Line 12: Line 12:
| identified by = NRC
| identified by = NRC
| Inspection procedure = IP 71111.13
| Inspection procedure = IP 71111.13
| Inspector = A Barrett, B Tindell, J Choate, M Tobin, N O, 'Keef
| Inspector = A Barrett, B Tindell, J Choate, M Tobin, N O'Keefe
| CCA = H.4
| CCA = H.4
| INPO aspect = PA.3
| INPO aspect = PA.3
| description = The inspectors identified a Green finding and an associated non-cited violation of 10 CFR 50.65(a)(4), Requirements for Monitoring the Effectiveness of Maintenance at Nuclear Power Plants, for the failure to assess and manage the increase in risk due to performing hot work near risk-significant Unit 1 non-vital switchgear. Specifically, the licensee failed to identify the work as having low integrated risk, and implement required risk management actions to protect available fire pumps and brief the fire brigade. As immediate corrective actions, the licensee stopped the hot work until they completed a risk assessment and risk management actions. This finding was entered into the licensees corrective action program as Condition Report CR-ANO-1-2016-00348. The failure to assess and manage the increase in risk of performing hot work near risk-significant Unit 1 non-vital switchgear is a performance deficiency. The finding is more than minor because it adversely affected the protection against external factors (i.e., fires) attribute of the initiating event cornerstone to limit the likelihood of events that upset plant stability and challenge critical safety functions during shutdown as well as power operations. Specifically, the licensee failed to assess the potential for hot work to cause a fire, and manage the risk to critical safety functions. Because the finding affects the assessment of risk associated with performing maintenance activities, NRC Manual Chapter 0609, Attachment 4, Initial Characterization of Findings, directs significance determination using NRC Manual Chapter 0609, Appendix K, Maintenance Risk Assessment and Risk Management Significance Determination Process. A regional senior reactor analyst used Manual Chapter 0609, Appendix K, Flowchart 2, Assessment of Risk Management Actions, dated May 19, 2005, to assess the significance of the finding. The licensee site probabilistic risk assessment engineer provided information which estimated the incremental core damage probability deficit of 3.3E-10. The analyst confirmed similar results using the NRC probabilistic risk assessment model. The incremental large early release probability deficit was conservatively estimated to be equal to the incremental core damage probability deficit. Since this issue dealt only with the failure to take risk management actions, Flowchart 2, Assessment of Risk Management Actions, of Appendix K was used. In accordance with Flowchart 2, because the incremental core damage probability deficit was less than 1E-10 and the incremental large early release probability deficit was less than 1E-7, the finding screened as having very low safety significance (Green). The inspectors determined this finding has a problem identification and resolution cross-cutting aspect in the area of Teamwork, because the most significant contributor involved the failure to communicate and coordinate activities across organizational boundaries to ensure nuclear safety is maintained. Specifically, work groups did not inform operations work control personnel that hot work was part of the intended work.
| description = The inspectors identified a Green finding and an associated non-cited violation of 10 CFR 50.65(a)(4), Requirements for Monitoring the Effectiveness of Maintenance at Nuclear Power Plants, for the failure to assess and manage the increase in risk due to performing hot work near risk-significant Unit 1 non-vital switchgear. Specifically, the licensee failed to identify the work as having low integrated risk, and implement required risk management actions to protect available fire pumps and brief the fire brigade. As immediate corrective actions, the licensee stopped the hot work until they completed a risk assessment and risk management actions. This finding was entered into the licensees corrective action program as Condition Report CR-ANO-1-2016-00348. The failure to assess and manage the increase in risk of performing hot work near risk-significant Unit 1 non-vital switchgear is a performance deficiency. The finding is more than minor because it adversely affected the protection against external factors (i.e., fires) attribute of the initiating event cornerstone to limit the likelihood of events that upset plant stability and challenge critical safety functions during shutdown as well as power operations. Specifically, the licensee failed to assess the potential for hot work to cause a fire, and manage the risk to critical safety functions. Because the finding affects the assessment of risk associated with performing maintenance activities, NRC Manual Chapter 0609, Attachment 4, Initial Characterization of Findings, directs significance determination using NRC Manual Chapter 0609, Appendix K, Maintenance Risk Assessment and Risk Management Significance Determination Process. A regional senior reactor analyst used Manual Chapter 0609, Appendix K, Flowchart 2, Assessment of Risk Management Actions, dated May 19, 2005, to assess the significance of the finding. The licensee site probabilistic risk assessment engineer provided information which estimated the incremental core damage probability deficit of 3.3E-10. The analyst confirmed similar results using the NRC probabilistic risk assessment model. The incremental large early release probability deficit was conservatively estimated to be equal to the incremental core damage probability deficit. Since this issue dealt only with the failure to take risk management actions, Flowchart 2, Assessment of Risk Management Actions, of Appendix K was used. In accordance with Flowchart 2, because the incremental core damage probability deficit was less than 1E-10 and the incremental large early release probability deficit was less than 1E-7, the finding screened as having very low safety significance (Green). The inspectors determined this finding has a problem identification and resolution cross-cutting aspect in the area of Teamwork, because the most significant contributor involved the failure to communicate and coordinate activities across organizational boundaries to ensure nuclear safety is maintained. Specifically, work groups did not inform operations work control personnel that hot work was part of the intended work.
}}
}}

Latest revision as of 23:23, 21 February 2018

01
Site: Arkansas Nuclear Entergy icon.png
Report IR 05000313/2016001 Section 1R13
Date counted Mar 31, 2016 (2016Q1)
Type: NCV: Green
cornerstone Initiating Events
Identified by: NRC identified
Inspection Procedure: IP 71111.13
Inspectors (proximate) A Barrett
B Tindell
J Choate
M Tobin
N O'Keefe
Violation of: 10 CFR 50.65

10 CFR 50.65(a)(4)
CCA H.4, Teamwork
INPO aspect PA.3
'