Letter Sequence Approval |
---|
|
|
MONTHYEARML0824704002008-01-29029 January 2008 E-mail from M. Thadani, NRR/DORL/LPL4, to S. Head, STP Nuclear Operating Company, Request for Additional Information Re Fire Protection Program Requirements License Amendment Request Project stage: RAI NOC-AE-08002274, Response to Request for Additional Information on Proposed Amendment for Deviation from Fire Protection Program Requirements2008-03-27027 March 2008 Response to Request for Additional Information on Proposed Amendment for Deviation from Fire Protection Program Requirements Project stage: Response to RAI NOC-AE-08002345, Units 1 & 2 - Supplement 1 to License Amendment Request for Deviation from Fire Protection Program Requirements2008-09-0505 September 2008 Units 1 & 2 - Supplement 1 to License Amendment Request for Deviation from Fire Protection Program Requirements Project stage: Supplement ML0822804652008-09-16016 September 2008 License Amendments, Issuance of Amendment Nos. 186 and 173, Deviation from Fire Protection Program Requirements Project stage: Approval ML0822804722008-09-16016 September 2008 Technical Specifications, Issuance of Amendment Nos. 186 and 173, Deviation from Fire Protection Program Requirements Project stage: Approval 2008-03-27
[Table View] |
|
---|
Category:Technical Specifications
MONTHYEARML21320A0022021-12-0808 December 2021 Issuance of Amendment Nos. 223 and 208 to Revise Technical Specification 3.6.3 and to Remove the Technical Specifications Index ML21106A2862021-05-0606 May 2021 Correction to Amendment Nos. 188 and 175 Regarding Relocation of Surveillance Test Intervals to Licensee-Controlled Program (Risk-Informed Initiative 5b) ML19067A2222019-06-0606 June 2019 Issuance of Amendment Nos. 215 and 201 Adoption of TSTF-522 Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month ML18159A2122018-07-19019 July 2018 Issuance of Amendment Nos. 214 and 200 Emergency Response Organization Time Augmentation and Staffing Chances to the Emergency Plan (CAC Nos. MG0024 and MG0025; EPID L-2017-LLA-0265) ML17191B1372017-09-28028 September 2017 South Texas Project, Unit 1, Renewed Facility Operating License NPF-76 ML17192A0182017-09-28028 September 2017 South Texas Project, Unit 2, Renewed Facility Operating License and Appendices NPF-80 ML17038A2232017-07-11011 July 2017 Issuance of Amendment Nos. 212 and 198 - Risk-Informed Approach to Resolve Generic Safety Issue 191 ML16116A0072016-04-29029 April 2016 Issuance of Amendment Nos. 210 and 197, Revise Technical Specification 6.8.3.j, Containment Leakage Rate Testing Program, to Extend Integrated Leak Rate Test Interval from 10 to 15 Years ML15342A0032015-12-28028 December 2015 Issuance of Amendment Nos. 209 and 196, Adopt Technical Specification Task Force (TSTF)-510-A, Revision 2, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection (CAC MF6178-MF6179) ML15343A1282015-12-11011 December 2015 Issuance of Amendment No. 208, Revise Technical Specification 5.3.2 to Allow Operation with 56 Full-Length Control Rod Assemblies for Unit 1 Cycle 20 (Emergency Circumstances) NOC-AE-15003315, Emergency License Amendment Request to Revise Technical Specification 5.3.2 to Allow Operation with 56 Full-Length Control Rod Assemblies for Cycle 202015-12-0303 December 2015 Emergency License Amendment Request to Revise Technical Specification 5.3.2 to Allow Operation with 56 Full-Length Control Rod Assemblies for Cycle 20 ML15209A6412015-09-22022 September 2015 Issuance of Amendment Nos. 207 and 195, Revise Updated Final Safety Analysis Report Table 15.6-17 to Correct Radiological Doses Resulting from Calculation Error Performed in Support of Amendments 182 and 169 ML15201A1952015-08-20020 August 2015 Issuance of Amendment Nos. 206 and 194, Revise the Emergency Action Level Scheme to the NRC-endorsed Scheme Contained in NEI-99, Revision 6 ML15075A1462015-04-29029 April 2015 Issuance of Amendment Nos. 205 and 193, Request to Revise Technical Specification 3.3.1, Functional Unit 20, Reactor Trip Breakers, for Required Actions and Allowed Outage Times ML15049A1292015-02-27027 February 2015 Issuance of Amendment Nos. 204 and 192, Revise Technical Specification 6.9.1.6, Core Operating Limits Report, with Respect to Analytical Methods Used to Determine Core Operating Limits ML14339A1702015-02-13013 February 2015 Issuance of Amendment Nos. 203 and 191, Revise Fire Hazards Analysis Report and Fire Protection Program License Conditions Related to Alternate Shutdown Capability ML14281A0652015-01-29029 January 2015 Issuance of Amendment Nos. 202 and 190, Revise Operating License Conditions Related to Cyber Security Plan Milestone 8 Full Implementation Date ML14260A4372014-08-14014 August 2014 Project Units 1 & 2, License Amendment Request - Proposed Administrative Controls Technical Specification 6.9.1.6, Core Operating Limits Report NOC-AE-14003143, Supplement to License Amendment Request Proposed Revision to Technical Specification 3.3.1, Functional Unit 20, Reactor Trip Breakers2014-06-0909 June 2014 Supplement to License Amendment Request Proposed Revision to Technical Specification 3.3.1, Functional Unit 20, Reactor Trip Breakers ML14106A3642014-04-22022 April 2014 Correction to Technical Specification Page 3/4 8-4, Amendment Nos. 188 and 175, Regarding Relocation of Surveillance Test Intervals to Licensee-Controlled Surveillance Frequency Control Program (TAC Nos. MF3732-33) NOC-AE-13003031, License Amendment Request, Proposed Revision to Technical Specification 3.3. 1, Functional Unit 20, Reactor Trip Breakers.2014-01-0606 January 2014 License Amendment Request, Proposed Revision to Technical Specification 3.3. 1, Functional Unit 20, Reactor Trip Breakers. ML13175A2112013-06-19019 June 2013 Project, Units 1 and 2, Revised STP Pilot Submittal and Requests for Exemptions and License Amendment for a Risk-Informed Approach to Resolving Generic Safety Issue (GSI)-191 NOC-AE-13002992, Supplement to License Amendment Request for Proposed Revision to Technical Specification 3.3.3.6, Accident Monitoring Instrumentation.2013-04-15015 April 2013 Supplement to License Amendment Request for Proposed Revision to Technical Specification 3.3.3.6, Accident Monitoring Instrumentation. ML12241A1932012-08-30030 August 2012 Correction Letter to Revised Technical Specification 3.7.7, Technical Specification Page 3/4 7-16 NOC-AE-12002877, Proposed Revision to Technical Specification 3.3.3.6, Accident Monitoring Instrumentation.2012-08-0101 August 2012 Proposed Revision to Technical Specification 3.3.3.6, Accident Monitoring Instrumentation. NOC-AE-11002677, Technical Specification Bases Control Program2011-06-16016 June 2011 Technical Specification Bases Control Program NOC-AE-10002605, License Amendment Request to Revise the Application of Risk-Managed Technical Specifications to Technical Specification 3.7.7, Control Room Makeup and Cleanup Filtration System.2010-11-22022 November 2010 License Amendment Request to Revise the Application of Risk-Managed Technical Specifications to Technical Specification 3.7.7, Control Room Makeup and Cleanup Filtration System. NOC-AE-10002541, Proposed Amendment to Technical Specification 6.8.3.I for Containment Post-Tensioning System Surveillance Program2010-05-18018 May 2010 Proposed Amendment to Technical Specification 6.8.3.I for Containment Post-Tensioning System Surveillance Program NOC-AE-09002389, License Amendment Request for Adoption of TSTF-511, Rev. 0, Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 26, Using the Consolidated Line Item Improvement Process2009-03-0303 March 2009 License Amendment Request for Adoption of TSTF-511, Rev. 0, Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 26, Using the Consolidated Line Item Improvement Process NOC-AE-09002390, Correction of Technical Specification Pages Previously Approved by Amendment2009-02-0404 February 2009 Correction of Technical Specification Pages Previously Approved by Amendment ML0822804722008-09-16016 September 2008 Technical Specifications, Issuance of Amendment Nos. 186 and 173, Deviation from Fire Protection Program Requirements ML0820504272008-07-29029 July 2008 License and Technical Specification Pages, Amendment Nos. 185 and 172, New License Condition/Revised TS Requirements Control Room Envelope Habitability in Accordance with TSTF-448, Rev. 3 ML0818902362008-07-0808 July 2008 Corrected Errata Sheet and TS Pages for Amendment No. 184 and 171 Issued June 30, 2008, Revise Technical Specification 3/4.8.2 to Modify Battery Surveillance Requirements ML0813303552008-06-30030 June 2008 License and Technical Specification Pages, Issuance of Amendment No. 184 and 171, Revise Technical Specification 3/4.8.2 to Modify Battery Surveillance Requirements NOC-AE-08002301, Withdrawal of Proposed Exception to Technical Specification 6.8.3.p.3, Control Room Envelope Habitability Program2008-05-27027 May 2008 Withdrawal of Proposed Exception to Technical Specification 6.8.3.p.3, Control Room Envelope Habitability Program ML0803603282008-03-25025 March 2008 Technical Specifications, Revise TS Surveillance Requirements for Emergency Core Cooling System Sumps ML0803604212008-03-0606 March 2008 Tech Spec Pages for Amendment Nos. 182 and 169, Adoption of Alternate Radiological Source Term in Assessment of Design-Basis Accident Dose Consequences ML0715901792007-07-20020 July 2007 Technical Specification Pages for Amendment Nos. 180 and 167 Technical Specification 3/4.8.2 for Batteries and DC Systems NOC-AE-07002183, Updated Pages to Incorporate Battery-Related Technical Specification Changes2007-07-17017 July 2007 Updated Pages to Incorporate Battery-Related Technical Specification Changes ML0720103122007-07-17017 July 2007 Project, Units 1 and 2 - Attachment to 7/18/07 E-Mail to M. Thadani, Nrr/Dorl/Lpliv, from P. Walker, STPNOC - Letter and Updated Technical Specification Pages - Battery Monitoring License Amendment Request (TAC MD0333, MD0334) ML0717801912007-07-13013 July 2007 Technical Specifications, Issuance of Amendment Nos. 179 and 166 Broad-Scope Risk-Informed Technical Specifications Amendments ML0714302512007-06-13013 June 2007 Tech Spec Pages for Amendment Nos. 177 and 164 Regarding TS 3.3.3.6, Accident Monitoring Instrumentation, NOC-AE-07002113, Proposed Change to Technical Specification 3.7.1.2, Auxiliary Feedwater System.2007-05-22022 May 2007 Proposed Change to Technical Specification 3.7.1.2, Auxiliary Feedwater System. NOC-AE-07002141, Resolution of Issues Regarding Proposed Amendment to Technical Specification 3/4.8.2 to Modify Requirements Related to Batteries and DC Systems2007-04-0606 April 2007 Resolution of Issues Regarding Proposed Amendment to Technical Specification 3/4.8.2 to Modify Requirements Related to Batteries and DC Systems NOC-AE-07002127, Request for License Amendment Related to Application of the Alternate Source Term2007-03-22022 March 2007 Request for License Amendment Related to Application of the Alternate Source Term ML0706503142007-02-28028 February 2007 South Texas Project, Units 1 and 2, Proposed Change to Technical Specification 3.7.1.2, Auxiliary Feedwater System. NOC-AE-06002036, Revised Broad Scope Risk-Informed Technical Specification Amendment Request2006-12-28028 December 2006 Revised Broad Scope Risk-Informed Technical Specification Amendment Request NOC-AE-06002095, Request for Enforcement Discretion for Technical Specifications 3.3.3.6 and 3.7.1.22006-12-18018 December 2006 Request for Enforcement Discretion for Technical Specifications 3.3.3.6 and 3.7.1.2 NOC-AE-06002060, Revision to Proposed Change to Technical Specification 3.3.3.6, Accident Monitoring Instrumentation.2006-10-0202 October 2006 Revision to Proposed Change to Technical Specification 3.3.3.6, Accident Monitoring Instrumentation. NOC-AE-06002040, Technical Specifications, Bases Control Program2006-07-20020 July 2006 Technical Specifications, Bases Control Program 2021-05-06
[Table view] |
Text
SOUTH TEXAS LICENSE (4) The facility has been granted a schedular exemption from Section 50.71(e)(3)(i) of 10 CFR 50 to extend the date for submittal of the updated Final Safety Analysis Report to no later than one year after the date of issuance of a low power license for the South Texas Project, Unit 2. This exemption is effective until August 1990. The staff's environmental assessment was published on December 16, 1987 (52 FR 47805).
E. Fire Protection STPNOC shall implement and maintain in effect all provisions of the approved fire protection program as described in the Final Safety Analysis Report through Amendment No. 55 and the Fire Hazards Analysis Report through Amendment No. 18, and submittals dated April 29, May 7, 8 and 29, June 11, 25 and 26, 1987, and as approved in the SER (NUREG-0781) dated April 1986 and its Supplements, subject to the following provision:
STPNOC may make changes to the approved fire protection program without prior approval of the Commission, only if those changes would not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire.
F. Physical Security STPNOC shall fully implement and maintain in effect all provisions of the physical security, training and qualification, and safeguards contingency plans previously approved by the Commission and all amendments and revisions to such plans made pursuant to the authority under 10 CFR 50.90 and 10 CFR 50.54(p).
The licensee shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822), and the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The combined set of plans, which contains Safeguards Information protected under 10 CFR 73.21, is entitled: "South Texas Project Electric Generating Station Security, Training and Qualification, and Safeguards Contingency Plan, Revision 2" submitted by letters dated May 17 and 18, 2006.
G. Not Used H. Financial Protection The Owners shall have and maintain financial protection of such type and in such amounts as the Commission shall require in accordance with Section 170 of the Atomic Energy Act of 1954, as amended, to cover public liability claims.
Amendment No. 186
(2) The facility was previously granted exemption from the criticality monitoring requirements of 10 CFR 70.24 (See Materials License No.
SNM-1983 dated August 30, 1988 and Section III.E. of the SER dated August 30, 1988). The South Texas Project Unit 2 is hereby exempted from the criticality monitoring provisions of 10 CFR 70.24 as applied to fuel assemblies held under this license.
(3) The facility requires a temporary exemption from the scheduler requirements of the decommissioning planning rule, 10 CFR 50.33(k) and 10 CFR 50.75. The justification for this exemption is contained in Section 22.2 of Supplement 6 to the Safety Evaluation Report. The staff's environmental assessment was published on December 16, 1988 (53 FR 50604). Therefore, pursuant to 10 CFR 50.12(a)(1), 50.12(a)(2)(ii) and 50.12(a)(2)(v), the South Texas Project, Unit 2 is hereby granted a temporary exemption from the schedular requirements of 10 CFR 50.33(k) and 10 CFR 50.75 and is required to submit the decommissioning plan for both South Texas Project, Units 1 and 2 on or before July 26, 1990.
E. Fire Protection STPNOC shall implement and maintain in effect all provisions of the approved fire protection program as described in the Final Safety Analysis Report through Amendment No. 62 and the Fire Hazards Analysis Report through Amendment No. 18, and submittals dated April 29, May 7, 8 and 29, June 11, 25, and 26, 1987, and as approved in the SER (NUREG-0781) dated April 1986 and its Supplements, subject to the following provisions:
STPNOC may make changes to the approved fire protection program without prior approval of the Commission, only if those changes would not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire.
F. Physical Security The licensee shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822), and the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The combined set of plans, which contain Safeguards Information protected under 10 CFR 73.21, is entitled: "South Texas Project Electric Generating Station Security, Training and Qualification, and Safeguards Contingency Plan, Revision 2" submitted by letters dated May 17 and 18, 2006.
G. Not Used Amendment No. 173