ML20069B343: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 2: Line 2:
| number = ML20069B343
| number = ML20069B343
| issue date = 02/28/1983
| issue date = 02/28/1983
| title = Annual Occupational Exposure Rept 7,1982.
| title = Annual Occupational Exposure Rept 7,1982
| author name = Fleischmann R
| author name = Fleischmann R
| author affiliation = PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
| author affiliation = PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:-        _ _ _ _        _
PHILADELPHIA ELECTRIC COMPANY PEACH BOTTOM ATOMIC POWER STATION UNIT NOS. 2 AND 3 DOCKET NOS. 50-277 & 50-278 i
ANNUAL OCCUPATIONAL EXPOSURE TABULATION NO. 7 JANUARY 1, 1982 THROUGH DECEMBER 31, 1982 O
Submitted to The United States Nuclear Regulatory Commission Pursuant to Facility Operating License No. DPR-Id4 & 56 Preparation Directed by:
R. S. Fleischmann, II, Superintendent Peach Bottom Atomic Power Station I
O g!le8?fa!88)h                                                                            f R
d
 
i.
O TABLE OF CONTENTS Page NA I.          INTRODUCTION                        1 II.        TABLES                                    ,
A. Standard Format for Reporting    2 Number of Personnel & Man-Rem for Work and Job Function B. Recorded Annual Wholebody        3 Exposure for Calendar Year 1982 O
O
 
O I. INTRODUCTION ANNUAL OCCUPATIONAL EXPOSURE TABULATION A tabulation of station, utility, and other personnel receiving exposures greater than 100 mrem / year, and their associated man-rem exposure according to work and job function is presented for Peach Bottom Atomic Power Station Units 2 and 3 in accordance with the Routine Reporting Requirements of Technical Specification 6.9 1.b. Annual wholebody exposures for the year are also presented in accordance with 10 CFR 20.h07(b). This data covers the period January 1, 1982 through December 31, 1982.
O O
 
TABLE A
                  -          PEACH BOTIOM AIOMIC POWER STATION UNITS 2 & 3 POR CALENDAR YEAR 1982 l
}                    STANDARD PORMAT POR REPORTING NIMBER OF PERSONNEL AND MAN-REM POR WORK AND JOB FUNCTION NUMBER OF PERSONNEL D100 MREM)                        TOTAL MAN-REM CONTRACT WORYERS                      CONTRACT WORKERS .
WORK & JOB FUNCTION      STATION  ITTILITY        AND OTHER  STATION ITTILITY      AND OTHERS Rsactor Operations &
Surveillance Maintenance Personnel    3        62              53      0.533    31 7h7          20.562 Operating Personnel    68          h              30      63 9h5    1.248          5.059 Health Physics Per. 62          1              49      52.618    0.258          52.277 Supervisory Personnel    0        0                1      0.000    0.000          0.183 Engineering Personnel  54          7              12    h5.h36    1 924          12 3hh Routine Maintenance Maintenance Personnel    7      52h              970      h.822 349 903          990.657 Operating Personnel      5        1              10      1.0hh    1.255            6.087 Health Physics Per. 13          0              19      3 971    0.000            6.580 Supervisory Personnel    0        1                0      0.000    0.h81            0.000 Engineering Personnel  13        1h              12      h.156    5.559            h.037 Inservice Inseection Maintenance Personnel    0        3              36      0.000    1.190          48.360 Operating Per.            0        0                0      0.000    0.000            0.000 Health Physics Per.      0        0                0      0.000    0.000            0.000 Supervisory Per.        0        0                2      0.000    0.000            1 380 Engineering Per.        0          2                2      0.000    0 370            1.012 Special Maintenance Maintenance Per.        0          2              72      0.000    0.hh5          79 138 0.000          0.000 Operating Per.            0          0                0      0.000 Health Physics Per.        0        0                0      0.000    0.000          0.000 Supervisory Per.          0        0                1      0.000    0.000          0.102 Eno.ineering Per.        0        0                2      0.000    0.000          0.652 Waste Processine Maintenance Per.          0          1              13      0.000    0 325            9.oh6 Operating Per.            9        0                1    3.638    0.000            0.260 Health Physics Per.      h        0                0      1 309    0.000            0.000 Supervisory Per.          0        0                0    0.000    0.000            0.000 Engineering Per.          0          0                1    0.000    0.000            0.110 Refueling Maintenance Per.          0          8              18      0.000    2.h52            3 319 Operating Per.            2          0                0      0.h71    0.000            0.000 Health Physics Per.        1        0                0      0.2h0    0.000            0.000 Supervisory Per.          0          1                0      0.000    0.5ho            0.000 Engineering Per.          0          0                0      0.000    0.000            0.000 TOTAL
                  ~~ Maintenance Per.          10      565            1076        5.687 392.002        1163.h61 Operating Per.          7h          6            h3    70 96h      2 731          12.178 63          1            58    59.55h      0.258          60 71h g  g Health Physics Per.                                            0.000    1.165            1.665 Supervisory Per.          0          3                3 Engineering Per.        5h        20                20    50.h66    8.237          18.h7h 3 RAND TOTAT.              201      595            1200    186.671 hoh.393        1256.h92
________ . . -                    .                                                                                  .a
 
i
      .                                          TABLE B                                  l l
PEACH BOTIDM ATOMIC POWER STATION WITS 2 & 3              !
RECORDED ANNUAL WHOLEBODY EXPOSURE FOR CALENDAR YEAR 1982 ANNUAL DOSE RANGES                                          NUMBER OF INDIVIDUALS (REM)                                                    IN EACH RANGE NO MEASURABLE EXPOSURE                                              1566 NEASURABLE EXPOSURE LESS THAN .100 731
        .100    .250                                                          277
        .250    .500                                                          492
        .500    .750                                                          30h
        .750 - 1.0                                            /              2h1 1.0 - 2.0                                            .,'            h74 2.0 - 3.0                                                            168 3.0 - 4.0                                                              35 4.0 - 5.0                                                              9 5.0 - 6.0                                                              2 6.0 - 7.0                                                              0 7.0 - 8.0                                                              0 8.0 -  .0                                                              0 9.0 - 10.0                                                              0 l    10.0 - 11.0                                                              0 l
11.0 - 12.0                                                              0
  -  12.0 +                                                                    0 TOTAL NWBER OF INDIVIDUALS REPORTED h300 l
l
* Individual exposures exactly equal to the value separating exposure ranges shall be reported in the higher range.}}

Latest revision as of 08:34, 27 August 2020

Annual Occupational Exposure Rept 7,1982
ML20069B343
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 02/28/1983
From: Fleischmann R
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
Shared Package
ML20069B329 List:
References
10CFR-020.407B, 10CFR-20.407B, NUDOCS 8303160567
Download: ML20069B343 (5)


Text

- _ _ _ _ _

PHILADELPHIA ELECTRIC COMPANY PEACH BOTTOM ATOMIC POWER STATION UNIT NOS. 2 AND 3 DOCKET NOS. 50-277 & 50-278 i

ANNUAL OCCUPATIONAL EXPOSURE TABULATION NO. 7 JANUARY 1, 1982 THROUGH DECEMBER 31, 1982 O

Submitted to The United States Nuclear Regulatory Commission Pursuant to Facility Operating License No. DPR-Id4 & 56 Preparation Directed by:

R. S. Fleischmann, II, Superintendent Peach Bottom Atomic Power Station I

O g!le8?fa!88)h f R

d

i.

O TABLE OF CONTENTS Page NA I. INTRODUCTION 1 II. TABLES ,

A. Standard Format for Reporting 2 Number of Personnel & Man-Rem for Work and Job Function B. Recorded Annual Wholebody 3 Exposure for Calendar Year 1982 O

O

O I. INTRODUCTION ANNUAL OCCUPATIONAL EXPOSURE TABULATION A tabulation of station, utility, and other personnel receiving exposures greater than 100 mrem / year, and their associated man-rem exposure according to work and job function is presented for Peach Bottom Atomic Power Station Units 2 and 3 in accordance with the Routine Reporting Requirements of Technical Specification 6.9 1.b. Annual wholebody exposures for the year are also presented in accordance with 10 CFR 20.h07(b). This data covers the period January 1, 1982 through December 31, 1982.

O O

TABLE A

- PEACH BOTIOM AIOMIC POWER STATION UNITS 2 & 3 POR CALENDAR YEAR 1982 l

} STANDARD PORMAT POR REPORTING NIMBER OF PERSONNEL AND MAN-REM POR WORK AND JOB FUNCTION NUMBER OF PERSONNEL D100 MREM) TOTAL MAN-REM CONTRACT WORYERS CONTRACT WORKERS .

WORK & JOB FUNCTION STATION ITTILITY AND OTHER STATION ITTILITY AND OTHERS Rsactor Operations &

Surveillance Maintenance Personnel 3 62 53 0.533 31 7h7 20.562 Operating Personnel 68 h 30 63 9h5 1.248 5.059 Health Physics Per. 62 1 49 52.618 0.258 52.277 Supervisory Personnel 0 0 1 0.000 0.000 0.183 Engineering Personnel 54 7 12 h5.h36 1 924 12 3hh Routine Maintenance Maintenance Personnel 7 52h 970 h.822 349 903 990.657 Operating Personnel 5 1 10 1.0hh 1.255 6.087 Health Physics Per. 13 0 19 3 971 0.000 6.580 Supervisory Personnel 0 1 0 0.000 0.h81 0.000 Engineering Personnel 13 1h 12 h.156 5.559 h.037 Inservice Inseection Maintenance Personnel 0 3 36 0.000 1.190 48.360 Operating Per. 0 0 0 0.000 0.000 0.000 Health Physics Per. 0 0 0 0.000 0.000 0.000 Supervisory Per. 0 0 2 0.000 0.000 1 380 Engineering Per. 0 2 2 0.000 0 370 1.012 Special Maintenance Maintenance Per. 0 2 72 0.000 0.hh5 79 138 0.000 0.000 Operating Per. 0 0 0 0.000 Health Physics Per. 0 0 0 0.000 0.000 0.000 Supervisory Per. 0 0 1 0.000 0.000 0.102 Eno.ineering Per. 0 0 2 0.000 0.000 0.652 Waste Processine Maintenance Per. 0 1 13 0.000 0 325 9.oh6 Operating Per. 9 0 1 3.638 0.000 0.260 Health Physics Per. h 0 0 1 309 0.000 0.000 Supervisory Per. 0 0 0 0.000 0.000 0.000 Engineering Per. 0 0 1 0.000 0.000 0.110 Refueling Maintenance Per. 0 8 18 0.000 2.h52 3 319 Operating Per. 2 0 0 0.h71 0.000 0.000 Health Physics Per. 1 0 0 0.2h0 0.000 0.000 Supervisory Per. 0 1 0 0.000 0.5ho 0.000 Engineering Per. 0 0 0 0.000 0.000 0.000 TOTAL

~~ Maintenance Per. 10 565 1076 5.687 392.002 1163.h61 Operating Per. 7h 6 h3 70 96h 2 731 12.178 63 1 58 59.55h 0.258 60 71h g g Health Physics Per. 0.000 1.165 1.665 Supervisory Per. 0 3 3 Engineering Per. 5h 20 20 50.h66 8.237 18.h7h 3 RAND TOTAT. 201 595 1200 186.671 hoh.393 1256.h92

________ . . - . .a

i

. TABLE B l l

PEACH BOTIDM ATOMIC POWER STATION WITS 2 & 3  !

RECORDED ANNUAL WHOLEBODY EXPOSURE FOR CALENDAR YEAR 1982 ANNUAL DOSE RANGES NUMBER OF INDIVIDUALS (REM) IN EACH RANGE NO MEASURABLE EXPOSURE 1566 NEASURABLE EXPOSURE LESS THAN .100 731

.100 .250 277

.250 .500 492

.500 .750 30h

.750 - 1.0 / 2h1 1.0 - 2.0 .,' h74 2.0 - 3.0 168 3.0 - 4.0 35 4.0 - 5.0 9 5.0 - 6.0 2 6.0 - 7.0 0 7.0 - 8.0 0 8.0 - .0 0 9.0 - 10.0 0 l 10.0 - 11.0 0 l

11.0 - 12.0 0

- 12.0 + 0 TOTAL NWBER OF INDIVIDUALS REPORTED h300 l

l

  • Individual exposures exactly equal to the value separating exposure ranges shall be reported in the higher range.