ML17003A122: Difference between revisions
From kanterella
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 13: | Line 13: | ||
| document type = Drawing | | document type = Drawing | ||
| page count = 1 | | page count = 1 | ||
}} | }} |
Revision as of 16:06, 26 February 2018
ML17003A122 | |
Person / Time | |
---|---|
Site: | Oconee |
Issue date: | 01/03/2017 |
From: | Duke Power Co |
To: | Office of Nuclear Reactor Regulation |
References | |
PO-107B-3, Rev 10 | |
Download: ML17003A122 (1) | |
Similar Documents at Oconee | |
---|---|
Category:Drawing
MONTHYEARML22124A2052022-05-0404 May 2022
[Table view]Summary of May 4, 2022, Clarification Call with Duke Energy Carolinas, LLC, Application to Revise TS 3.7.7, Low Pressure Service Water (LPSW) System ML20189A0912020-06-29029 June 2020 8 to Updated Final Safety Analysis Report, Chapter 8, Appendix 8B, Figures ML20189A0882020-06-29029 June 2020 8 to Updated Final Safety Analysis Report, Chapter 7, Appendix 7B, Figures ML20189A0852020-06-29029 June 2020 8 to Updated Final Safety Analysis Report, Chapter 6, Appendix 6B, Figures, (Redacted Version) ML20189A0822020-06-29029 June 2020 8 to Updated Final Safety Analysis Report, Chapter 5, Appendix 5B, Figures ML20189A0792020-06-29029 June 2020 8 to Updated Final Safety Analysis Report, Chapter 4, Appendix 4B, Figures ML20189A0762020-06-29029 June 2020 8 to Updated Final Safety Analysis Report, Chapter 3, Appendix 3B, Figures ML20189A0732020-06-29029 June 2020 8 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2B, Figures ML20189A0702020-06-29029 June 2020 8 to Updated Final Safety Analysis Report, Chapter 1, Appendix 1B, Figures, (Redacted Version) ONS-2018-038, Independent Spent Fuel Storage Installation, Appendix B. Figures, UFSAR, Rev. 272018-06-29029 June 2018 Independent Spent Fuel Storage Installation, Appendix B. Figures, UFSAR, Rev. 27 ML18192A9722017-12-31031 December 2017 Revision 27 to Updated Final Safety Analysis Report, Chapter 13, Appendix 13B, Figures ML18192A8942017-12-31031 December 2017 Revision 27 to Updated Final Safety Analysis Report, Chapter 1, Appendix 1B, Figures (Redacted) ML18192A9012017-12-31031 December 2017 Revision 27 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2B, Figures ML18192A9072017-12-31031 December 2017 Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Appendix 3B, Figures ML18192A9152017-12-31031 December 2017 Revision 27 to Updated Final Safety Analysis Report, Chapter 4, Appendix 4B, Figures ML18192A9482017-12-31031 December 2017 Revision 27 to Updated Final Safety Analysis Report, Chapter 9B, Figures (Redacted) ML18192A9542017-12-31031 December 2017 Revision 27 to Updated Final Safety Analysis Report, Chapter 10, Appendix 10B, Figures ML18192A9622017-12-31031 December 2017 Revision 27 to Updated Final Safety Analysis Report, Chapter 11, Appendix 11B, Figures ML17003A1222017-01-0303 January 2017 Drawing No. PO-107B-3, Rev. 10, Diagrammatic Layout of Liquid Waste Disposal System (Miscellaneous Waste Portion). ONS-2017-048, Oconee Nuclear Station, Units 1, 2 & 3, Revision 26 to Updated Final Safety Analysis Report, Chapter 15, Appendix 15B, Figures 15-1 Through 15-2322016-12-31031 December 2016 Oconee Nuclear Station, Units 1, 2 & 3, Revision 26 to Updated Final Safety Analysis Report, Chapter 15, Appendix 15B, Figures 15-1 Through 15-232 ML17234A1242016-12-31031 December 2016 Revision 26 to Updated Final Safety Analysis Report, Chapter 11, Appendix 11B, Figures 11-1 Through 11-6 ML17234A1202016-12-31031 December 2016 Revision 26 to Updated Final Safety Analysis Report, Chapter 10, Appendix 10B, Figures 10-1 Through 10-9 ML17234A1142016-12-31031 December 2016 Revision 26 to Updated Final Safety Analysis Report, Chapter 8, Appendix 8B, Figures 8-1 Through 8-9 ONS-2017-048, Redacted - Oconee Nuclear Station, Units 1, 2 & 3, Revision 26 to Updated Final Safety Analysis Report, Chapter 9, Appendix 9B, Figures 9-1 Through 9-46 Redacted2016-12-31031 December 2016 Redacted - Oconee Nuclear Station, Units 1, 2 & 3, Revision 26 to Updated Final Safety Analysis Report, Chapter 9, Appendix 9B, Figures 9-1 Through 9-46 Redacted ML17234A1292016-12-31031 December 2016 Revision 26 to Updated Final Safety Analysis Report, Chapter 13, Appendix 13B, Figures 13-1 Through 13-8 ML17234A1352016-12-31031 December 2016 Revision 26 to Updated Final Safety Analysis Report, Chapter 15, Appendix 15B, Figures 15-1 Through 15-232 ML17361A4102016-12-31031 December 2016 Redacted - Oconee Nuclear Station, Units 1, 2 & 3, Revision 26 to Updated Final Safety Analysis Report, Chapter 9, Appendix 9B, Figures 9-1 Through 9-46 Redacted ONS-2017-048, Oconee Nuclear Station, Units 1, 2 & 3, Revision 26 to Updated Final Safety Analysis Report, Chapter 13, Appendix 13B, Figures 13-1 Through 13-82016-12-31031 December 2016 Oconee Nuclear Station, Units 1, 2 & 3, Revision 26 to Updated Final Safety Analysis Report, Chapter 13, Appendix 13B, Figures 13-1 Through 13-8 ONS-2017-048, Oconee Nuclear Station, Units 1, 2 & 3, Revision 26 to Updated Final Safety Analysis Report, Chapter 11, Appendix 11B, Figures 11-1 Through 11-62016-12-31031 December 2016 Oconee Nuclear Station, Units 1, 2 & 3, Revision 26 to Updated Final Safety Analysis Report, Chapter 11, Appendix 11B, Figures 11-1 Through 11-6 ONS-2017-048, Oconee Nuclear Station, Units 1, 2 & 3, Revision 26 to Updated Final Safety Analysis Report, Chapter 10, Appendix 10B, Figures 10-1 Through 10-92016-12-31031 December 2016 Oconee Nuclear Station, Units 1, 2 & 3, Revision 26 to Updated Final Safety Analysis Report, Chapter 10, Appendix 10B, Figures 10-1 Through 10-9 ONS-2017-048, Oconee Nuclear Station, Units 1, 2 & 3, Revision 26 to Updated Final Safety Analysis Report, Chapter 8, Appendix 8B, Figures 8-1 Through 8-92016-12-31031 December 2016 Oconee Nuclear Station, Units 1, 2 & 3, Revision 26 to Updated Final Safety Analysis Report, Chapter 8, Appendix 8B, Figures 8-1 Through 8-9 ML1101806672011-01-0505 January 2011 Enclosure 2 (Part 2) - Major Projects Slides ML0900203552008-12-22022 December 2008 Proposed License Amendment Request to Revise Current Licensing Basis for HELB Events Outside of the Containment Building Unit 2; License Amendment Request No. 2008-006 ML0900203582008-12-22022 December 2008 Figures 5.1-9, Moisture Separator Reheater Drain System Though 5.1-12, Steam Seal Header System. ML0900203562008-12-22022 December 2008 Figures 5.1-3, Extraction Steam System Through 5.1-8, Main Steam System. ML0908907922008-04-29029 April 2008 Drawing OFD-124A-3.1, Rev 33, Flow Diagram of Low Pressure Service Water System Turbine Bldg (Low Pressure Service Water Pumps). ML0811600942008-04-21021 April 2008 Transmittal of Revision 1 to Request for Relief No. 04-ON-012 Third Ten Year Inservice Inspection Interval ML0908907842005-11-0707 November 2005 Drawing OFD-133A-2.1, Rev 26, Flow Diagram of Condenser Circulation Water System (CCW Intake Pumps Discharge). ML1019602852005-10-0101 October 2005 Monitoring Well Locations ML0908907932005-06-16016 June 2005 Drawing OFD-133A-1.1, Rev 28, Flow Diagram of Condenser Circulation Water System (CCW Intake Pumps Discharge). 2022-05-04 |
Retrieved from "https://kanterella.com/w/index.php?title=ML17003A122&oldid=368976"