Letter Sequence Other |
---|
|
|
MONTHYEARML0400808022004-01-0505 January 2004 Tech Spec Pages for License Amendment Nos. 160 and 150 on Radiation Monitoring Requirements Related to Containment Purge Project stage: Other ML0400704352004-01-0505 January 2004 Issuance of License Amendment Nos. 160 and 150 on Radiation Monitoring Requirements Related to Containment Purge Project stage: Approval 2004-01-05
[Table View] |
|
---|
Category:Technical Specifications
MONTHYEARML21320A0022021-12-0808 December 2021 Issuance of Amendment Nos. 223 and 208 to Revise Technical Specification 3.6.3 and to Remove the Technical Specifications Index ML21106A2862021-05-0606 May 2021 Correction to Amendment Nos. 188 and 175 Regarding Relocation of Surveillance Test Intervals to Licensee-Controlled Program (Risk-Informed Initiative 5b) ML19067A2222019-06-0606 June 2019 Issuance of Amendment Nos. 215 and 201 Adoption of TSTF-522 Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month ML18159A2122018-07-19019 July 2018 Issuance of Amendment Nos. 214 and 200 Emergency Response Organization Time Augmentation and Staffing Chances to the Emergency Plan (CAC Nos. MG0024 and MG0025; EPID L-2017-LLA-0265) ML17191B1372017-09-28028 September 2017 South Texas Project, Unit 1, Renewed Facility Operating License NPF-76 ML17192A0182017-09-28028 September 2017 South Texas Project, Unit 2, Renewed Facility Operating License and Appendices NPF-80 ML17038A2232017-07-11011 July 2017 Issuance of Amendment Nos. 212 and 198 - Risk-Informed Approach to Resolve Generic Safety Issue 191 ML16116A0072016-04-29029 April 2016 Issuance of Amendment Nos. 210 and 197, Revise Technical Specification 6.8.3.j, Containment Leakage Rate Testing Program, to Extend Integrated Leak Rate Test Interval from 10 to 15 Years ML15342A0032015-12-28028 December 2015 Issuance of Amendment Nos. 209 and 196, Adopt Technical Specification Task Force (TSTF)-510-A, Revision 2, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection (CAC MF6178-MF6179) ML15343A1282015-12-11011 December 2015 Issuance of Amendment No. 208, Revise Technical Specification 5.3.2 to Allow Operation with 56 Full-Length Control Rod Assemblies for Unit 1 Cycle 20 (Emergency Circumstances) NOC-AE-15003315, Emergency License Amendment Request to Revise Technical Specification 5.3.2 to Allow Operation with 56 Full-Length Control Rod Assemblies for Cycle 202015-12-0303 December 2015 Emergency License Amendment Request to Revise Technical Specification 5.3.2 to Allow Operation with 56 Full-Length Control Rod Assemblies for Cycle 20 ML15209A6412015-09-22022 September 2015 Issuance of Amendment Nos. 207 and 195, Revise Updated Final Safety Analysis Report Table 15.6-17 to Correct Radiological Doses Resulting from Calculation Error Performed in Support of Amendments 182 and 169 ML15201A1952015-08-20020 August 2015 Issuance of Amendment Nos. 206 and 194, Revise the Emergency Action Level Scheme to the NRC-endorsed Scheme Contained in NEI-99, Revision 6 ML15075A1462015-04-29029 April 2015 Issuance of Amendment Nos. 205 and 193, Request to Revise Technical Specification 3.3.1, Functional Unit 20, Reactor Trip Breakers, for Required Actions and Allowed Outage Times ML15049A1292015-02-27027 February 2015 Issuance of Amendment Nos. 204 and 192, Revise Technical Specification 6.9.1.6, Core Operating Limits Report, with Respect to Analytical Methods Used to Determine Core Operating Limits ML14339A1702015-02-13013 February 2015 Issuance of Amendment Nos. 203 and 191, Revise Fire Hazards Analysis Report and Fire Protection Program License Conditions Related to Alternate Shutdown Capability ML14281A0652015-01-29029 January 2015 Issuance of Amendment Nos. 202 and 190, Revise Operating License Conditions Related to Cyber Security Plan Milestone 8 Full Implementation Date ML14260A4372014-08-14014 August 2014 Project Units 1 & 2, License Amendment Request - Proposed Administrative Controls Technical Specification 6.9.1.6, Core Operating Limits Report NOC-AE-14003143, Supplement to License Amendment Request Proposed Revision to Technical Specification 3.3.1, Functional Unit 20, Reactor Trip Breakers2014-06-0909 June 2014 Supplement to License Amendment Request Proposed Revision to Technical Specification 3.3.1, Functional Unit 20, Reactor Trip Breakers ML14106A3642014-04-22022 April 2014 Correction to Technical Specification Page 3/4 8-4, Amendment Nos. 188 and 175, Regarding Relocation of Surveillance Test Intervals to Licensee-Controlled Surveillance Frequency Control Program (TAC Nos. MF3732-33) NOC-AE-13003031, License Amendment Request, Proposed Revision to Technical Specification 3.3. 1, Functional Unit 20, Reactor Trip Breakers.2014-01-0606 January 2014 License Amendment Request, Proposed Revision to Technical Specification 3.3. 1, Functional Unit 20, Reactor Trip Breakers. ML13175A2112013-06-19019 June 2013 Project, Units 1 and 2, Revised STP Pilot Submittal and Requests for Exemptions and License Amendment for a Risk-Informed Approach to Resolving Generic Safety Issue (GSI)-191 NOC-AE-13002992, Supplement to License Amendment Request for Proposed Revision to Technical Specification 3.3.3.6, Accident Monitoring Instrumentation.2013-04-15015 April 2013 Supplement to License Amendment Request for Proposed Revision to Technical Specification 3.3.3.6, Accident Monitoring Instrumentation. ML12241A1932012-08-30030 August 2012 Correction Letter to Revised Technical Specification 3.7.7, Technical Specification Page 3/4 7-16 NOC-AE-12002877, Proposed Revision to Technical Specification 3.3.3.6, Accident Monitoring Instrumentation.2012-08-0101 August 2012 Proposed Revision to Technical Specification 3.3.3.6, Accident Monitoring Instrumentation. NOC-AE-11002677, Technical Specification Bases Control Program2011-06-16016 June 2011 Technical Specification Bases Control Program NOC-AE-10002605, License Amendment Request to Revise the Application of Risk-Managed Technical Specifications to Technical Specification 3.7.7, Control Room Makeup and Cleanup Filtration System.2010-11-22022 November 2010 License Amendment Request to Revise the Application of Risk-Managed Technical Specifications to Technical Specification 3.7.7, Control Room Makeup and Cleanup Filtration System. NOC-AE-10002541, Proposed Amendment to Technical Specification 6.8.3.I for Containment Post-Tensioning System Surveillance Program2010-05-18018 May 2010 Proposed Amendment to Technical Specification 6.8.3.I for Containment Post-Tensioning System Surveillance Program NOC-AE-09002389, License Amendment Request for Adoption of TSTF-511, Rev. 0, Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 26, Using the Consolidated Line Item Improvement Process2009-03-0303 March 2009 License Amendment Request for Adoption of TSTF-511, Rev. 0, Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 26, Using the Consolidated Line Item Improvement Process NOC-AE-09002390, Correction of Technical Specification Pages Previously Approved by Amendment2009-02-0404 February 2009 Correction of Technical Specification Pages Previously Approved by Amendment ML0822804722008-09-16016 September 2008 Technical Specifications, Issuance of Amendment Nos. 186 and 173, Deviation from Fire Protection Program Requirements ML0820504272008-07-29029 July 2008 License and Technical Specification Pages, Amendment Nos. 185 and 172, New License Condition/Revised TS Requirements Control Room Envelope Habitability in Accordance with TSTF-448, Rev. 3 ML0818902362008-07-0808 July 2008 Corrected Errata Sheet and TS Pages for Amendment No. 184 and 171 Issued June 30, 2008, Revise Technical Specification 3/4.8.2 to Modify Battery Surveillance Requirements ML0813303552008-06-30030 June 2008 License and Technical Specification Pages, Issuance of Amendment No. 184 and 171, Revise Technical Specification 3/4.8.2 to Modify Battery Surveillance Requirements NOC-AE-08002301, Withdrawal of Proposed Exception to Technical Specification 6.8.3.p.3, Control Room Envelope Habitability Program2008-05-27027 May 2008 Withdrawal of Proposed Exception to Technical Specification 6.8.3.p.3, Control Room Envelope Habitability Program ML0803603282008-03-25025 March 2008 Technical Specifications, Revise TS Surveillance Requirements for Emergency Core Cooling System Sumps ML0803604212008-03-0606 March 2008 Tech Spec Pages for Amendment Nos. 182 and 169, Adoption of Alternate Radiological Source Term in Assessment of Design-Basis Accident Dose Consequences ML0715901792007-07-20020 July 2007 Technical Specification Pages for Amendment Nos. 180 and 167 Technical Specification 3/4.8.2 for Batteries and DC Systems NOC-AE-07002183, Updated Pages to Incorporate Battery-Related Technical Specification Changes2007-07-17017 July 2007 Updated Pages to Incorporate Battery-Related Technical Specification Changes ML0720103122007-07-17017 July 2007 Project, Units 1 and 2 - Attachment to 7/18/07 E-Mail to M. Thadani, Nrr/Dorl/Lpliv, from P. Walker, STPNOC - Letter and Updated Technical Specification Pages - Battery Monitoring License Amendment Request (TAC MD0333, MD0334) ML0717801912007-07-13013 July 2007 Technical Specifications, Issuance of Amendment Nos. 179 and 166 Broad-Scope Risk-Informed Technical Specifications Amendments ML0714302512007-06-13013 June 2007 Tech Spec Pages for Amendment Nos. 177 and 164 Regarding TS 3.3.3.6, Accident Monitoring Instrumentation, NOC-AE-07002113, Proposed Change to Technical Specification 3.7.1.2, Auxiliary Feedwater System.2007-05-22022 May 2007 Proposed Change to Technical Specification 3.7.1.2, Auxiliary Feedwater System. NOC-AE-07002141, Resolution of Issues Regarding Proposed Amendment to Technical Specification 3/4.8.2 to Modify Requirements Related to Batteries and DC Systems2007-04-0606 April 2007 Resolution of Issues Regarding Proposed Amendment to Technical Specification 3/4.8.2 to Modify Requirements Related to Batteries and DC Systems NOC-AE-07002127, Request for License Amendment Related to Application of the Alternate Source Term2007-03-22022 March 2007 Request for License Amendment Related to Application of the Alternate Source Term ML0706503142007-02-28028 February 2007 South Texas Project, Units 1 and 2, Proposed Change to Technical Specification 3.7.1.2, Auxiliary Feedwater System. NOC-AE-06002036, Revised Broad Scope Risk-Informed Technical Specification Amendment Request2006-12-28028 December 2006 Revised Broad Scope Risk-Informed Technical Specification Amendment Request NOC-AE-06002095, Request for Enforcement Discretion for Technical Specifications 3.3.3.6 and 3.7.1.22006-12-18018 December 2006 Request for Enforcement Discretion for Technical Specifications 3.3.3.6 and 3.7.1.2 NOC-AE-06002060, Revision to Proposed Change to Technical Specification 3.3.3.6, Accident Monitoring Instrumentation.2006-10-0202 October 2006 Revision to Proposed Change to Technical Specification 3.3.3.6, Accident Monitoring Instrumentation. NOC-AE-06002040, Technical Specifications, Bases Control Program2006-07-20020 July 2006 Technical Specifications, Bases Control Program 2021-05-06
[Table view] |
Text
TABLE 3.3-3 (Continued)
TABLE NOTATIONS
- Function is actuated by either actuation train A or actuation train B.
Actuation train C is not used for this function.
- Automatic switchover to containment sump is accomplished for each train using the corresponding RWST level transmitter.
- Trip function may be blocked Inthis MODE below the P-11 (Pressurizer Pressure Interlock) Setpoint.
- During CORE ALTERATIONS or movement of irradiated fuel within containment.
- Trip function automatically blocked above P-1I and may be blocked below P-11 when Low Compensated Steamline Pressure Protection is not blocked.
ACTION STATEMENTS ACTION 14- With the number of OPERABLE channels one less than the Minimum Channels OPERABLE requirement, restore the inoperable channel to OPERABLE status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />; however, one channel may be bypassed for up to 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> for surveillance testing per Specification 4.3.2.1, provided the other channel is OPERABLE.
ACTION 15- (Not Used)
ACTION 16- With the Charging Header Pressure channel inoperable:
a) Place the Charging Header Pressure channel in the tripped condition within one hour and b) Restore the Charging Header Pressure channel to operable status within 7 days or be in at least Hot Standby within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in Cold Shutdown within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
ACTION 17- With the number of OPERABLE channels one less than the Total Number of Channels, place the inoperable channel in the bypassed condition within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in at least HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />. One additional channel may be bypassed for up to 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> for surveillance testing per Specification 4.3.2.1.
ACTION 18- a) With less than the Minimum Channels OPERABLE requirement for Automatic Actuation Logic or Actuation Relays, operation may continue provided the containment purge supply and exhaust valves are maintained closed.
b) MODE,2,3,4,or5 :
- 1. With one less than the Minimum Channels OPERABLE requirement for RCB Purge Radioactivity-High, within 30 days restore the inoperable channel or maintain the containment purge supply and exhaust valves closed.
NOTE:
MODE 1, 2, 3, or 4: Supplementary containment purge supply and isolation valves may be open during the allowed outage time for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> at a time for required purge operation provided the valves are under administrative control.
MODE 5#: Supplementary or Normal containment purge supply and isolation valves may be open during the allowed outage time for up to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> at a time for required purge operation provided the valves are under administrative control.
SOUTH TEXAS - UNITS 1 & 2 3/4 3-26 Unit 1 - Amendment No- , 160 Unit 2 - Amendment No. X 160
TABLE 3.3-3 (Continued)
ACTION STATEMENTS (Continued)
- 2. With two less than the Minimum Channels OPERABLE requirement for RCB Purge Radioactivity-High, operation may continue provided the containment purge supply and exhaust valves are maintained closed.
c) MODE 6": With less than the Minimum Channels OPERABLE requirement for RCB Purge Radioactivity - High, apply the requirements of Technical Specification 3.9.9 for an inoperable Containment Ventilation Isolation System.
NOTE:
With one less than the Minimum Channels Operable requirement for RCB Purge Radioactivity-High, Supplementary or Normal containment purge supply and isolation valves may be open for up to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> at a time for required purge operation provided the valves are under administrative control.
ACTION 19- With the number of OPERABLE channels one less than the Minimum Channels OPERABLE requirement, restore the Inoperable channel to OPERABLE status within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or be In at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and In COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
ACTION 20 - With the number of OPERABLE channels one less than the Total Number of Channels, STARTUP andlor POWER OPERATION may proceed provided the following conditions are satisfied:
- a. For Functional Units with installed bypass test capability, the Inoperable channel may be placed in bypass, and must be placed in the tripped condition within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.
Note: A channel may be bypassed for up to 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> for surveillance testing per Specification 4.3.2.1, provided no more than one channel Is in bypass at any time.
- b. For Functional Units with no installed bypass test capability,
- 1. The inoperable channel is placed in the tripped condition within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, and
- 2. The Minimum Channels OPERABLE requirement is met; however, the inoperable channel may be bypassed for up to 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> for surveillance testing of other channels per Specification 4.3.2.1.
ACTION 21 - With less than the Minimum Number of Channels OPERABLE, within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> determine by observation of the associated permissive annunciator window(s) that the interlock is in its required state for the existing plant condition, or apply Specification 3.0.3.
ACTION 22- With the number of OPERABLE channels one less than the Minimum Channels OPERABLE requirement, restore the Inoperable channel to OPERABLE status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in at least HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />; however, one channel may be bypassed for up to 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> for surveillance testing per Specification 4.3.2.1 provided the other channel is OPERABLE.
ACTION 23 - With the number of OPERABLE channels one less than the Total Number of Channels, restore the inoperable channel to OPERABLE status within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or be in at least HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and Inat least HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
SOUTH TEXAS - UNITS I & 2 3/4 3-27 Unit 1 - Amendment No. ,160 Unit 2 - Amendment No. 150
REFUELING OPERATIONS 3/4.9.9 CONTAINMENT VENTILATION ISOLATION SYSTEM LIMITING CONDITION FOR OPERATION 3.9.9 The Containment Ventilation Isolation System shall be OPERABLE.
APPLICABILITY: During CORE ALTERATIONS or movement of irradiated fuel within the containment.
ACTION:
- a. With the Containment Ventilation Isolation System inoperable, close each of the purge and exhaust penetrations providing direct access from the containment atmosphere to the outside atmosphere.
NOTE:
In accordance with ACTION 18.b and ACTION 18.c of Table 3.3-3, Supplementary or Normal containment purge supply and solation valves may be open for up to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> at a time for required purge operation provided the valves are under administrative control.
- b. The provisions of Specification 3.0.3 are not applicable.
SURVEILLANCE REQUIREMENTS 4.9.9 The Containment Ventilation Isolation System shall be demonstrated OPERABLE within 100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br /> prior to the start of and at least once per 7 days during CORE ALTERATIONS by verifying that containment ventilation isolation occurs on manual initiation and on a High Radiation test signal from each of the RCB purge radiation monitoring instrumentation channels.
SOUTH TEXAS - UNITS 1 & 2 3/4 9-10 Unit 1 - Amendment No. 160 Unit 2 - Amendment No. 150