ML24136A136: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
Line 48: | Line 48: | ||
issued on DATE. July 30, 2024 | issued on DATE. July 30, 2024 | ||
ADDRESSES: Please refer to Docket ID | ADDRESSES: Please refer to Docket ID NRC-2022-0183 when contacting the NRC | ||
about the availability of information regar ding this document. You may obtain publicly | about the availability of information regar ding this document. You may obtain publicly | ||
Line 125: | Line 125: | ||
dated April 2024, the NRC staff initially considered 16 alternatives to license renewal. | dated April 2024, the NRC staff initially considered 16 alternatives to license renewal. | ||
The NRC staff dismissed 13 alternatives because of | The NRC staff dismissed 13 alternatives because of technical, resource availability, or | ||
commercial limitations that currently exist and that are likely to continue to exist when | commercial limitations that currently exist and that are likely to continue to exist when | ||
the existing CPNPP, Units 1 and 2, licenses | the existing CPNPP, Units 1 and 2, licenses expire, rendering these alternatives not | ||
feasible and commercially viable. This resulted in the three reasonable replacement | feasible and commercially viable. This resulted in the three reasonable replacement | ||
power alternatives for indepth- evaluation: (a) a new nuclear (Small Modular Reactor) | power alternatives for indepth-evaluation: (a) a new nuclear (Small Modular Reactor) | ||
generation alternative, (b) a natural gas combined-cycle power plant, and (c) a | generation alternative, (b) a natural gas combined-cycle power plant, and (c) a | ||
Line 169: | Line 169: | ||
Act of 1954, as amended (the Act), and the NRC s regulations. As required by the Act | Act of 1954, as amended (the Act), and the NRC s regulations. As required by the Act | ||
and NRC regulations in chapter 1 of title 10 of the | and NRC regulations in chapter 1 of title 10 of the Code of Federal Regulations | ||
(10 CFR), the NRC has made appropriate findings, which are set forth in the renewed | (10 CFR), the NRC has made appropriate findings, which are set forth in the renewed | ||
Line 177: | Line 177: | ||
A notice of the proposed issuance of the renewed licenses and an opportunity for | A notice of the proposed issuance of the renewed licenses and an opportunity for | ||
a hearing was published in the | a hearing was published in the Federal Register on December 1, 2022 (87 FR 73798). | ||
The adjudicatory proceeding before the Atomic Safety and Licensing Board (ASLB) is | The adjudicatory proceeding before the Atomic Safety and Licensing Board (ASLB) is | ||
Line 189: | Line 189: | ||
LLCs license renewal application for CPNPP, Units 1 and 2, dated October 3, 2022, as | LLCs license renewal application for CPNPP, Units 1 and 2, dated October 3, 2022, as | ||
supplemented by letters dated through | supplemented by letters dated through January 31, 2024; (2) the NRCs safety | ||
evaluation, dated March 2024; (3) the NRCs final environmental impact statement | evaluation, dated March 2024; (3) the NRCs final environmental impact statement | ||
Line 203: | Line 203: | ||
persons through one or more of the following methods, as indicated. | persons through one or more of the following methods, as indicated. | ||
DOCUMENT DESCRIPTION | DOCUMENT DESCRIPTION ADAMS ACCESSION NO | ||
Record of Decision - License Renewal Application Review - Comanche Peak | Record of Decision - License Renewal Application Review - Comanche Peak ML24136A135 Nuclear Power Plant Units 1 and 2 Safety Evaluation - License Renewal Application Review - Comanche Peak ML24068A075 Nuclear Power Plant Units 1 and 2 4 | ||
Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 60, Regarding License | Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 60, Regarding License ML24078A261 Renewal of Comanche Peak Nuclear Power Plant NUREG-1437, Generic Environmental Impact Statement for License Renewal of ML13107A023 Nuclear Power Plants Atomic Safety and Licensing Board Memorandum and Order ML23158A276 Comanche Peak Nuclear Power Plant Units 1 and 2 License Renewal ML22297A247 Application Comanche Peak Nuclear Power Plant Units 1 and 2 License Renewal ML23096A302 Application Supplement 1 Comanche Peak Nuclear Power Plant Units 1 and 2 License Renewal ML23114A377 Application Supplement 2 Comanche Peak Nuclear Power Plant Units 1 and 2 License Renewal ML24031A608 Application Supplement 3 | ||
Dated: July 30, 2024 | Dated: July 30, 2024 | ||
Line 212: | Line 212: | ||
For the Nuclear Regulatory Commission. | For the Nuclear Regulatory Commission. | ||
/RA/ | |||
Brian Smith, Director, Division of New and Renewed Licenses, Office of Nuclear Reactor Regulation. | Brian Smith, Director, Division of New and Renewed Licenses, Office of Nuclear Reactor Regulation. | ||
5}} | 5}} |
Latest revision as of 15:05, 4 October 2024
ML24136A136 | |
Person / Time | |
---|---|
Site: | Comanche Peak |
Issue date: | 07/30/2024 |
From: | Beverly Smith NRC/NRR/DNRL |
To: | |
Shared Package | |
ML24136A131 | List: |
References | |
NRC-2022-0183 | |
Download: ML24136A136 (5) | |
Text
[7590-01-P]
NUCLEAR REGULATORY COMMISSION
[Docket Nos. 50-445 and 50-446; NRC-2022-0183]
Vistra Operations Company LLC;
Comanche Peak Nuclear Power Plant, Units 1 and 2;
License Renewal and Record of Decision
AGENCY: Nuclear Regulatory Commission.
ACTION: Notice; issuance.
SUMMARY
- The U.S. Nuclear Regulatory Commission (NRC) has issued Renewed
Facility Operating License Nos. NPF-87 and NPF-89 to Vistra Operations Company
LLC, for Comanche Peak Nuclear Power Plant, Units 1 and 2, respectively. In addition,
the NRC has prepared a Record of Decision that supports the NRCs decision to issue
Renewed Facility Operating License Nos. NPF-87 and NPF-89.
DATES: The Renewed Facility Operating License Nos. NPF-87 and NPF-89 were
issued on DATE. July 30, 2024
ADDRESSES: Please refer to Docket ID NRC-2022-0183 when contacting the NRC
about the availability of information regar ding this document. You may obtain publicly
available information related to this document using any of the following methods:
- Federal Rulemaking Website: Go to https://www.regulations.gov and
search for Docket ID NRC-2022-0183. Address questions about Docket IDs in
Regulations.gov to Stacy Schumann; telephone: 301-415-0624; email:
Stacy.Schumann@nrc.gov. For technical questions, contact the individual listed in the
For Further Information Contact section of this document.
- NRCs Agencywide Documents Access and Management System
(ADAMS): You may obtain publicly available documents online in the ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/adams.html. To begin the
search, select Begin Web-based ADAMS Search. For problems with ADAMS, please
contact the NRCs Public Document Room (P DR) reference staff at 1-800-397-4209, at
301-415-4737, or by email to PDR.Resource@nrc.gov. For the convenience of the
reader, instructions about obtaining materials referenced in this document are provided
in the Availability of Documents section.
- NRCs PDR: The PDR, where you may examine and order copies of publicly
available documents, is open by appointment. To make an appointment to visit the PDR,
please send an email to PDR.Resource@nrc.gov or call 1-800-397-4209 or
301-415-4737, between 8 a.m. and 4 p.m. eastern time (ET), Monday through Friday,
except Federal holidays.
FOR FURTHER INFORMATION CONTACT: Mark Yoo, Office of Nuclear Reactor
Regulation, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001;
telephone: 301-415-8583, email: Mark.Yoo@nrc.gov.
SUPPLEMENTARY INFORMATION:
I. Discussion
Notice is hereby given that the NRC has issued Renewed Facility Operating
License Nos. NPF-87 and NPF-89 to Vistra Operations Company LLC (Vistra, the
licensee), for Comanche Peak Nuclear Power Plant (CPNPP), Units 1 and 2,
respectively. Vistra is the operator of the facility. Renewed Facility Operating License
Nos. NPF-87 and NPF-89 authorize operation of Unit 1 and Unit 2, respectively, by
Vistra at reactor core power levels not in excess of 3,612 megawatts thermal for each
unit, in accordance with the provisions of the CPNPP, Units 1 and 2, renewed licenses
and technical specifications. Notice is also given that the Record of Decision (ROD) that
2 supports the NRCs decision to issue Renew ed Facility Operating License Nos. NPF-87
and NPF-89 is available in the Availability of Documents table.
As discussed in the ROD and the final supplemental environmental impact
statement (FSEIS) for CPNPP, Units 1 and 2, Supplement 60, to NUREG-1437,
Generic Environmental Impact Statement for License Renewal of Nuclear Plants
Regarding License Renewal of Comanche Peak Nuclear Power Plant, Final Report,
dated April 2024, the NRC staff initially considered 16 alternatives to license renewal.
The NRC staff dismissed 13 alternatives because of technical, resource availability, or
commercial limitations that currently exist and that are likely to continue to exist when
the existing CPNPP, Units 1 and 2, licenses expire, rendering these alternatives not
feasible and commercially viable. This resulted in the three reasonable replacement
power alternatives for indepth-evaluation: (a) a new nuclear (Small Modular Reactor)
generation alternative, (b) a natural gas combined-cycle power plant, and (c) a
combination of natural gas combined-cycle power plant, solar, and demand-side
management. The FSEIS documents the environmental review, including the
determination that the adverse environmental impacts of license renewal for CPNPP,
Units 1 and 2, are not so great that preserving the option of license renewal for energy
planning decisionmakers would be unreasonable. In addition to the NRC staffs
independent environmental review, the FSEIS conclusion is based on (1) the analysis
and findings in NUREG-1437, Generic Environmental Impact Statement for License
Renewal of Nuclear Power Plants, (2) information provided in the environmental report
submitted by Vistra, (3) consultation with Federal, State, local, and Tribal agencies, and
(4) the NRC staffs consideration of public comments.
CPNPP, Units 1 and 2, are four-coolant-loop, pressurized light water reactors
located Somervell County, Texas. The application for the renewed licenses, Comanche
3 Peak Nuclear Power Plant Units 1 and 2 License Renewal Application, dated
October 3, 2022, as supplemented by letters dated April 6, 2023, April 24, 2023, and
January 31, 2024, complies with the standards and requirements of the Atomic Energy
Act of 1954, as amended (the Act), and the NRC s regulations. As required by the Act
and NRC regulations in chapter 1 of title 10 of the Code of Federal Regulations
(10 CFR), the NRC has made appropriate findings, which are set forth in the renewed
licenses.
A notice of the proposed issuance of the renewed licenses and an opportunity for
a hearing was published in the Federal Register on December 1, 2022 (87 FR 73798).
The adjudicatory proceeding before the Atomic Safety and Licensing Board (ASLB) is
terminated by ASLBs Memorandum and Order, which was issued on June 20, 2019
(LBP-23-06).
For further details with respect to this action, see: (1) Vistra Operations Company
LLCs license renewal application for CPNPP, Units 1 and 2, dated October 3, 2022, as
supplemented by letters dated through January 31, 2024; (2) the NRCs safety
evaluation, dated March 2024; (3) the NRCs final environmental impact statement
(NUREG-1437, Supplement 60) for CPNPP, Units 1 and 2, dated April 2024; and (4) the
NRCs ROD.
II. Availability of Documents
The documents identified in the following table are available to interested
persons through one or more of the following methods, as indicated.
DOCUMENT DESCRIPTION ADAMS ACCESSION NO
Record of Decision - License Renewal Application Review - Comanche Peak ML24136A135 Nuclear Power Plant Units 1 and 2 Safety Evaluation - License Renewal Application Review - Comanche Peak ML24068A075 Nuclear Power Plant Units 1 and 2 4
Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 60, Regarding License ML24078A261 Renewal of Comanche Peak Nuclear Power Plant NUREG-1437, Generic Environmental Impact Statement for License Renewal of ML13107A023 Nuclear Power Plants Atomic Safety and Licensing Board Memorandum and Order ML23158A276 Comanche Peak Nuclear Power Plant Units 1 and 2 License Renewal ML22297A247 Application Comanche Peak Nuclear Power Plant Units 1 and 2 License Renewal ML23096A302 Application Supplement 1 Comanche Peak Nuclear Power Plant Units 1 and 2 License Renewal ML23114A377 Application Supplement 2 Comanche Peak Nuclear Power Plant Units 1 and 2 License Renewal ML24031A608 Application Supplement 3
Dated: July 30, 2024
For the Nuclear Regulatory Commission.
/RA/
Brian Smith, Director, Division of New and Renewed Licenses, Office of Nuclear Reactor Regulation.