ML13280A151: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 18: Line 18:
=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:
[[Issue date::October 3, 2013]]
Mr. Mano Nazar Executive Vice President and Chief Nuclear Officer Florida Power and Light Company P.O. Box 14000 Juno Beach, FL 33408-0420
SUBJECT: NOTIFICATION OF TURKEY POINT NUCLEAR GENERATING UNITS 3 AND 4 COMPONENT DESIGN BASES INSPECTION - NRC INSPECTION REPORT 05000250/2014007 AND 05000251/2014007
==Dear Mr. Nazar:==
The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC) Region II staff will conduct a component design bases inspection (CDBI) at your Turkey Point Nuclear Generating Units 3 and 4 during the weeks of January 27 - 31, February 10 - 14, and February 24 - 28, 2014. Mr. Shakur Walker, a Senior Reactor Inspector from the NRC's Region II Office, will lead the inspection team. This inspection will be conducted in accordance with the baseline inspection procedure, Procedure 71111.21, "Component Design Bases Inspection," issued August 14, 2012.
The inspection will evaluate the capability of risk-significant / low margin components to function as designed and to support proper system operation. The inspection will also include a review of selected operator actions, operating experience, and modifications. During a telephone conversation on October 2, 2013, Mr. Walker confirmed with Ms. Stavy Mihalakea of your staff, arrangements for an information-gathering site visit and the three-week onsite inspection. The schedule is as follows:
* Information-gathering visit: Week of January 6 - 10, 2014 * Onsite weeks: January 27 - 31, February 10 - 14, and February 24 - 28, 2014 The purpose of the information-gathering visit is to meet with members of your staff to identify risk-significant components and operator actions. Information and documentation needed to support the inspection will also be identified. Mr. John Hanna, a Region II Senior Reactor Analyst, will support Mr. Walker during the information-gathering visit to review probabilistic risk assessment data and identify risk-significant components, which will be examined during the inspection. The Enclosure lists documents that will be needed prior to the information-gathering visit.
Please provide the referenced information to the Region II Office by December 2, 2013. Additional documents will be requested during the information-gathering visit. The inspectors will try to minimize your administrative burden by specifically identifying only those documents required for inspection preparation. The additional information will need to be available to the team in the Region II Office prior to the inspection team's preparation week of January 20, 2014. Mr. Walker will also discuss the following inspection support administrative details: (1)
availability of knowledgeable plant engineering and licensing personnel to serve as points of contact during the inspection, (2) method of tracking inspector requests during the inspection, (3) licensee computer access, (4) working space, (5) arrangements for site access, and (6)
other applicable information. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its Enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Thank you for your cooperation in this matter. If you have any questions, regarding the information requested or the inspection, please contact Mr. Walker at 404-997-4639 or contact me at 404-997-4530.
Sincerely,RA Rebecca L. Nease, Chief Engineering Branch 1 Division of Reactor Safety
Docket Nos.: 50-250, 50-251 License Nos.: DPR-31, DPR-41
===Enclosure:===
Information Request for Turkey Point Nuclear Generating Units 3 and 4 Component Design Bases Inspection cc: Distribution via Listserv
}}
}}

Revision as of 12:47, 13 February 2018

Turkey Point, Units 3 and 4, Component Design Bases Inspection 05000250/2014007 and 05000251/2014007, Notification Letter Final
ML13280A151
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 10/03/2013
From: Nease R L
NRC/RGN-II/DRS/EB1
To: Nazar M K
Florida Power & Light Co
References
IR-14-007
Download: ML13280A151 (5)


See also: IR 05000250/2014007

Text

October 3, 2013

Mr. Mano Nazar Executive Vice President and Chief Nuclear Officer Florida Power and Light Company P.O. Box 14000 Juno Beach, FL 33408-0420

SUBJECT: NOTIFICATION OF TURKEY POINT NUCLEAR GENERATING UNITS 3 AND 4 COMPONENT DESIGN BASES INSPECTION - NRC INSPECTION REPORT 05000250/2014007 AND 05000251/2014007

Dear Mr. Nazar:

The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC) Region II staff will conduct a component design bases inspection (CDBI) at your Turkey Point Nuclear Generating Units 3 and 4 during the weeks of January 27 - 31, February 10 - 14, and February 24 - 28, 2014. Mr. Shakur Walker, a Senior Reactor Inspector from the NRC's Region II Office, will lead the inspection team. This inspection will be conducted in accordance with the baseline inspection procedure, Procedure 71111.21, "Component Design Bases Inspection," issued August 14, 2012.

The inspection will evaluate the capability of risk-significant / low margin components to function as designed and to support proper system operation. The inspection will also include a review of selected operator actions, operating experience, and modifications. During a telephone conversation on October 2, 2013, Mr. Walker confirmed with Ms. Stavy Mihalakea of your staff, arrangements for an information-gathering site visit and the three-week onsite inspection. The schedule is as follows:

  • Information-gathering visit: Week of January 6 - 10, 2014 * Onsite weeks: January 27 - 31, February 10 - 14, and February 24 - 28, 2014 The purpose of the information-gathering visit is to meet with members of your staff to identify risk-significant components and operator actions. Information and documentation needed to support the inspection will also be identified. Mr. John Hanna, a Region II Senior Reactor Analyst, will support Mr. Walker during the information-gathering visit to review probabilistic risk assessment data and identify risk-significant components, which will be examined during the inspection. The Enclosure lists documents that will be needed prior to the information-gathering visit.

Please provide the referenced information to the Region II Office by December 2, 2013. Additional documents will be requested during the information-gathering visit. The inspectors will try to minimize your administrative burden by specifically identifying only those documents required for inspection preparation. The additional information will need to be available to the team in the Region II Office prior to the inspection team's preparation week of January 20, 2014. Mr. Walker will also discuss the following inspection support administrative details: (1)

availability of knowledgeable plant engineering and licensing personnel to serve as points of contact during the inspection, (2) method of tracking inspector requests during the inspection, (3) licensee computer access, (4) working space, (5) arrangements for site access, and (6)

other applicable information. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its Enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Thank you for your cooperation in this matter. If you have any questions, regarding the information requested or the inspection, please contact Mr. Walker at 404-997-4639 or contact me at 404-997-4530.

Sincerely,RA Rebecca L. Nease, Chief Engineering Branch 1 Division of Reactor Safety

Docket Nos.: 50-250, 50-251 License Nos.: DPR-31, DPR-41

Enclosure:

Information Request for Turkey Point Nuclear Generating Units 3 and 4 Component Design Bases Inspection cc: Distribution via Listserv