| identified by = NRC
| identified by = NRC
| Inspection procedure = IP 71111.21
| Inspection procedure = IP 71111.21
| Inspector = D Mas,-Penaranda G, Gardner G, Ottenberg J, Bartley R, Patterson S, Herrick T, Fanell
| Inspector = D Mas-Penaranda, G Gardner, G Ottenberg, J Bartley, R Patterson, S Herrick, T Fanelli
| CCA = N/A for ROP
| CCA = N/A for ROP
| INPO aspect =  
| INPO aspect =  
| description = The team identified a Green non-cited violation of 10 CFR Part 50, Appendix B, Criterion XI, Test Control, consisting of two examples. In one example, the licensee failed to scope some Class 1E molded case circuit breakers (MCCBs) into the Class 1E MCCB testing program. In the second example, the licensees test procedure preconditioned the Class 1E MCCBs before testing their safety function. The licensee initiated Action Request (AR) 1936760 and AR 01934403, which determined the systems were operable because an engineering review of previous TED breaker testing and PM's has not shown a trend of degradation of the breakers ability to perform its function. In addition, the licensee planned develop a more extensive and adequate testing program. The licensees failure to perform adequate MCCB testing in accordance with IEEE 308- 1971, Section 6.3, Periodic Equipment Tests, was a performance deficiency. The team determined that the performance deficiency was more than minor because it was associated with the Equipment Performance attribute of the Mitigating Systems Cornerstone and adversely affected the cornerstone objective of ensuring the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences. The finding was determined to be of very low safety significance (Green) because the deficiency affected the design or qualification of a mitigating structure, system, or component (SSC), but the SSC maintained its operability or functionality. No cross-cutting aspect was applicable because the finding was not indicative of current licensee performance.  
| description = The team identified a Green non-cited violation of 10 CFR Part 50, Appendix B, Criterion XI, Test Control, consisting of two examples. In one example, the licensee failed to scope some Class 1E molded case circuit breakers (MCCBs) into the Class 1E MCCB testing program. In the second example, the licensees test procedure preconditioned the Class 1E MCCBs before testing their safety function. The licensee initiated Action Request (AR) 1936760 and AR 01934403, which determined the systems were operable because an engineering review of previous TED breaker testing and PM's has not shown a trend of degradation of the breakers ability to perform its function. In addition, the licensee planned develop a more extensive and adequate testing program. The licensees failure to perform adequate MCCB testing in accordance with IEEE 308- 1971, Section 6.3, Periodic Equipment Tests, was a performance deficiency. The team determined that the performance deficiency was more than minor because it was associated with the Equipment Performance attribute of the Mitigating Systems Cornerstone and adversely affected the cornerstone objective of ensuring the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences. The finding was determined to be of very low safety significance (Green) because the deficiency affected the design or qualification of a mitigating structure, system, or component (SSC), but the SSC maintained its operability or functionality. No cross-cutting aspect was applicable because the finding was not indicative of current licensee performance.  
}}
}}

Latest revision as of 20:53, 20 February 2018

02
Site: McGuire Duke Energy icon.png
Report IR 05000369/2015007 Section 1R21
Date counted Jun 30, 2015 (2015Q2)
Type: NCV: Green
cornerstone Mitigating Systems
Identified by: NRC identified
Inspection Procedure: IP 71111.21
Inspectors (proximate) D Mas-Penaranda
G Gardner
G Ottenberg
J Bartley
R Patterson
S Herrick
T Fanelli
Violation of: 10 CFR 50 Appendix B Criterion XI
INPO aspect
'