ML21257A446: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
Line 19: Line 19:


=Text=
=Text=
{{#Wiki_filter:ES-201                                          Examination Preparation Checklist                                                  Form ES-201-1 Facility: Limerick                                                                  Date of Examination:                07/12/2021 Developed:  Written:  Facility:      NRC:                            //                Operating:      Facility:          NRC:
{{#Wiki_filter:}}
Days from                                                                                                                      Chief Examiner's Target Date*                                      Task Description (Reference)
Exam                                                                                                                                Initials
: 1. Examination administration date confirmed (C.1.a; C.2.a-b). For NRC-prepared exams,
    -240    11/14/2020                                                                                                            JD 9/24/2020 arrangements are made for the facility to submit reference materials (C.1.e; C.3.c; Attachment 3).
    -210    12/14/2020 2. NRC examiners and facility contact assigned (C.1.d; C.2.f).                                              JD 9/24/2020
: 3. Facility contact briefed on security and other requirements (C.2.c). As applicable, the facility
    -210    12/14/2020 contact submits to the NRC any prescreened K/As for elimination from the written examination                JD 9/24/2020 outline, with a description of the facilitys prescreening process (ES-401, D.1.b).
    -210    12/14/2020 4. Reference material due for NRC-prepared exams (C.1.e; C.3.c; Attachment 3).                                  N/A
    -210    12/14/2020 5. Corporate notification letter sent (C.2.e).                                                              JD 9/24/2020
: 6. NRC-developed written examination outline (ES-401-1/2 or ES-401N-1/2 and ES-401-3 or JD 9/24/2020 (Draft);
    -195    12/29/2020 ES-401N-3) sent to facility contact (must be on the exam security agreement) (C.1.e-f; C.2.h; JD 9/30/2020 (Rev 0)
C.3.d-e).
: 7. Operating test outline(s) and other checklists due, including Forms ES-201-2, ES-201-3,
    -150    02/12/2021                                                                                                            JD 1/28/2021 ES-301-1, ES-301-2, ES-301-5, and ES-D-1, as applicable (C.1.e-f; C.3.d-e).
: 8. Operating test outline(s) reviewed by the NRC and feedback provided to facility licensee (C.2.h;
    -136    02/26/2021                                                                                                              JD 2/5/2021 C.3.d-e).
: 9. Proposed examinations (written, JPMs, and scenarios, as applicable) and outlines (Forms ES-301-1, ES-301-2, ES-D-1, ES-401-1/2 or ES-401N-1/2, and ES-401-3 or ES-401N-3);
    -75    04/28/2021 supporting documentation (including Forms ES-301-3, ES-301-4, ES-301-5, ES-301-6, ES-401-6,                  JD 4/9/2021 ES-401N-6, and any Form ES-201-2 and ES-201-3 updates); and reference materials due (C.1.e-h; C.3.d).
: 10. Examinations prepared by the NRC are approved by the NRC supervisor and forwarded for
    -75    04/28/2021                                                                                                                  N/A facility licensee review (C.1.i; C.2.h; C.3.f-g).
    -60    05/13/2021 11. Preliminary waiver/excusal requests due (C.1.m; C.2.c; ES-202).                                        JD 5/13/2021
    -50    05/23/2021 12. Written exam and operating test reviews completed (C.3.f).                                              JD 4/30/2021 13a. Examination review results discussed between the NRC and facility licensee (C.1.i; C.1.k-l;
    -35    06/07/2021                                                                                                            JD 5/20/2021 C.2.h; C.3.g).
    -35    06/07/2021 13b. The NRC and the facility licensee conduct exam preparatory week.                                        JD 6/7/2021
: 14. Preliminary license applications and waiver/excusal requests, as applicable (NRC Form 398)
    -30    06/12/2021                                                                                                            JD 6/12/2021 due (C.1.m; C.2.i; ES-202).
: 15. Final license applications and waiver/excusal requests, as applicable (NRC Form 398), due
    -14    06/28/2021                                                                                                            JD 6/25/2021 and Form ES-201-4 prepared (C.1.m; C.2.k; ES-202).
      -7    07/05/2021 16. Written examinations and operating tests approved by the NRC supervisor (C.2.j-k; C.3.h).                JD 7/6/2021
      -7    07/05/2021 17. Request facility licensee management feedback on the examination (C.2.l).                                JD 7/6/2021
: 18. Final applications reviewed; one or two (if more than 10) applications audited to confirm
      -7    07/05/2021 qualifications/eligibility; and examination approval and waiver/excusal letters sent (C.2.k;                JD 6/29/2021 Attachment 5; ES-202, C.3.j; ES-204).
      -7    07/05/2021 19. Proctoring/written exam administration guidelines reviewed with facility licensee (C.3.k).              JD 7/6/2021
      -7    07/05/2021 20. Approved scenarios and job performance measures distributed to NRC examiners (C.3.i).                    JD 7/6/2021
* Target dates are based on facility prepared examinations and the examination date identified in the corporate Exam Date: 07/12/2021 notification letter. These dates are for planning purposes and may be adjusted on a case by case basis in coordination with the facility licensee.
 
ES-301                                        Transient and Event Checklist                                          Form ES-301-5 Facility: LGS                                        Date of Exam: 07/12/21                                        Operating Test No.: 1 A        E                                                              Scenarios P        V SEG-5006E                SEG-6215E              SEG-2158E                                    T            M P        E O              I L        N      CREW POSITION            CREW POSITION          CREW POSITION            CREW POSITION T            N I        T S        A      B        S      A      B        S      A      B      S        A      B                      I C                                                                                                                    A R        T      O        R      T    O          R      T      O      R        T      O                    M A        T                                                                                                          L O        C      P      O        C      P        O      C      P      O        C      P                    U N        Y M(*)
T        P E                                                                                                                R      I      U RX                                                                                                          0    1    1      0 NOR        1                                                                                                  1    1    1      1 SRO-U        I/C    3,4,5,                  2,3,4,5                                                                    12    4    4      2 (1)              6,8,9                      7,8 MAJ        7                        6                                                                        2    2    2      1 TS      2,5                      3,4,5                                                                      5    0    2      2 RX                4                                                                                        1    1    1      0 NOR                                                          1                                              1    1    1      1 SRO-I      I/C            3,5,6,                          3,7,8  2,3,4,5,                                          14    4    4      2 (1)                        8,9                                      6,8,9                                            15 MAJ                7                              6        7                                              3    2    2      1 TS                                                        3,4,5                                            3    0    2      2 RX                4                                                                                        1    1    1      0 NOR                                                                                                          0    1    1      1 SRO-I      I/C            3,5,6,          2,3,4,5                                                                    10    4    4      2 (2)                        8,9              7,8                                                                      11 MAJ                7                6                                                                        2    2    2      1 TS                                3,4,5                                                                      3    0    2      2 RX                                          1                                                                1    1    1      0 NOR        1                                                  1                                              2    1    1      1 SRO-I      I/C    3,4,5,                            2,4,5          2,3,4,5,                                          16    4    4      2 (3)              6,8,9                                              6,8,9 MAJ        7                                6                7                                              3    2    2      1 TS      2,5                                              3,4,5                                            5    0    2      2 Instructions:
: 1.        Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
: 2.        Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional I/C malfunctions on a one-for-one basis.
: 3.        Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
: 4.        For new reactor facility licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.
 
ES-301                                          Transient and Event Checklist                                                Form ES-301-5 Facility: LGS                        Date of Exam: 7/12/21                                          Operating Test No.: 1 A          E                                                                Scenarios P          V SEG-5006E                  SEG-6215E                SEG-2158E                                        T        M P          E O        I L          N        CREW POSITION              CREW POSITION            CREW POSITION              CREW POSITION T        N I          T S        A      B        S        A      B        S        A      B        S      A        B              I C                                                                                                                            A R        T      O        R        T      O        R          T      O        R      T        O              M A          T                                                                                                                L O        C      P        O        C      P      O          C      P        O      C        P              U N          Y M(*)
T          P E                                                                                                                        R      I    U RX                                                1                                                                    1    1      1    0 NOR            1                                                                    1                                2    1      1    1 SRO-I I/C              3,4,5,                            2,4,5                              3,4,5                              14    4      4    2 (4)                  6,8,9                                                                  8,9 MAJ            7                                  6                                  7                                3    2      2    1 TS            2,5                                                                                                      2    0      2    2 RX                                                                          1                                        1    1      1    0 NOR                            1                                                                                      1    1      1    1 SRO-I I/C                                5,8    2,3,4,5                              2,6                                      10    4      4    2 (5)                                            7, 8                                                                          9 MAJ                            7        6                                  7                                        3    2      2    1 TS                                    3,4,5                                                                          3    0      2    2 RX                      4                                                                                              1    1      1    0 NOR                                                                                  1                                1    1      1    1 I/C                  3,5,6,                            3,7,8                      3,4,5                              12    4      4    2 RO-1                            8,9                                                          8,9                              13 MAJ                    7                                6                          7                                3    2      2    1 TS                                                                                                                    0    0      2    2 RX                                                1                                                                    1    1      1    0 NOR                            1                                                                                      1    1      1    1 RO-2      I/C                            5,8              2,4,5                                                                54      4      4    2 MAJ                            7                6                                                                    2    2      2    1 TS                                                                                                                    0    0      2    2 Instructions:
: 1.        Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
: 2.        Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional I/C malfunctions on a one-for-one basis.
: 3.        Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
: 4.        For new reactor facility licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.
 
ES-301                                          Transient and Event Checklist                                                Form ES-301-5 Facility: LGS                                        Date of Exam: 7/12/21                                          Operating Test No.: 1 A          E                                                                Scenarios P          V SEG-5006E                SEG-6215E                SEG-2158E                                        T        M P          E O        I L          N      CREW POSITION            CREW POSITION            CREW POSITION              CREW POSITION T        N I          T S        A        B      S        A      B      S          A      B        S      A        B              I C                                                                                                                          A R        T      O        R        T      O        R          T      O        R      T        O              M A          T                                                                                                              L O        C        P      O        C      P      O          C      P        O      C        P              U N          Y M(*)
T          P E                                                                                                                    R      I      U RX                                                                      1                                        1    1      1      0 NOR                          1                                                                                    1    1      1      1 RO-3      I/C                        5,8                    3,7,8              2,6                                      76    4      4      2 MAJ                          7                        6                  7                                        3    2      2      1 TS                                                                                                                0    0      2      2 RX                                                                                                                      1      1      0 NOR                                                                                                                    1      1      1 I/C                                                                                                                    4      4      2 MAJ                                                                                                                    2      2      1 TS                                                                                                                      0      2      2 RX                                                                                                                      1      1      0 NOR                                                                                                                    1      1      1 I/C                                                                                                                    4      4      2 MAJ                                                                                                                    2      2      1 TS                                                                                                                      0      2      2 RX                                                                                                                      1      1      0 NOR                                                                                                                    1      1      1 I/C                                                                                                                    4      4      2 MAJ                                                                                                                    2      2      1 TS                                                                                                                      0      2      2 Instructions:
: 1.        Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
: 2.        Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional I/C malfunctions on a one-for-one basis.
: 3.        Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
: 4.        For new reactor facility licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.
 
ES-301                                  Competencies Checklist                        Form ES-301-6 Facility: Limerick                Date of Examination: 07/12/21          Operating Test No.: 001 APPLICANTS SRO-U (1)          SRO-I (1)        SRO-I (2)          SRO-I (3)
Competencies              SCENARIO          SCENARIO          SCENARIO          SCENARIO 1      2    3  4    1    2    3  4  1    2    3  4  1      2    3  4 Interpret/Diagnose Events      1-9    1-8          1-9  1-8  1-9    1-9  1-8        1-9    1-8  1-9 and Conditions Comply with and                1-9    1-8          1-9  1-8  1-9    1-9  1-8        1-9    1-8  1-9 Use Procedures (1)
Operate Control                                    1-9  1-8        1-9                      1-8 Boards (2)
Communicate                    1-9    1-8          1-9  1-8  1-9    1-9  1-8        1-9    1-8  1-9 and Interact Demonstrate Supervisory        1-9    1-8                    1-9          1-8        1-9          1-9 Ability (3)
Comply with and                      3,4,                    3,4,        3,4,                      3,4, 2, 5                                                    2, 5 Use TS (3)                              5                      5            5                        5 Notes:
(1)      Includes TS compliance for an RO.
(2)      Optional for an SRO-U.
(3)      Only applicable to SROs.
Instructions:
Check the applicants license type and enter one or more event numbers that will allow the examiners to evaluate every applicable competency for every applicant. (This includes all rating factors for each competency.) (Forms ES 303 1 and ES 303 3 describe the competency rating factors.)
 
ES-301                                  Competencies Checklist                        Form ES-301-6 Facility: Limerick                Date of Examination: 07/12/21        Operating Test No.: 001 APPLICANTS SRO-I (4)          SRO-I (5)        RO (1)            RO (2)
Competencies              SCENARIO          SCENARIO        SCENARIO          SCENARIO 1    2    3  4    1    2    3  4  1    2    3  4 1      2    3 4 Interpret/Diagnose Events      1-9  1-8  1-9    1-9  1-8  1-9  1-9  1-8  1-9    1-9  1-8 and Conditions Comply with and                1-9  1-8  1-9    1-9  1-8  1-9  1-9  1-8  1-9    1-9  1-8 Use Procedures (1)
Operate Control                      1-8  1-9    1-9        1-9  1-9  1-8  1-9    1-9  1-8 Boards (2)
Communicate                    1-9  1-8  1-9    1-9  1-8  1-9  1-9  1-8  1-9    1-9  1-8 and Interact Demonstrate Supervisory        1-9                      1-8 Ability (3)
Comply with and                                          3,4, 2, 5 Use TS (3)                                                5 Notes:
(1)      Includes TS compliance for an RO.
(2)      Optional for an SRO-U.
(3)      Only applicable to SROs.
Instructions:
Check the applicants license type and enter one or more event numbers that will allow the examiners to evaluate every applicable competency for every applicant. (This includes all rating factors for each competency.) (Forms ES 303 1 and ES 303 3 describe the competency rating factors.)
 
ES-301                                  Competencies Checklist                      Form ES-301-6 Facility: Limerick              Date of Examination: 07/12/21        Operating Test No.: 001 APPLICANTS RO-3 Competencies              SCENARIO          SCENARIO      SCENARIO          SCENARIO 1    2    3  4    1    2    3 4  1  2    3  4  1    2  3 4 Interpret/Diagnose Events      1-9  1-8  1-9 and Conditions Comply with and                1-9  1-8  1-9 Use Procedures (1)
Operate Control                1-9  1-8  1-9 Boards (2)
Communicate                    1-9  1-8  1-9 and Interact Demonstrate Supervisory Ability (3)
Comply with and Use TS (3)
Notes:
(1)      Includes TS compliance for an RO.
(2)      Optional for an SRO-U.
(3)      Only applicable to SROs.
Instructions:
Check the applicants license type and enter one or more event numbers that will allow the examiners to evaluate every applicable competency for every applicant. (This includes all rating factors for each competency.) (Forms ES 303 1 and ES 303 3 describe the competency rating factors.)}}

Revision as of 22:54, 16 January 2022

Final QA Related Forms (Folder 1)
ML21257A446
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 08/18/2021
From:
Exelon Generation Co
To:
Operations Branch I
Shared Package
ML19309G131 List:
References
EPID L-2021-OLL-0008
Download: ML21257A446 (16)


Text