Zion: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) No edit summary |
StriderTol (talk | contribs) No edit summary |
||
(3 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
{{Site | {{Site | ||
|name=Zion | |name=Zion | ||
|site type=Plant | |||
|region=1 | |region=1 | ||
|state=Illinois | |state=Illinois | ||
|mapping location=42° 26' 45.43" N, 87° 48' 7.34" W | |mapping location=42° 26' 45.43" N, 87° 48' 7.34" W | ||
|company= | |company=ZionSolutions | ||
|wikipedia=Zion Nuclear Power Station | |wikipedia=Zion Nuclear Power Station | ||
|site unit={{Site unit | |site unit={{Site unit | ||
|Unit number=1 | |Unit number=1 | ||
|Docket=05000295 | |Docket=05000295 | ||
|Commission date= | |is cancelled=No | ||
|License=DPR-39 | |||
|Commission date=31 December 1973 | |||
|Decommission date=13 February 1998 | |||
|Reactor type=Westinghouse PWR 4-Loop | |Reactor type=Westinghouse PWR 4-Loop | ||
}}{{Site unit | }}{{Site unit | ||
|Unit number=2 | |Unit number=2 | ||
|Docket=05000304 | |Docket=05000304 | ||
|Commission date= | |is cancelled=No | ||
|License=DPR-48 | |||
|Commission date=4 September 1974 | |||
|Decommission date=13 February 1998 | |||
|Reactor type=Westinghouse PWR 4-Loop | |Reactor type=Westinghouse PWR 4-Loop | ||
}} | }} | ||
|unit_Decommission date=January 1998 | |unit_Decommission date=January 1998 | ||
}} | }} |
Latest revision as of 22:50, 17 February 2021
Plant | |
---|---|
Company | ZionSolutionsFile:ZionSolutions icon.png |
Where | , Illinois |
Regulatory | |
Region | NRC Region 1 |
ISFSI docket | |
wikipedia link | |
Docket | 05000295 |
---|---|
License | DPR-39 |
Unit type | Westinghouse PWR 4-Loop |
Status | |
Commission | 31 December 1973 |
Decommission | 13 February 1998 |
Docket | 05000304 |
---|---|
License | DPR-48 |
Unit type | Westinghouse PWR 4-Loop |
Status | |
Commission | 4 September 1974 |
Decommission | 13 February 1998 |