05000445/FIN-2007008-01: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by Mark Hawes)
 
(Created page by program invented by StriderTol)
 
Line 1: Line 1:
{{finding
{{finding
| title = Painting Activities Result In Inoperability Of Emergency Diesel Generator
| title = Painting Activities Result in Inoperability of Emergency Diesel Generator
| docket = 05000445
| docket = 05000445
| inspection report = IR 05000445/2007008
| inspection report = IR 05000445/2007008

Latest revision as of 18:47, 20 February 2018

01
Site: Comanche Peak Luminant icon.png
Report IR 05000445/2007008 Section 4OA5
Date counted Mar 31, 2008 (2008Q1)
Type: Violation: White
cornerstone Mitigating Systems
Identified by: NRC identified
Inspection Procedure: IP 93812
Inspectors (proximate) D Loveless
C Johnson
A Sanchez
D Chamberlain
Violation of: Technical Specification
CCA H.2, Field Presence
INPO aspect LA.2
'