{{#Wiki_filter:MAINE YANKEE FINAL STATUS SURVEY RELEASE RECORD FR-O01O PAB ALLEYWAY SURVEY UNIT 3 Prepared By: ? -_ Date: _________FSS Engineer -Signature Prirfted Name Reviewed By: ___ Date: ct FSS Specialist-i n ture ,!Piri~ed ydme Reviewed By: h iDate: //$ npendcnt*
{{#Wiki_filter:MAINE YANKEE FINAL STATUS SURVEY RELEASE RECORD FR-O01O PAB ALLEYWAY SURVEY UNIT 3 Prepared By:       ?         -               _             Date: _________
l S-jAignature Printed Name Approved By: ___ _ Date:/sFS ndentO -Signature Printed Name Revision 0 MAINE YANKEE FINAL STATUS SURVEY RELEASE RECORD FR-0110 PAB ALLEYWN'AY SURVEY UNIT 3 A. SURVEY UNIT DESCRIPTION Survey Unit FR-01 10-03 is an excavated area that consists of soil media. The excavation was made in order to remove buried pipes running between the PAB and the Containment Spray Building.
FSS Engineer - Signature Prirfted Name Reviewed By: ___                                             Date:             ct FSS Specialist-           i n ture
The survey unit is located near grid coordinates 407,500 N and 623,800 E using the Maine State Coordinate System (West Zone) NAD 1927, as shown on Map FRO I 0-00, Attachment 1.The Alleyway was originally a paved area above the current pipe excavation located within the Restricted Area. It was bordered on the west by the Personnel Hatch, Main Steam Valve House/Reactor Motor Control Center, and the Emergency Feedwater Building, on the east by the Service Building, and by the PAB on the north. Survey Unit 3 is approximately 48 m 2.B. SURVEY UNIT DESIGN INFORMATION The area was designated a Class I land survey unit per the LTP (Table 5-IC, ROI 00, RCA Yard West). The Alleyway excavation was begun in late 2002 and the removed soil was spread and surveyed for possible reuse. Nearly all of the removed soil was found to be acceptable for reuse. The soil survey effort was suspended when the ground froze, and upon returning to soil surveying in the spring of 2003, it was determined that radioactivity had migrated into the remaining soil from the open, abandoned pipes within the excavation pit.Consequently, significant soil remediation had to be performed.
                        ,!Piri~ed ydme Reviewed By:         h           iDate:                                     //
Since the survey unit was already Class 1, no reassessment of classification was required.The survey unit design parameters are shown in Table 1. Given a relative shift of 1.2, it was determined that 23 direct measurements were required for the Sign Test, however, the number of samples was increased to improve the area factor. Twenty-eight direct measurements were actually performed.
                  $     npendcnt* l               S-jAignature Printed Name Approved By: ___                                     _     Date:
Measurement locations wvere randomly determined using a fixed grid with a randomly determined start point and are illustrated on the map FR 0 1O-SS-03 (Attachment 1). All direct measurements consisted of soil samples obtained at the required locations.
                    /sFS   ndentO   -Signature Printed Name Revision 0
The samples were analyzed by laboratory gamma spectroscopy.
 
Ten scan grids of approximately 5 m 2 were established, as indicated on survey map FR 0110-03. A 100% scan coverage of the area was required.
MAINE YANKEE FINAL STATUS SURVEY RELEASE RECORD FR-0110 PAB ALLEYWN'AY SURVEY UNIT 3 A. SURVEY UNIT DESCRIPTION Survey Unit FR-01 10-03 is an excavated area that consists of soil media. The excavation was made in order to remove buried pipes running between the PAB and the Containment Spray Building. The survey unit is located near grid coordinates 407,500 N and 623,800 E using the Maine State Coordinate System (West Zone) NAD 1927, as shown on Map FRO I 0-00, Attachment 1.
The survey instruments used, their MDCs, and alarm setpoints are provided in Attachment 2.Background values were established for the scan measurements based on local scaler values in the survey area. These background values were used to establish scan alarm setpoints, and to confirm the scan MDCs used were appropriate.
The Alleyway was originally a paved area above the current pipe excavation located within the Restricted Area. It was bordered on the west by the Personnel Hatch, Main Steam Valve House/Reactor Motor Control Center, and the Emergency Feedwater Building, on the east by the Service Building, and by the PAB on the north. Survey Unit 3 is approximately 48 m2 .
Since the design DCGLENtc is greater than the investigation level, no EMC sample size adjustment is required.FR-01 10-03, Revision 0 Page 2 of 22 TABLE I SURVEY UNIT DESIGN PARAMETERS Survey Unit Design Criteria Basis Area 48 <m <Class I limit per LTP Rev. 3 Based on an LBGR of 1.6 pCi/g, sigma of 1.33 pCi/g'Number of Direct 24 (23 required) and a relative shift of 1.2, N Measurements Required was adjusted to increase the area factor Type I = Type 11 = 0.05 Sample Area 2.0 m' 48mT/24 Sample Grid Spacing 1.4 m x 1.4 ml Scan Grid Area -5 < 1Om'Area Factor 6.8 LTP Rev. 3 Table 6-12 Scan Survey Area 48 mz Class I Area -100%Background SSPA-3 (scan) Average background  
B. SURVEY UNIT DESIGN INFORMATION The area was designated a Class I land survey unit per the LTP (Table 5-IC, ROI 00, RCA Yard West). The Alleyway excavation was begun in late 2002 and the removed soil was spread and surveyed for possible reuse. Nearly all of the removed soil was found to be acceptable for reuse. The soil survey effort was suspended when the ground froze, and upon returning to soil surveying in the spring of 2003, it was determined that radioactivity had migrated into the remaining soil from the open, abandoned pipes within the excavation pit.
+ DI 6-150, LTP Section 5 SSP A- (scan) 1 000 cpm _ _ _ _ _ _ _ _ _ _ _ _ _Sca Inesigaio Leel 3 sigma of background EC-009-01 (MY)Scan Investigation Level plus BKG (Reference 1), See Table 2-2 DCGL 3.2 pCi/g2 LTP, Rev. 3 (Reference 3), and addenda (Reference 4)Design DCGLENIC 21.76 Area factor
Consequently, significant soil remediation had to be performed. Since the survey unit was already Class 1, no reassessment of classification was required.
* DCGL C. SURVEY RESULTS Twenty-eight direct soil measurements were made and the results are presented in Table 2.Four of the direct measurements were above the DCGL unity fraction.
The survey unit design parameters are shown in Table 1. Given a relative shift of 1.2, it was determined that 23 direct measurements were required for the Sign Test, however, the number of samples was increased to improve the area factor. Twenty-eight direct measurements were actually performed. Measurement locations wvere randomly determined using a fixed grid with a randomly determined start point and are illustrated on the map FR 0 1O-SS-03 (Attachment 1). All direct measurements consisted of soil samples obtained at the required locations. The samples were analyzed by laboratory gamma spectroscopy.
The maximum direct result (SO 1I) was seven times the DCGL unity fraction.
Ten scan grids of approximately 5 m2 were established, as indicated on survey map FR 0110-03. A 100% scan coverage of the area was required. The survey instruments used, their MDCs, and alarm setpoints are provided in Attachment 2.
This grid (S002) was remediated, and a subsequent sample was less than the DCGL. This post-remediation sample result is used in Table 2. The original result is used in the Sign Test. The maximum post-remediation result was 1.52 times the DCGL. The mean residual activity is 43% of the unity fraction.The ten grids were scanned as required.
Background values were established for the scan measurements based on local scaler values in the survey area. These background values were used to establish scan alarm setpoints, and to confirm the scan MDCs used were appropriate. Since the design DCGLENtc is greater than the investigation level, no EMC sample size adjustment is required.
Eight of the ten grids required investigation.
FR-01 10-03, Revision 0 Page 2 of 22
Three were due to a low background at the start of the scan, three because the scan setpoint was exceeded, one because the background exceeded the alarm setpoint, and one (S002 as noted above) because the direct soil sample results exceeded the DCGL by a large margin. A discussion of the investigation performed in the survey unit is contained in Section D.Design sigma from the LTP Rev. 3, Table 5-IC for ROIOO, RCA Yard West.2 Design initially used a DCGL of 3.2 pCilg Cs-137. The Cs-137 DCGL was later reduced to 2.39 pCi/g (Reference 5).FR-O1 10-03, Revision 0 Page 3 of 22 It should be noted that the Co-60 DCGL is 0.86 pCi/g. This is an "adjusted DCGL" and can be derived from the unitized dose for surface soil, LTP Table 6-7 and the updated dose model in the activated concrete related license amendment (References 5 and 6). The Co-60 DCGL for surface soil is I pCi/g x 10/6.58 mrem/y (from LTP Table 6-7) or 1.5 pCi/g Co-60. This DCGL is further limited by the dose contribution allowed for surface soil only in the basement fill model per LTP Section 6 Attachment IX (revised LTP Table 6-1 1), in the activated concrete license amendment.
 
Thus, the Co-60 adjusted DCGL is 1.5 pCi/g x 5.63/1 0 mrem/y or 0.86 pCi/g.TABLE 2 DIRECT MEASUREMENTS SapeNme Co-60 Unetany Cs-137 Ucrany Unitized Value Sample Number (PCi/g) (Pci) of Unity Rule FROI 10-03-SOOI 5.32E-01 5.73E-02 3.72E-01 5.96E-02 0.77 FROI 0-03-S002 4.71E-O1 4.35E-02 3.72E-01 5.09E-02 0.70-FROI 10-03-S003 3.06E-01 2.98E-02 2.37E-O1 3.33E-02 0.45 FROI 0-03-S004 1.13E-01 2.38E-02 1.02E-01 2.59E-02 0.17 FROI 10-03-SO05 7.52E-01 4.98E-02 8.65E-01 7.21E-02 1.24 FROI 10-03-S006 7.42E-01 5.63E-02 9.65E-01 8.81E-02 1.27 FROI 10-03-S007 5.70E-01 4.52E-02 5.35E-01 5.61E-02 0.89 FROI 10-03-S008 4.28E-01 4.22E-02 4.53E-01 5.53E-02 0.69 FROI 0-03-SO09 5.41E-01 4.45E-02 5.93E-01 6.02E-02 0.88 FRO I10-03-SO 10 2.71E-01 3.26E-02 2.81E-01 4.41E-02 0.43 FR0110-03-SOII*
TABLE I SURVEY UNIT DESIGN PARAMETERS Survey Unit                       Design Criteria                           Basis Area                                 48                           <Class
1.74E-01 2.79E-02 1.57E-01 3.29E-02 0.27 FROI 10-03-SO 12 8.72E-01 5.50E-02 1.20E+00 9.29E-02 1.52 FROI 10-03-S013 1.55E-01 2.28E-02 1.21E-01 2.73E-02 0.23 FRO] 10-03-SO14 1.41E-01 2.54E-02 8.OOE-02 2.54E-02 0.20 FROI 10-03-SO15 2.02E-01 2.64E-02 2.65E-01 3.55E-02 0.35 FRO) 10-03-S016 8.33E-02 2.58E-02 6.44E-02 2.37E-02 0.12 FROI 10-03-S017 1.11E-O1 2.23E-02 5.63E-02 2.12E-02 0.15 FRO] 10-03-SO18 1.77E-01 2.28E-02 1.39E-01 2.65E-02 0.26 FRO I10-03-SO19 5.87E-02 3.49E-02 7.OOE-02 2.78E-02 0.10 FROI 0-03-S020 1.66E-01 2.23E-02 1.30E-01 2.68E-02 0.25 FROI 10-03-S021 2.02E-01 2.60E-02 2.83E-01 3.79E-02 0.35 FROI 0-03-S022 1.48E-01 2.25E-01 2.88E-01 3.49E-02 0.29 FROI 10-03-S023 4.53E-02 2.69E-02 4.44E-02 2.11E-02 0.07 FROI 10-03-S024  
                                                                      <m         I limit per LTP Rev. 3 Based on an LBGR of 1.6 pCi/g, sigma of 1.33 pCi/g' Number of Direct                     24 (23 required)             and a relative shift of 1.2, N Measurements Required                                             was adjusted to increase the area factor Type I = Type 11 = 0.05 Sample Area                         2.0 m'                       48mT/24 Sample Grid Spacing                 1.4 m x 1.4 ml Scan Grid Area                       -5                           <1Om' Area Factor                         6.8                           LTP Rev. 3 Table 6-12 Scan Survey Area                     48 mz                         Class I Area - 100%
<4.65E-02 3.55E-02 1.86E-02 0.07 FRO) 10-03-S025  
 
<4.69E-02  
===Background===
<4.43E-02 0.07 FROI 10-03-S026  
SSPA-3 (scan)                   Average background +           DI 6-150, LTP Section 5 SSP(scan)
<4.69E-02  
A-                  1000 cpm                     _ _ _   _   _ _ _ _ _ _ _ _ _
<4.03E-02 0.07 FROI 0-03-S027  
Sca Inesigaio Leel         3 sigma of background         EC-009-01 (MY)
<4.36E-02  
Scan Investigation Level           plus BKG                       (Reference 1), See Table 2-2 DCGL                                 3.2 pCi/g2                   LTP, Rev. 3 (Reference 3), and addenda (Reference 4)
<3.86E-02 0.07 FRO 10-03-S028  
Design DCGLENIC                     21.76                         Area factor
<3.16E-02 6.02E-02 2.27E-02 0.06 Mean 2.67E-01 2.82E-01 0.43 Median I .70E-0 I 1.48E1-0 _ 0.27 Standard Deviation 2.46E-01 3.04E-0 1 0.41 Range 0.032 to 0.87 __0.036 to 1.20 0.062 to 1.52* Since the grid for sample SOil lvas remediated,the post-remediation result is showvn.The original results were used for the Sign Test (Attachment 4)."<" indicates values less than the minimum detectable activity (MDA)FR-OI 10-03, Revision 0 Page 4 of 22 D. SURVEY UNIT INVESTIGATIONS PERFORMED AND RESULTS Survey Unit 3 was partitioned into 10 grids as shown on map FR 0110-03 (Attachment 1).Of the 10 grids, 8 required investigation due to a low background at the start of the scan (3), elevated direct sample results (1), the background exceeded the alarm setpoint (1), or the alarm setpoint was exceeded (3) during the scan. Four direct measurements exceeded the LTP Addendum revised DCGL (Reference 5). Three of these were in grids that were investigated as noted above. The fourth was not investigated because it did not exceed the DCGLs that were in effect at the time of the survey. This sample has been included in the Elevated Measurement Comparison Test (Table 3-1). One grid with a direct measurement that exceeded the DCGL was remediated and resampled during the investigation process.Investigation of the scan grids consisted of a 100% scan with the SSPA-3. The highest reading in the grid was flagged and a sample was collected for laboratory gamma analysis.The results of the investigations are shown in Attachment
* DCGL C. SURVEY RESULTS Twenty-eight direct soil measurements were made and the results are presented in Table 2.
: 3. Detectable concentrations of Co-60 and Cs-1 37 were found in six of the investigated grids with one sample's activity exceeding the unitized DCGL. Samples from the other two investigated grids did not show positive Co-60 or Cs-137, and so, for purposes of the EMC test, were assumed to be present at the observed MDA. The investigation results, including the positive results from an uninvestigated grid, are summarized in Attachment 3 (Table 3-1).E. SURVEY UNIT DATA ASSESSMENT An analysis of the direct sample measurement results, including the mean, median, standard deviation, and sample result range, are provided in Table 2. Of the 28 soil samples, four had concentrations of Co-60 and Cs-137 that exceeded unity. The grid for one of these samples was subsequently remediated and resampled.
Four of the direct measurements were above the DCGL unity fraction. The maximum direct result (SO 1I) was seven times the DCGL unity fraction. This grid (S002) was remediated, and a subsequent sample was less than the DCGL. This post-remediation sample result is used in Table 2. The original result is used in the Sign Test. The maximum post-remediation result was 1.52 times the DCGL. The mean residual activity is 43% of the unity fraction.
The results of the post-remediation sampling are used in this data assessment except that the original sample results wvere used in the Sign Test. The average of the DCGL unity fractions was 0.43 and the maximum unity fraction was 1.52 times the DCGL. The Elevated Measurement Comparison unity test was applied to the investigation data and conservatively includes one direct sample that was in a grid that was not investigated.
The ten grids were scanned as required. Eight of the ten grids required investigation. Three were due to a low background at the start of the scan, three because the scan setpoint was exceeded, one because the background exceeded the alarm setpoint, and one (S002 as noted above) because the direct soil sample results exceeded the DCGL by a large margin. A discussion of the investigation performed in the survey unit is contained in Section D.
The EMC test was 74% of unity, passing the EMC test. The final sigma was greater than the design sigma. A review of data indicates that a sufficient number of samples were collected provided the type 11 error is 0.10. The survey unit passed the Sign Test. Therefore, no additional samples were required.For illustrative purposes, as indicated in LTP Section 5.9.3, a simplified general retrospective dose estimate can be calculated from the average residual contamination level by subtracting the established mean fallout Cs-137 background value 3 (0.19 pCi/g) for disturbed soil from the survey unit sample mean Cs-137 activity (0.282 pCi/g). The result is a net value of 0.092 pCi/g. When the survey unit mean for Co-60 (0.267 pCi/g) is included, this would equate to an annual dose rate of 1.96 mrem/y.4 However, for the purposes of demonstrating compliance with the radiological criteria for license termination and the enhanced State Criteria, background activity is not subtracted from the soil sample analysis activity values.3 See Attachment E to Maine Yankee Procedure PMP 6.7.8 (Reference 2)4 [(0.276 pCi/g/O.86 pCi/g) + ((0.282 pCi/g -0. 19 pCilg) / 2.39)] x 5.63 mrem/y = 1.96 mrem/y FR-01 10-03, Revision 0 Page 5 of 22 F. ADDITIONAL DATA EVALUATION Attachment 4 provides additional data evaluation associated with this Survey Unit, including relevant statistical information.
Design sigma from the LTP Rev. 3, Table 5-IC for ROIOO, RCA Yard West.
Based on survey unit direct measurement data, this attachment provides the Sign Test Summary, Quantile Plot, Histogram, and Retrospective Power Curve.1. The Sign Test Summary provides an overall summary of design input and resulting calculated values used to determine the required number (N) of direct measurements (per LTP Section 5.4.2). The Sign Test Summary is a separate statistical analysis that also calculates the mean, median, and standard deviation of the direct measurements.
2 Design initially used a DCGL of 3.2 pCilg Cs-137. The Cs-137 DCGL was later reduced to 2.39 pCi/g (Reference 5).
The critical value and the result of the Sign Test are provided in the Sign Test Summary table, as well as a listing of the key release criteria.
FR-O1 10-03, Revision 0 Page 3 of 22
As is shown in the table, all of the key release criteria, except four samples had activity above the unitized DCGL and the final sigma was greater than the design value, were satisfied for the FSS of this survey unit. The elevated measurements were appropriately evaluated and found acceptable.
 
It should be noted that the Co-60 DCGL is 0.86 pCi/g. This is an "adjusted DCGL" and can be derived from the unitized dose for surface soil, LTP Table 6-7 and the updated dose model in the activated concrete related license amendment (References 5 and 6). The Co-60 DCGL for surface soil is I pCi/g x 10/6.58 mrem/y (from LTP Table 6-7) or 1.5 pCi/g Co-60. This DCGL is further limited by the dose contribution allowed for surface soil only in the basement fill model per LTP Section 6 Attachment IX (revised LTP Table 6-1 1), in the activated concrete license amendment. Thus, the Co-60 adjusted DCGL is 1.5 pCi/g x 5.63/1 0 mrem/y or 0.86 pCi/g.
TABLE 2 DIRECT MEASUREMENTS SapeNme Sample  Number            Co-60 (PCi/g)      Unetany             Cs-137 (Pci)      Ucrany       of Unity Value Unitized  Rule FROI 10-03-SOOI         5.32E-01       5.73E-02         3.72E-01     5.96E-02         0.77 FROI 0-03-S002           4.71E-O1       4.35E-02         3.72E-01     5.09E-02         0.70
-FROI 10-03-S003         3.06E-01       2.98E-02         2.37E-O1     3.33E-02         0.45 FROI 0-03-S004           1.13E-01       2.38E-02           1.02E-01     2.59E-02         0.17 FROI 10-03-SO05           7.52E-01       4.98E-02         8.65E-01     7.21E-02         1.24 FROI10-03-S006           7.42E-01       5.63E-02         9.65E-01     8.81E-02         1.27 FROI 10-03-S007         5.70E-01       4.52E-02         5.35E-01     5.61E-02         0.89 FROI 10-03-S008         4.28E-01       4.22E-02         4.53E-01     5.53E-02         0.69 FROI 0-03-SO09           5.41E-01       4.45E-02         5.93E-01     6.02E-02         0.88 FRO I10-03-SO 10         2.71E-01       3.26E-02         2.81E-01     4.41E-02         0.43 FR0110-03-SOII*           1.74E-01       2.79E-02           1.57E-01     3.29E-02         0.27 FROI 10-03-SO 12         8.72E-01       5.50E-02         1.20E+00     9.29E-02         1.52 FROI 10-03-S013         1.55E-01       2.28E-02           1.21E-01     2.73E-02         0.23 FRO] 10-03-SO14         1.41E-01       2.54E-02         8.OOE-02     2.54E-02         0.20 FROI 10-03-SO15         2.02E-01       2.64E-02         2.65E-01     3.55E-02         0.35 FRO) 10-03-S016         8.33E-02       2.58E-02         6.44E-02     2.37E-02         0.12 FROI 10-03-S017         1.11E-O1       2.23E-02         5.63E-02     2.12E-02         0.15 FRO] 10-03-SO18         1.77E-01       2.28E-02           1.39E-01     2.65E-02         0.26 FRO I10-03-SO19         5.87E-02       3.49E-02           7.OOE-02     2.78E-02         0.10 FROI 0-03-S020           1.66E-01       2.23E-02           1.30E-01     2.68E-02         0.25 FROI 10-03-S021         2.02E-01       2.60E-02         2.83E-01     3.79E-02         0.35 FROI 0-03-S022           1.48E-01       2.25E-01         2.88E-01     3.49E-02         0.29 FROI 10-03-S023         4.53E-02       2.69E-02           4.44E-02     2.11E-02         0.07 FROI 10-03-S024         <4.65E-02                         3.55E-02     1.86E-02         0.07 FRO) 10-03-S025         <4.69E-02                         <4.43E-02                     0.07 FROI 10-03-S026         <4.69E-02                         <4.03E-02                     0.07 FROI 0-03-S027         <4.36E-02                         <3.86E-02                     0.07 FRO 10-03-S028         <3.16E-02                         6.02E-02     2.27E-02         0.06 Mean               2.67E-01                         2.82E-01                     0.43 Median               I.70E-0 I                         1.48E1-0 _                   0.27 Standard Deviation         2.46E-01                         3.04E-0 1                     0.41 Range           0.032 to 0.87                 __0.036 to 1.20                 0.062 to 1.52
* Since the grid for sample SOil lvas remediated,the post-remediation result is showvn.
The original results were used for the Sign Test (Attachment 4).
  "<" indicates values less than the minimum detectable activity (MDA)
FR-OI 10-03, Revision 0 Page 4 of 22
 
D. SURVEY UNIT INVESTIGATIONS PERFORMED AND RESULTS Survey Unit 3 was partitioned into 10 grids as shown on map FR 0110-03 (Attachment 1).
Of the 10 grids, 8 required investigation due to a low background at the start of the scan (3),
elevated direct sample results (1), the background exceeded the alarm setpoint (1), or the alarm setpoint was exceeded (3) during the scan. Four direct measurements exceeded the LTP Addendum revised DCGL (Reference 5). Three of these were in grids that were investigated as noted above. The fourth was not investigated because it did not exceed the DCGLs that were in effect at the time of the survey. This sample has been included in the Elevated Measurement Comparison Test (Table 3-1). One grid with a direct measurement that exceeded the DCGL was remediated and resampled during the investigation process.
Investigation of the scan grids consisted of a 100% scan with the SSPA-3. The highest reading in the grid was flagged and a sample was collected for laboratory gamma analysis.
The results of the investigations are shown in Attachment 3. Detectable concentrations of Co-60 and Cs-1 37 were found in six of the investigated grids with one sample's activity exceeding the unitized DCGL. Samples from the other two investigated grids did not show positive Co-60 or Cs-137, and so, for purposes of the EMC test, were assumed to be present at the observed MDA. The investigation results, including the positive results from an uninvestigated grid, are summarized in Attachment 3 (Table 3-1).
E. SURVEY UNIT DATA ASSESSMENT An analysis of the direct sample measurement results, including the mean, median, standard deviation, and sample result range, are provided in Table 2. Of the 28 soil samples, four had concentrations of Co-60 and Cs-137 that exceeded unity. The grid for one of these samples was subsequently remediated and resampled. The results of the post-remediation sampling are used in this data assessment except that the original sample results wvere used in the Sign Test. The average of the DCGL unity fractions was 0.43 and the maximum unity fraction was 1.52 times the DCGL. The Elevated Measurement Comparison unity test was applied to the investigation data and conservatively includes one direct sample that was in a grid that was not investigated. The EMC test was 74% of unity, passing the EMC test. The final sigma was greater than the design sigma. A review of data indicates that a sufficient number of samples were collected provided the type 11 error is 0.10. The survey unit passed the Sign Test. Therefore, no additional samples were required.
For illustrative purposes, as indicated in LTP Section 5.9.3, a simplified general retrospective dose estimate can be calculated from the average residual contamination level by subtracting the established mean fallout Cs-137 background value 3 (0.19 pCi/g) for disturbed soil from the survey unit sample mean Cs-137 activity (0.282 pCi/g). The result is a net value of 0.092 pCi/g. When the survey unit mean for Co-60 (0.267 pCi/g) is included, this would equate to an annual dose rate of 1.96 mrem/y. 4 However, for the purposes of demonstrating compliance with the radiological criteria for license termination and the enhanced State Criteria, background activity is not subtracted from the soil sample analysis activity values.
3 See Attachment E to Maine Yankee Procedure PMP 6.7.8 (Reference 2) 4 [(0.276 pCi/g/O.86 pCi/g) + ((0.282 pCi/g - 0. 19 pCilg) / 2.39)] x 5.63 mrem/y = 1.96 mrem/y FR-01 10-03, Revision 0 Page 5 of 22
 
F. ADDITIONAL DATA EVALUATION Attachment 4 provides additional data evaluation associated with this Survey Unit, including relevant statistical information. Based on survey unit direct measurement data, this attachment provides the Sign Test Summary, Quantile Plot, Histogram, and Retrospective Power Curve.
: 1. The Sign Test Summary provides an overall summary of design input and resulting calculated values used to determine the required number (N) of direct measurements (per LTP Section 5.4.2). The Sign Test Summary is a separate statistical analysis that also calculates the mean, median, and standard deviation of the direct measurements.
The critical value and the result of the Sign Test are provided in the Sign Test Summary table, as well as a listing of the key release criteria. As is shown in the table, all of the key release criteria, except four samples had activity above the unitized DCGL and the final sigma was greater than the design value, were satisfied for the FSS of this survey unit. The elevated measurements were appropriately evaluated and found acceptable.
Similarly, the final sigma was evaluated in Section E and was found to be acceptable.
Similarly, the final sigma was evaluated in Section E and was found to be acceptable.
: 2. The Quantile Plot was generated from direct measurement data listed in Table 2. The data set and plot are consistent with expectations for a Class I survey unit. The survey unit average is well below the DCGLs of 0.86 pCi/g and 2.39 pCi/g for Co-60 and Cs-137 respectively.
: 2. The Quantile Plot was generated from direct measurement data listed in Table 2. The data set and plot are consistent with expectations for a Class I survey unit. The survey unit average is well below the DCGLs of 0.86 pCi/g and 2.39 pCi/g for Co-60 and Cs-137 respectively.
: 3. A Histogram Plot was also developed based on the direct measurement values. This plot shows that the direct data were essentially a log-normal distribution with no outliers.4. A Retrospective Power Curve was constructed, based on FSS results. The curve shows that this survey unit having a mean residual activity at a small fraction of the DCGL has a high probability
: 3. A Histogram Plot was also developed based on the direct measurement values. This plot shows that the direct data were essentially a log-normal distribution with no outliers.
("power")
: 4. A Retrospective Power Curve was constructed, based on FSS results. The curve shows that this survey unit having a mean residual activity at a small fraction of the DCGL has a high probability ("power") of meeting the release criteria. Thus, it can be concluded that the direct measurement data support rejection of the null hypothesis, providing high confidence that the survey unit satisfied the release criteria and that the data quality objectives were met.
of meeting the release criteria.
G. CHANGES IN INITIAL SURVEY UNIT ASSUMPTIONS ON EXTENT OF RESIDUAL ACTIVITY The survey was designed as a Class I area; the FSS results were consistent with that classification. Since the DCGLs were changed (decreased) by addendum to the LTP to account for the activated containment concrete pathway the design of the survey unit was confirmed and data reviewed against the revised DCGLs. Two of the four direct samples would still be above unity with the previous, higher DCGLs.
Thus, it can be concluded that the direct measurement data support rejection of the null hypothesis, providing high confidence that the survey unit satisfied the release criteria and that the data quality objectives were met.G. CHANGES IN INITIAL SURVEY UNIT ASSUMPTIONS ON EXTENT OF RESIDUAL ACTIVITY The survey was designed as a Class I area; the FSS results were consistent with that classification.
FR-OI 10-03, Revision 0 Page 6 of 22
Since the DCGLs were changed (decreased) by addendum to the LTP to account for the activated containment concrete pathway the design of the survey unit was confirmed and data reviewed against the revised DCGLs. Two of the four direct samples would still be above unity with the previous, higher DCGLs.FR-OI 10-03, Revision 0 Page 6 of 22 H. LTP CHANGES SUBSEQUENT TO SURVEY UNIT FSS The FSS of Survey Unit 3 was designed and performed per the criteria LTP Rev. 3 with Addenda (Reference 3 and 4). The subsequent LTP change with potential impact to this FSS requiring evaluations was the LTP change related to the activated concrete license amendment (Reference 5 and 6) which reduced the DCGLs for soil inside the RA.These changes were evaluated and found to have no impact on the FSS results or conclusions for this survey unit. The revised DCGLs were used for the evaluation of the results included herein.1. CONCLUSION The FSS of this survey unit was designed based on the LTP designation as a Class I area.The survey design parameters are presented in Table 1. The required number of direct measurements was determined for the Sign Test in accordance with the LTP. As presented in Table 2, the average of the direct measurements was well below the DCGL unity.A Sign Test Summary analysis was conducted.
 
Using the initial estimated sigma combined with the decreased DCGL, the sign test indicated that an insufficient number of direct samples was collected.
H. LTP CHANGES SUBSEQUENT TO SURVEY UNIT FSS The FSS of Survey Unit 3 was designed and performed per the criteria LTP Rev. 3 with Addenda (Reference 3 and 4). The subsequent LTP change with potential impact to this FSS requiring evaluations was the LTP change related to the activated concrete license amendment (Reference 5 and 6) which reduced the DCGLs for soil inside the RA.
By increasing the type II error to 0.10 the Sign Test Summary analysis demonstrated that the Sign Test criteria were satisfied and a sufficient number of samples were obtained.The Retrospective Power Curve shown in Attachment 4 confirmed that sufficient samples were taken to support rejection of the null hypothesis, providing high confidence that the survey unit satisfied the release criteria and the data quality objectives were met. Attachment 4 also revealed that direct measurement data represented essentially a log-normal distribution, with no outliers.The scan survey design for this survey unit was developed in accordance with the LTP with significant aspects of the design discussed in Section B and Table 1. Verified alarms were investigated and the survey unit meets Elevated Measurement Comparison unity rule per LTP methodology.
These changes were evaluated and found to have no impact on the FSS results or conclusions for this survey unit. The revised DCGLs were used for the evaluation of the results included herein.
It is concluded that FRO I 10 Survey Unit 3 meets the release criteria of I OCFR20.1402 and the State of Maine enhanced criteria.FR-01 10-03, Revision 0 Page 7 of 22 J. REFERENCES
: 1. CONCLUSION The FSS of this survey unit was designed based on the LTP designation as a Class I area.
: 1. Maine Yankee Engineering Calculation, EC-009-01 2. Approach for Dealing with Background Radioactivity for Maine Yankee Final Status Surveys, Attachment E to Maine Yankee Procedure PMP 6.7.8, FSS Data Processing and Reporting 3. Maine Yankee License Termination Plan, Revision 3, Maine Yankee letter to the NRC, MN-02-048, dated October 15, 2002 4. Maine Yankee License Termination Plan, Revision 3 Addenda, Maine Yankee letter to the NRC, MN-02-06 1, dated November 26,2002 5. Proposed License Amendment Related to Changes in the Activated Concrete Remediation Plans, Maine Yankee letter to the NRC, MN-03-049, dated September 11, 2003 6. Issuance of License Amendment No. 170, NRC letter to Maine Yankee, dated February 18, 2004 FR-01 10-03, Revision 0 Page 8 of 22 Attachment 1 Survey Unit Maps FR-O1 10-03, Revision 0 Page 9 of 22 Maine Yankee _ i Map ID #: FR 011-00 Decommissioning Team MaiIe Yankee Decommissioning Projct Survey Form Survey Type: -I Characterization 3i Turnover z Final Status Survey Survey Area Name: Alleyway Excavation lDate: 6-25-03 623,000 E 623,500 E 624.000 E 624,500 E 625,000 E o o o o o o a C aJ Co Ca O z 2O Z 2 2 Z Z Z Z Z Z SCALE Cft)0 400 MN E: N 800 1200 FR-O1 10-03, Revision 0 Page 10 of 22 W 0 Final Status Survey Unit Reference Map o co Alleyway Piping Excavation Pit 0.U x H<thIPersone/
The survey design parameters are presented in Table 1. The required number of direct measurements was determined for the Sign Test in accordance with the LTP. As presented in Table 2, the average of the direct measurements was well below the DCGL unity.
Cotiment E)=4 U) Sa E eu UClirg Slab *'* ..- ili ~T.f.JIW a) 0;).* 11I-reA to be surveyed at a later date Restricted Area Alleyway..
A Sign Test Summary analysis was conducted. Using the initial estimated sigma combined with the decreased DCGL, the sign test indicated that an insufficient number of direct samples was collected. By increasing the type II error to 0.10 the Sign Test Summary analysis demonstrated that the Sign Test criteria were satisfied and a sufficient number of samples were obtained.
-0 as part of FROI Il, Survey Unitl14PanVe Cl)0.n E0 5m loin 15m 20ri  
The Retrospective Power Curve shown in Attachment 4 confirmed that sufficient samples were taken to support rejection of the null hypothesis, providing high confidence that the survey unit satisfied the release criteria and the data quality objectives were met. Attachment 4 also revealed that direct measurement data represented essentially a log-normal distribution, with no outliers.
-en)MI X 0--U-*ii CL 2 L.4 t, L...tj:zE?E.t tj Ce I>'X W a E CO C 0-2 5U' C),.2_N 1)FR 01 10-03: Alleyway Piping Excavation Pit Soil Area West of Ledge Survey Scan 01-10-0 p5: o-_o oQ_0 G ,6t 01 02 03 04 05 06 07 08 09 10 MSVH & PHN Concrete Walls I 41 1 1.i i.i 0 5m 10m I --i I E 12 a) D 0 co This survey aresa un is approximately 48 square maters W.CD'(D cM.0 (DU E E>-.2 U).,o~.S 0$cU)9 ("4 (0 (U (U 0 C: 0 (U X Cl)x>1 w (U (U E Z z a (U (U 2 (U co (U 0 2(U)0 C I.-0 co C (U N (U C)0 Iii 0 0.1)>N co_CL U)FR 011 0-SS-03, Direct Point Survey, Soil Survey Unit 03 Alleyway Piping Excavation Pit Soil Area West of Ledge to Wall OQ 0;C4 0 O~ 2 c o v 0! S5rv --.-1.401m1 X I YR.,. 1 1 98nm ryP 1.96m l--.!j ).'1 1.. -.!C4 10* UY U7U* Ub
The scan survey design for this survey unit was developed in accordance with the LTP with significant aspects of the design discussed in Section B and Table 1. Verified alarms were investigated and the survey unit meets Elevated Measurement Comparison unity rule per LTP methodology.
* UO a U4 a W* 11 0 12 0 13 0 14 0 15 ' 16 i a UZ a U1 -.-- .._* 17 0 18
It is concluded that FRO I 10 Survey Unit 3 meets the release criteria of I OCFR20.1402 and the State of Maine enhanced criteria.
* 19 2.15m 021 020 -_ _._-28
FR-01 10-03, Revision 0 Page 7 of 22
 
J. REFERENCES
: 1. Maine Yankee Engineering Calculation, EC-009-01
: 2. Approach for Dealing with Background Radioactivity for Maine Yankee Final Status Surveys, Attachment E to Maine Yankee Procedure PMP 6.7.8, FSS Data Processing and Reporting
: 3. Maine Yankee License Termination Plan, Revision 3, Maine Yankee letter to the NRC, MN-02-048, dated October 15, 2002
: 4. Maine Yankee License Termination Plan, Revision 3 Addenda, Maine Yankee letter to the NRC, MN-02-06 1, dated November 26,2002
: 5. Proposed License Amendment Related to Changes in the Activated Concrete Remediation Plans, Maine Yankee letter to the NRC, MN-03-049, dated September 11, 2003
: 6. Issuance of License Amendment No. 170, NRC letter to Maine Yankee, dated February 18, 2004 FR-01 10-03, Revision 0 Page 8 of 22
 
Attachment 1 Survey Unit Maps FR-O1 10-03, Revision 0 Page 9 of 22
 
Maine Yankee                                             _                                   i Map ID#: FR 011-00 Decommissioning Team           MaiIe Yankee Decommissioning ProjctSurvey Form Survey Type: -I Characterization 3i Turnover z Final Status Survey   Survey Area Name: Alleyway Excavation lDate: 6-25-03 623,000 E 623,500 E 624.000 E 624,500 E 625,000 E o                     o               o                   o                 o                   o a                   C               aJ                   Co                 Ca                 O z                   2O               Z                   2                 2 Z                   Z               Z                   Z                 Z                 Z SCALE     Cft)
MN 0             400             800            1200 E:     N FR-O1 10-03, Revision 0 Page 10 of 22
 
W                                                                     0 o
Final Statusco Survey Unit Reference Map Alleyway Piping Excavation Pit 0.
U x
H<thIPersone/                                 Cotiment E)
  =4       U)                                                       Sa E                                                                           eu UClirg Slab *'*   ..- ili   ~T.f.JIW a)   0;).
* 11I-reA   to be surveyed at a later date Restricted Area Alleyway..
          - 0       as part of FROI Il, Survey Unitl14PanVe Cl) 0.n E0                                                                 5m loin 15m   20ri
 
                                                                          -en)
Ce             FR 01 10-03: Alleyway Piping Excavation Pit                                                       -
0 MI Soil Area West of Ledge           Survey Scan 01-10                                                 p5: o o    oQ
_0  G U-                                                                                                                             ,6t I>'
X              X ii            W 0--
CL 2
E t, a L.4 tj L..
:zE    ' C) 01 02     03   04 CO                                05     06       07 08       09               10
    ?            C
                , 0 E
MSVH & PHN Concrete Walls 5U
    .t - 2 tj      .2_
N 1)
I 41 1
1
      .i i
0       5m               10m
      .i I -         -i     ;      I E 12 a)     D 0       co                                                               This survey aresa un is approximately 48 square maters
 
          $cU)                                        FR 011 0-SS-03, Direct Point Survey, Soil                                                          0
                                                                                                                                                          ;C4 9                                                                                                                                             0
("4 (0                                                             Survey Unit 03                                                                OQ (U                                                                                                                                               c 0
(U Alleyway Piping Excavation Pit                                                            oO~2v C:
W.CD 0
X Cl)
(U Soil Area West of Ledge to Wall                                                            0 x
w
          >1 (U
(U E
zZ a
(U (U                                                                                       .-1.401m1 2
(U                                                                                 ,.X1 I       YR.
                                  ! S5rv   --                     1 98nm                                                           1.96m   l--
co                                                          ryP
'(D cM (U
0 2(
* UY                   U7U
* Ub
* UO     a U4           a Wi      a UZ      a U1    -.-- .    ._
U)        .    !j ).'11
    .0    0                      C4 10
* 11     0 12     0 13     0 14     0 15         ' 16
* 17     0 18
* 19         2.15m (DU co E                                    -     28
* 27
* 27
* 26
* 26
Line 68: Line 154:
* 24
* 24
* 23
* 23
* 22 L=1.4, N=24 This survey area unit is approximately 48 square meters Attachment 2 Survey Unit Instrumentation FR-01 10-03, Revision 0 Page 14 of 22 TABLE 2-1 INSTRUMENT INFORMATION E-600 S/N I Probe S/N (type)1929 1 725890 (SSPA-3)2489 J 726560 (SSPA-3)HPGc Detectors for Lab Analysis of Volumetrie Samples Detector Number MDC (pCi/g)FSS-l 0.04 -0.10 FSS-2 0.04 -0.10 DET2 0.10 (nominal)DET3 0.10 (nominal)TABLE 2-2 INSTRUMENT SCAN MDC, DCGL, INVESTIGATION LEVEL, AND DCGLEMC Detector SSPA-3 J Comments Scan MDC 5.9 Design Scan MDC, LTP (pCi/g) Table 5-6 (Reference 4)DCGL 2.39 Cs-137 Reference 5 (pCi/g) 0.86 Co-60 Investigation Level 3 sigma of Background (Alarm Setpoint) 21,110 plus BKG cpm .-Design DCGLEAIC 16.3 Cs-137 DCGL
* 22 C                                                                                                            021      020          -_    _._
* AF (6.8)(Pcilg) 5.8 Co-60 FR-01 10-03, Revision 0 Page 15 of 22 Attachment 3 Investigation Table FR-O1 10-03, Revision 0 Page 16 of 22 TABLE 3-1 INVESTIGATION INITIAL SURVEY INVESTIGATION RESULTS Alarm Alarm Max. ScaI ICGLDC Grid Setpoint Value au AreFactorea Unityml Sample Number Co60 + / Cs-137 DCGLEMC cpm cpm Va_ m Times AF ._______ Unity So0l 21110 21100 19140 5 3.6 3.6 XROI10-03-S001 6.26E-01 4.81E-02 5.93E-01 6.23E-02 <DCGL S002 21110 20300 21400 5 3.6 3.6 XROI 10-03-S006 1.74E-01 2.79E-02 1.57E-01 2.79E-02 <DCGL S003 21110 22100 18300 5 3.6 3.6 XROI10-03-S002 9.01E-01 5.60E-02 8.87E-01 17.37E-02 0.30 S004 21110 hb 20600 5 3.6 3.6 XRO1 10-03-ROOI
C I.-
< 1.48E-01 < l.30E-01 <DCGL S005 21110 21300 21500 5 3.6 3.6 XR0110-03-R002
0
< 1.26E-01 < 9.62E-02 <DCGL S008 21110 lb 17120 5 3.6 3.6 XROI 10-03-S003 1.38E-01 2.70E-02 6.08E-02 2.63E-02 <DCGL S009 21110 lb 16280 5 3.6 3.6 XROI 10-03-S004 4.29E-01 3.88E-02 2.65E-01 4.01E-02 <DCGL Solo 21110 lb 15790 5 3.6 3.6 XROI10-03-S005 3.86E-01 4.05E-02 2.77E-01 4.39E-02 <DCGL S006* N/A N/A N/A 1.7 8.3 8.3 FROI 10-03-SO05 7.52E-01 4.98E-02 8.65E-01 7.21 E-02 0.11 1 = = Unit mean 2.06E-01 1.96E-01 0.32-EMC Unity Sum 0.74 NOTES 1. lb -investigated due to low background in the grid 2. hb -investigated due to high background in the grid 3. * -S006 is the value from the direct sampling, included because the direct value was >DCGL but there was no alarm in the grid 4. "<" indicates values less than the minimum detectable activity (MDA)5. Scan area used for S006 was based on grid area of 5 m 2 with three samples (5/3 = 1.7).FR-01 10-03, Revision 0 Page 17 of 22 Attachment 4 Statistical Data FR-O 1 10-03, Revision 0 Page 18 of 22 Survey Package FRO110 Unit 3 UNITY Soil Sign Test Summary t'.- '.Y'',W Ev'autio in put enaiu .____________________________________
  >-.2 U) 0
Survey Package: FRO110 Survey Unit: 03 Evaluator:
  .      (U Iii N
WJC DCGLw: 1.OOE+00 using 2.39 pCi/gm DCGL DCGLemc: 6.80E+00 LBGR: 5.00E-01 Sigma: 5.66E-01 Type I error: 0.05 Type II error: 0.1 Type II error changed to 0.1 Nuclide: UNITY Soil Type: N/A.^<''9 ;CluaeVale ir-f jt,'-,,j ;' -S$-9A i -Cnmdnty !, , Z,<,: 1.645 ZI.P:1.282 Sign p: 0.788145 Calculated Relative Shift: 0.8 Relative Shift Used: 0.8 Uses 3.0 if Relative Shift is >3 N-Value: 26 N-Value+20%:
  ,o~
32 it .X-. .. 2qt~i.*Sample Data Values A c .... ........... "br" nt;'Number of Samples: 28 Median: 2.78E-01 Mean: 6.69E-01 Net Sample Standard Deviation:
          >N (U
1.31E+00 Total Standard Deviation:
C)
1.31E+00 Maximum: 7.01 E+00'jn&f ,4 'S ig tes t -Sigults'ni , -; RCiomte'i.
    .S 0    0 1)
Adjusted N Value: 28 S+ Value: 24 Critical Value: 18 Sign test results: Pass Sufficient samples collected:
E    co 0.
Pass Maximum value <DCGLw: Investigate Mean and Sign tests pass Median value <DCGLw: Pass Mean value <DCGLw: Pass Maximum value <DCGLe, : Fail Remediated Total Standard Deviation  
CL U)
<=Sigma: -."'-Investigate Sign test passes Criteria comparison results: Fail Remediated,mean and sign pass The survey unit passes all conditions:
L=1.4, N=24                                                              This survey area unit is approximately 48 square meters
Fail Remediated, Sign Passes- SUpasses FROi ID-SU3-SoilSign-UNITY~xs FR-01 10-03, Revision 0 12/6104 4:43 PM Page 19 of 22 FR-0110 SU-3 Quantile Plot 1.6 1.4 C 0 C.b,"1.t'J<C*00%la N._%._O A-._*1.2 1 0.8 0.6 0.4-6 +i i I I.* Activity (unitized)-Median (unitized)l
 
.1 0.2 0 0 25 50 75 100 Percent Page/Date/Time Database Variable One-Sample T-Test Report 2 12/7/04 12:16:28 PM C:\Program Files\NCSS97\FRQ11 OSU3.SO C2 Plots Section Histogram of FR-0110, SU-3 20 U)E CD 0.0 E z3 15 10*5.; I.!', , '- tr 4.I ZI( II_. N -' _!i I I ., n _U _ .._ ...; ... i. .......0.0 0.5 1.0 Activity (unitized) 1.5 2.0 FR-0I 10-03, Revision 0 Page 21 of 22 One-Sample T-Test Power Analysis Page/Date/Time 2 1217/04 12:17:00 PM Chart Section a)CL 0o Retrospective Power Curve to- .----..0.8 --------------0.64I 0O A- --------- --* .\ .0.0 A I 0.4 0.6 0.8 1.0 I2 a Survey Unit Mean (unitized)
Attachment 2 Survey Unit Instrumentation FR-01 10-03, Revision 0 Page 14 of 22
 
TABLE 2-1 INSTRUMENT INFORMATION E-600 S/N            I    Probe S/N (type) 1929              1    725890 (SSPA-3) 2489              J    726560 (SSPA-3)
HPGc Detectors for Lab Analysis of Volumetrie Samples Detector Number                MDC (pCi/g)
FSS-l                      0.04 - 0.10 FSS-2                      0.04 - 0.10 DET2                      0.10 (nominal)
DET3                      0.10 (nominal)
TABLE 2-2 INSTRUMENT SCAN MDC, DCGL, INVESTIGATION LEVEL, AND DCGLEMC Detector                      SSPA-3               J        Comments Scan MDC                            5.9                Design Scan MDC, LTP (pCi/g)                                              Table 5-6 (Reference 4)
DCGL                        2.39 Cs-137             Reference 5 (pCi/g)                    0.86 Co-60 Investigation Level                                        3 sigma of Background (Alarm Setpoint)                    21,110                plus BKG cpm                                                    .-
Design DCGLEAIC                  16.3 Cs-137              DCGL
* AF (6.8)
(Pcilg)                      5.8 Co-60 FR-01 10-03, Revision 0 Page 15 of 22
 
Attachment 3 Investigation Table FR-O1 10-03, Revision 0 Page 16 of 22
 
TABLE 3-1 INVESTIGATION INITIAL SURVEY                                                    INVESTIGATION RESULTS Alarm  Alarm Max. ScaI                                                                ICGLDC Grid  Setpoint Value    au  AreFactorea    Unityml  Sample Number            Co60      + /        Cs-137                DCGLEMC cpm    cpm    Va_    m          Times AF                                            . _______                      Unity So0l      21110   21100  19140    5   3.6     3.6     XROI10-03-S001        6.26E-01 4.81E-02     5.93E-01     6.23E-02   <DCGL S002      21110   20300  21400    5   3.6     3.6     XROI 10-03-S006        1.74E-01 2.79E-02      1.57E-01     2.79E-02    <DCGL S003      21110   22100  18300    5   3.6     3.6     XROI10-03-S002        9.01E-01 5.60E-02     8.87E-01    17.37E-02    0.30 S004      21110    hb  20600      5    3.6      3.6    XRO1 10-03-ROOI        < 1.48E-01             < l.30E-01                <DCGL S005      21110   21300  21500      5   3.6     3.6     XR0110-03-R002        < 1.26E-01             < 9.62E-02               <DCGL S008      21110     lb   17120    5   3.6     3.6     XROI 10-03-S003        1.38E-01 2.70E-02     6.08E-02    2.63E-02   <DCGL S009      21110    lb    16280    5    3.6      3.6      XROI 10-03-S004        4.29E-01 3.88E-02     2.65E-01     4.01E-02   <DCGL Solo      21110    lb    15790    5    3.6      3.6      XROI10-03-S005        3.86E-01 4.05E-02      2.77E-01    4.39E-02    <DCGL S006*       N/A    N/A    N/A    1.7  8.3      8.3      FROI 10-03-SO05        7.52E-01  4.98E-02      8.65E-01      7.21 E-02  0.11 1                          =    =                    Unit mean          2.06E-01               1.96E-01                  0.32
-                                                                                                              EMC Unity Sum        0.74 NOTES
: 1. lb - investigated due to low background in the grid
: 2. hb - investigated due to high background in the grid
: 3. * - S006 is the value from the direct sampling, included because the direct value was >DCGL but there was no alarm in the grid
: 4. "<" indicates values less than the minimum detectable activity (MDA)
: 5. Scan area used for S006 was based on grid area of 5 m2 with three samples (5/3 = 1.7).
FR-01 10-03, Revision 0 Page 17 of 22
 
Attachment 4 Statistical Data FR-O 110-03, Revision 0 Page 18 of 22
 
Survey Package FRO110 Unit 3 UNITY Soil Sign Test Summary t'.-        '.Y'',WEv'autio input                enaiu                                                        .__________________________________
Survey Package:                        FRO110 Survey Unit:                              03 Evaluator:                         WJC DCGLw:                     1.OOE+00 using 2.39 pCi/gm DCGL DCGLemc:                     6.80E+00 LBGR:                   5.00E-01 Sigma:                    5.66E-01 Type I error:                           0.05 Type II error:                            0.1 Type II error changed to 0.1 Nuclide:                      UNITY Soil Type:                           N/A
                        .^<''9      ;CluaeVale              ir-f  jt,'-,,j        ;'      -  S$-9A      i    -Cnmdnty      !,,
Z,<,:                        1.645 ZI.P:1.282 Sign p:                  0.788145 Calculated Relative Shift:                              0.8 Relative Shift Used:                            0.8 Uses 3.0 if Relative Shift is >3 N-Value:                              26 N-Value+20%:                                32 it    .X-. ..2qt~i.*Sample Data Values                A          c .... "br". nt;'..........
Number of Samples:                                 28 Median:                   2.78E-01 Mean:                   6.69E-01 Net Sample Standard Deviation:                           1.31E+00 Total Standard Deviation:                       1.31E+00 Maximum:                     7.01 E+00
            'jn&f               'S,4 -Sigults'ni ig tes t                                       , -               RCiomte'i.
Adjusted N Value:                               28 S+ Value:                             24 Critical Value:                             18 Sign test results:                         Pass Sufficient samples collected:                             Pass Maximum value <DCGLw:                         Investigate Mean and Sign tests pass Median value <DCGLw:                             Pass Mean value <DCGLw:                               Pass Maximum value <DCGLe,:                                     Fail Remediated Total Standard Deviation <=Sigma:                     ."'-Investigate
                                                                            -                Sign test passes Criteria comparison results:                               Fail Remediated,mean and sign pass The survey unit passes all conditions:                                   Fail Remediated, Sign Passes- SUpasses FROi ID-SU3-SoilSign-UNITY~xs                               FR-01 10-03, Revision 0                                                     12/6104 4:43 PM Page 19 of 22
 
FR-0110 SU-3 Quantile Plot 1.6 1.4
        *00% 1.2 la N
1 0b, CC.
"1.
        %._O
* Activity (unitized)
A-   0.8 t'J<                                                -Median (unitized)l.1 C
0.6                 - 6 +
0.4 i i       I         I.
0.2 0
25       50       75   100 Percent
 
One-Sample T-Test Report Page/Date/Time                        2 12/7/04 12:16:28 PM Database                              C:\Program Files\NCSS97\FRQ11 OSU3.SO Variable                              C2 Plots Section Histogram of FR-0110, SU-3 20 U) 15 E         ;      I CD 10*   .   !',
0
.0 E          ,'- tr4.
z3    5.
I ZI(II
_. N       -   ' _!
i I             I     .,
n _
_    .   . _                   . .; .   . i... .   . . ....
0.0                 0.5                   1.0       1.5         2.0 Activity (unitized)
FR-0I 10-03, Revision 0 Page 21 of 22
 
One-Sample T-Test Power Analysis Page/Date/Time         2   1217/04 12:17:00 PM Chart Section Retrospective Power Curve to-   .----..
0.8 -           --             -       - ---------
a) 0.64I 0o CL 0OA-                 *  - -- -     . \          .    ------ -
0.0                                       A                   I 0.4             0.6           0.8           1.0           I2 a Survey Unit Mean (unitized)
FR-01 10-03, Revision 0 Page 22 of 22}}
FR-01 10-03, Revision 0 Page 22 of 22}}

Latest revision as of 10:50, 15 March 2020

Final Status Survey Release Record FR-0110-03, Rev 0, Pab Alleyway Survey Unit 3.
ML043500340
Person / Time
Site: Maine Yankee
Issue date: 12/07/2004
From: Cooper W, Pillsbury G
Maine Yankee Atomic Power Co
To:
NRC/FSME
References
FR-0110-03, Rev 0
Download: ML043500340 (22)


Text

MAINE YANKEE FINAL STATUS SURVEY RELEASE RECORD FR-O01O PAB ALLEYWAY SURVEY UNIT 3 Prepared By:  ? - _ Date: _________

FSS Engineer - Signature Prirfted Name Reviewed By: ___ Date: ct FSS Specialist- i n ture

,!Piri~ed ydme Reviewed By: h iDate: //

$ npendcnt* l S-jAignature Printed Name Approved By: ___ _ Date:

/sFS ndentO -Signature Printed Name Revision 0

MAINE YANKEE FINAL STATUS SURVEY RELEASE RECORD FR-0110 PAB ALLEYWN'AY SURVEY UNIT 3 A. SURVEY UNIT DESCRIPTION Survey Unit FR-01 10-03 is an excavated area that consists of soil media. The excavation was made in order to remove buried pipes running between the PAB and the Containment Spray Building. The survey unit is located near grid coordinates 407,500 N and 623,800 E using the Maine State Coordinate System (West Zone) NAD 1927, as shown on Map FRO I 0-00, Attachment 1.

The Alleyway was originally a paved area above the current pipe excavation located within the Restricted Area. It was bordered on the west by the Personnel Hatch, Main Steam Valve House/Reactor Motor Control Center, and the Emergency Feedwater Building, on the east by the Service Building, and by the PAB on the north. Survey Unit 3 is approximately 48 m2 .

B. SURVEY UNIT DESIGN INFORMATION The area was designated a Class I land survey unit per the LTP (Table 5-IC, ROI 00, RCA Yard West). The Alleyway excavation was begun in late 2002 and the removed soil was spread and surveyed for possible reuse. Nearly all of the removed soil was found to be acceptable for reuse. The soil survey effort was suspended when the ground froze, and upon returning to soil surveying in the spring of 2003, it was determined that radioactivity had migrated into the remaining soil from the open, abandoned pipes within the excavation pit.

Consequently, significant soil remediation had to be performed. Since the survey unit was already Class 1, no reassessment of classification was required.

The survey unit design parameters are shown in Table 1. Given a relative shift of 1.2, it was determined that 23 direct measurements were required for the Sign Test, however, the number of samples was increased to improve the area factor. Twenty-eight direct measurements were actually performed. Measurement locations wvere randomly determined using a fixed grid with a randomly determined start point and are illustrated on the map FR 0 1O-SS-03 (Attachment 1). All direct measurements consisted of soil samples obtained at the required locations. The samples were analyzed by laboratory gamma spectroscopy.

Ten scan grids of approximately 5 m2 were established, as indicated on survey map FR 0110-03. A 100% scan coverage of the area was required. The survey instruments used, their MDCs, and alarm setpoints are provided in Attachment 2.

Background values were established for the scan measurements based on local scaler values in the survey area. These background values were used to establish scan alarm setpoints, and to confirm the scan MDCs used were appropriate. Since the design DCGLENtc is greater than the investigation level, no EMC sample size adjustment is required.

FR-01 10-03, Revision 0 Page 2 of 22

TABLE I SURVEY UNIT DESIGN PARAMETERS Survey Unit Design Criteria Basis Area 48 <Class

<m I limit per LTP Rev. 3 Based on an LBGR of 1.6 pCi/g, sigma of 1.33 pCi/g' Number of Direct 24 (23 required) and a relative shift of 1.2, N Measurements Required was adjusted to increase the area factor Type I = Type 11 = 0.05 Sample Area 2.0 m' 48mT/24 Sample Grid Spacing 1.4 m x 1.4 ml Scan Grid Area -5 <1Om' Area Factor 6.8 LTP Rev. 3 Table 6-12 Scan Survey Area 48 mz Class I Area - 100%

Background

SSPA-3 (scan) Average background + DI 6-150, LTP Section 5 SSP(scan)

A- 1000 cpm _ _ _ _ _ _ _ _ _ _ _ _ _

Sca Inesigaio Leel 3 sigma of background EC-009-01 (MY)

Scan Investigation Level plus BKG (Reference 1), See Table 2-2 DCGL 3.2 pCi/g2 LTP, Rev. 3 (Reference 3), and addenda (Reference 4)

Design DCGLENIC 21.76 Area factor

  • DCGL C. SURVEY RESULTS Twenty-eight direct soil measurements were made and the results are presented in Table 2.

Four of the direct measurements were above the DCGL unity fraction. The maximum direct result (SO 1I) was seven times the DCGL unity fraction. This grid (S002) was remediated, and a subsequent sample was less than the DCGL. This post-remediation sample result is used in Table 2. The original result is used in the Sign Test. The maximum post-remediation result was 1.52 times the DCGL. The mean residual activity is 43% of the unity fraction.

The ten grids were scanned as required. Eight of the ten grids required investigation. Three were due to a low background at the start of the scan, three because the scan setpoint was exceeded, one because the background exceeded the alarm setpoint, and one (S002 as noted above) because the direct soil sample results exceeded the DCGL by a large margin. A discussion of the investigation performed in the survey unit is contained in Section D.

Design sigma from the LTP Rev. 3, Table 5-IC for ROIOO, RCA Yard West.

2 Design initially used a DCGL of 3.2 pCilg Cs-137. The Cs-137 DCGL was later reduced to 2.39 pCi/g (Reference 5).

FR-O1 10-03, Revision 0 Page 3 of 22

It should be noted that the Co-60 DCGL is 0.86 pCi/g. This is an "adjusted DCGL" and can be derived from the unitized dose for surface soil, LTP Table 6-7 and the updated dose model in the activated concrete related license amendment (References 5 and 6). The Co-60 DCGL for surface soil is I pCi/g x 10/6.58 mrem/y (from LTP Table 6-7) or 1.5 pCi/g Co-60. This DCGL is further limited by the dose contribution allowed for surface soil only in the basement fill model per LTP Section 6 Attachment IX (revised LTP Table 6-1 1), in the activated concrete license amendment. Thus, the Co-60 adjusted DCGL is 1.5 pCi/g x 5.63/1 0 mrem/y or 0.86 pCi/g.

TABLE 2 DIRECT MEASUREMENTS SapeNme Sample Number Co-60 (PCi/g) Unetany Cs-137 (Pci) Ucrany of Unity Value Unitized Rule FROI 10-03-SOOI 5.32E-01 5.73E-02 3.72E-01 5.96E-02 0.77 FROI 0-03-S002 4.71E-O1 4.35E-02 3.72E-01 5.09E-02 0.70

-FROI 10-03-S003 3.06E-01 2.98E-02 2.37E-O1 3.33E-02 0.45 FROI 0-03-S004 1.13E-01 2.38E-02 1.02E-01 2.59E-02 0.17 FROI 10-03-SO05 7.52E-01 4.98E-02 8.65E-01 7.21E-02 1.24 FROI10-03-S006 7.42E-01 5.63E-02 9.65E-01 8.81E-02 1.27 FROI 10-03-S007 5.70E-01 4.52E-02 5.35E-01 5.61E-02 0.89 FROI 10-03-S008 4.28E-01 4.22E-02 4.53E-01 5.53E-02 0.69 FROI 0-03-SO09 5.41E-01 4.45E-02 5.93E-01 6.02E-02 0.88 FRO I10-03-SO 10 2.71E-01 3.26E-02 2.81E-01 4.41E-02 0.43 FR0110-03-SOII* 1.74E-01 2.79E-02 1.57E-01 3.29E-02 0.27 FROI 10-03-SO 12 8.72E-01 5.50E-02 1.20E+00 9.29E-02 1.52 FROI 10-03-S013 1.55E-01 2.28E-02 1.21E-01 2.73E-02 0.23 FRO] 10-03-SO14 1.41E-01 2.54E-02 8.OOE-02 2.54E-02 0.20 FROI 10-03-SO15 2.02E-01 2.64E-02 2.65E-01 3.55E-02 0.35 FRO) 10-03-S016 8.33E-02 2.58E-02 6.44E-02 2.37E-02 0.12 FROI 10-03-S017 1.11E-O1 2.23E-02 5.63E-02 2.12E-02 0.15 FRO] 10-03-SO18 1.77E-01 2.28E-02 1.39E-01 2.65E-02 0.26 FRO I10-03-SO19 5.87E-02 3.49E-02 7.OOE-02 2.78E-02 0.10 FROI 0-03-S020 1.66E-01 2.23E-02 1.30E-01 2.68E-02 0.25 FROI 10-03-S021 2.02E-01 2.60E-02 2.83E-01 3.79E-02 0.35 FROI 0-03-S022 1.48E-01 2.25E-01 2.88E-01 3.49E-02 0.29 FROI 10-03-S023 4.53E-02 2.69E-02 4.44E-02 2.11E-02 0.07 FROI 10-03-S024 <4.65E-02 3.55E-02 1.86E-02 0.07 FRO) 10-03-S025 <4.69E-02 <4.43E-02 0.07 FROI 10-03-S026 <4.69E-02 <4.03E-02 0.07 FROI 0-03-S027 <4.36E-02 <3.86E-02 0.07 FRO 10-03-S028 <3.16E-02 6.02E-02 2.27E-02 0.06 Mean 2.67E-01 2.82E-01 0.43 Median I.70E-0 I 1.48E1-0 _ 0.27 Standard Deviation 2.46E-01 3.04E-0 1 0.41 Range 0.032 to 0.87 __0.036 to 1.20 0.062 to 1.52

  • Since the grid for sample SOil lvas remediated,the post-remediation result is showvn.

The original results were used for the Sign Test (Attachment 4).

"<" indicates values less than the minimum detectable activity (MDA)

FR-OI 10-03, Revision 0 Page 4 of 22

D. SURVEY UNIT INVESTIGATIONS PERFORMED AND RESULTS Survey Unit 3 was partitioned into 10 grids as shown on map FR 0110-03 (Attachment 1).

Of the 10 grids, 8 required investigation due to a low background at the start of the scan (3),

elevated direct sample results (1), the background exceeded the alarm setpoint (1), or the alarm setpoint was exceeded (3) during the scan. Four direct measurements exceeded the LTP Addendum revised DCGL (Reference 5). Three of these were in grids that were investigated as noted above. The fourth was not investigated because it did not exceed the DCGLs that were in effect at the time of the survey. This sample has been included in the Elevated Measurement Comparison Test (Table 3-1). One grid with a direct measurement that exceeded the DCGL was remediated and resampled during the investigation process.

Investigation of the scan grids consisted of a 100% scan with the SSPA-3. The highest reading in the grid was flagged and a sample was collected for laboratory gamma analysis.

The results of the investigations are shown in Attachment 3. Detectable concentrations of Co-60 and Cs-1 37 were found in six of the investigated grids with one sample's activity exceeding the unitized DCGL. Samples from the other two investigated grids did not show positive Co-60 or Cs-137, and so, for purposes of the EMC test, were assumed to be present at the observed MDA. The investigation results, including the positive results from an uninvestigated grid, are summarized in Attachment 3 (Table 3-1).

E. SURVEY UNIT DATA ASSESSMENT An analysis of the direct sample measurement results, including the mean, median, standard deviation, and sample result range, are provided in Table 2. Of the 28 soil samples, four had concentrations of Co-60 and Cs-137 that exceeded unity. The grid for one of these samples was subsequently remediated and resampled. The results of the post-remediation sampling are used in this data assessment except that the original sample results wvere used in the Sign Test. The average of the DCGL unity fractions was 0.43 and the maximum unity fraction was 1.52 times the DCGL. The Elevated Measurement Comparison unity test was applied to the investigation data and conservatively includes one direct sample that was in a grid that was not investigated. The EMC test was 74% of unity, passing the EMC test. The final sigma was greater than the design sigma. A review of data indicates that a sufficient number of samples were collected provided the type 11 error is 0.10. The survey unit passed the Sign Test. Therefore, no additional samples were required.

For illustrative purposes, as indicated in LTP Section 5.9.3, a simplified general retrospective dose estimate can be calculated from the average residual contamination level by subtracting the established mean fallout Cs-137 background value 3 (0.19 pCi/g) for disturbed soil from the survey unit sample mean Cs-137 activity (0.282 pCi/g). The result is a net value of 0.092 pCi/g. When the survey unit mean for Co-60 (0.267 pCi/g) is included, this would equate to an annual dose rate of 1.96 mrem/y. 4 However, for the purposes of demonstrating compliance with the radiological criteria for license termination and the enhanced State Criteria, background activity is not subtracted from the soil sample analysis activity values.

3 See Attachment E to Maine Yankee Procedure PMP 6.7.8 (Reference 2) 4 [(0.276 pCi/g/O.86 pCi/g) + ((0.282 pCi/g - 0. 19 pCilg) / 2.39)] x 5.63 mrem/y = 1.96 mrem/y FR-01 10-03, Revision 0 Page 5 of 22

F. ADDITIONAL DATA EVALUATION Attachment 4 provides additional data evaluation associated with this Survey Unit, including relevant statistical information. Based on survey unit direct measurement data, this attachment provides the Sign Test Summary, Quantile Plot, Histogram, and Retrospective Power Curve.

1. The Sign Test Summary provides an overall summary of design input and resulting calculated values used to determine the required number (N) of direct measurements (per LTP Section 5.4.2). The Sign Test Summary is a separate statistical analysis that also calculates the mean, median, and standard deviation of the direct measurements.

The critical value and the result of the Sign Test are provided in the Sign Test Summary table, as well as a listing of the key release criteria. As is shown in the table, all of the key release criteria, except four samples had activity above the unitized DCGL and the final sigma was greater than the design value, were satisfied for the FSS of this survey unit. The elevated measurements were appropriately evaluated and found acceptable.

Similarly, the final sigma was evaluated in Section E and was found to be acceptable.

2. The Quantile Plot was generated from direct measurement data listed in Table 2. The data set and plot are consistent with expectations for a Class I survey unit. The survey unit average is well below the DCGLs of 0.86 pCi/g and 2.39 pCi/g for Co-60 and Cs-137 respectively.
3. A Histogram Plot was also developed based on the direct measurement values. This plot shows that the direct data were essentially a log-normal distribution with no outliers.
4. A Retrospective Power Curve was constructed, based on FSS results. The curve shows that this survey unit having a mean residual activity at a small fraction of the DCGL has a high probability ("power") of meeting the release criteria. Thus, it can be concluded that the direct measurement data support rejection of the null hypothesis, providing high confidence that the survey unit satisfied the release criteria and that the data quality objectives were met.

G. CHANGES IN INITIAL SURVEY UNIT ASSUMPTIONS ON EXTENT OF RESIDUAL ACTIVITY The survey was designed as a Class I area; the FSS results were consistent with that classification. Since the DCGLs were changed (decreased) by addendum to the LTP to account for the activated containment concrete pathway the design of the survey unit was confirmed and data reviewed against the revised DCGLs. Two of the four direct samples would still be above unity with the previous, higher DCGLs.

FR-OI 10-03, Revision 0 Page 6 of 22

H. LTP CHANGES SUBSEQUENT TO SURVEY UNIT FSS The FSS of Survey Unit 3 was designed and performed per the criteria LTP Rev. 3 with Addenda (Reference 3 and 4). The subsequent LTP change with potential impact to this FSS requiring evaluations was the LTP change related to the activated concrete license amendment (Reference 5 and 6) which reduced the DCGLs for soil inside the RA.

These changes were evaluated and found to have no impact on the FSS results or conclusions for this survey unit. The revised DCGLs were used for the evaluation of the results included herein.

1. CONCLUSION The FSS of this survey unit was designed based on the LTP designation as a Class I area.

The survey design parameters are presented in Table 1. The required number of direct measurements was determined for the Sign Test in accordance with the LTP. As presented in Table 2, the average of the direct measurements was well below the DCGL unity.

A Sign Test Summary analysis was conducted. Using the initial estimated sigma combined with the decreased DCGL, the sign test indicated that an insufficient number of direct samples was collected. By increasing the type II error to 0.10 the Sign Test Summary analysis demonstrated that the Sign Test criteria were satisfied and a sufficient number of samples were obtained.

The Retrospective Power Curve shown in Attachment 4 confirmed that sufficient samples were taken to support rejection of the null hypothesis, providing high confidence that the survey unit satisfied the release criteria and the data quality objectives were met. Attachment 4 also revealed that direct measurement data represented essentially a log-normal distribution, with no outliers.

The scan survey design for this survey unit was developed in accordance with the LTP with significant aspects of the design discussed in Section B and Table 1. Verified alarms were investigated and the survey unit meets Elevated Measurement Comparison unity rule per LTP methodology.

It is concluded that FRO I 10 Survey Unit 3 meets the release criteria of I OCFR20.1402 and the State of Maine enhanced criteria.

FR-01 10-03, Revision 0 Page 7 of 22

J. REFERENCES

1. Maine Yankee Engineering Calculation, EC-009-01
2. Approach for Dealing with Background Radioactivity for Maine Yankee Final Status Surveys, Attachment E to Maine Yankee Procedure PMP 6.7.8, FSS Data Processing and Reporting
3. Maine Yankee License Termination Plan, Revision 3, Maine Yankee letter to the NRC, MN-02-048, dated October 15, 2002
4. Maine Yankee License Termination Plan, Revision 3 Addenda, Maine Yankee letter to the NRC, MN-02-06 1, dated November 26,2002
5. Proposed License Amendment Related to Changes in the Activated Concrete Remediation Plans, Maine Yankee letter to the NRC, MN-03-049, dated September 11, 2003
6. Issuance of License Amendment No. 170, NRC letter to Maine Yankee, dated February 18, 2004 FR-01 10-03, Revision 0 Page 8 of 22

Attachment 1 Survey Unit Maps FR-O1 10-03, Revision 0 Page 9 of 22

Maine Yankee _ i Map ID#: FR 011-00 Decommissioning Team MaiIe Yankee Decommissioning ProjctSurvey Form Survey Type: -I Characterization 3i Turnover z Final Status Survey Survey Area Name: Alleyway Excavation lDate: 6-25-03 623,000 E 623,500 E 624.000 E 624,500 E 625,000 E o o o o o o a C aJ Co Ca O z 2O Z 2 2 Z Z Z Z Z Z SCALE Cft)

MN 0 400 800 1200 E: N FR-O1 10-03, Revision 0 Page 10 of 22

W 0 o

Final Statusco Survey Unit Reference Map Alleyway Piping Excavation Pit 0.

U x

H<thIPersone/ Cotiment E)

=4 U) Sa E eu UClirg Slab *'* ..- ili ~T.f.JIW a) 0;).

  • 11I-reA to be surveyed at a later date Restricted Area Alleyway..

- 0 as part of FROI Il, Survey Unitl14PanVe Cl) 0.n E0 5m loin 15m 20ri

-en)

Ce FR 01 10-03: Alleyway Piping Excavation Pit -

0 MI Soil Area West of Ledge Survey Scan 01-10 p5: o o oQ

_0 G U- ,6t I>'

X X ii W 0--

CL 2

E t, a L.4 tj L..

zE ' C) 01 02 03 04 CO 05 06 07 08 09 10

? C

, 0 E

MSVH & PHN Concrete Walls 5U

.t - 2 tj .2_

N 1)

I 41 1

1

.i i

0 5m 10m

.i I - -i  ; I E 12 a) D 0 co This survey aresa un is approximately 48 square maters

$cU) FR 011 0-SS-03, Direct Point Survey, Soil 0

C4 9 0

("4 (0 Survey Unit 03 OQ (U c 0

(U Alleyway Piping Excavation Pit oO~2v C:

W.CD 0

X Cl)

(U Soil Area West of Ledge to Wall 0 x

w

>1 (U

(U E

zZ a

(U (U .-1.401m1 2

(U ,.X1 I YR.

! S5rv -- 1 98nm 1.96m l--

co ryP

'(D cM (U

0 2(

  • UY U7U
  • Ub
  • UO a U4 a Wi a UZ a U1 -.-- . ._

U) . !j ).'11

.0 0 C4 10

  • 11 0 12 0 13 0 14 0 15 ' 16
  • 17 0 18
  • 19 2.15m (DU co E - 28
  • 27
  • 26
  • 25
  • 24
  • 23
  • 22 C 021 020 -_ _._

C I.-

0

>-.2 U) 0

. (U Iii N

,o~

>N (U

C)

.S 0 0 1)

E co 0.

CL U)

L=1.4, N=24 This survey area unit is approximately 48 square meters

Attachment 2 Survey Unit Instrumentation FR-01 10-03, Revision 0 Page 14 of 22

TABLE 2-1 INSTRUMENT INFORMATION E-600 S/N I Probe S/N (type) 1929 1 725890 (SSPA-3) 2489 J 726560 (SSPA-3)

HPGc Detectors for Lab Analysis of Volumetrie Samples Detector Number MDC (pCi/g)

FSS-l 0.04 - 0.10 FSS-2 0.04 - 0.10 DET2 0.10 (nominal)

DET3 0.10 (nominal)

TABLE 2-2 INSTRUMENT SCAN MDC, DCGL, INVESTIGATION LEVEL, AND DCGLEMC Detector SSPA-3 J Comments Scan MDC 5.9 Design Scan MDC, LTP (pCi/g) Table 5-6 (Reference 4)

DCGL 2.39 Cs-137 Reference 5 (pCi/g) 0.86 Co-60 Investigation Level 3 sigma of Background (Alarm Setpoint) 21,110 plus BKG cpm .-

Design DCGLEAIC 16.3 Cs-137 DCGL

(Pcilg) 5.8 Co-60 FR-01 10-03, Revision 0 Page 15 of 22

Attachment 3 Investigation Table FR-O1 10-03, Revision 0 Page 16 of 22

TABLE 3-1 INVESTIGATION INITIAL SURVEY INVESTIGATION RESULTS Alarm Alarm Max. ScaI ICGLDC Grid Setpoint Value au AreFactorea Unityml Sample Number Co60 + / Cs-137 DCGLEMC cpm cpm Va_ m Times AF . _______ Unity So0l 21110 21100 19140 5 3.6 3.6 XROI10-03-S001 6.26E-01 4.81E-02 5.93E-01 6.23E-02 <DCGL S002 21110 20300 21400 5 3.6 3.6 XROI 10-03-S006 1.74E-01 2.79E-02 1.57E-01 2.79E-02 <DCGL S003 21110 22100 18300 5 3.6 3.6 XROI10-03-S002 9.01E-01 5.60E-02 8.87E-01 17.37E-02 0.30 S004 21110 hb 20600 5 3.6 3.6 XRO1 10-03-ROOI < 1.48E-01 < l.30E-01 <DCGL S005 21110 21300 21500 5 3.6 3.6 XR0110-03-R002 < 1.26E-01 < 9.62E-02 <DCGL S008 21110 lb 17120 5 3.6 3.6 XROI 10-03-S003 1.38E-01 2.70E-02 6.08E-02 2.63E-02 <DCGL S009 21110 lb 16280 5 3.6 3.6 XROI 10-03-S004 4.29E-01 3.88E-02 2.65E-01 4.01E-02 <DCGL Solo 21110 lb 15790 5 3.6 3.6 XROI10-03-S005 3.86E-01 4.05E-02 2.77E-01 4.39E-02 <DCGL S006* N/A N/A N/A 1.7 8.3 8.3 FROI 10-03-SO05 7.52E-01 4.98E-02 8.65E-01 7.21 E-02 0.11 1 = = Unit mean 2.06E-01 1.96E-01 0.32

- EMC Unity Sum 0.74 NOTES

1. lb - investigated due to low background in the grid
2. hb - investigated due to high background in the grid
3. * - S006 is the value from the direct sampling, included because the direct value was >DCGL but there was no alarm in the grid
4. "<" indicates values less than the minimum detectable activity (MDA)
5. Scan area used for S006 was based on grid area of 5 m2 with three samples (5/3 = 1.7).

FR-01 10-03, Revision 0 Page 17 of 22

Attachment 4 Statistical Data FR-O 110-03, Revision 0 Page 18 of 22

Survey Package FRO110 Unit 3 UNITY Soil Sign Test Summary t'.- '.Y,WEv'autio input enaiu .__________________________________

Survey Package: FRO110 Survey Unit: 03 Evaluator: WJC DCGLw: 1.OOE+00 using 2.39 pCi/gm DCGL DCGLemc: 6.80E+00 LBGR: 5.00E-01 Sigma: 5.66E-01 Type I error: 0.05 Type II error: 0.1 Type II error changed to 0.1 Nuclide: UNITY Soil Type: N/A

.^<9 ;CluaeVale ir-f jt,'-,,j  ;' - S$-9A i -Cnmdnty  !,,

Z,<,: 1.645 ZI.P:1.282 Sign p: 0.788145 Calculated Relative Shift: 0.8 Relative Shift Used: 0.8 Uses 3.0 if Relative Shift is >3 N-Value: 26 N-Value+20%: 32 it .X-. ..2qt~i.*Sample Data Values A c .... "br". nt;'..........

Number of Samples: 28 Median: 2.78E-01 Mean: 6.69E-01 Net Sample Standard Deviation: 1.31E+00 Total Standard Deviation: 1.31E+00 Maximum: 7.01 E+00

'jn&f 'S,4 -Sigults'ni ig tes t , - RCiomte'i.

Adjusted N Value: 28 S+ Value: 24 Critical Value: 18 Sign test results: Pass Sufficient samples collected: Pass Maximum value <DCGLw: Investigate Mean and Sign tests pass Median value <DCGLw: Pass Mean value <DCGLw: Pass Maximum value <DCGLe,: Fail Remediated Total Standard Deviation <=Sigma: ."'-Investigate

- Sign test passes Criteria comparison results: Fail Remediated,mean and sign pass The survey unit passes all conditions: Fail Remediated, Sign Passes- SUpasses FROi ID-SU3-SoilSign-UNITY~xs FR-01 10-03, Revision 0 12/6104 4:43 PM Page 19 of 22

FR-0110 SU-3 Quantile Plot 1.6 1.4

  • 00% 1.2 la N

1 0b, CC.

"1.

%._O

  • Activity (unitized)

A- 0.8 t'J< -Median (unitized)l.1 C

0.6 - 6 +

0.4 i i I I.

0.2 0

0 25 50 75 100 Percent

One-Sample T-Test Report Page/Date/Time 2 12/7/04 12:16:28 PM Database C:\Program Files\NCSS97\FRQ11 OSU3.SO Variable C2 Plots Section Histogram of FR-0110, SU-3 20 U) 15 E  ; I CD 10* .  !',

0

.0 E ,'- tr4.

z3 5.

I ZI(II

_. N - ' _!

i I I .,

n U _

_ . . _ . .; . . i... . . . ....

0.0 0.5 1.0 1.5 2.0 Activity (unitized)

FR-0I 10-03, Revision 0 Page 21 of 22

One-Sample T-Test Power Analysis Page/Date/Time 2 1217/04 12:17:00 PM Chart Section Retrospective Power Curve to- .----..

0.8 - -- - - ---------

a) 0.64I 0o CL 0OA- * - -- - . \ . ------ -

0.0 A I 0.4 0.6 0.8 1.0 I2 a Survey Unit Mean (unitized)

FR-01 10-03, Revision 0 Page 22 of 22