05000369/FIN-2015007-01
Jump to navigation
Jump to search
| Site: | McGuire |
|---|---|
| Report | IR 05000369/2015007 Section 1R21 |
| Date counted | Jun 30, 2015 (2015Q2) |
| Type: | NCV: Green |
| cornerstone | Mitigating Systems |
| Identified by: | NRC identified |
| Inspection Procedure: | IP 71111.21 |
| Inspectors (proximate) | D Mas-Penaranda G Gardner G Ottenberg J Bartley R Patterson S Herrick T Fanelli |
| Violation of: | 10 CFR 50 Appendix B Criterion III, Design Control |
| INPO aspect | |
| ' | |