ML17206A971: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
| Line 2: | Line 2: | ||
| number = ML17206A971 | | number = ML17206A971 | ||
| issue date = 07/11/1979 | | issue date = 07/11/1979 | ||
| title = Responds to NRC 790620 Ltr Re Violation Noted in | | title = Responds to NRC 790620 Ltr Re Violation Noted in IE Insp Rept 50-335/79-14.Corrective Actions:Required Valves Are Locked & Prestart Check List Will Be Revised by 790801 | ||
| author name = UHRIG R E | | author name = UHRIG R E | ||
| author affiliation = FLORIDA POWER & LIGHT CO. | | author affiliation = FLORIDA POWER & LIGHT CO. | ||
Revision as of 01:58, 27 February 2018
| ML17206A971 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie |
| Issue date: | 07/11/1979 |
| From: | UHRIG R E FLORIDA POWER & LIGHT CO. |
| To: | OREILLY J P NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| Shared Package | |
| ML17206A970 | List: |
| References | |
| NUDOCS 7908200013 | |
| Download: ML17206A971 (4) | |
See also: IR 05000335/1979014
Text
8P.BOX013100.MIAMI.FL33101pR~3FLORIDAPOWER8cLIGHTCOMPANYJulyll,1979L-79-189Mr.JamesP.O'Reilly,Director,RegionIIOfficeofInspectionandEnforcementU.S.NuclearRegulatoryCommission101MariettaStreet,Suite3100Atlanta,Georgia30303
DearMr.O'Reilly:
Re:RII:JAD50-335/79-14FloridaPower5LightCompanyhasreviewedthesubjectinspectionreportandaresponseisattached.Thereisnoproprietaryinformationinthereport.Verytrulyyours,obertE.UhrigVicePresidentAdvancedSystems&TechnologyREU/MAS/malAttachmentcc:HaroldF.Reis,EsquireO82OOOi~PEOPLE...SERVINGPEOPLE
ATTACHMENTRe.RII:JAB50-335/79-14FindinnAsrequiredbyTechnicalSpecification6.8.l.a,writtenproceduresarerequiredtobeestablished,implementedandmaintainedcoveringtheapplicableproce-duresrecommendedinAppendix"A"ofRegulatoryGuide1.33,November,1972.Contrarytotheabove:l.PlantOperatingProcedure0410020"HPSI/LPSI-NormalOperation",Section8.1wasnotfollowedinthatsafeguardspumpsminimumflowisolationvalveNV-3660,requiredtobelockedopen,wasfoundopenbutunlockedonJune7,1979.2.PlantOperatingProcedure0420020"ContainmentSpray-InitialValveAlignment",Section8.1.9divasnotfollowedinthatBheadereductorinletvalve07261,requiredtobelockedopen,wasfoundopenbutunlockedonJune7,19/9.~ResenseThevalvesrequiredtobelockedarenowlocked.,Theindividualsresponsibleforvalvelockinghavebeenapprisedoftheimportanceofthefinding.Thepre-startchecklistprocedure(AdministrativeProcedure0030120)willberevisedbyAugust1,1979.Therevisedprocedurewillrequireverificationofthelockedvalvelistforaparticularmodeofoperationpriortoentryintothatmode.Thisrequirementwillbemandatoryafteranyoutageinvolvingsignificantvalvemanipulation.