Inservice Inspection Summary Report
ML21202A192
Person / Time
Site: Braidwood Constellation icon.png
Issue date: 07/21/2021
From: Keenan J
Exelon Generation Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML21202A191 List:
References
Bw210051
Download: ML21202A192 (1)


Text

Exelon Generation Company. LLC Braidwood Station

-~ Exelon Generation 35100 South Route 53, Suite 84 Braceville, IL 60407-9619 www.exeloncorp.com July 21, 2021 Bw210051 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Braidwood Station, Unit 1 Renewed Facility Operating License No. NPF-72 NRC Docket No. STN 50-456

Subject:

Braidwood Station, Unit 1 lnservice Inspection Summary Report Enclosed please find the post-outage summary report for lnservice Inspection (ISi) examinations conducted prior to and during Braidwood Station, Unit 1 Refueling Outage 22 (A 1R22). This report is submitted in accordance with the requirements of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code,Section XI, "Rules for the lnservice Inspection of Nuclear Power Plant Components," and ASME Code Case N-532-5, "Repair/Replacement Activity Documentation Requirements and lnservice Inspection Summary Report Preparation and Submission - Section XI, Division 1." provides the Owner's Activity Report (OAR) for ISi activities conducted prior to and during A 1R22 including a list of items with flaws or relevant conditions that required evaluation for continued service, and an abstract of repair/replacement activities required for continued service.

Please direct any questions you may have regarding this submittal to Mr. Kevin Lueshen, Regulatory Assurance Manager, at (815) 417-2800.

Keenan 1 Jo h n P.

Digitally signed by Keenan, John P.

DN:cn=Keenan,JohnP.

Date: 2021.07.21 07:36:38-05'00' John P Keenan Site Vice President Braidwood Station Attachments:

1. Owner's Activity Report (OAR) for refueling outage A 1R22 cc: Regional Administrator - NRC Region Ill NRC Senior Resident Inspector - Braidwood Station NRR Project Manager- Braidwood Station Illinois Emergency-Management Agency - Division of Nuclear Safety