ENS 56387: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 15: Line 15:
| NRC officer = Karen Cotton-Gross
| NRC officer = Karen Cotton-Gross
| event date = 01/29/2023 00:00 CST
| event date = 01/29/2023 00:00 CST
| last update date = 03/03/2023
| last update date = 03/31/2023
| title = Part 21 - Defect Identified in Automatic Transfer Switch
| title = Part 21 - Defect Identified in Automatic Transfer Switch
| event text = The following information was provided by Paragon Energy Solutions, LLC via email:
| event text = The following information was provided by Paragon Energy Solutions, LLC via email:
Line 29: Line 29:
817-284-0077
817-284-0077
rknott@paragones.com
rknott@paragones.com
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2023/20230306en.html#en56387
* * * UPDATE ON 03/31/23 AT 1607 EDT FROM PARAGON ENERGY SOLUTIONS TO BILL GOTT * * *
Paragon Energy Solutions submitted their final report in accordance with 10CFR 21.21(d)(4).
Paragon recommends inspection of the 4 automatic transfer switches supplied to Talen Susquehanna for insulator cracking at the next regularly scheduled maintenance period and replacement of any insulators found to exhibit stress cracking.
Notified R1DO (Schroeder) and Part 21/50.55 Group via email.
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2023/20230403en.html#en56387
}}
}}


{{ENS-Nav}}
{{ENS-Nav}}

Latest revision as of 07:30, 3 April 2023

ENS 56387 +/-
Where
Paragon Energy Solutions
Forth Worth, Texas (NRC Region 4)
Organization: Paragon Energy Solutions
Reporting
10 CFR 21.21(d)(3)(i), Failure to Comply or Defect
Time - Person (Reporting Time:+798.85 h33.285 days <br />4.755 weeks <br />1.094 months <br />)
Opened: Richard Knott
12:51 Mar 3, 2023
NRC Officer: Karen Cotton-Gross
Last Updated: Mar 31, 2023
56387 - NRC Website