{{#Wiki_filter:August 17, 2021 Mrs. Maria L. Lacal Executive Vice President/
{{#Wiki_filter:August 17, 2021 Mrs. Maria L. Lacal Executive Vice President/
Chief Nuclear Officer Mail Station 7605 Arizona Public Service Company P.O. Box 52034 Phoenix, AZ 85072-2034
Chief Nuclear Officer Mail Station 7605 Arizona Public Service Company P.O. Box 52034 Phoenix, AZ 85072-2034  


==SUBJECT:==
==SUBJECT:==
PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3 - ISSUANCE OF AMENDMENT NOS. 216, 216, AND 216 REGARDING REVISION TO TECHNICAL SPECIFICATIONS TO ADOPT TSTF-501, REVISION 1, RELOCATE STORED FUEL OIL AND LUBE OIL VOLUME VALUES TO LICENSEE CONTROL (EPID L-2020-LLA-0228)
PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3 - ISSUANCE OF AMENDMENT NOS. 216, 216, AND 216 REGARDING REVISION TO TECHNICAL SPECIFICATIONS TO ADOPT TSTF-501, REVISION 1, RELOCATE STORED FUEL OIL AND LUBE OIL VOLUME VALUES TO LICENSEE CONTROL (EPID L-2020-LLA-0228)  


==Dear Mrs. Lacal:==
==Dear Mrs. Lacal:==
The U.S. Nuclear Regulatory Commission (the Commission) has issued the enclosed Amendment Nos. 216, 216, and 216, to Renewed Facility Operating License Nos. NPF-41, NPF-51, and NPF-74 for the Palo Verde Nuclear Generating Station (Palo Verde), Units 1, 2, and 3, respectively. The amendments consist of changes to the technical specifications (TSs) in response to your application dated October 8, 2020.
The U.S. Nuclear Regulatory Commission (the Commission) has issued the enclosed Amendment Nos. 216, 216, and 216, to Renewed Facility Operating License Nos. NPF-41, NPF-51, and NPF-74 for the Palo Verde Nuclear Generating Station (Palo Verde), Units 1, 2, and 3, respectively. The amendments consist of changes to the technical specifications (TSs) in response to your application dated October 8, 2020.
The amendments change Palo Verde TS 3.8.3, Diesel Fuel Oil, Lube Oil, and Starting Air, by removing the current stored diesel fuel oil and lube oil numerical volume requirements from the TSs and placing them in the TS Bases so that they may be modified under licensee control, consistent with Technical Specifications Task Force (TSTF) Improved Standard Technical Specifications Change Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control, dated February 20, 2009. The availability of this TS improvement was announced in the Federal Register on May 26, 2010 (75 FR 29588) as part of the consolidated line item improvement process.
The amendments change Palo Verde TS 3.8.3, Diesel Fuel Oil, Lube Oil, and Starting Air, by removing the current stored diesel fuel oil and lube oil numerical volume requirements from the TSs and placing them in the TS Bases so that they may be modified under licensee control, consistent with Technical Specifications Task Force (TSTF) Improved Standard Technical Specifications Change Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control, dated February 20, 2009. The availability of this TS improvement was announced in the Federal Register on May 26, 2010 (75 FR 29588) as part of the consolidated line item improvement process.
The TSs are also revised such that the stored diesel fuel oil and lube oil inventory will require that a 7-day supply be available for each diesel generator at Palo Verde. The licensee also proposed associated changes to the corresponding surveillance requirements and TS Bases.
The TSs are also revised such that the stored diesel fuel oil and lube oil inventory will require that a 7-day supply be available for each diesel generator at Palo Verde. The licensee also proposed associated changes to the corresponding surveillance requirements and TS Bases.  


M. Lacal                                        A copy of the related Safety Evaluation is also enclosed. Notice of Issuance will be included in the Commissions monthly Federal Register notice.
A copy of the related Safety Evaluation is also enclosed. Notice of Issuance will be included in the Commissions monthly Federal Register notice.
Sincerely,
Sincerely,  
                                              /RA/
/RA/
Siva P. Lingam, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. STN 50-528, STN 50-529, and STN 50-530
Siva P. Lingam, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. STN 50-528, STN 50-529, and STN 50-530  


==Enclosures:==
==Enclosures:==
Line 39: Line 38:
: 2. Amendment No. 216 to NPF-51
: 2. Amendment No. 216 to NPF-51
: 3. Amendment No. 216 to NPF-74
: 3. Amendment No. 216 to NPF-74
: 4. Safety Evaluation cc: Listserv
: 4. Safety Evaluation cc: Listserv  


ARIZONA PUBLIC SERVICE COMPANY, ET AL.
ARIZONA PUBLIC SERVICE COMPANY, ET AL.
DOCKET NO. STN 50-528 PALO VERDE NUCLEAR GENERATING STATION, UNIT 1 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 216 License No. NPF-41
DOCKET NO. STN 50-528 PALO VERDE NUCLEAR GENERATING STATION, UNIT 1 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 216 License No. NPF-41
: 1. The Nuclear Regulatory Commission (the Commission) has found that:
: 1.
A. The application for amendment by the Arizona Public Service Company (APS or the licensee) on behalf of itself and the Salt River Project Agricultural Improvement and Power District, El Paso Electric Company, Southern California Edison Company, Public Service Company of New Mexico, Los Angeles Department of Water and Power, and Southern California Public Power Authority dated October 8, 2020, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commissions regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commissions regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commissions regulations and all applicable requirements have been satisfied.
The Nuclear Regulatory Commission (the Commission) has found that:
Enclosure 1
A.
: 2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C(2) of Renewed Facility Operating License No. NPF-41 is hereby amended to read as follows:
The application for amendment by the Arizona Public Service Company (APS or the licensee) on behalf of itself and the Salt River Project Agricultural Improvement and Power District, El Paso Electric Company, Southern California Edison Company, Public Service Company of New Mexico, Los Angeles Department of Water and Power, and Southern California Public Power Authority dated October 8, 2020, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commissions regulations set forth in 10 CFR Chapter I; B.
(2)     Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 216, and the Environmental Protection Plan contained in Appendix B, are hereby incorporated into this renewed operating license. APS shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan, except where otherwise stated in specific license conditions.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
: 3. This license amendment is effective as of the date of issuance and shall be implemented within 90 days of the date of issuance.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commissions regulations; D.
FOR THE NUCLEAR REGULATORY COMMISSION Digitally signed by Jennifer L. Jennifer L. Dixon-Herrity Date: 2021.08.17 Dixon-Herrity  14:32:19 -04'00' Jennifer L. Dixon-Herrity, Chief Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commissions regulations and all applicable requirements have been satisfied.
: 2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C(2) of Renewed Facility Operating License No. NPF-41 is hereby amended to read as follows:
(2)
Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 216, and the Environmental Protection Plan contained in Appendix B, are hereby incorporated into this renewed operating license. APS shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan, except where otherwise stated in specific license conditions.
: 3.
This license amendment is effective as of the date of issuance and shall be implemented within 90 days of the date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION Jennifer L. Dixon-Herrity, Chief Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation  


==Attachment:==
==Attachment:==
 
Changes to Renewed Facility Operating License No. NPF-41 and the Technical Specifications Date of Issuance: August 17, 2021 Jennifer L.
Changes to Renewed Facility Operating License No. NPF-41 and the Technical Specifications Date of Issuance: August 17, 2021
Dixon-Herrity Digitally signed by Jennifer L. Dixon-Herrity Date: 2021.08.17 14:32:19 -04'00'


ARIZONA PUBLIC SERVICE COMPANY, ET AL.
ARIZONA PUBLIC SERVICE COMPANY, ET AL.
DOCKET NO. STN 50-529 PALO VERDE NUCLEAR GENERATING STATION, UNIT 2 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 216 License No. NPF-51
DOCKET NO. STN 50-529 PALO VERDE NUCLEAR GENERATING STATION, UNIT 2 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 216 License No. NPF-51
: 1. The Nuclear Regulatory Commission (the Commission) has found that:
: 1.
A. The application for amendment by the Arizona Public Service Company (APS or the licensee) on behalf of itself and the Salt River Project Agricultural Improvement and Power District, El Paso Electric Company, Southern California Edison Company, Public Service Company of New Mexico, Los Angeles Department of Water and Power, and Southern California Public Power Authority dated October 8, 2020, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commissions regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commissions regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commissions regulations and all applicable requirements have been satisfied.
The Nuclear Regulatory Commission (the Commission) has found that:
Enclosure 2
A.
: 2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C(2) of Renewed Facility Operating License No. NPF-51 is hereby amended to read as follows:
The application for amendment by the Arizona Public Service Company (APS or the licensee) on behalf of itself and the Salt River Project Agricultural Improvement and Power District, El Paso Electric Company, Southern California Edison Company, Public Service Company of New Mexico, Los Angeles Department of Water and Power, and Southern California Public Power Authority dated October 8, 2020, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commissions regulations set forth in 10 CFR Chapter I; B.
(2)     Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 216, and the Environmental Protection Plan contained in Appendix B, are hereby incorporated into this renewed operating license. APS shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan, except where otherwise stated in specific license conditions.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
: 3. This license amendment is effective as of the date of issuance and shall be implemented within 90 days of the date of issuance.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commissions regulations; D.
FOR THE NUCLEAR REGULATORY COMMISSION Digitally signed by Jennifer L. Jennifer L. Dixon-Herrity Date: 2021.08.17 Dixon-Herrity  14:33:13 -04'00' Jennifer L. Dixon-Herrity, Chief Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commissions regulations and all applicable requirements have been satisfied.
: 2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C(2) of Renewed Facility Operating License No. NPF-51 is hereby amended to read as follows:
(2)
Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 216, and the Environmental Protection Plan contained in Appendix B, are hereby incorporated into this renewed operating license. APS shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan, except where otherwise stated in specific license conditions.
: 3.
This license amendment is effective as of the date of issuance and shall be implemented within 90 days of the date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION Jennifer L. Dixon-Herrity, Chief Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation  


==Attachment:==
==Attachment:==
 
Changes to Renewed Facility Operating License No. NPF-51 and the Technical Specifications Date of Issuance: August 17, 2021 Jennifer L.
Changes to Renewed Facility Operating License No. NPF-51 and the Technical Specifications Date of Issuance: August 17, 2021
Dixon-Herrity Digitally signed by Jennifer L. Dixon-Herrity Date: 2021.08.17 14:33:13 -04'00'


ARIZONA PUBLIC SERVICE COMPANY, ET AL.
ARIZONA PUBLIC SERVICE COMPANY, ET AL.
DOCKET NO. STN 50-530 PALO VERDE NUCLEAR GENERATING STATION, UNIT 3 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 216 License No. NPF-74
DOCKET NO. STN 50-530 PALO VERDE NUCLEAR GENERATING STATION, UNIT 3 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 216 License No. NPF-74
: 1. The Nuclear Regulatory Commission (the Commission) has found that:
: 1.
A. The application for amendment by the Arizona Public Service Company (APS or the licensee) on behalf of itself and the Salt River Project Agricultural Improvement and Power District, El Paso Electric Company, Southern California Edison Company, Public Service Company of New Mexico, Los Angeles Department of Water and Power, and Southern California Public Power Authority dated October 8, 2020, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commissions regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commissions regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commissions regulations and all applicable requirements have been satisfied.
The Nuclear Regulatory Commission (the Commission) has found that:
Enclosure 3
A.
: 2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C(2) of Renewed Facility Operating License No. NPF-74 is hereby amended to read as follows:
The application for amendment by the Arizona Public Service Company (APS or the licensee) on behalf of itself and the Salt River Project Agricultural Improvement and Power District, El Paso Electric Company, Southern California Edison Company, Public Service Company of New Mexico, Los Angeles Department of Water and Power, and Southern California Public Power Authority dated October 8, 2020, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commissions regulations set forth in 10 CFR Chapter I; B.
(2)     Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 216, and the Environmental Protection Plan contained in Appendix B, are hereby incorporated into this renewed operating license. APS shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan, except where otherwise stated in specific license conditions.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
: 3. This license amendment is effective as of the date of issuance and shall be implemented within 90 days of the date of issuance.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commissions regulations; D.
FOR THE NUCLEAR REGULATORY COMMISSION Digitally signed by Jennifer L. Jennifer L. Dixon-Herrity Date: 2021.08.17 Dixon-Herrity  14:41:55 -04'00' Jennifer L. Dixon-Herrity, Chief Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commissions regulations and all applicable requirements have been satisfied.
: 2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C(2) of Renewed Facility Operating License No. NPF-74 is hereby amended to read as follows:
(2)
Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 216, and the Environmental Protection Plan contained in Appendix B, are hereby incorporated into this renewed operating license. APS shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan, except where otherwise stated in specific license conditions.
: 3.
This license amendment is effective as of the date of issuance and shall be implemented within 90 days of the date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION Jennifer L. Dixon-Herrity, Chief Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation  


==Attachment:==
==Attachment:==
 
Changes to Renewed Facility Operating License No. NPF-74 and the Technical Specifications Date of Issuance: August 17, 2021 Jennifer L.
Changes to Renewed Facility Operating License No. NPF-74 and the Technical Specifications Date of Issuance: August 17, 2021
Dixon-Herrity Digitally signed by Jennifer L. Dixon-Herrity Date: 2021.08.17 14:41:55 -04'00'


ATTACHMENT TO LICENSE AMENDMENT NOS. 216, 216, AND 216 TO RENEWED FACILITY OPERATING LICENSE NOS. NPF-41, NPF-51, AND NPF-74 PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3 DOCKET NOS. STN 50-528, STN 50-529, AND STN 50-530 Replace the following pages of Renewed Facility Operating License Nos. NPF-41, NPF-51, and NPF-74, and the Appendix A, Technical Specifications, with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.
ATTACHMENT TO LICENSE AMENDMENT NOS. 216, 216, AND 216 TO RENEWED FACILITY OPERATING LICENSE NOS. NPF-41, NPF-51, AND NPF-74 PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3 DOCKET NOS. STN 50-528, STN 50-529, AND STN 50-530 Replace the following pages of Renewed Facility Operating License Nos. NPF-41, NPF-51, and NPF-74, and the Appendix A, Technical Specifications, with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.
Renewed Facility Operating License No. NPF-41 REMOVE                       INSERT 5                           5 Renewed Facility Operating License No. NPF-51 REMOVE                       INSERT 6                           6 Renewed Facility Operating License No. NPF-74 REMOVE                       INSERT 4                           4 Technical Specifications REMOVE                       INSERT 3.8.3-1                     3.8.3-1 3.8.3-3                     3.8.3-3
Renewed Facility Operating License No. NPF-41 REMOVE INSERT 5
5 Renewed Facility Operating License No. NPF-51 REMOVE INSERT 6
6 Renewed Facility Operating License No. NPF-74 REMOVE INSERT 4
4 Technical Specifications REMOVE INSERT 3.8.3-1 3.8.3-1 3.8.3-3 3.8.3-3  


(1)     Maximum Power Level Arizona Public Service Company (APS) is authorized to operate the facility at reactor core power levels not in excess of 3990 megawatts thermal (100% power), in accordance with the conditions specified herein.
Renewed Facility Operating License No. NPF-41 Amendment No. 216 (1)
(2)     Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 216, and the Environmental Protection Plan contained in Appendix B, are hereby incorporated into this renewed operating license.
Maximum Power Level Arizona Public Service Company (APS) is authorized to operate the facility at reactor core power levels not in excess of 3990 megawatts thermal (100% power), in accordance with the conditions specified herein.
(2)
Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 216, and the Environmental Protection Plan contained in Appendix B, are hereby incorporated into this renewed operating license.
APS shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan, except where otherwise stated in specific license conditions.
APS shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan, except where otherwise stated in specific license conditions.
(3)     Antitrust Conditions This renewed operating license is subject to the antitrust conditions delineated in Appendix C to this renewed license.
(3)
(4)     Operating Staff Experience Requirements Deleted (5)     Post-Fuel-Loading Initial Test Program (Section 14, SER and SSER 2)*
Antitrust Conditions This renewed operating license is subject to the antitrust conditions delineated in Appendix C to this renewed license.
Deleted (6)     Environmental Qualification Deleted (7)     Fire Protection Program APS shall implement and maintain in effect all provisions of the approved fire protection program as described in the Final Safety Analysis Report for the facility, as supplemented and amended, and as approved in the SER through Supplement 11, subject to the following provision:
(4)
Operating Staff Experience Requirements Deleted (5)
Post-Fuel-Loading Initial Test Program (Section 14, SER and SSER 2)*
Deleted (6)
Environmental Qualification Deleted (7)
Fire Protection Program APS shall implement and maintain in effect all provisions of the approved fire protection program as described in the Final Safety Analysis Report for the facility, as supplemented and amended, and as approved in the SER through Supplement 11, subject to the following provision:
APS may make changes to the approved fire protection program without prior approval of the Commission only if those changes would not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire.
APS may make changes to the approved fire protection program without prior approval of the Commission only if those changes would not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire.
The parenthetical notation following the title of many license conditions denotes the section of the Safety Evaluation Report and/or its supplements wherein the license condition is discussed.
* The parenthetical notation following the title of many license conditions denotes the section of the Safety Evaluation Report and/or its supplements wherein the license condition is discussed.  
Renewed Facility Operating License No. NPF-41 Amendment No. 216


(1)     Maximum Power Level Arizona Public Service Company (APS) is authorized to operate the facility at reactor core power levels not in excess of 3990 megawatts thermal (100% power) in accordance with the conditions specified herein.
Renewed Facility Operating License No. NPF-51 Amendment No. 216 (1)
(2)     Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 216, and the Environmental Protection Plan contained in Appendix B, are hereby incorporated into this renewed operating license.
Maximum Power Level Arizona Public Service Company (APS) is authorized to operate the facility at reactor core power levels not in excess of 3990 megawatts thermal (100% power) in accordance with the conditions specified herein.
(2)
Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 216, and the Environmental Protection Plan contained in Appendix B, are hereby incorporated into this renewed operating license.
APS shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan, except where otherwise stated in specific license conditions.
APS shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan, except where otherwise stated in specific license conditions.
(3)     Antitrust Conditions This renewed operating license is subject to the antitrust conditions delineated in Appendix C to this renewed operating license.
(3)
(4)     Operating Staff Experience Requirements (Section 13.1.2, SSER 9)*
Antitrust Conditions This renewed operating license is subject to the antitrust conditions delineated in Appendix C to this renewed operating license.
Deleted (5)     Initial Test Program (Section 14, SER and SSER 2)
(4)
Deleted (6)     Fire Protection Program APS shall implement and maintain in effect all provisions of the approved fire protection program as described in the Final Safety Analysis Report for the facility, as supplemented and amended, and as approved in the SER through Supplement 11, subject to the following provision:
Operating Staff Experience Requirements (Section 13.1.2, SSER 9)*
Deleted (5)
Initial Test Program (Section 14, SER and SSER 2)
Deleted (6)
Fire Protection Program APS shall implement and maintain in effect all provisions of the approved fire protection program as described in the Final Safety Analysis Report for the facility, as supplemented and amended, and as approved in the SER through Supplement 11, subject to the following provision:
APS may make changes to the approved fire protection program without prior approval of the Commission only if those changes would not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire.
APS may make changes to the approved fire protection program without prior approval of the Commission only if those changes would not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire.
(7)     Inservice Inspection Program (Sections 5.2.4 and 6.6, SER and SSER 9)
(7)
Deleted The parenthetical notation following the title of many license conditions denotes the section of the Safety Evaluation Report and/or its supplements wherein the license condition is discussed.
Inservice Inspection Program (Sections 5.2.4 and 6.6, SER and SSER 9)
Renewed Facility Operating License No. NPF-51 Amendment No. 216
Deleted
* The parenthetical notation following the title of many license conditions denotes the section of the Safety Evaluation Report and/or its supplements wherein the license condition is discussed.  


(4)     Pursuant to the Act and 10 CFR Part 30, 40, and 70, APS to receive, possess, and use in amounts required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (5)     Pursuant to the Act and 10 CFR Parts 30, 40, and 70, APS to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.
Renewed Facility Operating License No. NPF-74 Amendment No. 216 (4)
C. This renewed operating license shall be deemed to contain and is subject to the conditions specified in the Commissions regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:
Pursuant to the Act and 10 CFR Part 30, 40, and 70, APS to receive, possess, and use in amounts required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (5)
(1)     Maximum Power Level Arizona Public Service Company (APS) is authorized to operate the facility at reactor core power levels not in excess of 3990 megawatts thermal (100% power), in accordance with the conditions specified herein.
Pursuant to the Act and 10 CFR Parts 30, 40, and 70, APS to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.
(2)     Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 216, and the Environmental Protection Plan contained in Appendix B, are hereby incorporated into this renewed operating license.
C.
This renewed operating license shall be deemed to contain and is subject to the conditions specified in the Commissions regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:
(1)
Maximum Power Level Arizona Public Service Company (APS) is authorized to operate the facility at reactor core power levels not in excess of 3990 megawatts thermal (100% power), in accordance with the conditions specified herein.
(2)
Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 216, and the Environmental Protection Plan contained in Appendix B, are hereby incorporated into this renewed operating license.
APS shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan, except where otherwise stated in specific license conditions.
APS shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan, except where otherwise stated in specific license conditions.
(3)     Antitrust Conditions This renewed operating license is subject to the antitrust conditions delineated in Appendix C to this renewed operating license.
(3)
(4)     Initial Test Program (Section 14, SER and SSER 2)
Antitrust Conditions This renewed operating license is subject to the antitrust conditions delineated in Appendix C to this renewed operating license.
Deleted (5)     Additional Conditions The Additional Conditions contained in Appendix D, as revised through Amendment No. 212, are hereby incorporated into this renewed operating license. The licensee shall operate the facility in accordance with the Additional Conditions.
(4)
Renewed Facility Operating License No. NPF-74 Amendment No. 216
Initial Test Program (Section 14, SER and SSER 2)
Deleted (5)
Additional Conditions The Additional Conditions contained in Appendix D, as revised through Amendment No. 212, are hereby incorporated into this renewed operating license. The licensee shall operate the facility in accordance with the Additional Conditions.  


Diesel Fuel Oil, Lube Oil, and Starting Air 3.8.3 3.8 ELECtRICAL POVVER SYSTEMS 3.8.3 Diesel Fuel Oil, Lube Oil, and Starting Air LCO 3.8.3
Diesel Fuel Oil, Lube Oil, and Starting Air 3.8.3 3.8 ELECtRICAL POVVER SYSTEMS 3.8.3 Diesel Fuel Oil, Lube Oil, and Starting Air LCO 3.8.3
* Toe stored diesel fuel oil, lube oil, and starting air subsystem shall be within limits for each required diesel generator (DG).         --
* Toe stored diesel fuel oil, lube oil, and starting air subsystem shall be within limits for each required diesel generator (DG).
APPLICABILITY:         VVhen associated DG is required to be OPERABLE.
APPLICABILITY:
ACTIONS
VVhen associated DG is required to be OPERABLE.
ACTIONS  
--------------NOTE--------------
--------------NOTE--------------
Separate Condition entry is allowed for each DG.
Separate Condition entry is allowed for each DG.
CONDITION                     REQUIRED ACTION                 COMPLETION TIME A. One or more DGs           A1         Restore fuel oirleyel to   48 hours with fuel level less                 within limits.
CONDITION REQUIRED ACTION COMPLETION TIME A.
One or more DGs A1 Restore fuel oirleyel to 48 hours with fuel level less within limits.
than a 7 day supply and greater than a 6 day supply in storage tank.
than a 7 day supply and greater than a 6 day supply in storage tank.
I                                           -                        '
I
: 8. One or more DGs           8.1       Restore lube oil             48 hours with lube oil inventory             inventory to within less than a 7 day                   limits.                               -
: 8.
supply and greater
One or more DGs 8.1 Restore lube oil 48 hours with lube oil inventory inventory to within less than a 7 day limits.
    - than a 6 day supply.                               -
supply and greater  
C. One or more DGs with           C.1       Restore fuel oil total       7days stored fuel oil total                   ~articulates to within
- than a 6 day supply.
    ~articulates not within                   mits.                           --
C. One or more DGs with C.1 Restore fuel oil total 7days stored fuel oil total  
~articulates to within  
~articulates not within mits.
mits.
mits.
(continued)
( continued)
PALO VERDE UNITS 1,2,3                         3.8.3-1                 AMENDMENT NO. 447; 216
PALO VERDE UNITS 1,2,3 3.8.3-1 AMENDMENT NO. 447; 216  


Diesel Fuel Oil, Lube Oil, and Starting Air 3.8.3 SURVEILLANCE REQUIREMENTS SURVEILLANCE                                    FREQUENCY SR 3.8.3.1 Verify each fuel oil storage tank contains :2: a 7     In accordance day supply of fuel.                                   with the Surveillance Frequency Control Program SR 3.8.3.2  Verify lubricating oil inventory is :2: a 7 day       In accordance supply.                                               with the Surveillance Frequency Control Program SR 3.8.3.3  Verify fuel oil properties of new and stored fuel     In accordance oil are tested in accordance with, and                 with the Diesel maintained within the limits of, the Diesel Fuel      Fuel Oil Testing Oil Testing Program.                                   Program SR 3.8.3.4  Verify each DG starting air receiver pressure is       In accordance
Diesel Fuel Oil, Lube Oil, and Starting Air 3.8.3 SURVEILLANCE REQUIREMENTS SR 3.8.3.1 SR 3.8.3.2 SR 3.8.3.3 SR 3.8.3.4 SR 3.8.3.5 SURVEILLANCE Verify each fuel oil storage tank contains :2: a 7 day supply of fuel.
:2: 230 psig.                                         with the Surveillance Frequency Control Program SR 3.8.3.5  Check for and remove accumulated water from           In accordance each fuel oil storage tank.                           with the Surveillance Frequency Control Program PALO VERDE UNITS 1,2,3                 3.8.3-3             AMENDMENT NO. 484, 4 , 216
Verify lubricating oil inventory is :2: a 7 day supply.
Verify fuel oil properties of new and stored fuel oil are tested in accordance with, and maintained within the limits of, the Diesel Fuel Oil Testing Program.
Verify each DG starting air receiver pressure is
:2: 230 psig.
Check for and remove accumulated water from each fuel oil storage tank.
FREQUENCY In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program In accordance with the Diesel Fuel Oil Testing Program In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program PALO VERDE UNITS 1,2,3 3.8.3-3 AMENDMENT NO. 484, 4-88-, 216


SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NOS. 216, 216, AND 216 TO RENEWED FACILITY OPERATING LICENSE NOS. NPF-41, NPF-51, AND NPF-74 ARIZONA PUBLIC SERVICE COMPANY, ET AL.
SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NOS. 216, 216, AND 216 TO RENEWED FACILITY OPERATING LICENSE NOS. NPF-41, NPF-51, AND NPF-74 ARIZONA PUBLIC SERVICE COMPANY, ET AL.
PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3 DOCKET NOS. STN 50-528, STN 50-529, AND STN 50-530
PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3 DOCKET NOS. STN 50-528, STN 50-529, AND STN 50-530  
 
==1.0      INTRODUCTION==


==1.0 INTRODUCTION==
By {{letter dated|date=October 8, 2020|text=letter dated October 8, 2020}} (Agencywide Documents Access and Management System (ADAMS) Accession No. ML20282A953), Arizona Public Service Company (the licensee) submitted a license amendment request to revise the Technical Specifications (TSs) for Palo Verde Nuclear Generating Station (Palo Verde), Units 1, 2, and 3.
By {{letter dated|date=October 8, 2020|text=letter dated October 8, 2020}} (Agencywide Documents Access and Management System (ADAMS) Accession No. ML20282A953), Arizona Public Service Company (the licensee) submitted a license amendment request to revise the Technical Specifications (TSs) for Palo Verde Nuclear Generating Station (Palo Verde), Units 1, 2, and 3.
The proposed changes would revise Palo Verde TS 3.8.3, Diesel Fuel Oil, Lube Oil, and Starting Air, by removing the current stored diesel fuel oil and lube oil numerical volume requirements from the TSs and placing them in the TS Bases so that they may be modified under licensee control, consistent with Technical Specifications Task Force (TSTF) Improved Standard Technical Specifications Change Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control, dated February 20, 2009 (ADAMS Accession No. ML090510686). The TSs would also be revised such that the stored diesel fuel oil and lube oil inventory will require that a 7-day supply be available for each diesel generator (DG) at Palo Verde. The licensee also proposed associated changes to the corresponding surveillance requirements (SRs) and TS Bases.
The proposed changes would revise Palo Verde TS 3.8.3, Diesel Fuel Oil, Lube Oil, and Starting Air, by removing the current stored diesel fuel oil and lube oil numerical volume requirements from the TSs and placing them in the TS Bases so that they may be modified under licensee control, consistent with Technical Specifications Task Force (TSTF) Improved Standard Technical Specifications Change Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control, dated February 20, 2009 (ADAMS Accession No. ML090510686). The TSs would also be revised such that the stored diesel fuel oil and lube oil inventory will require that a 7-day supply be available for each diesel generator (DG) at Palo Verde. The licensee also proposed associated changes to the corresponding surveillance requirements (SRs) and TS Bases.
Any change to the TSs, including the numerical volume requirements contained therein, requires prior approval from the U.S. Nuclear Regulatory Commission (NRC, the Commission).
Any change to the TSs, including the numerical volume requirements contained therein, requires prior approval from the U.S. Nuclear Regulatory Commission (NRC, the Commission).
A licensee may need to modify diesel fuel oil numerical volumes to account for changes to the energy content (British Thermal Units (BTU)/gallon)) of available fuels in the market.
A licensee may need to modify diesel fuel oil numerical volumes to account for changes to the energy content (British Thermal Units (BTU)/gallon)) of available fuels in the market.
Fluctuations in energy content could be caused by a variety of factors, including changes to regulatory requirements. Accordingly, the licensees proposed changes would remove the numerical volume requirements for stored diesel fuel oil and lube oil from the TSs and would replace them with duration-based diesel operating time requirements. If approved, these amendments would permit the numerical volume requirements for stored diesel fuel oil and lube oil to be modified under licensee control. Changes to the affected TS Bases pages will be made by the licensee in accordance with TS 5.5.14, Technical Specifications (TS) Bases Control Program.
Fluctuations in energy content could be caused by a variety of factors, including changes to regulatory requirements. Accordingly, the licensees proposed changes would remove the numerical volume requirements for stored diesel fuel oil and lube oil from the TSs and would replace them with duration-based diesel operating time requirements. If approved, these amendments would permit the numerical volume requirements for stored diesel fuel oil and lube oil to be modified under licensee control. Changes to the affected TS Bases pages will be made by the licensee in accordance with TS 5.5.14, Technical Specifications (TS) Bases Control Program.  
Enclosure 4


==2.0     REGULATORY EVALUATION==
==2.0 REGULATORY EVALUATION==
2.1


2.1      System Description The standby alternating current (AC) power sources are a part of the primary success path and function, or actuate to mitigate a design-basis accident or transient that either assumes the failure of, or presents a challenge to, the integrity of a fission product barrier. Diesel fuel oil and lube oil requirements are retained in the TSs as a limiting condition for operation (LCO) under Title 10 of the Code of Federal Regulations Part 50, Section 50.36(c)(2)(i) because they support the operation of the standby AC power sources.
===System Description===
The standby alternating current (AC) power sources are a part of the primary success path and function, or actuate to mitigate a design-basis accident or transient that either assumes the failure of, or presents a challenge to, the integrity of a fission product barrier. Diesel fuel oil and lube oil requirements are retained in the TSs as a limiting condition for operation (LCO) under Title 10 of the Code of Federal Regulations Part 50, Section 50.36(c)(2)(i) because they support the operation of the standby AC power sources.
Each Palo Verde Units standby AC power system is powered by two independent DGs capable of an automatic start at any time and capable of continued operation at rated load, voltage, and frequency until manually stopped. Each DG is provided with a storage tank having a diesel fuel oil capacity sufficient to operate that DG for a period of 7 days while the DG is supplying maximum post loss-of-coolant accident load demand. The maximum load demand is calculated using the assumption that at least two DGs are available. This onsite fuel oil capacity is sufficient to operate the DGs for longer than the time to replenish the onsite supply from outside sources. Diesel fuel oil is transferred from each storage tank to its respective day tank by a transfer pump associated with each storage tank.
Each Palo Verde Units standby AC power system is powered by two independent DGs capable of an automatic start at any time and capable of continued operation at rated load, voltage, and frequency until manually stopped. Each DG is provided with a storage tank having a diesel fuel oil capacity sufficient to operate that DG for a period of 7 days while the DG is supplying maximum post loss-of-coolant accident load demand. The maximum load demand is calculated using the assumption that at least two DGs are available. This onsite fuel oil capacity is sufficient to operate the DGs for longer than the time to replenish the onsite supply from outside sources. Diesel fuel oil is transferred from each storage tank to its respective day tank by a transfer pump associated with each storage tank.
The DG lubrication system is designed to provide sufficient lubrication to permit proper operation of its associated DG under all loading conditions. The system is required to circulate the lube oil to the diesel engine working surfaces and to remove excess heat generated by friction during operation. Each diesel engine oil sump contains an inventory capable of supporting a minimum of 7 days of operation. This supply is sufficient to allow the operator to replenish lube oil from outside sources.
The DG lubrication system is designed to provide sufficient lubrication to permit proper operation of its associated DG under all loading conditions. The system is required to circulate the lube oil to the diesel engine working surfaces and to remove excess heat generated by friction during operation. Each diesel engine oil sump contains an inventory capable of supporting a minimum of 7 days of operation. This supply is sufficient to allow the operator to replenish lube oil from outside sources.
2.2     Description of the Proposed Changes The proposed changes would revise Palo Verde TS 3.8.3 by removing the current stored diesel fuel oil and lube oil numerical volume requirements from the TSs and placing them in the TS Bases so that they may be modified under licensee control. The specific TS changes are described in the following sections.
2.2 Description of the Proposed Changes The proposed changes would revise Palo Verde TS 3.8.3 by removing the current stored diesel fuel oil and lube oil numerical volume requirements from the TSs and placing them in the TS Bases so that they may be modified under licensee control. The specific TS changes are described in the following sections.
2.2.1   Proposed Changes to TS 3.8.3 Actions Table Conditions A and B Conditions A and B of TS 3.8.3 would be revised in the Actions table. Currently, Conditions A and B are entered when the stored fuel oil numerical volume requirement is not met. As discussed in the current TS Bases, the numerical volume requirements for Palo Verde are based on volumes less than a 7-day supply, but at least a 6-day supply. The proposed TS revision incorporates the volumetric requirements from the TSs into the TS Bases. In addition, the Palo Verde TSs are revised so that Condition A is entered when the stored diesel fuel oil inventory is less than a 7-day supply, but greater than a 6-day supply. Condition B would be entered when the stored lube oil inventory is less than a 7-day supply, but greater than a 6-day supply.
2.2.1 Proposed Changes to TS 3.8.3 Actions Table Conditions A and B Conditions A and B of TS 3.8.3 would be revised in the Actions table. Currently, Conditions A and B are entered when the stored fuel oil numerical volume requirement is not met. As discussed in the current TS Bases, the numerical volume requirements for Palo Verde are based on volumes less than a 7-day supply, but at least a 6-day supply. The proposed TS revision incorporates the volumetric requirements from the TSs into the TS Bases. In addition, the Palo Verde TSs are revised so that Condition A is entered when the stored diesel fuel oil inventory is less than a 7-day supply, but greater than a 6-day supply. Condition B would be entered when the stored lube oil inventory is less than a 7-day supply, but greater than a 6-day supply.
2.2.2   Proposed Changes to SRs 3.8.3.1 and 3.8.3.2 Currently, SR 3.8.3.1 requires the licensee to verify that each fuel oil storage tanks numerical volume requirements are met. SR 3.8.3.2 requires the licensee to verify that the stored lube oil
2.2.2 Proposed Changes to SRs 3.8.3.1 and 3.8.3.2 Currently, SR 3.8.3.1 requires the licensee to verify that each fuel oil storage tanks numerical volume requirements are met. SR 3.8.3.2 requires the licensee to verify that the stored lube oil numerical volume requirements are met. As discussed in the current TS Bases, the numerical volume requirements of SR 3.8.3.1 and SR 3.8.3.2 are based on maintaining at least a 7-day supply. The revision would incorporate the volumetric requirements from the TSs into the TS Bases. The licensee proposed that the TSs be revised so that SR 3.8.3.1 requires the licensee to verify that the stored diesel fuel inventory is greater than or equal to a 7-day supply of fuel for each DG at Palo Verde. The licensee further proposed that the TSs be revised so that SR 3.8.3.2 requires the licensee to verify that the lube oil inventory is greater than or equal to a 7-day supply for all DGs at Palo Verde.
 
2.2.3 Proposed Changes to the TS Bases The reference to Appendix B of American National Standards Institute (ANSI) N195-1976, Fuel Oil Systems for Standby Diesel-Generators, in the Palo Verde TS Bases is deleted to correctly identify that the bases now reference the entire ANSI N195-1976. As a result, the only reference will be to ANSI N195-1976.
numerical volume requirements are met. As discussed in the current TS Bases, the numerical volume requirements of SR 3.8.3.1 and SR 3.8.3.2 are based on maintaining at least a 7-day supply. The revision would incorporate the volumetric requirements from the TSs into the TS Bases. The licensee proposed that the TSs be revised so that SR 3.8.3.1 requires the licensee to verify that the stored diesel fuel inventory is greater than or equal to a 7-day supply of fuel for each DG at Palo Verde. The licensee further proposed that the TSs be revised so that SR 3.8.3.2 requires the licensee to verify that the lube oil inventory is greater than or equal to a 7-day supply for all DGs at Palo Verde.
2.3 Regulatory Requirements and Guidance Used in the Evaluation of the Proposed Changes 2.3.1 Regulatory Requirements The regulation in 10 CFR 50.36, Technical specifications, provides the regulatory requirements for the content of the TSs and requires, in relevant part, that a summary statement of the bases for such specifications shall be included by applicants for a license authorizing operation of a utilization facility. Specifically, 10 CFR 50.36(c) requires that TSs include items in five specific categories related to station operation. These categories are: (1) safety limits, limiting safety system settings, and limiting control settings; (2) LCOs; (3) SRs; (4) design features; and (5) administrative controls.
2.2.3   Proposed Changes to the TS Bases The reference to Appendix B of American National Standards Institute (ANSI) N195-1976, Fuel Oil Systems for Standby Diesel-Generators, in the Palo Verde TS Bases is deleted to correctly identify that the bases now reference the entire ANSI N195-1976. As a result, the only reference will be to ANSI N195-1976.
2.3     Regulatory Requirements and Guidance Used in the Evaluation of the Proposed Changes 2.3.1   Regulatory Requirements The regulation in 10 CFR 50.36, Technical specifications, provides the regulatory requirements for the content of the TSs and requires, in relevant part, that a summary statement of the bases for such specifications shall be included by applicants for a license authorizing operation of a utilization facility. Specifically, 10 CFR 50.36(c) requires that TSs include items in five specific categories related to station operation. These categories are: (1) safety limits, limiting safety system settings, and limiting control settings; (2) LCOs; (3) SRs; (4) design features; and (5) administrative controls.
The regulation in 10 CFR 50.36(c)(2)(i), states, in part, that LCOs are the lowest functional capability or performance levels of equipment required for safe operation of the facility.
The regulation in 10 CFR 50.36(c)(2)(i), states, in part, that LCOs are the lowest functional capability or performance levels of equipment required for safe operation of the facility.
Section 50.36(c)(2)(i) of 10 CFR further states, When a limiting condition for operation of a nuclear reactor is not met, the licensee shall shut down the reactor or follow any remedial action permitted by the technical specifications until the condition can be met.
Section 50.36(c)(2)(i) of 10 CFR further states, When a limiting condition for operation of a nuclear reactor is not met, the licensee shall shut down the reactor or follow any remedial action permitted by the technical specifications until the condition can be met.
The regulation in 10 CFR 50.36(c)(3) states that SRs are requirements related to test, calibration, or inspection to assure that the necessary quality of systems and components is maintained, that facility operation will be within safety limits, and that the limiting conditions for operation will be met.
The regulation in 10 CFR 50.36(c)(3) states that SRs are requirements related to test, calibration, or inspection to assure that the necessary quality of systems and components is maintained, that facility operation will be within safety limits, and that the limiting conditions for operation will be met.
As described in 10 CFR 50.92(a), in determining whether an amendment to a license will be issued to the applicant, the Commission will be guided by the considerations that govern the issuance of initial licenses to the extent applicable and appropriate. The general considerations that guide the Commission include, as stated in 10 CFR 50.40(a), that the TSs provide reasonable assurance that the health and safety of the public will not be endangered and, as stated in 10 CFR 50.40(d), that any applicable requirements of 10 CFR Part 51 have been satisfied.
As described in 10 CFR 50.92(a), in determining whether an amendment to a license will be issued to the applicant, the Commission will be guided by the considerations that govern the issuance of initial licenses to the extent applicable and appropriate. The general considerations that guide the Commission include, as stated in 10 CFR 50.40(a), that the TSs provide reasonable assurance that the health and safety of the public will not be endangered and, as stated in 10 CFR 50.40(d), that any applicable requirements of 10 CFR Part 51 have been satisfied.
 
2.3.2 Guidance Regulatory Guide (RG) 1.137, Revision 1, Fuel-Oil Systems for Standby Diesel Generators (ADAMS Accession No. ML003740180), provides guidance that describes a method acceptable to the NRC staff for complying with the Commission's regulations regarding diesel fuel oil systems for standby DGs and endorses ANSI standard ANSI N195-1976, with certain limitations. RG 1.137, Section C.1.c sets forth two methods for the calculation of diesel fuel oil storage requirements as described in ANSI N195-1976, Section 5.4 Calculation of Fuel Oil Storage Requirements. These methods are: (1) calculations based on the assumption that the DG operates continuously for 7 days at its rated capacity, and (2) calculations based on the time-dependent loads of the DG. If the time-dependent load method is used, the minimum required capacity should include the capacity to power engineered safety features.
2.3.2   Guidance Regulatory Guide (RG) 1.137, Revision 1, Fuel-Oil Systems for Standby Diesel Generators (ADAMS Accession No. ML003740180), provides guidance that describes a method acceptable to the NRC staff for complying with the Commission's regulations regarding diesel fuel oil systems for standby DGs and endorses ANSI standard ANSI N195-1976, with certain limitations. RG 1.137, Section C.1.c sets forth two methods for the calculation of diesel fuel oil storage requirements as described in ANSI N195-1976, Section 5.4 Calculation of Fuel Oil Storage Requirements. These methods are: (1) calculations based on the assumption that the DG operates continuously for 7 days at its rated capacity, and (2) calculations based on the time-dependent loads of the DG. If the time-dependent load method is used, the minimum required capacity should include the capacity to power engineered safety features.
NUREG-1434, Revision 4.0, Standard Technical Specifications General Electric BWR
NUREG-1434, Revision 4.0, Standard Technical Specifications General Electric BWR
[Boiling-Water Reactors]/6 Plants, dated April 2012 (ADAMS Accession No. ML12104A195),
[Boiling-Water Reactors]/6 Plants, dated April 2012 (ADAMS Accession No. ML12104A195),
provides example TS LCOs and acceptable remedial actions that meet the requirements in 10 CFR 50.36(c)(2)(i) for a standard plant design.
provides example TS LCOs and acceptable remedial actions that meet the requirements in 10 CFR 50.36(c)(2)(i) for a standard plant design.
The NRC-approved TSTF Traveler TSTF-501, Revision 1, provides an acceptable method of modifying the stored diesel fuel oil and lube oil requirements contained in the Standard Technical Specifications.
The NRC-approved TSTF Traveler TSTF-501, Revision 1, provides an acceptable method of modifying the stored diesel fuel oil and lube oil requirements contained in the Standard Technical Specifications.  


==3.0     TECHNICAL EVALUATION==
==3.0 TECHNICAL EVALUATION==
 
3.1 NRC Staff Evaluation of Proposed Changes to TS 3.8.3 Actions Table Conditions A and B Currently, Condition A of TS 3.8.3 is entered when the diesel fuel oil volume requirement is not met, and Condition B is entered when the lube oil inventory requirement is not met. The current TS Bases state that the numerical volume requirements in Conditions A and B are based on volumes less than a 7-day supply, but at least a 6-day supply. The proposed changes would remove the numerical volumetric requirements from the TSs and would modify Conditions A and B to replace them with duration-based DG operating time requirements, such that Condition A is entered when the stored diesel fuel oil inventory is less than a 7-day supply, but greater than a 6-day supply, and Condition B is entered when the lube oil inventory is less than a 7-day supply, but greater than a 6-day supply for one or more DGs. No other parts of Condition A or B are proposed to be modified.
3.1     NRC Staff Evaluation of Proposed Changes to TS 3.8.3 Actions Table Conditions A and B Currently, Condition A of TS 3.8.3 is entered when the diesel fuel oil volume requirement is not met, and Condition B is entered when the lube oil inventory requirement is not met. The current TS Bases state that the numerical volume requirements in Conditions A and B are based on volumes less than a 7-day supply, but at least a 6-day supply. The proposed changes would remove the numerical volumetric requirements from the TSs and would modify Conditions A and B to replace them with duration-based DG operating time requirements, such that Condition A is entered when the stored diesel fuel oil inventory is less than a 7-day supply, but greater than a 6-day supply, and Condition B is entered when the lube oil inventory is less than a 7-day supply, but greater than a 6-day supply for one or more DGs. No other parts of Condition A or B are proposed to be modified.
As described in Section 3.2 below, the licensee stated that the stored diesel fuel oil and lube oil numerical volumes sufficient to meet the duration-based operating time requirements will be calculated using Section 5.4 of ANSI N195-1976, and the volumes are based on DG manufacturers consumption values for the run-time of the DGs. The use of this methodology will ensure that the supplies of stored diesel fuel oil and lube oil for each DG that dictate Condition entry will continue to be calculated in accordance with NRC-approved methods.
As described in Section 3.2 below, the licensee stated that the stored diesel fuel oil and lube oil numerical volumes sufficient to meet the duration-based operating time requirements will be calculated using Section 5.4 of ANSI N195-1976, and the volumes are based on DG manufacturers consumption values for the run-time of the DGs. The use of this methodology will ensure that the supplies of stored diesel fuel oil and lube oil for each DG that dictate Condition entry will continue to be calculated in accordance with NRC-approved methods.
Based on the above evaluation, the NRC staff concludes that the changes to the TS 3.8.3 Actions table are acceptable.
Based on the above evaluation, the NRC staff concludes that the changes to the TS 3.8.3 Actions table are acceptable.
 
3.2 NRC Staff Evaluation of Proposed Changes to SRs 3.8.3.1 and 3.8.3.2 Currently, SRs 3.8.3.1 and 3.8.3.2 require the licensee to verify that the stored diesel fuel oil and lube oil numerical volume requirements are met. The licensee proposes to revise SRs 3.8.3.1 and 3.8.3.2 to reflect the change from numerical volume requirements to durational requirements made in the TS 3.8.3 Actions table. Specifically, SRs 3.8.3.1 and 3.8.3.2 would be revised to require availability of a 7-day supply of diesel fuel oil and lube oil for each DG, rather than a specified numerical volume. As a result, SRs 3.8.3.1 and 3.8.3.2 would require the licensee to verify that the combined volume of the diesel fuel oil storage tanks and the lube oil inventory are each greater than or equal to a 7-day supply for a DG.
3.2     NRC Staff Evaluation of Proposed Changes to SRs 3.8.3.1 and 3.8.3.2 Currently, SRs 3.8.3.1 and 3.8.3.2 require the licensee to verify that the stored diesel fuel oil and lube oil numerical volume requirements are met. The licensee proposes to revise SRs 3.8.3.1 and 3.8.3.2 to reflect the change from numerical volume requirements to durational requirements made in the TS 3.8.3 Actions table. Specifically, SRs 3.8.3.1 and 3.8.3.2 would be revised to require availability of a 7-day supply of diesel fuel oil and lube oil for each DG, rather than a specified numerical volume. As a result, SRs 3.8.3.1 and 3.8.3.2 would require the licensee to verify that the combined volume of the diesel fuel oil storage tanks and the lube oil inventory are each greater than or equal to a 7-day supply for a DG.
The licensee stated in its application that an NRC-approved fuel oil calculation methodology is currently used to calculate fuel oil volumes. Specifically, on page 3 of the enclosure to the application, the licensee states:
The licensee stated in its application that an NRC-approved fuel oil calculation methodology is currently used to calculate fuel oil volumes. Specifically, on page 3 of the enclosure to the application, the licensee states:
The specific volume of fuel oil equivalent to a 7 and 6-day supply [for Palo Verde]
The specific volume of fuel oil equivalent to a 7 and 6-day supply [for Palo Verde]
Line 187: Line 237:
This includes the fuel required for operation of the DG at the minimum loads specified by the DG manufacturer.
This includes the fuel required for operation of the DG at the minimum loads specified by the DG manufacturer.
One variable used in both stored diesel fuel oil calculation methods is the fuel consumption rate.
One variable used in both stored diesel fuel oil calculation methods is the fuel consumption rate.
The property of diesel fuel oil having the most significant effect on the fuel consumption rate is the energy content (heating value) of the fuel. There are standards that correlate the energy content to the fuels American Petroleum Institute (API) gravity or absolute specific gravity. At a minimum, plants calculate their required fuel storage values assuming the most limiting API gravity or absolute specific gravity, and therefore, the most limiting fuel energy content. As long as the diesel fuel oil placed in the storage tank is within the API gravity range or absolute
The property of diesel fuel oil having the most significant effect on the fuel consumption rate is the energy content (heating value) of the fuel. There are standards that correlate the energy content to the fuels American Petroleum Institute (API) gravity or absolute specific gravity. At a minimum, plants calculate their required fuel storage values assuming the most limiting API gravity or absolute specific gravity, and therefore, the most limiting fuel energy content. As long as the diesel fuel oil placed in the storage tank is within the API gravity range or absolute specific gravity range specified by the licensee, the calculations of fuel consumption and required stored volume remains valid. Current SR 3.8.3.3 requires new fuel to be tested in order to verify that the new fuel API gravity or absolute specific gravity is within the range assumed in the diesel fuel oil consumption calculations.
 
specific gravity range specified by the licensee, the calculations of fuel consumption and required stored volume remains valid. Current SR 3.8.3.3 requires new fuel to be tested in order to verify that the new fuel API gravity or absolute specific gravity is within the range assumed in the diesel fuel oil consumption calculations.
The lube oil inventory equivalent to a 7-day supply, as well as the 6-day supply associated with TS 3.8.3, Condition B, is based on the DG manufacturer consumption values for the run time of the DG.
The lube oil inventory equivalent to a 7-day supply, as well as the 6-day supply associated with TS 3.8.3, Condition B, is based on the DG manufacturer consumption values for the run time of the DG.
Accordingly, the NRC staff finds that the above methods used by the licensee still provide reasonable assurance that the necessary quality of systems and components are maintained, that facility operation will be within safety limits, and that the LCOs will be met. Therefore, the changes to SRs 3.8.3.1 and 3.8.3.2 are acceptable.
Accordingly, the NRC staff finds that the above methods used by the licensee still provide reasonable assurance that the necessary quality of systems and components are maintained, that facility operation will be within safety limits, and that the LCOs will be met. Therefore, the changes to SRs 3.8.3.1 and 3.8.3.2 are acceptable.
3.3     TS Bases Changes The regulation at 10 CFR 50.36(a)(1) states, in part, that a summary statement of the bases or reasons for such specifications, other than those covering administrative controls, shall also be included in the application but shall not become part of the technical specifications. Consistent with 10 CFR 50.36(a)(1), the licensee submitted corresponding TS Bases changes that provide the reasons for the proposed TSs changes. The NRC staff concludes that the proposed TS Bases changes describe the bases for the affected TSs and follow the Final Policy Statement on Technical Specifications Improvements for Nuclear Power Reactors (58 FR 39132).
3.3 TS Bases Changes The regulation at 10 CFR 50.36(a)(1) states, in part, that a summary statement of the bases or reasons for such specifications, other than those covering administrative controls, shall also be included in the application but shall not become part of the technical specifications. Consistent with 10 CFR 50.36(a)(1), the licensee submitted corresponding TS Bases changes that provide the reasons for the proposed TSs changes. The NRC staff concludes that the proposed TS Bases changes describe the bases for the affected TSs and follow the Final Policy Statement on Technical Specifications Improvements for Nuclear Power Reactors (58 FR 39132).
3.4     Technical Conclusion The proposed changes will continue to require that the appropriate volumes of stored diesel fuel oil and lube oil are maintained. The proposed changes to TS 3.8.3 Actions table continue to provide reasonable assurance that the lowest functional capability or performance levels of equipment required for safe operation of the facility will continue to be met. Conditions A and B of TS 3.8.3 Actions table continue to provide acceptable remedial actions to follow until LCO 3.8.3 can be met. The replacement of the TS numerical value volume requirements with durational requirements does not change the current plant configuration, the current volume requirements, or the current basis for diesel fuel oil and lube oil volume requirements.
3.4 Technical Conclusion The proposed changes will continue to require that the appropriate volumes of stored diesel fuel oil and lube oil are maintained. The proposed changes to TS 3.8.3 Actions table continue to provide reasonable assurance that the lowest functional capability or performance levels of equipment required for safe operation of the facility will continue to be met. Conditions A and B of TS 3.8.3 Actions table continue to provide acceptable remedial actions to follow until LCO 3.8.3 can be met. The replacement of the TS numerical value volume requirements with durational requirements does not change the current plant configuration, the current volume requirements, or the current basis for diesel fuel oil and lube oil volume requirements.
Therefore, the changes to TS 3.8.3 Actions table will continue to meet 10 CFR 50.36(c)(2) and are acceptable.
Therefore, the changes to TS 3.8.3 Actions table will continue to meet 10 CFR 50.36(c)(2) and are acceptable.
In addition, the proposed changes to SRs 3.8.3.1 and 3.8.3.2 continue to provide reasonable assurance that the necessary quality of systems and components is maintained, the facility will be within safety limits, and that the LCO will be met. Because the revised SRs will continue to meet 10 CFR 50.36(c)(3), the NRC staff finds them acceptable.
In addition, the proposed changes to SRs 3.8.3.1 and 3.8.3.2 continue to provide reasonable assurance that the necessary quality of systems and components is maintained, the facility will be within safety limits, and that the LCO will be met. Because the revised SRs will continue to meet 10 CFR 50.36(c)(3), the NRC staff finds them acceptable.
In summary, the NRC staff finds that the proposed Palo Verde TSs changes collectively provide reasonable assurance that the health and safety of the public will not be endangered.
In summary, the NRC staff finds that the proposed Palo Verde TSs changes collectively provide reasonable assurance that the health and safety of the public will not be endangered.  
 
==4.0    STATE CONSULTATION==


In accordance with the Commissions regulations, the Arizona State official was notified of the proposed issuance of the amendments on August 11, 2021. The State official had no comments.
==4.0 STATE CONSULTATION==
 
In accordance with the Commissions regulations, the Arizona State official was notified of the proposed issuance of the amendments on August 11, 2021. The State official had no comments.  
==5.0    ENVIRONMENTAL CONSIDERATION==


==5.0 ENVIRONMENTAL CONSIDERATION==
The amendments change requirements with respect to installation or use of facility components located within the restricted area as defined in 10 CFR Part 20 and change SRs. The NRC staff has determined that the amendments involve no significant increase in the amounts, and no significant change in the types, of any effluents that may be released offsite, and that there is no significant increase in individual or cumulative occupational radiation exposure. The Commission has previously issued a proposed finding that the amendments involve no significant hazards consideration, published in the Federal Register on December 1, 2020 (85 FR 77273), and there has been no public comment on such finding. Accordingly, the amendments meet the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9).
The amendments change requirements with respect to installation or use of facility components located within the restricted area as defined in 10 CFR Part 20 and change SRs. The NRC staff has determined that the amendments involve no significant increase in the amounts, and no significant change in the types, of any effluents that may be released offsite, and that there is no significant increase in individual or cumulative occupational radiation exposure. The Commission has previously issued a proposed finding that the amendments involve no significant hazards consideration, published in the Federal Register on December 1, 2020 (85 FR 77273), and there has been no public comment on such finding. Accordingly, the amendments meet the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9).
Pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendments.
Pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendments.  
 
==6.0    CONCLUSION==


==6.0 CONCLUSION==
The Commission has concluded, based on the considerations discussed above, that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) there is reasonable assurance that such activities will be conducted in compliance with the Commissions regulations, and (3) the issuance of the amendments will not be inimical to the common defense and security or to the health and safety of the public.
The Commission has concluded, based on the considerations discussed above, that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) there is reasonable assurance that such activities will be conducted in compliance with the Commissions regulations, and (3) the issuance of the amendments will not be inimical to the common defense and security or to the health and safety of the public.
Principal Contributor: K. West, NRR Date: August 17, 2021
Principal Contributor: K. West, NRR Date: August 17, 2021  


ML21225A093                                               *by e-mail OFFICE   NRR/DORL/LPL4/PM*   NRR/DORL/LPL4/LA*   NRR/DSS/STSB/BC (A)* NRR/DORL/LPL4/BC*
ML21225A093  
NAME     SLingam             PBlechman           NJordan             JDixon-Herrity DATE     8/13/2021           8/16/2021           8/10/2021           8/17/2021 OFFICE   NRR/DORL/LPL4/PM*
*by e-mail OFFICE NRR/DORL/LPL4/PM*
NAME     SLingam DATE     8/17/2021}}
NRR/DORL/LPL4/LA*
NRR/DSS/STSB/BC (A)*
NRR/DORL/LPL4/BC*
NAME SLingam PBlechman NJordan JDixon-Herrity DATE 8/13/2021 8/16/2021 8/10/2021 8/17/2021 OFFICE NRR/DORL/LPL4/PM*
NAME SLingam DATE 8/17/2021}}

Latest revision as of 00:04, 28 November 2024

Ng Station, Units 1, 2,& 3 - Issuance of Amendment Nos. 216, 216, and 216 Regarding Revision to Technical Specifications to Adopt TSTF-501, Rev.1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control
ML21225A093
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 08/17/2021
From: Siva Lingam
Plant Licensing Branch IV
To: Lacal M
Arizona Public Service Co
Lingam S, 301-415-1564
References
EPID L-2020-LLA-0228
Download: ML21225A093 (22)


Text

August 17, 2021 Mrs. Maria L. Lacal Executive Vice President/

Chief Nuclear Officer Mail Station 7605 Arizona Public Service Company P.O. Box 52034 Phoenix, AZ 85072-2034

SUBJECT:

PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3 - ISSUANCE OF AMENDMENT NOS. 216, 216, AND 216 REGARDING REVISION TO TECHNICAL SPECIFICATIONS TO ADOPT TSTF-501, REVISION 1, RELOCATE STORED FUEL OIL AND LUBE OIL VOLUME VALUES TO LICENSEE CONTROL (EPID L-2020-LLA-0228)

Dear Mrs. Lacal:

The U.S. Nuclear Regulatory Commission (the Commission) has issued the enclosed Amendment Nos. 216, 216, and 216, to Renewed Facility Operating License Nos. NPF-41, NPF-51, and NPF-74 for the Palo Verde Nuclear Generating Station (Palo Verde), Units 1, 2, and 3, respectively. The amendments consist of changes to the technical specifications (TSs) in response to your application dated October 8, 2020.

The amendments change Palo Verde TS 3.8.3, Diesel Fuel Oil, Lube Oil, and Starting Air, by removing the current stored diesel fuel oil and lube oil numerical volume requirements from the TSs and placing them in the TS Bases so that they may be modified under licensee control, consistent with Technical Specifications Task Force (TSTF) Improved Standard Technical Specifications Change Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control, dated February 20, 2009. The availability of this TS improvement was announced in the Federal Register on May 26, 2010 (75 FR 29588) as part of the consolidated line item improvement process.

The TSs are also revised such that the stored diesel fuel oil and lube oil inventory will require that a 7-day supply be available for each diesel generator at Palo Verde. The licensee also proposed associated changes to the corresponding surveillance requirements and TS Bases.

A copy of the related Safety Evaluation is also enclosed. Notice of Issuance will be included in the Commissions monthly Federal Register notice.

Sincerely,

/RA/

Siva P. Lingam, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. STN 50-528, STN 50-529, and STN 50-530

Enclosures:

1. Amendment No. 216 to NPF-41
2. Amendment No. 216 to NPF-51
3. Amendment No. 216 to NPF-74
4. Safety Evaluation cc: Listserv

ARIZONA PUBLIC SERVICE COMPANY, ET AL.

DOCKET NO. STN 50-528 PALO VERDE NUCLEAR GENERATING STATION, UNIT 1 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 216 License No. NPF-41

1.

The Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment by the Arizona Public Service Company (APS or the licensee) on behalf of itself and the Salt River Project Agricultural Improvement and Power District, El Paso Electric Company, Southern California Edison Company, Public Service Company of New Mexico, Los Angeles Department of Water and Power, and Southern California Public Power Authority dated October 8, 2020, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commissions regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commissions regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commissions regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C(2) of Renewed Facility Operating License No. NPF-41 is hereby amended to read as follows:

(2)

Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 216, and the Environmental Protection Plan contained in Appendix B, are hereby incorporated into this renewed operating license. APS shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan, except where otherwise stated in specific license conditions.

3.

This license amendment is effective as of the date of issuance and shall be implemented within 90 days of the date of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION Jennifer L. Dixon-Herrity, Chief Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

Attachment:

Changes to Renewed Facility Operating License No. NPF-41 and the Technical Specifications Date of Issuance: August 17, 2021 Jennifer L.

Dixon-Herrity Digitally signed by Jennifer L. Dixon-Herrity Date: 2021.08.17 14:32:19 -04'00'

ARIZONA PUBLIC SERVICE COMPANY, ET AL.

DOCKET NO. STN 50-529 PALO VERDE NUCLEAR GENERATING STATION, UNIT 2 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 216 License No. NPF-51

1.

The Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment by the Arizona Public Service Company (APS or the licensee) on behalf of itself and the Salt River Project Agricultural Improvement and Power District, El Paso Electric Company, Southern California Edison Company, Public Service Company of New Mexico, Los Angeles Department of Water and Power, and Southern California Public Power Authority dated October 8, 2020, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commissions regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commissions regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commissions regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C(2) of Renewed Facility Operating License No. NPF-51 is hereby amended to read as follows:

(2)

Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 216, and the Environmental Protection Plan contained in Appendix B, are hereby incorporated into this renewed operating license. APS shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan, except where otherwise stated in specific license conditions.

3.

This license amendment is effective as of the date of issuance and shall be implemented within 90 days of the date of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION Jennifer L. Dixon-Herrity, Chief Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

Attachment:

Changes to Renewed Facility Operating License No. NPF-51 and the Technical Specifications Date of Issuance: August 17, 2021 Jennifer L.

Dixon-Herrity Digitally signed by Jennifer L. Dixon-Herrity Date: 2021.08.17 14:33:13 -04'00'

ARIZONA PUBLIC SERVICE COMPANY, ET AL.

DOCKET NO. STN 50-530 PALO VERDE NUCLEAR GENERATING STATION, UNIT 3 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 216 License No. NPF-74

1.

The Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment by the Arizona Public Service Company (APS or the licensee) on behalf of itself and the Salt River Project Agricultural Improvement and Power District, El Paso Electric Company, Southern California Edison Company, Public Service Company of New Mexico, Los Angeles Department of Water and Power, and Southern California Public Power Authority dated October 8, 2020, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commissions regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commissions regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commissions regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C(2) of Renewed Facility Operating License No. NPF-74 is hereby amended to read as follows:

(2)

Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 216, and the Environmental Protection Plan contained in Appendix B, are hereby incorporated into this renewed operating license. APS shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan, except where otherwise stated in specific license conditions.

3.

This license amendment is effective as of the date of issuance and shall be implemented within 90 days of the date of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION Jennifer L. Dixon-Herrity, Chief Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

Attachment:

Changes to Renewed Facility Operating License No. NPF-74 and the Technical Specifications Date of Issuance: August 17, 2021 Jennifer L.

Dixon-Herrity Digitally signed by Jennifer L. Dixon-Herrity Date: 2021.08.17 14:41:55 -04'00'

ATTACHMENT TO LICENSE AMENDMENT NOS. 216, 216, AND 216 TO RENEWED FACILITY OPERATING LICENSE NOS. NPF-41, NPF-51, AND NPF-74 PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3 DOCKET NOS. STN 50-528, STN 50-529, AND STN 50-530 Replace the following pages of Renewed Facility Operating License Nos. NPF-41, NPF-51, and NPF-74, and the Appendix A, Technical Specifications, with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.

Renewed Facility Operating License No. NPF-41 REMOVE INSERT 5

5 Renewed Facility Operating License No. NPF-51 REMOVE INSERT 6

6 Renewed Facility Operating License No. NPF-74 REMOVE INSERT 4

4 Technical Specifications REMOVE INSERT 3.8.3-1 3.8.3-1 3.8.3-3 3.8.3-3

Renewed Facility Operating License No. NPF-41 Amendment No. 216 (1)

Maximum Power Level Arizona Public Service Company (APS) is authorized to operate the facility at reactor core power levels not in excess of 3990 megawatts thermal (100% power), in accordance with the conditions specified herein.

(2)

Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 216, and the Environmental Protection Plan contained in Appendix B, are hereby incorporated into this renewed operating license.

APS shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan, except where otherwise stated in specific license conditions.

(3)

Antitrust Conditions This renewed operating license is subject to the antitrust conditions delineated in Appendix C to this renewed license.

(4)

Operating Staff Experience Requirements Deleted (5)

Post-Fuel-Loading Initial Test Program (Section 14, SER and SSER 2)*

Deleted (6)

Environmental Qualification Deleted (7)

Fire Protection Program APS shall implement and maintain in effect all provisions of the approved fire protection program as described in the Final Safety Analysis Report for the facility, as supplemented and amended, and as approved in the SER through Supplement 11, subject to the following provision:

APS may make changes to the approved fire protection program without prior approval of the Commission only if those changes would not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire.

  • The parenthetical notation following the title of many license conditions denotes the section of the Safety Evaluation Report and/or its supplements wherein the license condition is discussed.

Renewed Facility Operating License No. NPF-51 Amendment No. 216 (1)

Maximum Power Level Arizona Public Service Company (APS) is authorized to operate the facility at reactor core power levels not in excess of 3990 megawatts thermal (100% power) in accordance with the conditions specified herein.

(2)

Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 216, and the Environmental Protection Plan contained in Appendix B, are hereby incorporated into this renewed operating license.

APS shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan, except where otherwise stated in specific license conditions.

(3)

Antitrust Conditions This renewed operating license is subject to the antitrust conditions delineated in Appendix C to this renewed operating license.

(4)

Operating Staff Experience Requirements (Section 13.1.2, SSER 9)*

Deleted (5)

Initial Test Program (Section 14, SER and SSER 2)

Deleted (6)

Fire Protection Program APS shall implement and maintain in effect all provisions of the approved fire protection program as described in the Final Safety Analysis Report for the facility, as supplemented and amended, and as approved in the SER through Supplement 11, subject to the following provision:

APS may make changes to the approved fire protection program without prior approval of the Commission only if those changes would not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire.

(7)

Inservice Inspection Program (Sections 5.2.4 and 6.6, SER and SSER 9)

Deleted

  • The parenthetical notation following the title of many license conditions denotes the section of the Safety Evaluation Report and/or its supplements wherein the license condition is discussed.

Renewed Facility Operating License No. NPF-74 Amendment No. 216 (4)

Pursuant to the Act and 10 CFR Part 30, 40, and 70, APS to receive, possess, and use in amounts required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (5)

Pursuant to the Act and 10 CFR Parts 30, 40, and 70, APS to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.

C.

This renewed operating license shall be deemed to contain and is subject to the conditions specified in the Commissions regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:

(1)

Maximum Power Level Arizona Public Service Company (APS) is authorized to operate the facility at reactor core power levels not in excess of 3990 megawatts thermal (100% power), in accordance with the conditions specified herein.

(2)

Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 216, and the Environmental Protection Plan contained in Appendix B, are hereby incorporated into this renewed operating license.

APS shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan, except where otherwise stated in specific license conditions.

(3)

Antitrust Conditions This renewed operating license is subject to the antitrust conditions delineated in Appendix C to this renewed operating license.

(4)

Initial Test Program (Section 14, SER and SSER 2)

Deleted (5)

Additional Conditions The Additional Conditions contained in Appendix D, as revised through Amendment No. 212, are hereby incorporated into this renewed operating license. The licensee shall operate the facility in accordance with the Additional Conditions.

Diesel Fuel Oil, Lube Oil, and Starting Air 3.8.3 3.8 ELECtRICAL POVVER SYSTEMS 3.8.3 Diesel Fuel Oil, Lube Oil, and Starting Air LCO 3.8.3

  • Toe stored diesel fuel oil, lube oil, and starting air subsystem shall be within limits for each required diesel generator (DG).

APPLICABILITY:

VVhen associated DG is required to be OPERABLE.

ACTIONS


NOTE--------------

Separate Condition entry is allowed for each DG.

CONDITION REQUIRED ACTION COMPLETION TIME A.

One or more DGs A1 Restore fuel oirleyel to 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> with fuel level less within limits.

than a 7 day supply and greater than a 6 day supply in storage tank.

I

8.

One or more DGs 8.1 Restore lube oil 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> with lube oil inventory inventory to within less than a 7 day limits.

supply and greater

- than a 6 day supply.

C. One or more DGs with C.1 Restore fuel oil total 7days stored fuel oil total

~articulates to within

~articulates not within mits.

mits.

( continued)

PALO VERDE UNITS 1,2,3 3.8.3-1 AMENDMENT NO. 447; 216

Diesel Fuel Oil, Lube Oil, and Starting Air 3.8.3 SURVEILLANCE REQUIREMENTS SR 3.8.3.1 SR 3.8.3.2 SR 3.8.3.3 SR 3.8.3.4 SR 3.8.3.5 SURVEILLANCE Verify each fuel oil storage tank contains :2: a 7 day supply of fuel.

Verify lubricating oil inventory is :2: a 7 day supply.

Verify fuel oil properties of new and stored fuel oil are tested in accordance with, and maintained within the limits of, the Diesel Fuel Oil Testing Program.

Verify each DG starting air receiver pressure is

2: 230 psig.

Check for and remove accumulated water from each fuel oil storage tank.

FREQUENCY In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program In accordance with the Diesel Fuel Oil Testing Program In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program PALO VERDE UNITS 1,2,3 3.8.3-3 AMENDMENT NO. 484, 4-88-, 216

SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NOS. 216, 216, AND 216 TO RENEWED FACILITY OPERATING LICENSE NOS. NPF-41, NPF-51, AND NPF-74 ARIZONA PUBLIC SERVICE COMPANY, ET AL.

PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3 DOCKET NOS. STN 50-528, STN 50-529, AND STN 50-530

1.0 INTRODUCTION

By letter dated October 8, 2020 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML20282A953), Arizona Public Service Company (the licensee) submitted a license amendment request to revise the Technical Specifications (TSs) for Palo Verde Nuclear Generating Station (Palo Verde), Units 1, 2, and 3.

The proposed changes would revise Palo Verde TS 3.8.3, Diesel Fuel Oil, Lube Oil, and Starting Air, by removing the current stored diesel fuel oil and lube oil numerical volume requirements from the TSs and placing them in the TS Bases so that they may be modified under licensee control, consistent with Technical Specifications Task Force (TSTF) Improved Standard Technical Specifications Change Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control, dated February 20, 2009 (ADAMS Accession No. ML090510686). The TSs would also be revised such that the stored diesel fuel oil and lube oil inventory will require that a 7-day supply be available for each diesel generator (DG) at Palo Verde. The licensee also proposed associated changes to the corresponding surveillance requirements (SRs) and TS Bases.

Any change to the TSs, including the numerical volume requirements contained therein, requires prior approval from the U.S. Nuclear Regulatory Commission (NRC, the Commission).

A licensee may need to modify diesel fuel oil numerical volumes to account for changes to the energy content (British Thermal Units (BTU)/gallon)) of available fuels in the market.

Fluctuations in energy content could be caused by a variety of factors, including changes to regulatory requirements. Accordingly, the licensees proposed changes would remove the numerical volume requirements for stored diesel fuel oil and lube oil from the TSs and would replace them with duration-based diesel operating time requirements. If approved, these amendments would permit the numerical volume requirements for stored diesel fuel oil and lube oil to be modified under licensee control. Changes to the affected TS Bases pages will be made by the licensee in accordance with TS 5.5.14, Technical Specifications (TS) Bases Control Program.

2.0 REGULATORY EVALUATION

2.1

System Description

The standby alternating current (AC) power sources are a part of the primary success path and function, or actuate to mitigate a design-basis accident or transient that either assumes the failure of, or presents a challenge to, the integrity of a fission product barrier. Diesel fuel oil and lube oil requirements are retained in the TSs as a limiting condition for operation (LCO) under Title 10 of the Code of Federal Regulations Part 50, Section 50.36(c)(2)(i) because they support the operation of the standby AC power sources.

Each Palo Verde Units standby AC power system is powered by two independent DGs capable of an automatic start at any time and capable of continued operation at rated load, voltage, and frequency until manually stopped. Each DG is provided with a storage tank having a diesel fuel oil capacity sufficient to operate that DG for a period of 7 days while the DG is supplying maximum post loss-of-coolant accident load demand. The maximum load demand is calculated using the assumption that at least two DGs are available. This onsite fuel oil capacity is sufficient to operate the DGs for longer than the time to replenish the onsite supply from outside sources. Diesel fuel oil is transferred from each storage tank to its respective day tank by a transfer pump associated with each storage tank.

The DG lubrication system is designed to provide sufficient lubrication to permit proper operation of its associated DG under all loading conditions. The system is required to circulate the lube oil to the diesel engine working surfaces and to remove excess heat generated by friction during operation. Each diesel engine oil sump contains an inventory capable of supporting a minimum of 7 days of operation. This supply is sufficient to allow the operator to replenish lube oil from outside sources.

2.2 Description of the Proposed Changes The proposed changes would revise Palo Verde TS 3.8.3 by removing the current stored diesel fuel oil and lube oil numerical volume requirements from the TSs and placing them in the TS Bases so that they may be modified under licensee control. The specific TS changes are described in the following sections.

2.2.1 Proposed Changes to TS 3.8.3 Actions Table Conditions A and B Conditions A and B of TS 3.8.3 would be revised in the Actions table. Currently, Conditions A and B are entered when the stored fuel oil numerical volume requirement is not met. As discussed in the current TS Bases, the numerical volume requirements for Palo Verde are based on volumes less than a 7-day supply, but at least a 6-day supply. The proposed TS revision incorporates the volumetric requirements from the TSs into the TS Bases. In addition, the Palo Verde TSs are revised so that Condition A is entered when the stored diesel fuel oil inventory is less than a 7-day supply, but greater than a 6-day supply. Condition B would be entered when the stored lube oil inventory is less than a 7-day supply, but greater than a 6-day supply.

2.2.2 Proposed Changes to SRs 3.8.3.1 and 3.8.3.2 Currently, SR 3.8.3.1 requires the licensee to verify that each fuel oil storage tanks numerical volume requirements are met. SR 3.8.3.2 requires the licensee to verify that the stored lube oil numerical volume requirements are met. As discussed in the current TS Bases, the numerical volume requirements of SR 3.8.3.1 and SR 3.8.3.2 are based on maintaining at least a 7-day supply. The revision would incorporate the volumetric requirements from the TSs into the TS Bases. The licensee proposed that the TSs be revised so that SR 3.8.3.1 requires the licensee to verify that the stored diesel fuel inventory is greater than or equal to a 7-day supply of fuel for each DG at Palo Verde. The licensee further proposed that the TSs be revised so that SR 3.8.3.2 requires the licensee to verify that the lube oil inventory is greater than or equal to a 7-day supply for all DGs at Palo Verde.

2.2.3 Proposed Changes to the TS Bases The reference to Appendix B of American National Standards Institute (ANSI) N195-1976, Fuel Oil Systems for Standby Diesel-Generators, in the Palo Verde TS Bases is deleted to correctly identify that the bases now reference the entire ANSI N195-1976. As a result, the only reference will be to ANSI N195-1976.

2.3 Regulatory Requirements and Guidance Used in the Evaluation of the Proposed Changes 2.3.1 Regulatory Requirements The regulation in 10 CFR 50.36, Technical specifications, provides the regulatory requirements for the content of the TSs and requires, in relevant part, that a summary statement of the bases for such specifications shall be included by applicants for a license authorizing operation of a utilization facility. Specifically, 10 CFR 50.36(c) requires that TSs include items in five specific categories related to station operation. These categories are: (1) safety limits, limiting safety system settings, and limiting control settings; (2) LCOs; (3) SRs; (4) design features; and (5) administrative controls.

The regulation in 10 CFR 50.36(c)(2)(i), states, in part, that LCOs are the lowest functional capability or performance levels of equipment required for safe operation of the facility.

Section 50.36(c)(2)(i) of 10 CFR further states, When a limiting condition for operation of a nuclear reactor is not met, the licensee shall shut down the reactor or follow any remedial action permitted by the technical specifications until the condition can be met.

The regulation in 10 CFR 50.36(c)(3) states that SRs are requirements related to test, calibration, or inspection to assure that the necessary quality of systems and components is maintained, that facility operation will be within safety limits, and that the limiting conditions for operation will be met.

As described in 10 CFR 50.92(a), in determining whether an amendment to a license will be issued to the applicant, the Commission will be guided by the considerations that govern the issuance of initial licenses to the extent applicable and appropriate. The general considerations that guide the Commission include, as stated in 10 CFR 50.40(a), that the TSs provide reasonable assurance that the health and safety of the public will not be endangered and, as stated in 10 CFR 50.40(d), that any applicable requirements of 10 CFR Part 51 have been satisfied.

2.3.2 Guidance Regulatory Guide (RG) 1.137, Revision 1, Fuel-Oil Systems for Standby Diesel Generators (ADAMS Accession No. ML003740180), provides guidance that describes a method acceptable to the NRC staff for complying with the Commission's regulations regarding diesel fuel oil systems for standby DGs and endorses ANSI standard ANSI N195-1976, with certain limitations. RG 1.137, Section C.1.c sets forth two methods for the calculation of diesel fuel oil storage requirements as described in ANSI N195-1976, Section 5.4 Calculation of Fuel Oil Storage Requirements. These methods are: (1) calculations based on the assumption that the DG operates continuously for 7 days at its rated capacity, and (2) calculations based on the time-dependent loads of the DG. If the time-dependent load method is used, the minimum required capacity should include the capacity to power engineered safety features.

NUREG-1434, Revision 4.0, Standard Technical Specifications General Electric BWR

[Boiling-Water Reactors]/6 Plants, dated April 2012 (ADAMS Accession No. ML12104A195),

provides example TS LCOs and acceptable remedial actions that meet the requirements in 10 CFR 50.36(c)(2)(i) for a standard plant design.

The NRC-approved TSTF Traveler TSTF-501, Revision 1, provides an acceptable method of modifying the stored diesel fuel oil and lube oil requirements contained in the Standard Technical Specifications.

3.0 TECHNICAL EVALUATION

3.1 NRC Staff Evaluation of Proposed Changes to TS 3.8.3 Actions Table Conditions A and B Currently, Condition A of TS 3.8.3 is entered when the diesel fuel oil volume requirement is not met, and Condition B is entered when the lube oil inventory requirement is not met. The current TS Bases state that the numerical volume requirements in Conditions A and B are based on volumes less than a 7-day supply, but at least a 6-day supply. The proposed changes would remove the numerical volumetric requirements from the TSs and would modify Conditions A and B to replace them with duration-based DG operating time requirements, such that Condition A is entered when the stored diesel fuel oil inventory is less than a 7-day supply, but greater than a 6-day supply, and Condition B is entered when the lube oil inventory is less than a 7-day supply, but greater than a 6-day supply for one or more DGs. No other parts of Condition A or B are proposed to be modified.

As described in Section 3.2 below, the licensee stated that the stored diesel fuel oil and lube oil numerical volumes sufficient to meet the duration-based operating time requirements will be calculated using Section 5.4 of ANSI N195-1976, and the volumes are based on DG manufacturers consumption values for the run-time of the DGs. The use of this methodology will ensure that the supplies of stored diesel fuel oil and lube oil for each DG that dictate Condition entry will continue to be calculated in accordance with NRC-approved methods.

Based on the above evaluation, the NRC staff concludes that the changes to the TS 3.8.3 Actions table are acceptable.

3.2 NRC Staff Evaluation of Proposed Changes to SRs 3.8.3.1 and 3.8.3.2 Currently, SRs 3.8.3.1 and 3.8.3.2 require the licensee to verify that the stored diesel fuel oil and lube oil numerical volume requirements are met. The licensee proposes to revise SRs 3.8.3.1 and 3.8.3.2 to reflect the change from numerical volume requirements to durational requirements made in the TS 3.8.3 Actions table. Specifically, SRs 3.8.3.1 and 3.8.3.2 would be revised to require availability of a 7-day supply of diesel fuel oil and lube oil for each DG, rather than a specified numerical volume. As a result, SRs 3.8.3.1 and 3.8.3.2 would require the licensee to verify that the combined volume of the diesel fuel oil storage tanks and the lube oil inventory are each greater than or equal to a 7-day supply for a DG.

The licensee stated in its application that an NRC-approved fuel oil calculation methodology is currently used to calculate fuel oil volumes. Specifically, on page 3 of the enclosure to the application, the licensee states:

The specific volume of fuel oil equivalent to a 7 and 6-day supply [for Palo Verde]

is calculated using the NRC-approved methodology described in Regulatory Guide (RG) 1.137, Revision 1, Fuel-Oil Systems for Standby Diesel Generators and ANSI-N195-1976, Fuel Oil Systems for Standby Diesel-Generators. The specific volume of lube oil equivalent to a 7-day and 6-day supply is based on the diesel generator manufacturers consumption values for the run time of the diesel generator.

The methodology for determining the 7-day stored diesel fuel oil supply for each DG, as well as the 7-day supply associated with Condition A, is calculated in accordance with RG 1.137, Revision 1 and ANSI N195 1976. The methodology in ANSI N195-1976 discusses how the stored diesel fuel oil requirement should be calculated based upon the DGs operating at the minimum required capacity for the plant condition, which is most limiting for the calculation of such capacity. One method for calculating the stored fuel oil supply in ANSI N195-1976 takes into account the time-dependence of DG loads. That is, if DG loads increase or decrease during the event, the load changes should be included in the required fuel storage calculation. If the design includes provisions for an operator to supply power to equipment other than the minimum required for the plant condition, such additional loads should be included in the calculation of required fuel storage capacity. Revision 1 of RG 1.137 supplements the above by stating that for the time-dependent load method, the minimum required capacity should include the capacity to power the engineered safety features. A minimum margin of 10 percent shall be added to the calculated storage requirement if the alternate conservative calculation discussed next is not used. Another method for calculating the stored fuel oil supply, which is more conservative than the time-dependent load method, is to calculate the storage capacity by assuming that the DG operates continuously for 7 days at its rated capacity. Both calculation methods shall include an explicit allowance for fuel consumption required by periodic testing.

This includes the fuel required for operation of the DG at the minimum loads specified by the DG manufacturer.

One variable used in both stored diesel fuel oil calculation methods is the fuel consumption rate.

The property of diesel fuel oil having the most significant effect on the fuel consumption rate is the energy content (heating value) of the fuel. There are standards that correlate the energy content to the fuels American Petroleum Institute (API) gravity or absolute specific gravity. At a minimum, plants calculate their required fuel storage values assuming the most limiting API gravity or absolute specific gravity, and therefore, the most limiting fuel energy content. As long as the diesel fuel oil placed in the storage tank is within the API gravity range or absolute specific gravity range specified by the licensee, the calculations of fuel consumption and required stored volume remains valid. Current SR 3.8.3.3 requires new fuel to be tested in order to verify that the new fuel API gravity or absolute specific gravity is within the range assumed in the diesel fuel oil consumption calculations.

The lube oil inventory equivalent to a 7-day supply, as well as the 6-day supply associated with TS 3.8.3, Condition B, is based on the DG manufacturer consumption values for the run time of the DG.

Accordingly, the NRC staff finds that the above methods used by the licensee still provide reasonable assurance that the necessary quality of systems and components are maintained, that facility operation will be within safety limits, and that the LCOs will be met. Therefore, the changes to SRs 3.8.3.1 and 3.8.3.2 are acceptable.

3.3 TS Bases Changes The regulation at 10 CFR 50.36(a)(1) states, in part, that a summary statement of the bases or reasons for such specifications, other than those covering administrative controls, shall also be included in the application but shall not become part of the technical specifications. Consistent with 10 CFR 50.36(a)(1), the licensee submitted corresponding TS Bases changes that provide the reasons for the proposed TSs changes. The NRC staff concludes that the proposed TS Bases changes describe the bases for the affected TSs and follow the Final Policy Statement on Technical Specifications Improvements for Nuclear Power Reactors (58 FR 39132).

3.4 Technical Conclusion The proposed changes will continue to require that the appropriate volumes of stored diesel fuel oil and lube oil are maintained. The proposed changes to TS 3.8.3 Actions table continue to provide reasonable assurance that the lowest functional capability or performance levels of equipment required for safe operation of the facility will continue to be met. Conditions A and B of TS 3.8.3 Actions table continue to provide acceptable remedial actions to follow until LCO 3.8.3 can be met. The replacement of the TS numerical value volume requirements with durational requirements does not change the current plant configuration, the current volume requirements, or the current basis for diesel fuel oil and lube oil volume requirements.

Therefore, the changes to TS 3.8.3 Actions table will continue to meet 10 CFR 50.36(c)(2) and are acceptable.

In addition, the proposed changes to SRs 3.8.3.1 and 3.8.3.2 continue to provide reasonable assurance that the necessary quality of systems and components is maintained, the facility will be within safety limits, and that the LCO will be met. Because the revised SRs will continue to meet 10 CFR 50.36(c)(3), the NRC staff finds them acceptable.

In summary, the NRC staff finds that the proposed Palo Verde TSs changes collectively provide reasonable assurance that the health and safety of the public will not be endangered.

4.0 STATE CONSULTATION

In accordance with the Commissions regulations, the Arizona State official was notified of the proposed issuance of the amendments on August 11, 2021. The State official had no comments.

5.0 ENVIRONMENTAL CONSIDERATION

The amendments change requirements with respect to installation or use of facility components located within the restricted area as defined in 10 CFR Part 20 and change SRs. The NRC staff has determined that the amendments involve no significant increase in the amounts, and no significant change in the types, of any effluents that may be released offsite, and that there is no significant increase in individual or cumulative occupational radiation exposure. The Commission has previously issued a proposed finding that the amendments involve no significant hazards consideration, published in the Federal Register on December 1, 2020 (85 FR 77273), and there has been no public comment on such finding. Accordingly, the amendments meet the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9).

Pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendments.

6.0 CONCLUSION

The Commission has concluded, based on the considerations discussed above, that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) there is reasonable assurance that such activities will be conducted in compliance with the Commissions regulations, and (3) the issuance of the amendments will not be inimical to the common defense and security or to the health and safety of the public.

Principal Contributor: K. West, NRR Date: August 17, 2021

ML21225A093

  • by e-mail OFFICE NRR/DORL/LPL4/PM*