ML050470059: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
Line 74: Line 74:
: 1. Adjust NIS and N-16 Power Monitor channel if absolute difference is > 2%.
: 1. Adjust NIS and N-16 Power Monitor channel if absolute difference is > 2%.
: 2. Not required to be performed until 24 hours after THERMAL POWER is 2 15% RTP.
: 2. Not required to be performed until 24 hours after THERMAL POWER is 2 15% RTP.
_ -    - _ _-                  _ __--_-_          __-_--_-_
Compare results of calorimetric heat balance calculation                    24 hours to Nuclear Instrumentation System (NIS) and N-16 Power Monitor channel output.
Compare results of calorimetric heat balance calculation                    24 hours to Nuclear Instrumentation System (NIS) and N-16 Power Monitor channel output.
SR 3.3.1.3            ---- --- ~    ~~I
SR 3.3.1.3            ---- --- ~    ~~I
Line 84: Line 83:
COMANCHE PEAK - UNITS 1 AND 2                    3.3-10                          Amendment No. 64 ,114
COMANCHE PEAK - UNITS 1 AND 2                    3.3-10                          Amendment No. 64 ,114


                                                      ..
RTS Instrumentation 3.3.1 SURVEILLANCE REQUIREMENTS (continued)
RTS Instrumentation 3.3.1 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE                                      FREQUENCY SR 3.3.1.5 Perform ACTUATION LOGIC TEST.                                    92 days on a STAGGERED TEST BASIS SR 3.3.1.6                        --------------N------
SURVEILLANCE                                      FREQUENCY SR 3.3.1.5 Perform ACTUATION LOGIC TEST.                                    92 days on a STAGGERED TEST BASIS SR 3.3.1.6                        --------------N------
                                                  -------------- --
Not required to be performed until 72 hours after achieving equilibrium conditions with THERMAL POWER 275 % RTP.
Not required to be performed until 72 hours after achieving equilibrium conditions with THERMAL POWER 275 % RTP.
Calibrate excore channels to agree with incore detector        92 EFPD measurements.
Calibrate excore channels to agree with incore detector        92 EFPD measurements.
Line 100: Line 97:
SURVEILLANCE                                      I    FREQUENCY SR 3.3.1.8      -  ---------------          --      NOTE      ----------------
SURVEILLANCE                                      I    FREQUENCY SR 3.3.1.8      -  ---------------          --      NOTE      ----------------
This Surveillance shall include verification that interlocks P-6 and P-1 0 are in their required state for existing unit conditions.
This Surveillance shall include verification that interlocks P-6 and P-1 0 are in their required state for existing unit conditions.
            - --  --  -  - ---      -- - --- _ - _ --  - --- -_--      -    - -
Perform COT.                                                              ----- NOTE-------
Perform COT.                                                              ----- NOTE-------
Only required when not .
Only required when not .

Latest revision as of 03:52, 15 March 2020

Tech Spec Pages for Amendments 114 & 114 Plant Protection Plant Times, Completion Times and Surveillance Test Intervals
ML050470059
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 01/31/2005
From:
NRC/NRR/DLPM
To:
Thadani M, NRR/DLPM, 415-1476
References
TAC MC1845, TAC MC1846
Download: ML050470059 (15)


Text

RTS Instrumentation 3.3.1 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME D. One Power Range Neutron -- NOTE---

Flux - High channel The inoperable channel or another inoperable. channel may be bypassed for up to 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> for surveillance testing and setpoint adjustment of other channels.

D.1.1 ------- NOTE----

Only required to be performed when the Power Range Neutron Flux input to QPTR is inoperable.

Perform SR 3.2.4.2. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> from discovery of THERMAL POWER > 75%

RTP AND Once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> thereafter AND D.1.2 Place channel in trip. 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> OR D.2 Be in MODE 3 78 hours9.027778e-4 days <br />0.0217 hours <br />1.289683e-4 weeks <br />2.9679e-5 months <br /> n

____________________________________________________________________________ A.-

(continued)

COMANCHE PEAK - UNITS 1 AND 2 3.3-3 Amendment No. 64 ,114

RTS Instrumentation 3.3.1 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME E. One channel inoperable. -------------NOTE--------------------

The inoperable channel or another channel may be bypassed for up to 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> for surveillance testing of I other channels.

E.1 Place channel in trip. 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> OR E.2 Be in MODE 3. 78 hours9.027778e-4 days <br />0.0217 hours <br />1.289683e-4 weeks <br />2.9679e-5 months <br /> F. One Intermediate Range F.1 Reduce THERMAL 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> Neutron Flux channel POWER to < P-6.

inoperable.

OR F.2 Increase THERMAL 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> POWER to > P-10.

G. Two Intermediate Range G.1 ---- NOTE----

Neutron Flux channels Limited boron inoperable. concentration changes associated with RCS inventory control or limited plant temperature changes are allowed.

Suspend operations Immediately involving positive reactivity additions.

AND G.2 Reduce THERMAL 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> POWER to < P-6.

H. Not used.

(continued)

COMANCHE PEAK - UNITS 1 AND 2 3.3-4 Amendment No. 4g ,114

RTS Instrumentation 3.3.1 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME M. One channel inoperable. ---------NOTE----

The inoperable channel or another channel may be bypassed for up to 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> for surveillance testing of I other channels.

M.1 Place channel in trip. 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> I OR M.2 Reduce THERMAL 78 hours9.027778e-4 days <br />0.0217 hours <br />1.289683e-4 weeks <br />2.9679e-5 months <br /> I POWER to < P-7.

N. Not used.

0. One Low Fluid Oil pressure -- NOTE---

Turbine Trip channel The inoperable channel or another inoperable. channel may be bypassed for up to 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> for surveillance testing of other channels.

0.1 Place channel in trip. 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> OR 0.2 Reduce THERMAL 76 hours8.796296e-4 days <br />0.0211 hours <br />1.256614e-4 weeks <br />2.8918e-5 months <br /> POWER to < P-9.

(continued)

COMANCHE PEAK - UNITS 1AND 2 3.3-6 Amendment No. 64 ,114

RTS Instrumentation 3.3.1 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME P. One or more Turbine Stop P.1 Place channel(s) in trip. 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />. I Valve Closure Turbine Trip channel(s) inoperable. OR P.2 Reduce THERMAL 76 hours8.796296e-4 days <br />0.0211 hours <br />1.256614e-4 weeks <br />2.8918e-5 months <br /> I POWER to < P-9.

Q. One train inoperable. -- NOTE------

One train may be bypassed for up to 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> for surveillance testing provided the other train is OPERABLE.

Q.1 Restore train to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> I OPERABLE status.

OR Q.2 Be in MODE 3. 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br /> I (continued)

COMANCHE PEAK - UNITS 1 AND 2 3.3-7 Amendment No. 64,.14

RTS Instrumentation 3.3.1 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME R. One RTB train inoperable. ------- NOTE ------- -

One train may be bypassed for up to 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> for surveillance testing I or maintenance, provided the other train is OPERABLE.

I R.1 Restore train to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> I OPERABLE status.

OR R.2 Be in MODE 3. 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br /> I S. One or more required S.1 Verify interlock is in 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> channel(s) inoperable. required state for existing unit conditions.

OR S.2 Be in MODE 3. 7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br /> (continued)

COMANCHE PEAK - UNITS I AND 2 3.3-8 Amendment No. 64 ,114

RTS Instrumentation 3.3.1 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.3.1.2 - - -- --------- NOTES -- -------- --------

1. Adjust NIS and N-16 Power Monitor channel if absolute difference is > 2%.
2. Not required to be performed until 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after THERMAL POWER is 2 15% RTP.

Compare results of calorimetric heat balance calculation 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> to Nuclear Instrumentation System (NIS) and N-16 Power Monitor channel output.

SR 3.3.1.3 ---- --- ~ ~~I


NI to -------- _____ __

1. Adjust NIS channel if absolute difference is 2 3%.
2. Not required to be performed until 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after THERMAL POWER is 2 50% RTP.

Compare results of the incore detector measurements to 31 effective full NIS AFD. power days (EFPD) 1-SR 3.3.1.4 -a--- --------- NOTE- -----a This Surveillance must be performed on the reactor trip bypass breaker for the local manual shunt trip only prior to placing the bypass breaker in service.

Perform TADOT. 62 days on a I STAGGERED TEST BASIS (continued)

COMANCHE PEAK - UNITS 1 AND 2 3.3-10 Amendment No. 64 ,114

RTS Instrumentation 3.3.1 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.3.1.5 Perform ACTUATION LOGIC TEST. 92 days on a STAGGERED TEST BASIS SR 3.3.1.6 --------------N------

Not required to be performed until 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> after achieving equilibrium conditions with THERMAL POWER 275 % RTP.

Calibrate excore channels to agree with incore detector 92 EFPD measurements.

SR 3.3.1.7 ------- --------

1. Not required to be performed for source range instrumentation prior to entering MODE 3 from MODE 2 until 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> after entry into MODE 3.
2. Source range instrumentation shall include verification.

that interlocks P-6 and P-10 are in their required state for existing unit conditions.

Perform COT. 184 days (continued)

COMANCHE PEAK - UNITS 1 AND 2 3.3-1 1 Amendment No. 6 ,114

RTS Instrumentation 3.3.1 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE I FREQUENCY SR 3.3.1.8 - --------------- -- NOTE ----------------

This Surveillance shall include verification that interlocks P-6 and P-1 0 are in their required state for existing unit conditions.

Perform COT. ----- NOTE-------

Only required when not .

performed within previous 184 days I Prior to reactor startup AND 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after reducing power below P-10 for power and intermediate instrumentation AND Four hours after reducing power below P-6 for source range instrumentation AND Every 184 days I thereafter (continued)

COMANCHE PEAK- UNITS 1 AND 2 3.3-12 Amendment No. 64 ,114

ESFAS Instrumentation 3.3.2 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME C. One train inoperable. ------------NOTE-------

One train may be bypassed for up to 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> for surveillance testing provided the other train is OPERABLE.

C.1 Restore train to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> OPERABLE status.

OR C.2.1 Be in MODE 3. 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br /> AND C.2.2 Be in MODE 5. 60 hours6.944444e-4 days <br />0.0167 hours <br />9.920635e-5 weeks <br />2.283e-5 months <br /> D. One channel inoperable. NOTE----

The inoperable channel or another channel may be bypassed for up to 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> for surveillance testing of other channels.

D.1 Place channel in trip. 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> OR D.2.1 Be in MODE 3. 78 hours9.027778e-4 days <br />0.0217 hours <br />1.289683e-4 weeks <br />2.9679e-5 months <br /> AND D.2.2 Be in MODE 4. 84 hours9.722222e-4 days <br />0.0233 hours <br />1.388889e-4 weeks <br />3.1962e-5 months <br /> (continued)

COMANCHE PEAK - UNITS 1 AND 2 3.3-22 Amendmnent No. 64 ,114

ESFAS Instrumentation 3.3.2 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME E. One Containment Pressure ------------NOTE----------

channel inoperable. One additional channel may be bypassed for up to 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> for surveillance testing.

E.1 Place channel in bypass. 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> OR E.2.1 Be in MODE 3. 78 hours9.027778e-4 days <br />0.0217 hours <br />1.289683e-4 weeks <br />2.9679e-5 months <br /> AND E.2.2 Be in MODE 4. 84 hours9.722222e-4 days <br />0.0233 hours <br />1.388889e-4 weeks <br />3.1962e-5 months <br /> F. One channel or train F.1 Restore channel or train 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> inoperable. to OPERABLE status.

OR F.2.1 Be in MODE 3. 54 hours6.25e-4 days <br />0.015 hours <br />8.928571e-5 weeks <br />2.0547e-5 months <br /> AND F.2.2 Be in MODE 4. 60 hours6.944444e-4 days <br />0.0167 hours <br />9.920635e-5 weeks <br />2.283e-5 months <br /> (continued)

COMANCHE PEAK - UNITS I AND 2 3.3-23 Amendment No. 64X114

ESFAS Instrumentation 3.3.2 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME G. One train inoperable. --NOTE------NOTE-------

One train may be bypassed for up to 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> for surveillance testing provided the other train is OPERABLE.

G.1 Restore train to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> OPERABLE status.

OR G.2.1 Be in MODE 3. 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br /> AND G.2.2 Be in MODE 4. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> H. One train inoperable. ---- -NOTE--

One train may be bypassed for up to 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> for surveillance testing provided the other train is OPERABLE.

H.1 Restore train to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> OPERABLE status.

OR H.2 Be in MODE 3. 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br /> (continued)

COMANCHE PEAK - UNITS 1 AND 2 3.3-24 Amendment No." ,G1-14

ESFAS Instrumentation 3.3.2 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME I. One channel inoperable. --------- NOTE----------

The inoperable channel or another channel may be bypassed for up to 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> for surveillance testing of other channels.

1.1 Place channel in trip. 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> OR 1.2 Be in MODE 3. 78 hours9.027778e-4 days <br />0.0217 hours <br />1.289683e-4 weeks <br />2.9679e-5 months <br /> J. One Main Feedwater Pump J.1 Place channel in trip. 6 hour6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> trip channel inoperable.

OR J.2 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> K. One channel inoperable.

One additional channel may be bypassed for up to 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> for surveillance testing.

K.1 Place channel In bypass. 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> OR K.2.1 Be in MODE 3. 78 hours9.027778e-4 days <br />0.0217 hours <br />1.289683e-4 weeks <br />2.9679e-5 months <br /> AND K.2.2 Be in MODE 5. 108 hours0.00125 days <br />0.03 hours <br />1.785714e-4 weeks <br />4.1094e-5 months <br /> (continued)

COMANCHE PEAK - UNITS 1 AND 2 3.3-25 Amendment No. 664,114

ESFAS Instrumentation 3.3.2 ACTIONS (continued) .

CONDITION REQUIRED ACTION COMPLETION TIME L. One or more required L.1 Verify interlock is in 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> channel(s) inoperable. required state for existing unit condition.

OR L.2.1 Be in MODE 3. 7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br /> AND L.2.2 Be in MODE 4. 13 hours1.50463e-4 days <br />0.00361 hours <br />2.149471e-5 weeks <br />4.9465e-6 months <br /> SURVEILLANCE REQUIREMENTS Refer to Table 3.3.2-1 to determine which SRs apply for each ESFAS Function.

SURVEILLANCE FREQUENCY SR 3.3.2.1 Perform CHANNEL CHECK. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> SR 3.3.2.2 Perform ACTUATION LOGIC TEST. 92 days on a STAGGERED TEST BASIS SR 3.3.2.3 Not Used.

(continued)

COMANCHE PEAK - UNITS 1 AND 2 3.3-26 Amendment No. 64 ,114

ESFAS Instrumentation 3.3.2 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.3.2.4 Perform MASTER RELAY TEST. 92 days on a STAGGERED TEST BASIS SR 3.3.2.5 Perform COT. 184 days SR 3.3.2.6 Perform SLAVE RELAY TEST. 92 days OR 18 months for Westinghouse type AR relays with AC coils SR 3.3.2.7 ---- NOTES- -----------

1. Verification of relay setpoints not required.
2. Actuation of final devices not included Perform TADOT. 31 days SR 3.3.2.8 --------- ----- NOTE------ ----

Verification of setpoint not required for manual initiation functions.

Perform TADOT. 18 months SR 3.3.2.9 ---------------- NOTE This Surveillance shall include verification that the time constants are adjusted to the prescribed values.

Perform CHANNEL CALIBRATION. 18 months (continued)

COMANCHE PEAK - UNITS 1 AND 2 3.3-27 Amendment No. Oq ,11 4

Containment Ventilation Isolation Instrumentation 3.3.6 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.3.6.2 Perform ACTUATION LOGIC TEST. 92 days on a STAGGERED TEST BASIS SR 3.3.6.3 Perform MASTER RELAY TEST. 92 days on a STAGGERED TEST BASIS SR 3.3.6.4 Perform COT. 92 days SR 3.3.6.5 Perform SLAVE RELAY TEST. 92 days OR 18 months for Westinghouse type AR relays with AC coils S R 3.3.6.6 Not Used.

SR 3.3.6.7 Perform CHANNEL CALIBRATION. 18 months COMANCHE PEAK - UNITS.1 AND 2 3.3-50 Amendment No. G6 ,11 4