Next, the Board considered the assertedly new information supplied by Fasken in support of its motion to reopen and ultimately found it was not materially different from information previously available. For example, the Board held that the June 2019 letter from New Mexicos Commissioner of Public Lands concerning subsurface mineral rights was not new because the information contained in the letter was available in Holtecs application materials and in a letter from Faskens own Vice President, which was submitted to the NRC nearly a year before Faskens original Contention 2 was filed.52 Further, the Board determined that Fasken failed to identify how the difference in terminology between Holtecs application and the DEIS regarding the incremental and cumulative impacts analysis for geology and soils is material or is otherwise based on information that was not previously available. 53 The Board also found that the DEISs use of a six-mile radius for assessing the cumulative impacts on land use was neither new nor materially different because the information relied upon in the DEIS was based on a subset of information included in Holtecs Environmental Report.54 Similarly, the Board concluded that Faskens claims concerning the DEISs description of oil and gas operations in the vicinity of the proposed site (including specific drilling depths and an active oil and gas well near the site) are not based on information that is new or materially different. Rather, the Board found that the descriptions in the DEIS are based on information cited in Holtecs application materials and that Fasken did not articulate how any purported difference is material to the analyses presented in the DEIS.55 Finally, in LBP-20-10 the Board also declined for several reasons to exercise its discretion under 10 C.F.R. § 2.326(a)(1) to consider Amended Contention 2 under the exceptionally grave issue exception to timeliness. Specifically, the Board found that Fasken 52 Holtec Intl, LBP-20-10, 92 NRC at __ (slip op. at 11).
Next, the Board considered the assertedly new information supplied by Fasken in support of its motion to reopen and ultimately found it was not materially different from information previously available. For example, the Board held that the {{letter dated|date=June 20, 19|text=June 2019 letter}} from New Mexicos Commissioner of Public Lands concerning subsurface mineral rights was not new because the information contained in the letter was available in Holtecs application materials and in a letter from Faskens own Vice President, which was submitted to the NRC nearly a year before Faskens original Contention 2 was filed.52 Further, the Board determined that Fasken failed to identify how the difference in terminology between Holtecs application and the DEIS regarding the incremental and cumulative impacts analysis for geology and soils is material or is otherwise based on information that was not previously available. 53 The Board also found that the DEISs use of a six-mile radius for assessing the cumulative impacts on land use was neither new nor materially different because the information relied upon in the DEIS was based on a subset of information included in Holtecs Environmental Report.54 Similarly, the Board concluded that Faskens claims concerning the DEISs description of oil and gas operations in the vicinity of the proposed site (including specific drilling depths and an active oil and gas well near the site) are not based on information that is new or materially different. Rather, the Board found that the descriptions in the DEIS are based on information cited in Holtecs application materials and that Fasken did not articulate how any purported difference is material to the analyses presented in the DEIS.55 Finally, in LBP-20-10 the Board also declined for several reasons to exercise its discretion under 10 C.F.R. § 2.326(a)(1) to consider Amended Contention 2 under the exceptionally grave issue exception to timeliness. Specifically, the Board found that Fasken 52 Holtec Intl, LBP-20-10, 92 NRC at __ (slip op. at 11).
53 Id. at __ (slip op. at 11-12).
53 Id. at __ (slip op. at 11-12).
54 Id. at __ (slip op. at 12).
54 Id. at __ (slip op. at 12).

Revision as of 14:51, 14 March 2021

NRC Staff'S Answer Opposing Fasken Oil and Ranch, Ltd'S and Permian Basin Land and Royalty Owners' Petition for Review of LBP-20-10
ML20297A211
Person / Time
Site: HI-STORE
Issue date: 10/23/2020
From: Rebecca Susko
NRC/OGC
To:
NRC/OCM
SECY RAS
References
ASLBP 18-958-01-ISFSI-BD01, Holtec International, LBP-20-10, RAS 55840
Download: ML20297A211 (26)


Text

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE COMMISSION In the Matter of HOLTEC INTERNATIONAL Docket No. -

(HI-STORE Consolidated Interim Storage Facility)

NRC STAFFS ANSWER IN OPPOSITION TO FASKEN OIL AND RANCH, LTD.S AND PERMIAN BASIN LAND AND ROYALTY OWNERS PETITION FOR REVIEW OF LBP- -

Rebecca Susko Counsel for NRC Staff October 23, 2020

TABLE OF CONTENTS INTRODUCTION .......................................................................................................................... 1 BACKGROUND ............................................................................................................................ 2 DISCUSSION ................................................................................................................................ 5 I. Applicable Legal Standards .................................................................................................... 5 A. Standard of Review ........................................................................................................... 5 B. Requirements for Reopening the Record .......................................................................... 6 C. Good Cause Requirements for New or Amended Contentions ......................................... 7 D. Requirements for Contention Admissibility ........................................................................ 8 II. The Commission Should Affirm the Boards Decision Because Fasken Has Not Identified Any Legal Error or Abuse of Discretion ................................................................................... 9 A. The Board Properly Denied Faskens Motion to Reopen the Record as Untimely............ 9 B. The Board Correctly Found that Fasken Failed to Satisfy the Good Cause Requirements in 10 C.F.R. § 2.309(c) ............................................................................. 13 C. The Board Correctly Rejected Amended Contention 2 as Inadmissible.......................... 16 D. The Board Did Not Err in Limiting Statements from Faskens Affiant During Oral Argument ......................................................................................................................... 18 CONCLUSION ............................................................................................................................ 20 ii

TABLE OF AUTHORITIES Commission Decisions AmerGen Energy Co., LLC (Oyster Creek Nuclear Generating Station),

CLI-06-24, 64 NRC 111 (2006) ................................................................................................. 8 AmerGen Energy Co., LLC (Oyster Creek Nuclear Generating Station),

CLI-08-28, 68 NRC 658 (2008) ................................................................................................ 7 AmerGen Energy Co., LLC (Oyster Creek Nuclear Generating Station),

CLI-09-7, 69 NRC 235 (2009) .................................................................................................. 7 Dominion Nuclear Conn., Inc. (Millstone Nuclear Power Station, Unit 2),

CLI-03-14, 58 NRC 207 (2003) ................................................................................................ 9 Dominion Nuclear Conn., Inc. (Millstone Nuclear Power Station, Unit 3),

CLI-08-17, 68 NRC 231 (2008) ................................................................................................ 6 Dominion Nuclear Conn., Inc. (Millstone Nuclear Power Station, Units 2 & 3),

CLI-01-24, 54 NRC 349 (2001) ................................................................................................ 8 DTE Electric Co. (Fermi Nuclear Power Plant, Unit 3), CLI-15-1, 81 NRC 1 (2015) ................................................................................................................................. 8, 15 Entergy Nuclear Operations, Inc. (Indian Point, Unit 2), CLI-16-5, 83 NRC 131 (2016) ................................................................................................................................ 8 Entergy Nuclear Vermont Yankee, LLC and Entergy Nuclear Operations, Inc.

(Vermont Yankee Nuclear Power Station), CLI-11-2, 73 NRC 333 (2011) ............................... 6 Entergy Nuclear Vermont Yankee, LLC, and Entergy Nuclear Operations, Inc. (Vermont Yankee Nuclear Power Station), CLI-16-8, 83 NRC 463 (2016) ..................................................................................................................................... 14 FirstEnergy Nuclear Operating Co. (Davis-Besse Nuclear Power Station, Unit 1), CLI-12-8, 75 NRC 393 (2012)...................................................................................... 9 Fla. Power & Light Co. (Turkey Point Nuclear Generating Units 6 and 7),

CLI-17-12, 86 NRC 215 (2017) ...................................................................................... passim Holtec Intl (HI-STORE Consolidated Interim Storage Facility), CLI- - ,

NRC __ (Apr. , ) (slip op.)......................................................................................... 4 La. Energy Servs, L.P. (Natl Enrichment Facility), CLI-98-03, 47 NRC 77 (1998) ..................................................................................................................................... 17 Luminant Generation Co. LLC (Comanche Peak Nuclear Power Plant, Units 3 & 4), CLI-12-7, 75 NRC 379 (2012) ............................................................................. 5 PPL Susquehanna, LLC (Susquehanna Steam Electric Station, Units 1 & 2),

CLI-15-08, 81 NRC 500 (2015) .............................................................................................. 17 Private Fuel Storage, L.L.C. (Independent Spent Fuel Storage Installation),

CLI-00-21, 52 NRC 261 (2000) ................................................................................................ 8 Private Fuel Storage, L.L.C. (Independent Spent Fuel Storage Installation),

CLI-99-10, 49 NRC 318 (1999) ................................................................................................ 8 iii

Tenn. Valley Auth. (Clinch River Nuclear Site Early Site Permit Application),

CLI-18-5, 87 NRC 119 (2018) .................................................................................................. 8 USEC Inc. (American Centrifuge Plant), CLI-06-9, 63 NRC 433 (2006) ....................................... 8 Virginia Electric and Power Co. (North Anna Power Station, Unit 3), CLI-12-14, 75 NRC 692 (2012) .................................................................................................................. 6 Atomic Safety Licensing Board Decisions Calvert Cliffs 3 Nuclear Project, LLC, and Unistar Nuclear Operating Services, LLC (Calvert Cliffs Nuclear Power Plant, Unit 3), LBP-10-24, 72 NRC 720 (2010) ................................................................................................................ 14 Crow Butte Res., Inc. (Marsland Expansion Area), LBP-18-3, 88 NRC 13 (2018) ....................................................................................................................................... 8 Detroit Edison Co. (Fermi Nuclear Power Plant, Unit 3), LBP-12-12, 75 NRC 742 (2012) ................................................................................................................................ 8 Entergy Nuclear Vt. Yankee, LLC (Vermont Yankee Nuclear Power Station),

LBP-06-14, 63 NRC 568 (2006) ............................................................................................... 8 Holtec Intl (HI-STORE Consolidated Interim Storage Facility), LBP- - ,

NRC ( ) ................................................................................................................... 3 Holtec Intl (HI-STORE Consolidated Interim Storage Facility), LBP-20-10, 92 NRC __ (Sept. 3, 2020) (slip op.) .............................................................................. passim Holtec Intl (HI-STORE Consolidated Interim Storage Facility), LBP-20-6, 91 NRC __ (June 18, 2020) (slip op.)................................................................................... 4, 5 Shaw AREVA MOX Services (Mixed Oxide Fuel Fabrication Facility),

LBP-08-11, 67 NRC 460 (2008) ............................................................................................... 6 Regulations 10 C.F.R. § 2.309(c) ............................................................................................................ passim 10 C.F.R. § 2.309(f)(1) ........................................................................................................ passim 10 C.F.R. § 2.309(f)(2) ........................................................................................................ passim 10 C.F.R. § 2.311 ...................................................................................................................... 1, 5 10 C.F.R. § 2.314(b).................................................................................................................... 18 10 C.F.R. § 2.315(a).................................................................................................................... 19 10 C.F.R. § 2.326 ................................................................................................................ passim 10 C.F.R. § 2.341 .......................................................................................................................... 5 10 C.F.R. Part 72 .......................................................................................................................... 2 iv

Other Authorities Amendments to Adjudicatory Process Rules and Related Requirements, 77 Fed.

Reg. 46,562 (Aug. 3, 2012) .............................................................................................. 14, 15 Environmental Impact Statement for the Holtec Internationals License Application for a Consolidated Interim Storage Facility for Spent Nuclear Fuel and High Level Waste (Draft Report for Comment), NUREG- (Mar. ) ...................... 3 Final Rule, Changes to Adjudicatory Process, 69 Fed. Reg. 2182 (Jan. 14, 2004) ...................... 9 Final Rule, Criteria for Reopening Records in Formal Licensing Proceedings, 51 Fed. Reg. 19,535 (May 30, 1986) .......................................................................................... 13 Holtec International HI-STORE Consolidated Interim Storage Facility for Interim Storage of Spent Nuclear Fuel, Fed. Reg. , (Mar. , )........................... 2 Holtec International HI-STORE Consolidated Interim Storage Facility for Interim Storage of Spent Nuclear Fuel, Fed. Reg. , (July , ) ....................................... 2 v

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE COMMISSION In the Matter of HOLTEC INTERNATIONAL Docket No. -

(HI-STORE Consolidated Interim Storage Facility)

NRC Staffs Answer in Opposition to Fasken Oil and Ranch, Ltd.s and Permian Basin Land and Royalty Owners Petition for Review of LBP-20-10 INTRODUCTION Pursuant to 10 C.F.R. § 2.311(b), the U.S. Nuclear Regulatory Commission Staff submits its answer opposing Fasken Land and Minerals, Ltd.s and Permian Basin Land and Royalty Owners (together, Faskens) petition for review of LBP-20-10. In LBP-20-10, the Atomic Safety and Licensing Board ruled on Faskens motions to amend its Contention and reopen the record.1 The Board determined that Fasken did not meet the good cause requirements of 10 C.F.R. § 2.309(c) for contentions filed after the initial intervention deadline or the requirements in 10 C.F.R. § 2.326 for reopening the record. Although those determinations alone provided sufficient grounds to reject Amended Contention 2, the Board further concluded that Fasken failed to satisfy the contention admissibility requirements in 10 C.F.R. § 2.309(f)(1). In its Appeal, Fasken has not demonstrated that the Board committed an error of law or abused its discretion. Therefore, the Commission should affirm the Boards decision.

1 Holtec Intl (HI-STORE Consolidated Interim Storage Facility), LBP-20-10, 92 NRC __ (Sept. 3, 2020)

(slip op. at 1).

1

BACKGROUND This proceeding concerns Holtec Internationals (Holtec) HI-STORE license application to construct and operate a consolidated interim storage facility (CISF) pursuant to the NRCs regulations in 10 C.F.R. Part 72. On March , , Holtec submitted an application, including a Safety Analysis Report (SAR), Environmental Report (ER), and proposed license, requesting that the NRC grant Holtec a license for the construction and operation of a CISF for spent nuclear fuel.2 The proposed CISF would be located in Lea County, New Mexico. In its license application, Holtec requests authorization to store up to , metric tons of uranium in up to canisters for a license period of years.3 The NRC published a notice in the Federal Register regarding the acceptance and docketing of Holtecs CISF license application.4 The NRC subsequently published a Federal Register notice of opportunity to request a hearing and to petition for leave to intervene.5 Multiple petitioners filed hearing requests and petitions to intervene.6 Rather than filing a petition to intervene, Fasken instead filed before the Commission a motion to dismiss the proceeding, arguing that the NRC lacked jurisdiction over the application.7 The Secretary of the Commission denied the motion and referred it to the Board for consideration under 10 C.F.R. 2 Holtecs application materials are available at: https://www.nrc.gov/waste/spent-fuel-storage/cis/holtec-international.html. Citations to the proposed license are to Revision (ML17310A223) (Proposed License), citations to the Safety Analysis Report (SAR) are to Revision H (ML19163A062), and citations to the Environmental Report (ER) are to Revision 7 (ML19309E337).

3 Proposed License at .

4 Holtec International HI-STORE Consolidated Interim Storage Facility for Interim Storage of Spent Nuclear Fuel, Fed. Reg. , (Mar. , ).

5 Holtec International HI-STORE Consolidated Interim Storage Facility for Interim Storage of Spent Nuclear Fuel, Fed. Reg. , (July , ).

6 The other petitioners are: Alliance for Environmental Strategies; Beyond Nuclear, Inc.; NAC International Inc.; Sierra Club; and a group of joint petitioners led by Dont Waste Michigan.

7 Motion of Fasken to Dismiss Licensing Proceedings for HI-STORE CISF and WCS CISF (Sept. 14, 2018), at 1-8 (ML18257A330).

2

§ . .8 In May , the Board denied all petitions and terminated the proceeding, thereby closing the record.9 Regarding Fasken, the Board held that it had demonstrated standing but had not submitted a proposed contention that met the requirements of C.F.R. § . (f)( ).10 On June , , Fasken appealed the Boards decision.11 On June , , the New Mexico Commissioner of Public Lands issued a letter to Holtec President and CEO regarding Holtecs CISF application. The letter was served on the docket of this proceeding on July , .12 Fasken then filed its new proposed Contention on August , .13 Thereafter, Fasken filed a motion to reopen, but subsequently withdrew it without withdrawing the initial motion for leave to admit new proposed Contention .14 On March , , the NRC made the draft Environmental Impact Statement (DEIS) for Holtecs license application publicly available.15 Subsequently, on April , , Fasken filed an unopposed motion to extend by days the deadline for any interested party to file petitions to 8

Holtec Intl (HI-STORE Consolidated Interim Storage Facility) and Interim Storage Partners, LLC (WCS Consolidated Interim Storage Facility), Order of the Secretary (Oct. 29, 2018), at 2.

(unpublished) (ML18302A328).

9 Holtec Intl (HI-STORE Consolidated Interim Storage Facility), LBP- - , NRC , - ( ).

10 Id. at - .

11 Fasken and PBLRO [Permian Basin Land and Royalty Owners] Notice of Appeal and Petition for Review (June 3, 2019) (ML19154A455); see also NRC Staff Answer in Opposition to Fasken Land and Minerals, Ltd. and Permian Basin Land and Royalty Owners Appeal of LBP-19-4 (June 28, 2019)

(ML19179A221).

12 Letter from Stephanie Garcia Richard, Commr, N.M. State Land Office, to Krishna Singh, President and CEO, Holtec (June 19, 2019) (ML19183A429).

13 Fasken Oil and Ranch, Ltd. and Permian Basin Land and Royalty Owners Motion for Leave to File a New Contention (Aug. 1, 2019) (ML19213A171); see also NRC Staff Answer in Opposition to Fasken Oil and Ranch, Ltd. and Permian Basin Land and Royalty Owners Motion to File New Contention (Aug. 26, 2019) (ML19238A183).

14 See Fasken Oil and Ranch and Permian Basin Land and Royalty Owners Motion for Leave to Reopen and Incorporate Contention Filed August 1, 2019 (Sept. 3, 2019) (ML19246B809); Fasken and PBLROs Withdrawal of Their Motion for Leave to Reopen and Incorporate Contention Filed August 1, 2019 (Sept. 12, 2019) (ML19255G616).

15 Environmental Impact Statement for the Holtec Internationals License Application for a Consolidated Interim Storage Facility for Spent Nuclear Fuel and High Level Waste (Draft Report for Comment),

NUREG- (Mar. ) (ML G ) (DEIS).

3

intervene, new or amended contentions, or hearing requests based on the DEIS due to the COVID- public health emergency.16 The Secretary of the Commission granted Faskens motion, setting May , , as the new deadline for such filings.17 On April , , the Commission issued a decision in which it ruled on Faskens June 3, 2019, appeal.18 The Commission affirmed the Boards determination in LBP- - that Fasken had not submitted a proposed contention that met the requirements of C.F.R. § . (f)( ).

But because Faskens Contention 2 had been filed after the Boards decision and the closing of the record, the Commission remanded Contention 2 to the Board for a threshold consideration under the standards for reopening the closed record and the admissibility standards for contentions filed after the initial intervention deadline.19 While Faskens original Contention 2 was pending before the Board on remand, Fasken filed a motion to amend Contention and an accompanying motion to reopen the record based on the issuance of the DEIS.20 Subsequently, on June , , the Board issued its decision in LBP-20-6, denying Contention 2, as originally filed, based on Faskens failure to address the reopening standards and its failure to demonstrate that the contention is based on new and materially different information.21 However, at that time, the Board reserved consideration of Faskens Amended 16 Fasken Land and Minerals, Ltd.s and Permian Basin Land and Royalty Owners Unopposed Motion to Extend Deadlines Pending the COVID-19 National Emergency (Apr. 2, 2020) (ML20093K565).

17 Holtec Intl (HI-STORE Consolidated Interim Storage Facility), Order of the Secretary (Apr. 7, 2020),

at 1 (unpublished) (ML20098F515).

18 Holtec Intl (HI-STORE Consolidated Interim Storage Facility), CLI- - , NRC __ (Apr. , )

(slip op.).

19 Id. at __ (slip op. at - ).

20 Fasken Land and Minerals, Ltd.s and Permian Basin Land and Royalty Owners Motion for Leave to File Amended Contention No. 2 (May 11, 2020) (ML20132F019) (Motion to Amend); Fasken Land and Minerals, Ltd.s and Permian Basin Land and Royalty Owners Motion to Reopen the Record (May 11, 2020) (ML20132E724) (Motion to Reopen).

21 Holtec Intl (HI-STORE Consolidated Interim Storage Facility), LBP-20-6, 91 NRC __ (June 18, 2020)

(slip op.).

4

Contention 2 for a subsequent order.22 Thereafter, the Board heard oral argument on Faskens Amended Contention 2 and motion to reopen the record on August 5, 2020.23 On September 3, 2020, the Board issued its decision in LBP-20-10, holding that Faskens motion to reopen the record was untimely, that Fasken failed to demonstrate good cause for filing Amended Contention 2 after the initial intervention deadline, and that Amended Contention 2 did not meet the contention admissibility requirements.24 Fasken now appeals the Boards ruling.25 DISCUSSION I. Applicable Legal Standards A. Standard of Review The NRCs regulation at 10 C.F.R. § 2.311(c) provides an appeal as of right on the question of whether a petition to intervene or request for hearing should have been granted.

However, Fasken here seeks review under 10 C.F.R. § 2.341.26 Where an appeal arguably could be considered under either § 2.341 or § 2.311, the Commission has determined that

§ 2.311(c) should apply based on considerations of fairness to the appellant. This is so because denial of an intervention petition is usually subject to an appeal as of right, while review under

§ 2.341 is discretionary.27 22 Id. at __ (slip op. at ).

23 See Holtec Intl (HI-STORE Consolidated Interim Storage Facility), Order (Scheduling Oral Argument)

(Jun. 25, 2020), at 1 (unpublished) (ML20177A577); Transcript of August 5, 2020, Oral Argument (ML20220A688).

24 Holtec Intl, LBP-20-10, 92 NRC at __ (slip op. at 8, 16).

25 Fasken Land and Minerals, Ltd.s and Permian Basin Land and Royalty Owners Combined Notice of Appeal And Petition For Review of Atomic Safety Licensing Boards Denial Of Motion For Leave To File Amended Contention and Motion To Reopen The Record (Sep. 28, 2020) (ADAMS Accession No. ML20273A001) (Appeal). The Appeal was served via the Electronic Information Exchange (the NRCs E-Filing System) on September 29, 2020, at 12:04 AM, four minutes after the deadline.

26 Id. at 7.

27 Fla. Power & Light Co. (Turkey Point Nuclear Generating Units 6 and 7), CLI-17-12, 86 NRC 215, 219 (2017). In any event, the standard of review for contention admissibility determinations is the same whether an appeal lies under § 2.341 or § 2.311. Luminant Generation Co. LLC (Comanche Peak Nuclear Power Plant, Units 3 & 4), CLI-12-7, 75 NRC 379, 386 (2012).

5

On threshold matters such as contention admissibility, the Commission gives substantial deference to board rulings unless the appeal points to an error of law or abuse of discretion that might serve as grounds for reversal of the boards decision.28 The Commission has maintained that [r]ecitation of an appellants prior positions in a proceeding or statement of general disagreement with a decisions result is not sufficient.29 Rather, a valid appeal must point out the errors in the [b]oards decision.30 B. Requirements for Reopening the Record Pursuant to 10 C.F.R. § 2.326(a), a petitioner seeking to open a closed record must show that its motion (1) is timely, however, an exceptionally grave issue may be considered in the discretion of the presiding officer even if untimely presented; (2) addresses a significant safety or environmental issue; and (3) demonstrates that a materially different result would be or would have been likely had the newly proffered evidence been considered initially.31 A motion to reopen the record accompanying an amended contention may be considered timely if filed within 30 days of the date upon which the new information is available.32 Reopening the record is an extraordinary action, and thus, the Commission imposes a deliberately heavy burden upon a petitioner who seeks to supplement the evidentiary record after it has been closed, even with respect to an existing contention.33 28 Dominion Nuclear Conn., Inc. (Millstone Nuclear Power Station, Unit 3), CLI-08-17, 68 NRC 231, 234 (2008).

29 Turkey Point, CLI-17-12, 86 NRC at 219 (citations omitted).

30 Id.

31 10 C.F.R. §§ 2.326(a)(1)-(3); see also Virginia Electric and Power Co. (North Anna Power Station, Unit 3), CLI-12-14, 75 NRC 692, 700 n.54, 701 (2012).

32 See Shaw AREVA MOX Services (Mixed Oxide Fuel Fabrication Facility), LBP-08-11, 67 NRC 460, 493 (2008) (noting that [m]any times, boards have selected 30 days as [the] specific presumptive time period for timeliness of contentions filed after the initial deadline).

33 Entergy Nuclear Vermont Yankee, LLC and Entergy Nuclear Operations, Inc. (Vermont Yankee Nuclear Power Station), CLI-11-2, 73 NRC 333, 337-38 (2011). Reopening will only be allowed where the proponent presents material, probative evidence which either could not have been discovered before or could have been discovered but is so grave that, in the judgement of the 6

Additionally, 10 C.F.R. § 2.326(b) requires supporting affidavits from experts or otherwise competent individuals to accompany the motion that set forth the factual and/or technical bases for the movants claim that the criteria of [10 C.F.R. § 2.326(a)] have been satisfied.34 The affidavits must address each criterion of 10 C.F.R. § 2.326(a) separately . . . with a specific explanation of why it has been met.35 Affidavits containing bare assertions or speculation and lacking technical details or analysis are insufficient to meet the reopening standards.36 C. Good Cause Requirements for New or Amended Contentions Amended contentions submitted after the initial date for hearing requests must meet the requirements of 10 C.F.R. § 2.309(c)(1). To do so, a petitioner must demonstrate good cause by showing that the information upon which the filing is based was not previously available, that the information upon which the filing is based is materially different from information previously available, and that the filing has been submitted in a timely fashion based on the availability of the subsequent information.37 The petitioner has the burden of demonstrating that any new or amended contention meets the standards in 10 C.F.R. § 2.309(c)(1).38 New environmental contentions based on the NRC Staffs DEIS are permitted if data or conclusions in the NRC Staffs environmental document differ significantly from the applicants environmental report.39 Nevertheless, NRC regulations and longstanding Commission presiding officer, it must be considered anyway. Criteria for Reopening Records in Formal Licensing Proceedings, 51 Fed. Reg. 19,535, 19,538 (May 30, 1986).

34 10 C.F.R. § 2.326(b).

35 Id.

36 AmerGen Energy Co., LLC (Oyster Creek Nuclear Generating Station), CLI-08-28, 68 NRC 658, 670, 674 (2008).

37 10 C.F.R. § 2.309(c)(1).

38 AmerGen Energy Co., LLC (Oyster Creek Nuclear Generating Station), CLI-09-7, 69 NRC 235, 260-61 (2009).

39 See 10 C.F.R. § 2.309(f)(2) (Participants may file new or amended environmental contentions after the deadline in [§ 2.309(b)] (e.g., based on a draft or final NRC environmental impact statement, environmental assessment, or any supplements to these documents) if the contention complies with the requirements in [§ 2.309(c)].); Private Fuel Storage, L.L.C. (Independent Spent Fuel Storage 7

precedent make clear that for issues arising under the National Environmental Policy Act (NEPA), a petitioner must first file contentions based on the applicant's environmental report and may amend those contentions only if the draft or final EIS differ significantly from the data or conclusions in the applicants documents.40 It is fundamental that a new or amended contention must be raised at the earliest possible opportunity.41 Thus, as a general rule, environmental contentions submitted for the first time after the DEIS is issued will be deemed untimely unless there are data or conclusions in the DEIS that differ significantly from the data or conclusions in the applicants documents.42 D. Requirements for Contention Admissibility The regulation at C.F.R. § . (f)( ) establishes the basic criteria that all contentions must meet in order to be admissible.43 The Commission strictly applies these contention admissibility requirements in NRC adjudications.44 Failure to comply with any one of the criteria is grounds for the dismissal of a contention.45 The requirements are intended to focus litigation Installation), CLI-00-21, 52 NRC 261, 264 n.6 (2000) (citing former 10 C.F.R. § 2.714(b)(2)(iii),

currently § 2.309(f)(2)).

40 See 10 C.F.R. § 2.309(f)(2) (On issues arising under the National Environmental Policy Act, participants shall file contentions based on the applicant's environmental report.); Tenn. Valley Auth.

(Clinch River Nuclear Site Early Site Permit Application), CLI-18-5, 87 NRC 119, 122-23 (2018).

41 See Clinch River, CLI-18-5, 87 NRC at 122-23 (citations omitted); Crow Butte Res., Inc. (Marsland Expansion Area), LBP-18-3, 88 NRC 13, 26 (2018) (citing DTE Electric Co. (Fermi Nuclear Power Plant, Unit 3), CLI-15-1, 81 NRC 1, 7 (2015)).

42 Detroit Edison Co. (Fermi Nuclear Power Plant, Unit 3), LBP-12-12, 75 NRC 742, 755-56 (2012).

43 Entergy Nuclear Vt. Yankee, LLC (Vermont Yankee Nuclear Power Station), LBP-06-14, 63 NRC 568, 572 (2006); see also USEC Inc. (American Centrifuge Plant), CLI-06-9, 63 NRC 433, 436-37 (2006)

(stating that the Commission will reject any contention that does not satisfy the requirements).

44 AmerGen Energy Co., LLC (Oyster Creek Nuclear Generating Station), CLI-06-24, 64 NRC 111, 118 (2006) (citing Dominion Nuclear Conn., Inc. (Millstone Nuclear Power Station, Units 2 & 3),

CLI-01-24, 54 NRC 349, 358 (2001), petition for reconsideration denied, CLI-02-1, 55 NRC 1 (2002)).

45 Private Fuel Storage, L.L.C. (Independent Spent Fuel Storage Installation), CLI-99-10, 49 NRC 318, 325 (1999); see also Entergy Nuclear Operations, Inc. (Indian Point, Unit 2), CLI-16-5, 83 NRC 131, 136 (2016).

8

on concrete issues and result in a clearer and more focused record for decision.46 The hearing process is reserved for genuine, material controversies between knowledgeable litigants.47 II. The Commission Should Affirm the Boards Decision Because Fasken Has Not Identified Any Legal Error or Abuse of Discretion A. The Board Properly Denied Faskens Motion to Reopen the Record as Untimely In support of its motion for leave to file Amended Contention 2, Fasken filed an accompanying motion to reopen the record. In LBP-20-10, the Board properly denied Faskens motion to reopen. As an initial matter, the Board expressed skepticism as to whether the affidavit from Faskens counsel satisfied the requirements in 10 C.F.R. § 2.326(b) for supporting affidavits.48 Specifically, the Board noted that Faskens affiant did not claim technical expertise in the relevant matters and did not claim personal knowledge of the critical facts.49 Faskens failure to meet this requirement would be sufficient grounds to deny the motion to reopen.

However, the Board also correctly found that, in any event, Faskens motion to reopen must be denied because it is untimely.50 First, the Board determined that to the extent Amended Contention 2 asserts deficiencies in Holtecs application, the motion to reopen is clearly untimely because such challenges to Holtecs application could have been raised years ago.51 46 Final Rule, Changes to Adjudicatory Process, 69 Fed. Reg. 2182, 2202 (Jan. 14, 2004).

47 FirstEnergy Nuclear Operating Co. (Davis-Besse Nuclear Power Station, Unit 1), CLI-12-8, 75 NRC 393, 396 (2012) (quoting Dominion Nuclear Conn., Inc. (Millstone Nuclear Power Station, Unit 2),

CLI-03-14, 58 NRC 207, 219 (2003)).

48 Holtec Intl, LBP-20-10, 92 NRC at __ (slip op. at 8).

49 Id. at __ (slip op. at 7-8).

50 Id. at __ (slip op. at 8).

51 Id. at __ (slip op. at 10). In its Appeal, Fasken states that it considers the Holtec DEIS to be encompassed in Holtecs application since the Holtec DEIS (and final EIS) are required to issue a license under the agencys applicable rules and regulations. Appeal at 13 n.51. However, the Part 2 regulation that Fasken relies on elsewhere in its Appeal (§ 2.309(f)(2)) distinguishes environmental contentions raised on the NRC Staffs environmental review documents from those originally filed on the applicants ER. And as explained infra, regardless of whether Fasken intended Amended Contention 2 to refer to the DEIS, the Board found the motion to reopen untimely because of Faskens failure to support its motion to reopen with information or conclusions in the DEIS that are new and materially different from the information that was previously available.

9

Next, the Board considered the assertedly new information supplied by Fasken in support of its motion to reopen and ultimately found it was not materially different from information previously available. For example, the Board held that the June 2019 letter from New Mexicos Commissioner of Public Lands concerning subsurface mineral rights was not new because the information contained in the letter was available in Holtecs application materials and in a letter from Faskens own Vice President, which was submitted to the NRC nearly a year before Faskens original Contention 2 was filed.52 Further, the Board determined that Fasken failed to identify how the difference in terminology between Holtecs application and the DEIS regarding the incremental and cumulative impacts analysis for geology and soils is material or is otherwise based on information that was not previously available. 53 The Board also found that the DEISs use of a six-mile radius for assessing the cumulative impacts on land use was neither new nor materially different because the information relied upon in the DEIS was based on a subset of information included in Holtecs Environmental Report.54 Similarly, the Board concluded that Faskens claims concerning the DEISs description of oil and gas operations in the vicinity of the proposed site (including specific drilling depths and an active oil and gas well near the site) are not based on information that is new or materially different. Rather, the Board found that the descriptions in the DEIS are based on information cited in Holtecs application materials and that Fasken did not articulate how any purported difference is material to the analyses presented in the DEIS.55 Finally, in LBP-20-10 the Board also declined for several reasons to exercise its discretion under 10 C.F.R. § 2.326(a)(1) to consider Amended Contention 2 under the exceptionally grave issue exception to timeliness. Specifically, the Board found that Fasken 52 Holtec Intl, LBP-20-10, 92 NRC at __ (slip op. at 11).

53 Id. at __ (slip op. at 11-12).

54 Id. at __ (slip op. at 12).

55 Id. at __ (slip op. at 13-15).

10

invoked the exceptionally grave issue exception for the first time at oral argument and that Fasken did not proffer an admissible contention, much less one that raises an exceptionally grave issue.56 In its Appeal, Fasken asserts that its motion to reopen was timely filed pursuant to the Secretarys May 11, 2020, order extending the deadline to file petitions to intervene, new or amended contentions, or hearing requests based on the DEIS, and Fasken states that its motion to reopen raises significant and serious environmental impacts and safety concerns.57 Fasken further states that the Boards decision is misguided and inappropriate and warrants review by the Commission.58 However, Fasken does nothing more than repeat its original claims that Amended Contention is based on information that is new and materially different.

Nowhere does Fasken point to any error in the Boards thorough analysis of each of those underlying claims. Recitations of an appellants prior position and statements of general disagreement with a decisions result are not sufficient to support a valid appeal.59 Therefore, the Commission should affirm the Boards denial of Faskens motion to reopen the record.

Fasken further requests that the Commission exercise its discretion to consider Amended Contention under the exceptionally grave issue exception to timeliness in 10 C.F.R. § 2.326(a)(1).60 In declining to exercise such discretion in the first instance, the Board appropriately emphasized that the exceptionally grave issue exception is a narrow one that is 56 Id. at __ (slip op. at 15). The Board noted that Faskens failure to satisfy the timeliness requirement in 10 C.F.R. § 2.326(a)(1) is sufficient reason alone to deny Faskens motion to reopen. Nonetheless, the Board also addressed the other requirements in 10 C.F.R. §§ 2.326(a)(2)-(3). In particular, the Board found that Fasken had not raised a significant issue that must be adjudicated by reopening the closed proceeding, nor had Fasken demonstrated that a materially different result would be likely.

Holtec Intl, LBP-20-10, 92 NRC at __ (slip op. at 16).

57 Appeal at 26.

58 Id.

59 Turkey Point, CLI-17-12, 86 NRC at 219 (citations omitted).

60 Appeal at 27-28.

11

to be granted rarely and only in truly exceptional circumstances.61 And indeed, the Board declined to considered whether Amended Contention raises an exceptionally grave issue on multiple grounds. First, the Board appropriately found that Fasken advanced this position for the first time at oral argument.62 The Board further held that because Fasken failed to proffer an admissible contention, Fasken also necessarily failed to raise an exceptionally grave issue.63 In its Appeal, Fasken has not demonstrated that the Board committed an error of law or abuse of discretion in either respect. In fact, Fasken does not even acknowledge, much less specifically refute, any of the grounds on which the Board based its ruling on this issue. Moreover, Faskens Appeal fails to provide any information that would support finding that an exceptionally grave issue exists here; the Appeal simply reiterates Faskens earlier unsupported assertions (which were rejected by the Board) that the projects location in the Permian Basin inherently raises important safety and environmental issues related to transportation and storage of spent nuclear fuel.64 As such, the Commission should affirm the Boards decision that the issues raised by Amended Contention 2 do not meet the exceptionally grave issue exception.

Lastly, Fasken asserts that it satisfied the affidavit requirements in 10 C.F.R. § 2.326(b) because the affidavit submitted by its counsel in support of the motion to reopen confirmed, attached and incorporated by reference the statements from two of Faskens other affiants.65 Fasken further claims that nothing in NRCs regulations prohibits a lawyer from filing an affidavit in support of a motion to reopen the record.66 But the Board did not rely on Faskens deficient 61 Holtec Intl, LBP-20-10, 92 NRC at __ (slip op. at 15) (citing Entergy Nuclear Generation Co. and Entergy Nuclear Operations, Inc. (Pilgrim Nuclear Power Station), CLI-12-21, 76 NRC 491, 500-01 (2012)).

62 Id.

63 Id.

64 Appeal at 14.

65 Id. at 26-27.

66 Id.

12

affidavit as a necessary, independent basis for denying Faskens motion to reopen.67 Nevertheless, in LBP-20-10 the Board correctly noted that the Commission already directly addressed the insufficiency of an affidavit provided by a petitioners lawyer when the rules for reopening the record were first codified. Indeed, the Commission adopted the requirement that affidavits supporting a motion to reopen must be from either competent individuals with knowledge of the facts alleged or from experts in the disciplines appropriate to the issues raised.68 In its Appeal, Fasken has not identified any error in the Boards reliance on the relevant regulatory history, nor has Fasken demonstrated any error in the Boards interpretation of the affidavit requirement in § 2.326(b). Therefore, Fasken has not demonstrated grounds for reversal of the Boards decision.

B. The Board Correctly Found that Fasken Failed to Satisfy the Good Cause Requirements in 10 C.F.R. § 2.309(c)

In its motion for leave to file Amended Contention 2, Fasken asserted that it satisfied the good cause requirements because the information forming the basis of Amended Contention 2 was not available prior to the DEISs issuance and that certain sources and conclusions in the DEIS vary in material respects from the information contained in Holtecs license application documents.69 In LBP-20-10, the Board determined that Fasken did not meet its obligation to show that Amended Contention 2 is based on new, previously unavailable information that differs materially from information that was previously available.70 The Boards conclusion 67 Holtec Intl, LBP-20-10, 92 NRC at __ (slip op. at 8) (finding it questionable whether Mr. Kanners affidavit can properly support a motion to reopen the record, but stating that the Board need not rely on this possible pleading defect to deny Faskens motion to reopen).

68 Id. at __ (slip op. at 7) (citing Final Rule, Criteria for Reopening Records in Formal Licensing Proceedings, 51 Fed. Reg. 19,535, 19,537 (May 30, 1986)).

69 Fasken Motion to Amend at 5.

70 Holtec Intl, LBP-20-10, 92 NRC at __ (slip op. at 16-17).

13

relied on the same reasons undergirding its rejection of Faskens motion to reopen (as described above).71 In doing so, the Board applied the correct legal standard in evaluating whether Amended Contention 2 meets the good cause requirements in 10 C.F.R. § 2.309(c). In its Appeal, Fasken incorrectly states that [m]ultiple avenues exist to establish good cause.72 Fasken claims that the Board misapplies precedent by mandating reliance on new information under the good cause standard [in] 10 C.F.R. § 2.309(f) and largely ignor[es] the governing precedent of Calvert Cliff[s], which provides an alternative test for good cause.73 But Faskens claim that there is an alternative test for good cause is erroneous and its reliance on Calvert Cliffs is both misplaced and a misreading of the Boards basis for denying Faskens motion.74 In 2012, the Commission promulgated a final rule in which it clarified that new or amended environmental contentions may be filed after the initial intervention deadline if the contention complies with the good cause requirements in 10 C.F.R. § 2.309(c).75 In the statement of considerations for the 2012 final rule, the Commission noted that the similarities between former §§ 2.309(c)(1) and 2.309(f)(2) had resulted in doctrinal confusion concerning the proper way to evaluate pleadings filed out of time.76 The 2012 final rule resolved the ambiguity and clearly eliminated any alternative approaches to evaluating new or amended environmental contentions filed after the 71 Id. at __ (slip op. at 17).

72 Appeal at 10.

73 Id. at 16 (citing Calvert Cliffs 3 Nuclear Project, LLC, and UniStar Nuclear Operating Services, LLC (Calvert Cliffs Nuclear Power Plant, Unit 3), LBP-10-24, 72 NRC 720, 729-30 (2010)).

74 Calvert Cliffs is a licensing board decision. Unreviewed licensing board decisions do not create binding legal precedent. Entergy Nuclear Vermont Yankee, LLC, and Entergy Nuclear Operations, Inc. (Vermont Yankee Nuclear Power Station), CLI-16-8, 83 NRC 463, 469 (2016).

75 Amendments to Adjudicatory Process Rules and Related Requirements, 77 Fed. Reg. 46,562, 46,572 (Aug. 3, 2012).

76 Id. at 46,571.

14

initial deadline.77 Recognizing that under § 2.309(f)(2) amended environmental contentions filed after the initial deadline must satisfy the requirements in § 2.309(c), the Board properly evaluated Amended Contention 2 under the good cause criteria, including whether the information (data or conclusions) upon which Amended Contention 2 is based was previously available and whether the information (data or conclusions) is materially different from what was previously available. As such, Fasken has not identified an error of law in the Boards decision.

Fasken further asserts that the Boards decision and its conclusions are based on clear errors in factual findings.78 But Fasken merely repeats the assertions in its original filing regarding the cumulative impacts for geology and soils, ownership of subsurface mineral rights, and the description of past, present, and future oil and gas operations.79 The Board fully considered and engaged with each of Faskens underlying claims, explaining why they were based on information that was either not new or was not materially different from previously available information.80 It is the petitioners burden to demonstrate that an amended contention meets the requirements in 10 C.F.R. § 2.309(c)(1), and the Board found that Fasken had not carried that burden.81 Other than conclusory statements of disagreement, Fasken has not identified any error in the Boards reasoning. Simply reciting a prior position is insufficient to support a valid appeal.82 Because Fasken has not demonstrated an error of law or an abuse of 77 Id.; see also Fermi, CLI-15-1, 81 NRC at 7 n.29 (The standard for admitting a new or amended contention, however, was simplified rather than overhauled [when the rules of practice were amended in 2012]. Both before and after the 2012 amendment, proponents of new or amended contentions were, and are, required to demonstrate good cause for their filing, which includes a demonstration that the information on which the new or amended contention is based is materially different from information previously available.) (citations omitted).

78 Appeal at 20.

79 Id. at 20-23.

80 Holtec Intl, LBP-20-10, 92 NRC at __ (slip op. at 10-15).

81 Id. at __ (slip op. at 17).

82 Turkey Point, CLI-17-12, 86 NRC at 219 (citations omitted).

15

discretion, the Commission should affirm the Boards determination that Fasken has not shown good cause for filing Amended Contention 2.

C. The Board Correctly Rejected Amended Contention 2 as Inadmissible In LBP-20-10, the Board found sufficient grounds to reject Amended Contention 2 based either on Faskens failure to satisfy the requirements for reopening the record or its failure to show good cause for proffering a contention out of time.83 Nevertheless, the Board also rejected Amended Contention 2 for failing to satisfy the contention admissibility requirements in 10 C.F.R. § 2.309(f)(1).84 Fundamentally, the Board found that Fasken did not meet its burden to proffer an admissible contention because the issues raised in Amended Contention 2 are either not material to the findings the NRC must make in the DEIS, fail to raise a genuine dispute on a material issue of law or fact, or both.85 The Board systematically examined Faskens claims against the contention admissibility standards. For instance, the Board held that Fasken did not show that the DEISs cumulative impacts analysis for geology and soils is materially different from the information in Holtecs application materials, nor did Fasken explain what aspect of the DEISs conclusions it disputes.86 Regarding subsurface mineral rights, the Board likewise concluded that Fasken failed to raise a genuine dispute on a material issue because the DEIS acknowledges that the State of New Mexico and the Bureau of Land Management own the subsurface property rights beneath and surrounding proposed site and because Fasken did not explain how ownership and control of subsurface mineral rights would affect, much less contradict, the DEIS.87 Further, the Board determined that Faskens claim concerning the DEISs use of a 6-mile radius to 83 Holtec Intl, LBP-20-10, 92 NRC at __ (slip op. at 17).

84 Id.

85 See id. at __ (slip op. at 18).

86 Id. at __ (slip op. at 19).

87 Id. at __ (slip op. at 20).

16

evaluate cumulative land use impacts does not raise a genuine dispute because Fasken did not articulate how the NRC Staffs approach violates NEPA, which gives agencies broad discretion to keep their inquiries within appropriate and manageable boundaries.88 Concerning the DEISs description of oil and gas operations in the region, the Board held that Fasken failed to raise a genuine dispute on a material issue because Fasken failed to (1) identify any statement in the DEIS that is inaccurate, (2) explain how the DEISs partial reliance on a 1978 study is at all impacted by advancements in drilling technologies, and (3) show that the existence of wells at any depth is material to the NRC Staffs environmental assessment.89 The Board also held that Faskens claims related to a recent earthquake do not raise a genuine dispute with the DEIS because the DEIS provides a discussion of seismicity in the region, which Fasken did not acknowledge or address.90 Finally, the Board determined that Faskens assertions related to several outstanding safety Requests for Additional Information (RAIs) do not raise a genuine dispute with the DEIS because, as Commission case law instructs, [p]etitioners must do more than rest on the mere existence of RAIs as a basis for their contention, and in any event, Fasken did not identify any section of the DEIS that relies on information that Holtec may provide in responses to the outstanding RAIs.91 On appeal, Fasken does little more than repeat in a conclusory fashion that it made the requisite showings in its original filing, asserting that it had identified differences between the DEIS and the application materials and identified the existence of RAIs to which Holtec had not yet responded. But as noted above, the Board directly considered each of these arguments and 88 Id. at __ (slip op. at 20-21) (quoting La. Energy Servs, L.P. (Natl Enrichment Facility), CLI-98-3, 47 NRC 77, 103 (1998)).

89 Id. at __ (slip op. at 21-22).

90 Id. at __ (slip op. at 22).

91 Id. at __ (slip op. at 22-23) (quoting PPL Susquehanna, LLC (Susquehanna Steam Electric Station, Units 1 & 2), CLI-15-08, 81 NRC 500, 506 n.47 (2015)). Indeed, all of the pending RAIs that Fasken relies on pertain to the NRC Staffs safety review, not the NRC Staffs environmental review.

17

explained why they did not ultimately represent a genuine dispute on a material issue. In connection with its claims about drilling depths in the vicinity of the site, Fasken appears to also assert that questions posed during oral argument from a Board judge about that issue (and the applicants comment that it may revise certain statements in its ER) illustrate the materiality of the contention.92 However, the Boards written decision specifies why the Board ultimately determined that Fasken had not shown a material dispute with the DEIS, and speculation about future revisions to the application does not provide a basis for an admissible contention.

Accordingly, Faskens assertions are insufficient to support a valid appeal.93 Here, it is Faskens burden to proffer an admissible contention that meets the requirements in § 2.309(f)(1), and the Board found that Fasken has not done so. Because Fasken has failed to demonstrated error of law or abuse of discretion, the Commission should affirm the Board determination that Amended Contention 2 is inadmissible.

D. The Board Did Not Err in Limiting Statements from Faskens Affiant During Oral Argument During oral argument, the Board properly applied the NRCs rules of practice and appropriately exercised its discretion to decline statements from Faskens affiant. In its Appeal, Fasken asserts that the Board abused its discretion in denying Faskens expert[ ] [Mr. Stonnie Pollock] an opportunity to address discrepancies and disputes at the August 5, 2020 hearing.94 However, as provided in NRCs rules of practice, a person may appear in an adjudication in a representative capacity only upon filing a written notice of appearance.95 Mr. Pollock did not enter a notice of appearance in this proceeding. Furthermore, as was apparent based on the stage of the proceeding and from the Boards order concerning oral argument, the August 5, 92 Appeal at 21-22.

93 Turkey Point, CLI-17-12, 86 NRC at 219 (citations omitted).

94 Appeal at 23.

95 10 C.F.R. § 2.314(b).

18

2020, oral argument was an opportunity to answer the Boards questions on the legal and procedural aspects of Faskens motions, not an evidentiary hearing to receive expert testimony.96 As such, the Board appropriately exercised its authority in limiting Mr. Pollocks statements at oral argument.97 To be sure, the Board has discretion to permit a person who is not a partyincluding persons who are affiliated with a petitioner, as is Mr. Pollockto make a limited appearance.98 But Fasken has not articulated in what way the Board abused its discretion by disallowing oral statements from Mr. Pollock concerning extraction activities in the vicinity of the proposed CISF site. Indeed, Mr. Pollock already provided written statements on such topics in his declaration submitted in support of Amended Contention 2.99 In addition, Fasken asserts that its counsel was denied the right to consult with Mr.

Pollock during oral argument.100 This is false. The Board did not deny Faskens counsel the opportunity to consult or confer with Mr. Pollock (nor is it clear how the Board could have effectuated such a denial). Rather, the Board limited Mr. Pollocks ability to make oral statements directly to the Board during the oral argument.101 Beyond its own bare assertion, Fasken does not explain in what way this amounts an abuse of discretion. As noted above, the Boards order concerning oral argument indicated that the argument was a focused opportunity for the Board to ask questions regarding the participants positions on Faskens pending motions, not an open-ended forum for the participants to present witnesses or new evidence.102 Without more, Fasken has failed to demonstrate an error of law or abuse of discretion, and thus, has not provided valid grounds for reversal of the Boards decision.

96 See Order (Concerning Oral Argument) (Jul. 20, 2020), at 1-2 (unpublished) (ML20202A053).

97 Tr. at 456-57.

98 10 C.F.R. § 2.315(a).

99 See Tr. at 456; Motion to Amend, Ex. 4 at 3-4.

100 Appeal at 23-24.

101 See Tr. at 456.

102 See Order (Concerning Oral Argument) (Jul. 20, 2020), at 1-2 (ML20202A053) (unpublished).

19

CONCLUSION For the reasons set forth above, Fasken has not shown that the Boards decision in LBP-20-10 contains an error of law or an abuse of discretion. Accordingly, the Commission should affirm the Boards decision.

Respectfully submitted,

/Signed (electronically) by/

Rebecca Susko Mail Stop: O- -A U.S. Nuclear Regulatory Commission Washington, DC -

Telephone: ( ) -

E-mail: Rebecca.Susko@nrc.gov Counsel for NRC Staff Dated this rd day of October 20

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE COMMISSION In the Matter of HOLTEC INTERNATIONAL Docket No. -

(HI-STORE Consolidated Interim Storage Facility)

CERTIFICATE OF SERVICE Pursuant to C.F.R. § . , I hereby certify that copies of the foregoing NRC Staffs Answer in Opposition to Fasken Oil and Ranch, Ltd.s and Permian Basin Land and Royalty Owners Petition for Review of LBP- - , dated October , , have been served upon the Electronic Information Exchange (the NRCs E-Filing System), in the above-captioned proceeding, this rd day of October .

/Signed (electronically) by/

Rebecca Susko Mail Stop: O- -A U.S. Nuclear Regulatory Commission Washington, DC -

Telephone: ( ) -

E-mail: Rebecca.Susko@nrc.gov Counsel for NRC Staff Dated this rd day of October