ML040080802: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:TABLE 3.3-3 (Continued)
TABLE NOTATIONS
***Function is actuated by either actuation train A or actuation train B.
Actuation train C is not used for this function.
  ****Automatic switchover to containment sump is accomplished for each train using the corresponding RWST level transmitter.
      # Trip function may be blocked Inthis MODE below the P-11 (Pressurizer Pressure Interlock) Setpoint.
      ## During CORE ALTERATIONS or movement of irradiated fuel within containment.
    ### Trip function automatically blocked above P-1I and may be blocked below P-11 when Low Compensated Steamline Pressure Protection is not blocked.
ACTION STATEMENTS ACTION 14-        With the number of OPERABLE channels one less than the Minimum Channels OPERABLE requirement, restore the inoperable channel to OPERABLE status within 24 hours, or be in at least HOT STANDBY within the next 6 hours and in COLD SHUTDOWN within the following 30 hours; however, one channel may be bypassed for up to 4 hours for surveillance testing per Specification 4.3.2.1, provided the other channel is OPERABLE.
ACTION 15-        (Not Used)
ACTION 16-        With the Charging Header Pressure channel inoperable:
a)    Place the Charging Header Pressure channel in the tripped condition within one hour and b)    Restore the Charging Header Pressure channel to operable status within 7 days or be in at least Hot Standby within the next 6 hours and in Cold Shutdown within the following 30 hours.
ACTION 17-      With the number of OPERABLE channels one less than the Total Number of Channels, place the inoperable channel in the bypassed condition within 72 hours, or be in at least HOT STANDBY within the next 6 hours and in at least HOT SHUTDOWN within the following 6 hours. One additional channel may be bypassed for up to 12 hours for surveillance testing per Specification 4.3.2.1.
ACTION 18-      a)    With less than the Minimum Channels OPERABLE requirement for Automatic Actuation Logic or Actuation Relays, operation may continue provided the containment purge supply and exhaust valves are maintained closed.
b)    MODE,2,3,4,or5 :
: 1. With one less than the Minimum Channels OPERABLE requirement for RCB Purge Radioactivity-High, within 30 days restore the inoperable channel or maintain the containment purge supply and exhaust valves closed.
NOTE:
MODE 1, 2, 3, or 4: Supplementary containment purge supply and isolation valves may be open during the allowed outage time for up to 2 hours at a time for required purge operation provided the valves are under administrative control.
MODE 5#: Supplementary or Normal containment purge supply and isolation valves may be open during the allowed outage time for up to 6 hours at a time for required purge operation provided the valves are under administrative control.
SOUTH TEXAS - UNITS 1 & 2                                  3/4 3-26          Unit 1 - Amendment No-              , 160 Unit 2 - Amendment No.            X 160
 
TABLE 3.3-3 (Continued)
ACTION STATEMENTS (Continued)
: 2. With two less than the Minimum Channels OPERABLE requirement for RCB Purge Radioactivity-High, operation may continue provided the containment purge supply and exhaust valves are maintained closed.
c)    MODE 6": With less than the Minimum Channels OPERABLE requirement for RCB Purge Radioactivity - High, apply the requirements of Technical Specification 3.9.9 for an inoperable Containment Ventilation Isolation System.
NOTE:
With one less than the Minimum Channels Operable requirement for RCB Purge Radioactivity-High, Supplementary or Normal containment purge supply and isolation valves may be open for up to 6 hours at a time for required purge operation provided the valves are under administrative control.
ACTION 19-  With the number of OPERABLE channels one less than the Minimum Channels OPERABLE requirement, restore the Inoperable channel to OPERABLE status within 48 hours or be In at least HOT STANDBY within the next 6 hours and In COLD SHUTDOWN within the following 30 hours.
ACTION 20 - With the number of OPERABLE channels one less than the Total Number of Channels, STARTUP andlor POWER OPERATION may proceed provided the following conditions are satisfied:
: a.      For Functional Units with installed bypass test capability, the Inoperable channel may be placed in bypass, and must be placed in the tripped condition within 72 hours.
Note: A channel may be bypassed for up to 12 hours for surveillance testing per Specification 4.3.2.1, provided no more than one channel Is in bypass at any time.
: b.      For Functional Units with no installed bypass test capability,
: 1. The inoperable channel is placed in the tripped condition within 72 hours, and
: 2. The Minimum Channels OPERABLE requirement is met; however, the inoperable channel may be bypassed for up to 12 hours for surveillance testing of other channels per Specification 4.3.2.1.
ACTION 21 - With less than the Minimum Number of Channels OPERABLE, within 1 hour determine by observation of the associated permissive annunciator window(s) that the interlock is in its required state for the existing plant condition, or apply Specification 3.0.3.
ACTION 22-  With the number of OPERABLE channels one less than the Minimum Channels OPERABLE requirement, restore the Inoperable channel to OPERABLE status within 24 hours, or be in at least HOT STANDBY within the next 6 hours and in at least HOT SHUTDOWN within the following 6 hours; however, one channel may be bypassed for up to 4 hours for surveillance testing per Specification 4.3.2.1 provided the other channel is OPERABLE.
ACTION 23 - With the number of OPERABLE channels one less than the Total Number of Channels, restore the inoperable channel to OPERABLE status within 48 hours or be in at least HOT STANDBY within 6 hours and Inat least HOT SHUTDOWN within the following 6 hours.
SOUTH TEXAS - UNITS I & 2                                3/4 3-27          Unit 1 - Amendment No.            ,160 Unit 2 - Amendment No.              150
 
REFUELING OPERATIONS 3/4.9.9 CONTAINMENT VENTILATION ISOLATION SYSTEM LIMITING CONDITION FOR OPERATION 3.9.9      The Containment Ventilation Isolation System shall be OPERABLE.
APPLICABILITY:      During CORE ALTERATIONS or movement of irradiated fuel within the containment.
ACTION:
: a. With the Containment Ventilation Isolation System inoperable, close each of the purge and exhaust penetrations providing direct access from the containment atmosphere to the outside atmosphere.
NOTE:
In accordance with ACTION 18.b and ACTION 18.c of Table 3.3-3, Supplementary or Normal containment purge supply and solation valves may be open for up to 6 hours at a time for required purge operation provided the valves are under administrative control.
: b. The provisions of Specification 3.0.3 are not applicable.
SURVEILLANCE REQUIREMENTS 4.9.9      The Containment Ventilation Isolation System shall be demonstrated OPERABLE within 100 hours prior to the start of and at least once per 7 days during CORE ALTERATIONS by verifying that containment ventilation isolation occurs on manual initiation and on a High Radiation test signal from each of the RCB purge radiation monitoring instrumentation channels.
SOUTH TEXAS - UNITS 1 & 2                          3/4 9-10        Unit 1 - Amendment No. 160 Unit 2 - Amendment No. 150}}

Latest revision as of 04:10, 25 March 2020

Tech Spec Pages for License Amendment Nos. 160 and 150 on Radiation Monitoring Requirements Related to Containment Purge
ML040080802
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 01/05/2004
From:
NRC/NRR/DLPM
To:
References
TAC MB9102, TAC MB9103
Download: ML040080802 (3)


Text

TABLE 3.3-3 (Continued)

TABLE NOTATIONS

      • Function is actuated by either actuation train A or actuation train B.

Actuation train C is not used for this function.

        • Automatic switchover to containment sump is accomplished for each train using the corresponding RWST level transmitter.
  1. Trip function may be blocked Inthis MODE below the P-11 (Pressurizer Pressure Interlock) Setpoint.
    1. During CORE ALTERATIONS or movement of irradiated fuel within containment.
      1. Trip function automatically blocked above P-1I and may be blocked below P-11 when Low Compensated Steamline Pressure Protection is not blocked.

ACTION STATEMENTS ACTION 14- With the number of OPERABLE channels one less than the Minimum Channels OPERABLE requirement, restore the inoperable channel to OPERABLE status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />; however, one channel may be bypassed for up to 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> for surveillance testing per Specification 4.3.2.1, provided the other channel is OPERABLE.

ACTION 15- (Not Used)

ACTION 16- With the Charging Header Pressure channel inoperable:

a) Place the Charging Header Pressure channel in the tripped condition within one hour and b) Restore the Charging Header Pressure channel to operable status within 7 days or be in at least Hot Standby within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in Cold Shutdown within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

ACTION 17- With the number of OPERABLE channels one less than the Total Number of Channels, place the inoperable channel in the bypassed condition within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in at least HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />. One additional channel may be bypassed for up to 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> for surveillance testing per Specification 4.3.2.1.

ACTION 18- a) With less than the Minimum Channels OPERABLE requirement for Automatic Actuation Logic or Actuation Relays, operation may continue provided the containment purge supply and exhaust valves are maintained closed.

b) MODE,2,3,4,or5 :

1. With one less than the Minimum Channels OPERABLE requirement for RCB Purge Radioactivity-High, within 30 days restore the inoperable channel or maintain the containment purge supply and exhaust valves closed.

NOTE:

MODE 1, 2, 3, or 4: Supplementary containment purge supply and isolation valves may be open during the allowed outage time for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> at a time for required purge operation provided the valves are under administrative control.

MODE 5#: Supplementary or Normal containment purge supply and isolation valves may be open during the allowed outage time for up to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> at a time for required purge operation provided the valves are under administrative control.

SOUTH TEXAS - UNITS 1 & 2 3/4 3-26 Unit 1 - Amendment No- , 160 Unit 2 - Amendment No. X 160

TABLE 3.3-3 (Continued)

ACTION STATEMENTS (Continued)

2. With two less than the Minimum Channels OPERABLE requirement for RCB Purge Radioactivity-High, operation may continue provided the containment purge supply and exhaust valves are maintained closed.

c) MODE 6": With less than the Minimum Channels OPERABLE requirement for RCB Purge Radioactivity - High, apply the requirements of Technical Specification 3.9.9 for an inoperable Containment Ventilation Isolation System.

NOTE:

With one less than the Minimum Channels Operable requirement for RCB Purge Radioactivity-High, Supplementary or Normal containment purge supply and isolation valves may be open for up to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> at a time for required purge operation provided the valves are under administrative control.

ACTION 19- With the number of OPERABLE channels one less than the Minimum Channels OPERABLE requirement, restore the Inoperable channel to OPERABLE status within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or be In at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and In COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

ACTION 20 - With the number of OPERABLE channels one less than the Total Number of Channels, STARTUP andlor POWER OPERATION may proceed provided the following conditions are satisfied:

a. For Functional Units with installed bypass test capability, the Inoperable channel may be placed in bypass, and must be placed in the tripped condition within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.

Note: A channel may be bypassed for up to 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> for surveillance testing per Specification 4.3.2.1, provided no more than one channel Is in bypass at any time.

b. For Functional Units with no installed bypass test capability,
1. The inoperable channel is placed in the tripped condition within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, and
2. The Minimum Channels OPERABLE requirement is met; however, the inoperable channel may be bypassed for up to 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> for surveillance testing of other channels per Specification 4.3.2.1.

ACTION 21 - With less than the Minimum Number of Channels OPERABLE, within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> determine by observation of the associated permissive annunciator window(s) that the interlock is in its required state for the existing plant condition, or apply Specification 3.0.3.

ACTION 22- With the number of OPERABLE channels one less than the Minimum Channels OPERABLE requirement, restore the Inoperable channel to OPERABLE status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in at least HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />; however, one channel may be bypassed for up to 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> for surveillance testing per Specification 4.3.2.1 provided the other channel is OPERABLE.

ACTION 23 - With the number of OPERABLE channels one less than the Total Number of Channels, restore the inoperable channel to OPERABLE status within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or be in at least HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and Inat least HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

SOUTH TEXAS - UNITS I & 2 3/4 3-27 Unit 1 - Amendment No. ,160 Unit 2 - Amendment No. 150

REFUELING OPERATIONS 3/4.9.9 CONTAINMENT VENTILATION ISOLATION SYSTEM LIMITING CONDITION FOR OPERATION 3.9.9 The Containment Ventilation Isolation System shall be OPERABLE.

APPLICABILITY: During CORE ALTERATIONS or movement of irradiated fuel within the containment.

ACTION:

a. With the Containment Ventilation Isolation System inoperable, close each of the purge and exhaust penetrations providing direct access from the containment atmosphere to the outside atmosphere.

NOTE:

In accordance with ACTION 18.b and ACTION 18.c of Table 3.3-3, Supplementary or Normal containment purge supply and solation valves may be open for up to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> at a time for required purge operation provided the valves are under administrative control.

b. The provisions of Specification 3.0.3 are not applicable.

SURVEILLANCE REQUIREMENTS 4.9.9 The Containment Ventilation Isolation System shall be demonstrated OPERABLE within 100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br /> prior to the start of and at least once per 7 days during CORE ALTERATIONS by verifying that containment ventilation isolation occurs on manual initiation and on a High Radiation test signal from each of the RCB purge radiation monitoring instrumentation channels.

SOUTH TEXAS - UNITS 1 & 2 3/4 9-10 Unit 1 - Amendment No. 160 Unit 2 - Amendment No. 150