ENS 56861: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 25: Line 25:
The following additional information was obtained from the licensee in accordance with Headquarters Operations Officers Report Guidance:
The following additional information was obtained from the licensee in accordance with Headquarters Operations Officers Report Guidance:
The 'B' train Emergency Diesel Generator was also inoperable due to planned maintenance and continues to be inoperable. It was considered in the Configuration Risk Management Program and it was determined this condition could be maintained. LCO 3.7.7, Action c requires reactor shutdown within 72 hours.
The 'B' train Emergency Diesel Generator was also inoperable due to planned maintenance and continues to be inoperable. It was considered in the Configuration Risk Management Program and it was determined this condition could be maintained. LCO 3.7.7, Action c requires reactor shutdown within 72 hours.
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2023/20231117en.html#en56861
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2023/20231120en.html#en56861
}}{{unit info
}}{{unit info
| Unit = 2
| Unit = 2

Latest revision as of 08:30, 20 November 2023

ENS 56861 +/-
Where
South Texas STP Nuclear Operating Company icon.png
Texas (NRC Region 4)
Reporting
10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident
Time - Person (Reporting Time:+-0.18 h-0.0075 days <br />-0.00107 weeks <br />-2.46564e-4 months <br />)
Opened: Neil Rocha
21:30 Nov 16, 2023
NRC Officer: Ian Howard
Last Updated: Nov 16, 2023
56861 - NRC Website
Loading map...