ML23212B265: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
(One intermediate revision by the same user not shown) | |||
Line 1: | Line 1: | ||
{{Adams | |||
| number = ML23212B265 | |||
| issue date = 07/27/2023 | |||
| title = – Operator Licensing Written Examination Approval 05000335/2023301 and 05000389/2023301 | |||
| author name = Bacon D | |||
| author affiliation = NRC/RGN-II/DRS/EB2 | |||
| addressee name = Feightner E | |||
| addressee affiliation = Florida Power & Light Co | |||
| docket = 05000335, 05000389 | |||
| license number = DPR-067, NPF-016 | |||
| contact person = | |||
| document report number = IR 2023301 | |||
| document type = Letter | |||
| page count = 2 | |||
}} | |||
See also: [[see also::IR 05000335/2023301]] | |||
=Text= | |||
{{#Wiki_filter:July 27, 2023 | |||
Florida Power and Light Company | |||
ATTN: Erik Feightner | |||
Plant Training Manager | |||
St Lucie Nuclear Plant | |||
6501 South Ocean Drive | |||
Jensen Beach, FL 34957 | |||
SUBJECT: ST. LUCIE NUCLEAR PLANT - OPERATOR LICENSING WRITTEN | |||
EXAMINATION APPROVAL 05000335/2023301 AND 05000389/2023301 | |||
Mr. Feightner: | |||
The purpose of this letter is to provide U.S. Nuclear Regulator y Commission (NRC) approval of the | |||
proposed written examination and operating test under Title 10 of the Code of Federal Regulations | |||
(10 CFR) 55.40(b)(4) and to confirm the final arrangements for the upcoming operator licensing | |||
examination at St. Lucie Nuclear Plant. | |||
The NRC has approved the subject e xaminations, and you may admi nister the written examination | |||
on August 17, 2023, in accordance with Revision 12 to NUREG-102 1, Operator Licensing | |||
Examination Standards for Power Reactors, issued September 202 1. The NRC staff will | |||
administer the operating test during the week of August 7, 2023 . The NRC has provided the list of | |||
applicants approved to take the examinations to your office. T he examinations have undergone | |||
extensive review by my staff and representatives responsible fo r licensed operator training at your | |||
facility. Based on this review , I have concluded that the exam inations meet the guidelines of | |||
NUREG-1021 for content, operational, and discrimination validit y. By administering the written | |||
examination, you also agree tha t the examination meets NUREG-10 21 guidelines and are | |||
appropriate for measuring the qualifications of licensed operat or applicants at your facility. If you | |||
determine that these examinations are not appropriate for licen sing operators at your facility, do | |||
not administer the written examination and contact me at 404-99 7-4518. | |||
Please contact your NRC Chief E xaminer, Kevin Kirchbaum, at 404 -997-4641, if you have | |||
questions or identify any errors or changes in the license leve l (reactor operator or senior reactor | |||
operator) or type of examination (partial or complete written e xamination or operating test, or both) | |||
specified for each applicant approved to take the examination. | |||
Sincerely, | |||
/RA/ | |||
DanBacon | |||
C hief, Engineering Branch 2 | |||
Divis ion of Reactor Safety | |||
Docket No.: 50-335, 50-389 | |||
License No.: DPR-67, NPF-16 | |||
E.Feightner 2 | |||
SUBJECT: ST. LUCIE NUCLEAR PLANT - OPERATOR LICENSING WRITTEN | |||
EXAMINATION APPROVAL 05000335/2023301 AND 05000389/2023301 | |||
dated July 27, 2023 | |||
*See Previous page for concurrence | |||
PUBLICLY AVAILABLE NON-PUBLICLY AVAILABLE SENSITIVE NON-SENSITIVE | |||
ADAMS: Yes ACCESSION NUMBER: ML23212B265 SUNSI REVIEW COMPLETE FORM 665 ATTACHED | |||
OFFICE RII/DRS/OB RII/DRS/OB RII/DRS/EB2 | |||
NAME DEgelstad KKirchbaum DBacon | |||
DATE 7/27/2023 7/ 27/2023 7/ 27/2023 | |||
OFFICIAL RECORD COPY DOCUMENT NAME: https://usnrc- | |||
my.sharepoint.com/personal/dje_nrc_gov/Documents/Desktop/STL 2023-301 Exam Approval Letter .docx | |||
}} |
Latest revision as of 17:43, 13 November 2024
ML23212B265 | |
Person / Time | |
---|---|
Site: | Saint Lucie |
Issue date: | 07/27/2023 |
From: | Daniel Bacon NRC/RGN-II/DRS/EB2 |
To: | Feightner E Florida Power & Light Co |
References | |
IR 2023301 | |
Download: ML23212B265 (2) | |
See also: IR 05000335/2023301
Text
July 27, 2023
Florida Power and Light Company
ATTN: Erik Feightner
Plant Training Manager
St Lucie Nuclear Plant
6501 South Ocean Drive
Jensen Beach, FL 34957
SUBJECT: ST. LUCIE NUCLEAR PLANT - OPERATOR LICENSING WRITTEN
EXAMINATION APPROVAL 05000335/2023301 AND 05000389/2023301
Mr. Feightner:
The purpose of this letter is to provide U.S. Nuclear Regulator y Commission (NRC) approval of the
proposed written examination and operating test under Title 10 of the Code of Federal Regulations
(10 CFR) 55.40(b)(4) and to confirm the final arrangements for the upcoming operator licensing
examination at St. Lucie Nuclear Plant.
The NRC has approved the subject e xaminations, and you may admi nister the written examination
on August 17, 2023, in accordance with Revision 12 to NUREG-102 1, Operator Licensing
Examination Standards for Power Reactors, issued September 202 1. The NRC staff will
administer the operating test during the week of August 7, 2023 . The NRC has provided the list of
applicants approved to take the examinations to your office. T he examinations have undergone
extensive review by my staff and representatives responsible fo r licensed operator training at your
facility. Based on this review , I have concluded that the exam inations meet the guidelines of
NUREG-1021 for content, operational, and discrimination validit y. By administering the written
examination, you also agree tha t the examination meets NUREG-10 21 guidelines and are
appropriate for measuring the qualifications of licensed operat or applicants at your facility. If you
determine that these examinations are not appropriate for licen sing operators at your facility, do
not administer the written examination and contact me at 404-99 7-4518.
Please contact your NRC Chief E xaminer, Kevin Kirchbaum, at 404 -997-4641, if you have
questions or identify any errors or changes in the license leve l (reactor operator or senior reactor
operator) or type of examination (partial or complete written e xamination or operating test, or both)
specified for each applicant approved to take the examination.
Sincerely,
/RA/
DanBacon
C hief, Engineering Branch 2
Divis ion of Reactor Safety
Docket No.: 50-335, 50-389
E.Feightner 2
SUBJECT: ST. LUCIE NUCLEAR PLANT - OPERATOR LICENSING WRITTEN
EXAMINATION APPROVAL 05000335/2023301 AND 05000389/2023301
dated July 27, 2023
- See Previous page for concurrence
PUBLICLY AVAILABLE NON-PUBLICLY AVAILABLE SENSITIVE NON-SENSITIVE
ADAMS: Yes ACCESSION NUMBER: ML23212B265 SUNSI REVIEW COMPLETE FORM 665 ATTACHED
OFFICE RII/DRS/OB RII/DRS/OB RII/DRS/EB2
NAME DEgelstad KKirchbaum DBacon
DATE 7/27/2023 7/ 27/2023 7/ 27/2023
OFFICIAL RECORD COPY DOCUMENT NAME: https://usnrc-
my.sharepoint.com/personal/dje_nrc_gov/Documents/Desktop/STL 2023-301 Exam Approval Letter .docx