-18; 50-446/79-18 (August and September 1979)

Waterford, Unit No. 3, IE Inspection Report No.. 50-382/79-10 (8/15-17&,21-24/79)

' l' River Bend, Units No.1 & 2 IE Inspection Report No. 50-458/80-02; 50-459/80-02 (1/30 & 2/12-15/80 The above facilities include all those in Region IV for which a construction I

pennit has been issued.

~

1 If you have any questions _ in regard to our findings, please contact us.

i W. A. Crossman, Chief prn p -+e m.%

... bYV..........

  • maa n

..............a;.....

gC;g.ggn.t.1

..............................................................................................c......................

nac scr.u m mn mtcu o:n

  • ~.=~ ~~== ~~>~=c""='*"

c" i.

~"

8708180365 870814 PDR FOIA WILLIAM 87-428 PDR

@l Y

t e

?

f j'!

September 18, 1979 l

Docket No. 50-446 l

Texas Utilities Generating Company ATTN:

Mr. R. J. Gary, Executive Vice President and General Manager 2001 Bryan Tower Dallas, Texas 75201 Gentlemen:

This refers to the telephone conversations between Mr. L. F. Pikar and me on September 17, 1979, and between Mr. Pikar and Mr. W. C. Seidle of my staff on September 18, 1979, concerning your plans to resume the placement of concrete in the Reactor Containment Building exterior wall and dome on September 18, 1979.

Fellowing the detection of the inadvertent omission of shear tie reinforcing steel in the 32nd lift of the Unit No. 2 Raactor Containment Building (RCB) exterior wall, placement of additional concrete in the RCB was stopped by a TUGC0 stop work order issued on September 7,1979. This action was confirmed by a Region IV Immediate Action Letter, dated September 7,1979.

On September 18, 1979, our on-site Resident Raaetor Inspector completed the NRC review of the actions identified in the RIV Immediate Action Letter to correct concrete placement problems which resulted in the omission of shear tie reinforcing steel. Based on the results of the NRC review, we have no f

objection to your plan to resume concrete placement in the shield wall and dome. We will continue to monitor closely your work activities, management controls and implementation of your Quality Assurance program during subsequent inspections.

If you have any questions regarding this matter, please contact this office.

Sincerely, Original Signed by

  • ) Q )

KMl V. Seyfrit bec to DAC:ADM for dist. {[ I f A. ' ~ ~ ~ ' ' " K. V. Seyfrit Central Files Director PDR dist. by RIV bec to Reproduction Unit for dist. 9/18/79 LPDR Tex. Dpt. of H.1 . Central IE Files. ELD. NRR. MIPC. / TTC n AD/F Standards Develpment NSIC Y"RGTaylor/1 h-~~WA0rossa m-idie4 " -WEVet er-.< ~~ ~.4VSeyfri c-~~.-~~~ .. SM..I -} .g.j. 7g......... .../.. .g. ....~.........g. .........................m.................................................. ,,s ,,,s, .s. -_ p' x}}