ENS 54403: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(StriderTol Bot change)
 
(8 intermediate revisions by the same user not shown)
Line 10: Line 10:
| utype = GE-6
| utype = GE-6
| cfr = 10 CFR 50.72(b)(3)(v)(D)
| cfr = 10 CFR 50.72(b)(3)(v)(D)
| emergency class = Non Emergency  
| emergency class = Non Emergency
| notification date = 11/21/2019 21:11
| notification date = 11/21/2019 21:11
| retracted = Yes
| notification by = Allen Brand
| notification by = Allen Brand
| NRC officer = Brian Lin
| NRC officer = Brian Lin
| event date = 11/21/2019 12:25 CST
| event date = 11/21/2019 12:25 CST
| last update date = 11/21/2019
| last update date = 01/10/2020
| title = Unit 1 High Pressure Core Spray Inoperable
| title =  
| event text = On 11/21/2019, at 1225 CST, as a result of Division 4 DC bus voltage oscillations, bus voltage lowered to less than the required improved technical specification (ITS) voltage of 127.6 VDC. This resulted in declaring High Pressure Core Spray (HPCS) system inoperable per technical specification LCO 3.8.4 and 3.8.9 actions. Division 4 DC bus voltage was restored to greater than 127.6 VDC at 1227 CST. The HPCS system remains inoperable due to Division 4 DC battery charger inoperability.
| event text = EN Revision Imported Date : 1/13/2020
Since HPCS is an emergency core cooling system and is a single train safety system, this condition is reportable under 10 CFR 50.72(b)(3)(v)(D) .
UNIT 1 HIGH PRESSURE CORE SPRAY INOPERABLE
On 11/21/2019, at 1225 CST, as a result of Division 4 DC bus voltage oscillations, bus voltage lowered to less than the required improved technical specification (ITS) voltage of 127.6 VDC. This resulted in declaring High Pressure Core Spray (HPCS) system inoperable per technical specification LCO 3.8.4 and 3.8.9 actions. Division 4 DC bus voltage was restored to greater than 127.6 VDC at 1227 CST. The HPCS system remains inoperable due to Division 4 DC battery charger inoperability.
Since HPCS is an emergency core cooling system and is a single train safety system, this condition is reportable under 10 CFR 50.72(b)(3)(v)(D).
The NRC Resident Inspector has been notified.
The NRC Resident Inspector has been notified.
Clinton Power Station has implemented required compensatory actions due to the Division 4 DC battery charger and HPCS remaining inoperable.
Clinton Power Station has implemented required compensatory actions due to the Division 4 DC battery charger and HPCS remaining inoperable.
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2019/20191122en.html#en54403
* * * RETRACTION ON 1/10/20 AT 1145 EST FROM JACOB HENRY TO KARL DIEDERICH * * *
}}{{unit info
The purpose of this notification is to retract a previous report made on 11/21/2019 (EN 54403) under 10 CFR 50.72(b)(3)(v)(D). Subsequent to the initial notification, the event and the NRC guidance in NUREG-1022 pertaining to 10 CFR 50.72(b)(3)(v)(D) were reviewed further. The evaluation determined that the Division 4 DC bus voltage oscillations were caused by a degraded but operable charger. The Division 4 battery remained fully charged during the event and its operability was not impacted. Therefore, the HPCS system remained Operable.
| Unit =  1
Under these circumstances, this event does not represent an inoperability of an accident mitigation system under 10 CFR 50.72(b)(3)(v)(D). Therefore, EN 54403 is retracted.
| type =
The NRC Resident Inspector has been notified.
| Scram code =  N
Notified R3DO (Hanna).
| Reactor critical =  Y
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2020/20200113en.html#en54403
| Initial power =  99
| Initial reactor mode =  Power Operation
| Current power =  99
| Current reactor mode =  Power Operation
}}
}}


{{ENS-Nav}}[[Category:Power Reactor]]
{{ENS-Nav}}[[Category:Power Reactor]]

Latest revision as of 13:00, 15 January 2021

ENS 54403 +/- *RETRACTED*
Where
Clinton Constellation icon.png
Illinois (NRC Region 3)
Reporting
10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident
Time - Person (Reporting Time:+2.77 h0.115 days <br />0.0165 weeks <br />0.00379 months <br />)
Opened: Allen Brand
21:11 Nov 21, 2019
NRC Officer: Brian Lin
Last Updated: Jan 10, 2020
54403 - NRC Website