ML062090529

From kanterella
Jump to navigation Jump to search

Tech Spec Pages for Amendments 127 & 127 Regarding Revision to Technical Specification 5.5.13, Diesel Fuel Oil Testing Program.
ML062090529
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 07/28/2006
From:
NRC/NRR/ADRO/DORL/LPLIV
To:
Thadani M, NRR/DORL, 415-1476
References
TAC MC8161, TAC MC8162
Download: ML062090529 (3)


Text

(3) TXU Generation Company LP, pursuant to the Act and 10 CFR Part 70, to receive, possess and use at any time, special nuclear material as reactor fuel, In accordance with the limitations for storage and amounts required for reactor operation, and described in the Final Safety Analysis Report, as supplemented and amenrded; (4) TXU Generation Company LP, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use, at any time, any byproduct, source, and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors In amounts as required; (5) TXU Generation Company LP, pursuant to the Act and 10 CFR Patts 30, 40 and 70, to receive, possess, and use Inamounts as required, any byproduct, source oi special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (6) TXU Generation Company LP, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.

C. This license shall be deemed to contain and Is subject to the conditions specified in the Commission's regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:

(1) Maximum Power Level TXU Generation Company LP Is authorized to operate the facility at reactor core power levels not In excess of 3458 megawatts thermal In accordance with the conditions specified herein.

(2) Technical Specifications and Environmental Protection Plan The Technical Specifications contained In Appendix A as revised through Amendment No..12? rdindthe Environmental Protection Plan contained In Appendix B, are Incorporated Into this license. TXU Generation Company LP shall operate the.facility In accordance with the Technical Specifications and the Environmental Protection Plan.

Amendment No. 6;§,99 127

(3) TXU Generation Company LP, pursuant to the Act and 10 CFR Part 70, to receive, possess and use at any time, special nuclear material as reactor fuel, In accordance with the limitations for storage and amounts required for reactor operation, and described In the Final Safety Analysis Report, as supplemented and amended; (4) TXU Generation Company LP, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use, at any time, any byproduct, source, and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor Instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required;.

(5) TXU Generation Company LP, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use In amounts as required, any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or Instrument calibration or associated with radioactive apparatus or components; and

-(6) TXU Generation Company LP, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.

C. This license shall be deemed to contain and is subject to the conditions specified In the Commission's regulations set forth In 10 CFR Chapter I and Is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter In effect; and Is subject to the additional conditions specified or Incorporated below*.

(1) Maximum Power Level TXU Generation Company LP Is authorized to operate the facility at reactor core poWer levels not in excess of 3458 megawatts thermal In accordance with the conditions specified herein.

(2) lechnical Specifications and Environmental Protection Plan The Technical Specifications contained In Appendix A as revised through Amendment No. fl 7and the Environmental Protection Plan contained In Appendix B, are heieby Incorporated Into this license. TXU Generation Company LP'shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

(3) Antitrust Conditions DELETED Amendment No. 72,* . S. 90

' . .. , 127 2

Programs and Manuals 5.5 5.5 Programs and Manuals (continued) 5.5.13 Diesel Fuel Oil Testing Program A diesel fuel oil testing program to implement required testing of both new fuel oil and stored fuel oil shall be established. The program shall include sampling and testing requirements, and acceptance criteria, all in accordance with applicable ASTM Standards. The purpose of the program is to establish the following:

a. Acceptability of new fuel oil for use prior to addition to storage tanks by determining that the fuel oil has:
1. An API gravity or an absolute specific gravity within limits,
2. A flash point and kinematic viscosity within limits for ASTM 2D fuel oil, and
3. A clear and bright appearance with proper color or a water and sediment content within limits.
b. Within 31 days following addition of the new fuel oil to the storage tanks, verify that the properties of the new fuel oil, other than those addressed in a., above, are within limits for ASTM 2D fuel oil, and
c. Total particulate concentration of the fuel oil is < 10 mg/l when tested every 31 days.

The provisions of SR 3.0.2 and SR 3.0.3 are applicable to the Diesel Fuel Oil Testing Program.

(continued)

COMANCHE PEAK - UNITS I AND 2 5.0-2-4 Amendment No. 64 127