MONTHYEARML20105A1072020-04-13013 April 2020 NRR E-mail Capture - Comanche Peak - Request for Additional Information - Exigent Amendment Request for One Time Change to Unit 2 Steam Generator Inspection Frequency Project stage: RAI ML20101P5592020-04-13013 April 2020 Public Notice of Application for Amendment to Facility Operating License Project stage: Other ML20101P5532020-04-13013 April 2020 Letter, Public Notice of Application for Amendment to Facility Operating License Project stage: Other ML20108E8782020-04-17017 April 2020 Issuance of Amendment Nos. 173 and 173 Revision to TS 5.5.9, Unit 1 Model D76 and Unit 2 Model D5 Steam Generator (SG) Program (Exigent Circumstances) Project stage: Approval 2020-04-13
[Table View] |
|
---|
Category:Federal Register Notice
MONTHYEARML23312A0292023-11-0808 November 2023 Federal Register Notice: Comanche Peak Draft Supplemental Environmental Impact Statement Comment Period Correction ML23237B4412023-09-29029 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Federal Register Notice, Direct and Indirect License Transfer Issuance Order ML23124A0772023-05-17017 May 2023 Notice of Consideration of Approval of Indirect and Direct License Transfer for Comanche Peak Plant, Units 1 & 2, Beaver Valley Station, Units 1 & 2, Davis Besse Station, Unit 1 and Perry Plant, Unit 1 (EPID L-2023-LLM-0000) (FRN) ML23039A0532023-02-16016 February 2023 FRN - Comanche Peak Second Notice of Intent to Prepare EIS and to Conduct EIS Scoping ML22299A1792022-12-0808 December 2022 FRN - Comanche Peak Notice of Intent to Prepare EIS and to Conduct EIS Scoping ML22297A0062022-11-28028 November 2022 Notice of Acceptance and Opportunity for Federal Register Notice ML22285A0742022-10-26026 October 2022 LRA - Receipt and Availability FRN ML21147A5192021-06-24024 June 2021 FRN - Notice of Issuance of Multiple COVID-19 Exemptions Regarding Various Parts of 10 CFR Issued in May 2021 ML21060A5962021-03-0909 March 2021 FRN - Notice of Issuance of Multiple COVID-19 Exemptions Regarding 10 CFR Part 26 for February 2021 ML20255A1002020-10-0707 October 2020 Proposed Alternative to the Requirements of the ASME OM Code to Extend the Inservice Test Program Interval for Certain Check and Relief Valves (EPID L-2020-LLR-0061 and EPID L-2020-LLR-0062 (COVID-19)) ML20101P5592020-04-13013 April 2020 Public Notice of Application for Amendment to Facility Operating License ML20035C4082020-02-18018 February 2020 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: 02/25/2020 ML20015A0542020-02-14014 February 2020 Federal Register Notice - Individual Notice of Consideration of Issuance of Amendments to Adopt TSTF-513, Revision 3 ML20015A3962020-02-14014 February 2020 Letter - Individual Notice of Consideration of Issuance of Amendments to Adopt TSTF-513, Revision 3 ML19122A1572019-05-15015 May 2019 Federal Register Notice: Comanche Peak Independent Spent Fuel Storage Installation - Environmental Assessment and Finding of No Significant Impact; Issues NRC-2018-0287, Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: 01/02/20192019-01-0202 January 2019 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: 01/02/2019 ML18351A0022019-01-0202 January 2019 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: 01/02/2019 ML18295A7442018-10-25025 October 2018 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: 11/06/18 NRC-2018-0205, FRN - Renotice Individual 14-day Exigent Notice of Consideration of Issuance of Amendment, Revise TS 3.8.4, DC Sources - Operating, to Modify TS Actions for One Inoperable Battery2018-10-0404 October 2018 FRN - Renotice Individual 14-day Exigent Notice of Consideration of Issuance of Amendment, Revise TS 3.8.4, DC Sources - Operating, to Modify TS Actions for One Inoperable Battery ML18276A0262018-10-0404 October 2018 Letter - Renotice Individual 14-day Exigent Notice of Consideration of Issuance of Amendment, Revise TS 3.8.4, DC Sources - Operating, to Modify TS Actions for One Inoperable Battery ML18276A0292018-10-0404 October 2018 FRN - Renotice Individual 14-day Exigent Notice of Consideration of Issuance of Amendment, Revise TS 3.8.4, DC Sources - Operating, to Modify TS Actions for One Inoperable Battery ML18254A0162018-09-13013 September 2018 FRN, Individual 14-day Exigent Notice of Consideration of Issuance of Amendment, Revise Technical Specification (TS) 3.8.4, DC Sources - Operating, to Modify TS Actions for One Inoperable Battery ML18173A1792018-08-0707 August 2018 OEDO-17-00070 - Notice of Issuance of Director'S Decision, 2.206 Petition for Emergency Enforcement Action Per 10 CFR 2.206 at Listed U.S. Reactors with Forged Components and Parts Manufactured at France'S AREVA-Le Creusot Forge and Japan C ML17198A3292017-08-30030 August 2017 OEDO-17-00070 - Acknowledgement Letter, Paul Gunter, Beyond Nuclear, Petition for Emergency Enforcement Action Per 10 CFR 2.206 at Listed U.S. Reactors with Forged Components and Parts Manufactured at France'S AREVA-Le Creusot Forge and Jap ML17200A0652017-08-30030 August 2017 OEDO-17-00070 - Acknowledgement FRN, Paul Gunter, Beyond Nuclear, 2.206 Petition for Emergency Enforcement Action Per 10 CFR 2.206 at Listed U.S. Reactors with Forged Components and Parts Manufactured at France'S AREVA-Le Creusot Forge and ML16300A1772016-10-27027 October 2016 Biweekly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Consideration; Correction to Notice Published October 25, 2016 NRC-2016-0214, Biweekly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Consideration; Correction to Notice Published October 25, 20162016-10-27027 October 2016 Biweekly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Consideration; Correction to Notice Published October 25, 2016 NRC-2016-0020, ISFSI - FRN, Order Approving Direct and Indirect Transfer of Licenses and Draft Conforming License Amendments (CAC Nos. MF7075 and MF7076)2016-05-0606 May 2016 ISFSI - FRN, Order Approving Direct and Indirect Transfer of Licenses and Draft Conforming License Amendments (CAC Nos. MF7075 and MF7076) ML16130A6492016-05-0606 May 2016 ISFSI - FRN, Order Approving Direct and Indirect Transfer of Licenses and Draft Conforming License Amendments ML16032A3492016-02-0202 February 2016 Independent Spent Fuel Storage Installation - Correction Letter, Notice of Consideration of Approval of Transfer of Facility Operating Licenses and Conforming Amendments, and Opportunity for a Hearing (CAC MF7075-MF7076) ML15351A0532016-01-27027 January 2016 Independent Spent Fuel Storage Installation - FRN, Notice of Consideration of Approval of Transfer of Facility Operating Licenses and Conforming Amendment, and Opportunity for a Hearing ML15351A0502016-01-27027 January 2016 Independent Spent Fuel Storage Installation - Letter, Notice of Consideration of Approval of Transfer of Facility Operating Licenses and Conforming Amendment, and Opportunity for a Hearing ML15218A6252015-08-14014 August 2015 Biweekly FRN - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: August 14, 2015 ML14043A2032014-02-19019 February 2014 Federal Register Notice Regarding the 612th ACRS Meeting, March 6-8, 2014 ML13225A5572013-08-12012 August 2013 Rescission of Certain Security Orders Concerning Spent Nuclear Fuel in Transit ML13210A2782013-08-0606 August 2013 FRN, Withdrawal of Amendment Request, Revise Technical Specification (TS) 3.3.1, Reactor Trip System (RTS) Instrumentation, and TS 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation ML13210A2772013-08-0606 August 2013 Letter, Withdrawal of Amendment Request, Revise Technical Specification (TS) 3.3.1, Reactor Trip System (RTS) Instrumentation, and TS 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation ML13064A4302013-03-12012 March 2013 Correction FRN, Correct Date of Safety Evaluation in One Column; Order Approving the Proposed Internal Restructuring and Indirect Transfer of License NRC-2012-0310, FRN, Order Approving Indirect License Transfer Regarding the Proposed Energy Future Holdings Corporate Internal Restructuring (TAC Nos. ME9767 and ME9768)2013-02-22022 February 2013 FRN, Order Approving Indirect License Transfer Regarding the Proposed Energy Future Holdings Corporate Internal Restructuring (TAC Nos. ME9767 and ME9768) ML13022A3342013-02-22022 February 2013 FRN, Order Approving Indirect License Transfer Regarding the Proposed Energy Future Holdings Corporate Internal Restructuring ML12292A2022013-01-0202 January 2013 ISFSI - Notice of Consideration of Approval of Application Containing SUNSI, Opportunity for a Hearing; Indirect License Transfer, Proposed Energy Future Holdings Corporation Internal Transaction NRC-2012-0301, ISFSI - FRN, Notice of Consideration of Approval of Application Containing SUNSI, Opportunity for a Hearing - Indirect License Transfer, Proposed Energy Future Holdings Corporation Internal Transaction2012-12-26026 December 2012 ISFSI - FRN, Notice of Consideration of Approval of Application Containing SUNSI, Opportunity for a Hearing - Indirect License Transfer, Proposed Energy Future Holdings Corporation Internal Transaction ML12292A2092012-12-26026 December 2012 ISFSI - FRN, Notice of Consideration of Approval of Application Containing SUNSI, Opportunity for a Hearing - Indirect License Transfer, Proposed Energy Future Holdings Corporation Internal Transaction ML12056A0442012-03-12012 March 2012 Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Effective Immediately) - to All Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status NRC-2012-0067, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Effective Immediately) - to All Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status2012-03-12012 March 2012 Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Effective Immediately) - to All Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status ML1126504892011-09-22022 September 2011 FRN: General Notice. Biweekly Notice - Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations NRC-2011-0230, FRN: General Notice. Biweekly Notice - Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations2011-09-22022 September 2011 FRN: General Notice. Biweekly Notice - Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations ML1126306232011-09-20020 September 2011 Commission Meetings - FRN ML1021403872010-07-30030 July 2010 Nuclear Regulatory Commission Biweekly Notice - Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations - Publication Date of August 10, 2010 NRC-2009-0510, Environment Assessment and Finding of No Significant Impact (TAC Nos. ME0643 and ME0644)2009-11-17017 November 2009 Environment Assessment and Finding of No Significant Impact (TAC Nos. ME0643 and ME0644) 2023-09-29
[Table view] |
Text
PUBLIC NOTICE THE U.S. NUCLEAR REGULATORY COMMISSION PROPOSES TO AMEND THE FACILITY OPERATING LICENSE FOR THE COMANCHE PEAK NUCLEAR POWER PLANT, UNIT NOS. 1 AND 2 The U.S. Nuclear Regulatory Commission (NRC, the Commission) has received an application dated April 10, 2020 (available in the NRCs Agencywide Documents Access and Management System (ADAMS) at Accession No. ML20101M879), from Vistra Operations Company LLC (Vistra OpCo, the licensee) for an exigent amendment to the facility operating license for the Comanche Peak Nuclear Power Plant (Comanche Peak), Unit Nos. 1 and 2, located in Somervell County, Texas. The licensee requests NRC approval by April 19, 2020.
The proposed exigent amendment would allow a one-time change in Comanche Peak Unit 2 inspection frequency. Specifically, the proposed change would allow the licensee to defer the 100 percent inspection scope currently required for the third sequential inspection period from refueling outage (RF) 2RF18 (April 2020) to 2RF19 (October 2021).
The licensee requested that the proposed amendment be processed on an exigent basis in accordance with the provisions in Title 10 of the Code of Federal Regulations (10 CFR)
Section 50.91(a)(6). Under 10 CFR 50.91(a)(6)(i), where the Commission finds that exigent circumstances exist, in that a licensee and the Commission must act quickly and that time does not permit the Commission to publish a Federal Register notice allowing 30 days for prior public comment, and it also determines that the amendment involves no significant hazards considerations, the Commission will either (A) issue a Federal Register notice providing notice of an opportunity for hearing and allowing at least 2 weeks from the date of the notice for prior public comment or (B) use local media to provide reasonable notice to the public in the area surrounding a licensees facility of the licensees amendment and of its proposed determination that no significant hazards consideration is involved, consulting with the licensee on the
proposed media release and on the geographical area of its coverage. Due to the timing of the proposed amendment, the NRC is providing this notice in local media pursuant to 10 CFR 50.91(a)(6)(i)(B), and has consulted with the licensee and the NRC regional office on the proposed media release.
The licensee provided the following information to explain the exigency of the proposed amendment. The licensee stated that it is necessary due to unforeseen circumstances related to the ongoing COVID-19 virus pandemic, which has resulted in a need to defer Comanche Peak Unit 2 steam generator inspections from the current spring 2020 refueling outage to the next refueling outage in fall 2021. The licensee requested processing of the amendment under exigent circumstances to avoid potential unnecessary personnel exposure to the COVID-19 virus which could also expose the general public.
As required by 10 CFR 50.91(a), the licensee has provided its analysis of the issue of no significant hazards consideration using the standards in 10 CFR 50.92. Under the NRCs regulations in 10 CFR 50.92, this means that operation of the facility in accordance with the proposed amendment would not (1) involve a significant increase in the probability or consequences of an accident previously evaluated; or (2) create the possibility of a new or different kind of accident from any accident previously evaluated; or (3) involve a significant reduction in a margin of safety. The licensee and the NRC have evaluated the proposed change with regard to the determination of whether or not a significant hazards consideration is involved as described below.
Operation of Comanche Peak Unit 2 in accordance with the proposed amendment will not involve a significant increase in the probability or consequences of an accident previously evaluated. The proposed change calls for a one-time change in inspection frequencies for steam generator tube inspections and associated reporting requirements. Inspection frequencies are not an initiator to a steam generator tube rupture accident, or any other accident
previously evaluated. As a result, the probability of any accident previously evaluated is not significantly increased. The steam generator tubes inspected by the Steam Generator Program continue to be required to meet the Steam Generator Program performance criteria and to be capable of performing any functions assumed in the accident analysis. As a result, the consequences of any accident previously evaluated are not significantly increased. Therefore, the proposed change does not result in a significant increase in the probability or consequences of an accident previously evaluated.
The proposed amendment will not create the possibility of a new or different kind of accident from any previously evaluated. The proposed change calls for a one-time change in inspection frequencies for steam generator tube inspections and associated reporting requirements. The proposed change does not alter the design function or operation of the steam generators or the ability of a steam generator to perform the design function. The steam generator tubes continue to be required to meet the Steam Generator Program performance criteria. The proposed change does not create the possibility of a new or different kind of accident due to credible new failure mechanisms, malfunctions, or accident initiators that are not considered in the design and licensing bases. Therefore, the proposed change does not create the possibility of a new or different kind of accident from any previously evaluated.
The proposed amendment will not involve a significant reduction in a margin of safety.
The proposed change calls for a one-time change in inspection frequencies for steam generator tube inspections and associated reporting requirements. The proposed change does not change any of the controlling values of parameters used to avoid exceeding regulatory or licensing limits. The proposed change does not affect a design basis or safety limit, or any controlling value for a parameter established in the Final Safety Analysis Report or the license. Therefore, the proposed change does not involve a significant reduction in a margin of safety.
Following an initial review of this application, the requested amendment has been evaluated against the standards in 10 CFR 50.92 and the NRC has made a proposed determination that the requested amendment involves no significant hazards considerations.
The proposed change would not significantly increase the probability or consequences of any accident previously considered, nor create the possibility of a new or different kind of accident, nor significantly reduce any margin of safety.
The NRC is seeking public comments on this proposed determination that the amendment involves no significant hazards considerations. The NRC will consider comments received through April 16, 2020. If the proposed determination that the requested amendment involves no significant hazards consideration becomes final, the NRC will issue the amendment without first offering an opportunity for a public hearing. An opportunity for a hearing will be published in the Federal Register at a later date and any hearing request will not delay the effective date of the amendment.
The NRC may issue the amendment prior to the expiration of the comment period, should circumstances change such that failure to act in a timely way would result, for example, in derating or shutdown of the facility. Should the NRC take action prior to the expiration of the comment period, it will publish in the Federal Register a notice of issuance. Before any issuance of the proposed amendment, the NRC will need to make the findings required by the Atomic Energy Act of 1954, as amended, and NRC regulations.
If the NRC decides in its final determination that the amendment does involve a significant hazards consideration, a notice of opportunity for a prior hearing will be published in the Federal Register and, if a hearing is granted, it will be held before the amendment is issued.
Comments on the proposed determination of no significant hazards consideration may be (1) telephoned to Jennifer Dixon-Herrity, Chief, Plant Licensing Branch 4, by collect call to 301-415-2967, (2) e-mailed to Jennifer.Dixon-Herrity@nrc.gov, or (3) submitted in writing to
Office of Administration, Mail Stop: TWFN-7-A60M, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, ATTN: Program Management, Announcements and Editing Staff.
All comments received by close of business, 4:15 pm EDT, on April 16, 2020, will be considered in reaching a final determination.
A copy of the application may be examined electronically through the NRCs ADAMS in the NRC Library at https://www.nrc.gov/reading-rm/adams.html under Accession No. ML20101M879. Persons who do not have access to ADAMS or who encounter problems in accessing the documents located in ADAMS should contact the NRC Public Document Room Reference staff by telephone at 1-800-397-4209, or 301-415-4737, or by e-mail to pdr.resource@nrc.gov.