| {{#Wiki_filter:}} | | {{#Wiki_filter:Mar 9 '04 10:19 P.01 NUCLEAR REG AFFAIRS Fax :949-368-7575 Jndusfty H~istory of ObstructedSleeves in loss KORI ¶ fgjlbun14 of 558 obStrUcted after I cirtl Trojan found 2 eic~sIvellwelded sleeves |
| | ,ob-shictde In 2001 feaver Valley fosrid 4 of 350 W~er to-wed le-eves obstructed afte I cycle Fwlay fund I of -1000 lservveldsed&eve Since the 'ealy 80s. -10 of 12,000 TIG welded sleeves h2V9 been found oebtrude (Girtna, Zion, Prairie Island) |
| | SONGS,. 318semvs, 10 wrth bthr.cdons None of t1hece resulted In prmbary to secodry Possible Leak Paths |
| | * Obstructed Slaevo L~su&s |
| | - Parent Tuba rierecd |
| | * Bu1Zed Sleolmm. Iim-it ECT probea8 |
| | - E.xpamilon transizion zone |
| | * Bulged sleeves may tnrfado P&Mary flow |
| | - LoyAer rZ2Od Joint zone - Snmll number of obtxsrce sleevts mnintoIlees effect. (lo out of 39a eafarng |
| | * Slecve mrube Weld sleeves orabout 2.5%) |
| | - L-c* of fusion SLV~ctural and lealmlge irtari-' |
| | * Sleeve to Tube Relied Joint - No Primary to saoindarf leakage lost cycle. |
| | * sleeve material - Qua~ificaotb of sleeve indude4 collaps testing (rOPIC-al RePO4 OEN-630-P, Rev 02) |
| | Both wielded and rolled joint Mmrained lok tg,,ht a |
| | 1 |
| | |
| | Fax :949-368-7575 Mar 9 '04 10:20 P.02 NUCLERR REG RFFRIRS Actions Taken |
| | * Data ftom eviu3 sleeving campaigns ruviewe |
| | - No =aGem to affected sleeves |
| | - UT dama shlows co=pea weld fusion |
| | ,L |
| | - Toerue trsas dat shows norinal values |
| | * P edure review condurced I. - No process changes between SONGS campaigns |
| | - No cbvious reasons for the 10 sleeve bulges A -. |
| | Actions Proceed with Slevirng In Urit 2 |
| | - Ver~ied that no-ube deteas eist in the rec jcint fne |
| | - As diswssed we perforn visual lnepcion of tube In rall joint zone to characride surtam cand.Son, arnd modifed the procedure to capture the deenirg pros& |
| | - Operators and inspectors were bdefad on |
| | -X,* 4 situation and ro-reviewed V* critical pfocess smeps, e o. cleaning and roll paraneters 2}} |
Latest revision as of 23:27, 24 March 2020
Letter Sequence Meeting |
---|
|
|
MONTHYEARML0409801432004-03-0909 March 2004 Meeting Slides - Summary of Conference Calls with Southern California Edison Co Regarding 2004 Steam Generators Tube Inspections for San Onofre Nuclear Station (Songs), Unit 2 (Tac. MC2302) Project stage: Meeting 2004-03-09
[Table View] |
|
---|
Category:Slides and Viewgraphs
MONTHYEARML21053A2382021-02-22022 February 2021 Southern California Edison Slides for Feb 23, 2021, Pre-submission Meeting for SONGS Proposed Exemption- 10 CFR 72.106b ML21042A0772021-02-11011 February 2021 Public-Watchdogs-Langley-Final-02-11-2021 ML20178A2482020-06-24024 June 2020 Public Watchdogs 10 CFR 2.206 Petition - E-mail from Public Watchdogs with Presentations for June 24th Public Meeting with the NRC ML20178A2492020-06-24024 June 2020 Public Watchdogs - 10 CFR 2.206 Meeting with NRC - Petition Review Board, June 23, 2020 ML19255F6182019-09-17017 September 2019 Presentation Slides: SONGS Recent Dry Storage Operating Experience ML19235A1892019-08-29029 August 2019 Final NEIMA Meeting Slides - SONGS Presentation ML19234A0082019-08-20020 August 2019 Southern California Edison Company, San Onofre Nuclear Generating Station, August 20 2019 NRC Town Hall Meeting Sjc ML19154A1372019-06-0303 June 2019 June 3, 2019, Webinar Slides ML19084A1342019-03-25025 March 2019 NRC Slides for March 25 2019 Public Webinar ML19029B5092019-01-24024 January 2019 Final NRC Presentation for SCE Enforcement Conference ML19023A0332019-01-24024 January 2019 Southern California Edison Company; San Onofre Nuclear Generating Station, Pre-Decisional Enforcement Conference Slides ML19023A2492019-01-23023 January 2019 NRC Slides for Southern California Edison Conference January 24, 2019 ML18353A7492018-12-12012 December 2018 Presentation Slides: NRC SONGS Presentation December 2018, Victor ML18340A1762018-11-29029 November 2018 Southern California Edison Company; San Onofre Nuclear Generating Station; SONGS Community Engagement Panel, November 29, 2018 ML18318A0642018-11-0808 November 2018 Public Meeting Slides with Extra Content ML18312A1182018-11-0808 November 2018 Presentation for San Onofre Special Inspection Webinar November 8, 2018 ML17088A6572017-03-28028 March 2017 2017 RIC Presentation from Yamir Diaz-Castillo Entitled, Current NRC Vendor Findings and the Results from the 1st SONGS Lessons Learned Inspection. ML14216A4512015-02-0909 February 2015 7/31/14 Summary of Closed Meeting with Southern California Edison to Discuss Scope and Schedule Related to Cyber Security License Amendment Request for San Onofre Nuclear Generating Station, Units 2 and 3 ML14303A6392014-10-27027 October 2014 NRC Slides - SONGS PSDAR Public Meeting October 27, 2014 ML14303A6242014-10-27027 October 2014 Licensee'S Slides - SONGS PSDAR Public Meeting October 27, 2014 ML14272A4152014-09-25025 September 2014 SONGS EP RAI Response Review Slides - Public Meeting September 25, 2014 ML14272A4652014-09-24024 September 2014 SONGS Public Meeting Slides (Non-Public Portion) - Public Meeting September 24, 2014 ML14239A4642014-08-28028 August 2014 August 28, 2014, Public Meeting Slides Concerning San Onofre Nuclear Generating Station (SONGS) Decommisioning Quality Assurance Program ML14199A0982014-07-17017 July 2014 SONGS Cep Meeting Slides- Reactor Decommissioning Process ML13268A0032013-09-25025 September 2013 Reactor Decommissioning Process- Presentation for San Onofre 2&3 PSDAR Public Meeting ML13227A1102013-08-13013 August 2013 8/13/13 Michael F. Weber, Deputy Executive Director for Materials, Waste, Research, State, Tribal, and Compliance Programs Testimony on: the U.S. Nrc'S Power Reactor Decommissioning Process ML13092A2882013-04-0202 April 2013 Licensee Slides for 4/3/13 Pre-Submittal Meeting to Discuss License Amendment Request ML13059A1522013-02-27027 February 2013 NRC Meeting Slides from 2/27/13 Public RAI Meeting ML13016A0922013-01-16016 January 2013 G20120891, Friends of the Earth Presentation for 1/16/13 Meeting with to Provide an Opportunity to Address the NRC PRB, Pursuant to 10 CFR 2.206. ML13016A0862013-01-16016 January 2013 Fairwinds Presentation for 1/16/13 Meeting with Friends of the Earth to Provide an Opportunity to Address the NRC PRB, Pursuant to 10 CFR 2.206 (TAC Nos. MF0060 & MF0060) ML12352A4112012-12-18018 December 2012 NRC Slides for 12/18/12 Meeting with Southern California Edison ML12352A3852012-12-18018 December 2012 Licensee Slides for 12/18/12 Public Meeting ML12346A1162012-12-10010 December 2012 Meeting Summary for November 30, 2012, Meeting with Southern California Edison Company ML12311A0492012-09-18018 September 2012 Part 26 Public Meeting NEI Presentation Slides ML12179A4472012-06-26026 June 2012 6/18/2012 Meeting Summary for Augmented Inspection Team Exit Meeting with Southern California Edison Co ML12157A2722012-06-11011 June 2012 5/31/2012 Summary of Telephone Conference with Licensees Regarding Near Term Task Force Recommendation 2.1 Seismic Reevaluations - Diablo Canyon, 1 and 2, San Onofre, Units 2 and 3, Columbia Generating Station, and Palo Verde, Units 1, 2, a ML1101206302011-01-12012 January 2011 License Amendment Request to Support Use of Areva Nuclear Fuel, Slides from 1/12/2011 Meeting ML0932402122009-11-20020 November 2009 Summary of Public Meeting with Southern California Edison Company on San Onofre Nuclear Generating Station 2009 Performance ML0926502992009-09-22022 September 2009 Summary of Public Meeting with Southern California Edison Regarding Site Improvement Initiatives ML0914905092009-05-28028 May 2009 Summary of Meeting with Southern California Edison Company Several Initiatives That Were Being Implemented to Improve Licensed Operator Training at San Onofre Nuclear Generating Station ML11216A2442008-12-12012 December 2008 0523 - R504P - Westinghouse Advanced Technology - 07.3 - Water Hammer at San Onofre ML0832408342008-10-30030 October 2008 Licensee Handout for 10-31-08 Call ML0828804352008-10-14014 October 2008 Summary of Meeting with Southern California Edison to Discuss Performance at San Onofre Nuclear Generating Station ML0822602532008-08-12012 August 2008 Summary of Meeting on with Southern California Edison Co Regarding the End-of-Cycle Assessment of San Onofre Nuclear Generating Station ML0819303742008-06-11011 June 2008 Attachment 2: Presentation Slides by James Shepherd, NRC from June 11, 2008 Public Meeting with SONGS ML0819305802008-06-11011 June 2008 Attachment 4: Presentation Slides, James Reilly, SONGS from June 11, 2008 Public Meeting with SONGS ML0819305432008-06-11011 June 2008 Attachment 3: Presentation Slides, Emilio Garcia, NRC from June 11, 2008 Public Meeting with SONGS ML0729806642007-10-24024 October 2007 Meeting Presentation on Update on Generic Safety Issue 191 Plant Audits ML0727500132007-09-25025 September 2007 9/25/2007 Licensee Handouts for Meeting Re San Onofre Nuclear Generating Station, Unit 3 - Reclassification of Control Rod Drive Mechanism 56 NDE (Non Destructive Examination) Indication ML0720703362007-07-20020 July 2007 Summary of San Onofre Nuclear Generating Station End-Of-Cycle Public Meeting 2021-02-22
[Table view] |
Text
Mar 9 '04 10:19 P.01 NUCLEAR REG AFFAIRS Fax :949-368-7575 Jndusfty H~istory of ObstructedSleeves in loss KORI ¶ fgjlbun14 of 558 obStrUcted after I cirtl Trojan found 2 eic~sIvellwelded sleeves
,ob-shictde In 2001 feaver Valley fosrid 4 of 350 W~er to-wed le-eves obstructed afte I cycle Fwlay fund I of -1000 lservveldsed&eve Since the 'ealy 80s. -10 of 12,000 TIG welded sleeves h2V9 been found oebtrude (Girtna, Zion, Prairie Island)
SONGS,. 318semvs, 10 wrth bthr.cdons None of t1hece resulted In prmbary to secodry Possible Leak Paths
- Parent Tuba rierecd
- Bu1Zed Sleolmm. Iim-it ECT probea8
- E.xpamilon transizion zone
- Bulged sleeves may tnrfado P&Mary flow
- LoyAer rZ2Od Joint zone - Snmll number of obtxsrce sleevts mnintoIlees effect. (lo out of 39a eafarng
- L-c* of fusion SLV~ctural and lealmlge irtari-'
- Sleeve to Tube Relied Joint - No Primary to saoindarf leakage lost cycle.
- sleeve material - Qua~ificaotb of sleeve indude4 collaps testing (rOPIC-al RePO4 OEN-630-P, Rev 02)
Both wielded and rolled joint Mmrained lok tg,,ht a
1
Fax :949-368-7575 Mar 9 '04 10:20 P.02 NUCLERR REG RFFRIRS Actions Taken
- Data ftom eviu3 sleeving campaigns ruviewe
- No =aGem to affected sleeves
- UT dama shlows co=pea weld fusion
,L
- Toerue trsas dat shows norinal values
- P edure review condurced I. - No process changes between SONGS campaigns
- No cbvious reasons for the 10 sleeve bulges A -.
Actions Proceed with Slevirng In Urit 2
- Ver~ied that no-ube deteas eist in the rec jcint fne
- As diswssed we perforn visual lnepcion of tube In rall joint zone to characride surtam cand.Son, arnd modifed the procedure to capture the deenirg pros&
- Operators and inspectors were bdefad on
-X,* 4 situation and ro-reviewed V* critical pfocess smeps, e o. cleaning and roll paraneters 2