{{#Wiki_filter:June 30, 2021 Southern Nuclear Operating Company ATTN: Mr. Glenn Chick Executive President 7835 River Road, Bldg. 140, Vogtle 3&4 Waynesboro, GA 30830
{{#Wiki_filter:}}
 
==SUBJECT:==
VOGTLE ELECTRIC GENERATING PLANT UNIT 3 & UNIT 4 - NOTIFICATION OF LICENSED OPERATOR INITIAL EXAMINATION (05200025/2022301 AND 0500026/2022301)
 
==Dear Mr. Chick:==
 
During a telephone conversation on June 23, 2021, between Mr. Chuck Howard, Exam Author of Record, and Mr. Bruno Caballero, Senior Operations Engineer, arrangements were made for the administration of licensing examinations at the Vogtle Electric Generating Plant Unit 3 & 4.
The on-site preparatory week is scheduled for the week of February 14, 2022. The operating test is scheduled to be administered during the week of March 21, 2022. The written examination is scheduled to be administered the week of April 4, 2022.
As agreed during the telephone conversation, your staff will prepare both the operating test and written examination based on the guidelines in Revision 11 of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors." However, if Revision 12 of NUREG-1021 is issued more than six months prior to the start of your exam, then both the operating test and written examination must meet the requirements of Revision 12 in accordance with 10 CFR 55.40, Implementation.
The U.S. Nuclear Regulatory Commission (NRC) regional office will discuss with your staff any changes that might be necessary before the examinations are administered. Your staff has also agreed to make copies of all examination materials that are necessary for administering the examination.
Mr. Caballero provided the written examination outline to your staff on March 22, 2021. To meet the above schedule, it will be necessary for your staff to furnish the supporting reference materials identified in Attachment 3 to ES-201 by August 2, 2021, and the operating test outline by October 11, 2021. The written examination will be due by November 8, 2021 and the operating test will be due by December 27, 2021. Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the outline, examination, and test before they are submitted to the NRC for review and approval. All materials shall be complete and ready-to-use.
We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked. Any delay in receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled.
 
G. Chick                                      2 In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the NRC takes licensing action on all the applications and any adjudicatory actions on any hearing demands are complete.
Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.
To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator waiver and/or excusal requests (Office of Management and Budget (OMB) approval number 3150-0090) at least 60 days before the first examination date (if possible). Contact Mr. Caballero to determine the method for submission of the waiver or excusal requests. Preliminary reactor operator and senior reactor operator license applications (OMB approval number 3150-0090) and medical certifications (OMB approval number 3150-0024) should be submitted at least 30 days before the first examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Final signed applications certifying that all training has been completed and requesting any waivers or excusals, as applicable, should be submitted at least 14 days before the first examination date.
Although the guidelines for receiving waiver or excusal requests call for at least 30 days before the first examination date (preliminary) and 14 days before the first examination date (final), the requests should be submitted as early as possible in the process (see the 60-day guideline above). Resolutions resulting from verbal inquiries by the licensee to the NRC are not binding.
Submittals addressing waivers or excusals, or both, should be in writing (i.e., using NRC Form 398, Personal Qualifications Statement - Licensee, or as directed by Mr. Caballero when contacting him to determine the method for submission). The NRC will document its final decision on whether to grant a waiver or excusal on the final (not preliminary) NRC Form 398 submitted for the applicant. The NRC will not provide its decision until the final application is submitted to the agency.
Paperwork Reduction Act Statement This letter contains information collection requirements that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0018.
The burden to the public for these mandatory information collections is estimated to average 2,250 hours per examination, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the information collections. You may submit comments on any aspect of the information collections, including suggestions for reducing the burden, to FOIA, Privacy and Information Collections Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by electronic mail to infocollects.resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503.
 
G. Chick                                      3 Public Protection Notification The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information, unless the document requesting or requiring the collection displays a currently valid OMB control number.
In accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding, of the agencys Rules of Practice, a copy of this letter and its enclosures will be available electronically for public inspection through the Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html.
Thank you for your cooperation in this matter. Mr. Chuck Howard has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Caballero at (404) 997-4608, (Internet E-mail: bruno.caballero@nrc.gov), or me at (404) 997-4552, (Internet E-mail:
eugene.guthrie@nrc.gov).
Sincerely,
                                              /RA/
Eugene F. Guthrie, Chief Operations Branch 2 Division of Reactor Safety Docket Nos.: 52-00025 and 52-00026 License Nos.: NPF-91 and NPF-92 cc: Distribution via Listserv
 
G. Chick                                                4
 
==SUBJECT:==
VOGTLE ELECTRIC GENERATING PLANT UNIT 3 & UNIT 4 - NOTIFICATION OF LICENSED OPERATOR INITIAL EXAMINATION (05200025/2022301 AND 0500026/2022301) dated June 30, 2021
*See previous page for concurrence PUBLICLY AVAILABLE          NON-PUBLICLY AVAILABLE                          SENSITIVE        NON-SENSITIVE ADAMS:      Yes  ACCESSION NUMBER      :ML21181A391                      SUNSI REVIEW COMPLETE      FORM 665 ATTACHED OFFICE              RII:DRS          RII:DRS NAME                B. Caballero      G. Guthrie DATE                6/30 /2021        6/ 30  /2021 OFFICIAL    RECORD    COPY            G:\OLExams\Vogtle      Examinations\Unit  3&4\Initial Exam  AP1000    2022-301 (bruno)\Correspondence\Vogtle 3 & 4 2022-301 Corporate Notification Letter.docx}}

Revision as of 07:58, 17 January 2022

301 Corporate Notification Letter
ML21181A391
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 06/30/2021
From: Eugene Guthrie
Division of Reactor Safety II
To: Chick G
Southern Nuclear Operating Co
References
52-025/OL-22, 52-026/OL-22 52-025/22-01, 52-026/22-01