ML062840102

From kanterella
Jump to navigation Jump to search

Technical Specification, Revisions to TS 3.3.2, ESFAS Instrumentation; and TS 3.5.2, ECCS - Operating
ML062840102
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 10/05/2006
From: Thadani M
NRC/NRR/ADRO/DORL/LPLIV
To:
Thadani, M C, NRR/DORL/LP4, 415-1476
Shared Package
ML062550059 List:
References
TAC MC9494, TAC MC9495
Download: ML062840102 (4)


Text

.3-(3) -TXU Gerferation Company LP', pursuant 'tothe Act and 10 CFR Part 70, to ifeceive, possess and use at any time, special nuclear material as reactor fuel, Inaccordance with the limitations for storage and amounts required for react or operation, and described Inthe Final Safety Analysis Report, as supplemented and amen~ded; (4) TX1J Generation Company LP', pursuant to the Act and 10 CFR Parts 30, 40and 70, to receive, possess, ;ýnd uie, at any timne, an by~ioduct, souirce, and special nuclear material 'assealed neutfron sources for reactor startup, sealed sburces for reacto'r instrumentatio.nand radiation monitoring 8*quipment calibration, and as fission detectors Inamounts as required; (5) TXU Generation Company LP', pursuan~t to t~he Act and 10 CFR Patis s0, 40 and 70, to ricelve, possess, E~nd uie Inamounts as required, ally' byproduct, source oi special riuclear matbrial withiou't restriction to chemical or physical form; for sample analysis or instrum~ent calibrillon or associaed With radioactive apparatus or components; and (5) TXU Generation'Company LP', pursuant to the Act and 10 CFR Parts ad, 40Oand 70, to~posse~ss,*but not~separate;such'byproduct and special nuclear materials as may be produced by the operation of the facility.

C. This license shall be deemed to contain and Is subject to the conditions specified Inthe Commission's iegulalions set forth In10 CFR.Chiapter I and is subject to all applicabl~e proVisions of the Act and to the rules, regulations, and orders of the Commission now or hebreafter in effect; -andIs subject to the additional conditions specified or incorporated below:

(1) Maximum Power Level TXU Generation Comp any LP' Is authorized to operate the facility at reactor core power levels not inexcess cif 3458 megawatts thermal In accordance Wtth the conditio.ns specified herein.

(2) Technicgi S~bcificatlon's and Environmental Protection Plan The Technical S'peclficallors coni~ined inAppqhd1xA as revised through Amnendriient No.-129 gridIcf d EvrneaiProtection Plan contained In tAppindix'13, area lncorpbrated into thisi ficbrnse. VXU Geneiration company Lýi' hal opeara te thle.f acliti Inh 666rd ancld With th ei Te cft ic.6 Specificatiorns ind the Ehvironme~ntil*Protection Plain.

Amendma~nifNo.6 * § 96 129

3-.

(3) TXU Generation Company LP, pursuant to the Act and 10 CHR Part 70, to irebeive, possý.ess and use at any tirfie, spdclai nuclear material as reactor fudel, inac6ordance with the limitations for storage and aimounts required for reactor operation, and described Inthe Final Safety Analysis Report, as supplemented And amended; (4) TXU Generatiop Company LP, pursuant to the Act and 10 CFR Pa'rts 30, 40 and 70,16b receive, possess, and use, at any lime , any,byproduct, source, and speci~i nucleir material as seaibd neutron sources for reactor startup, sealed soUrces' for teactor Instrumentation and radiation monitorinj equipment *calibration, and as'fission detectors Inamounts as required;.

(5) TXIJ Gene ration Company LP, pursuant to the Act and 10 CFR Parts 20, 40 and 70,1t6 receivei, p'ossess, and use 1n amount~ as required, any byio~duct, source or special nucl~ar niiateria! Wvithout rittriction to ch.emical or physical form, for tamole analysis or Instrument calibration or associated with radioactive apparatus or componentls; and

  • (6) TXU Generation Company LP, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to possess, but not separate, such byp~roduct and special n~uclear material's as may be produced by the' operation of the facility.

C. This license Mhall b deemdt contain and Is subject to the conditions.specified

  • Inthe Oommlsslon's*regulations set forth In10 CFR Chapter I*andIs subje~t to alt applicable provisions of the Act-and to the rules, regulations; and orders of the Commission how or hereafter Ineffect; and Is subject. to the additional conditions specified or Incorporated beipdw.

(1) Mairmumn Power Level TXU Generation Company LP Is authorized to operate the facility at reactor *corepo~ler levels not Inexcess of 3458 megawatts thermal In accordance with the conditions specified herein.

  • (2) Technical Sgacuficati6ns and Environmnental Protection Plan The Technical Spe2cificaiiops contalned InApj~endlx A as revised lhrou~qh Amnendmenrt No. 12ard the Erivirbhmenitai Pr~tectlon Plan coitalned In AppendtiCB; are hereby lnc6rpbia16d Into thIs licenise. TX1J Generation Corripy* LP "h6all 6rate the Waility Inacdbrdanc&with the Technical Spcfifcatlons and the Environmental Ptotetilon Plan.

(3). hntltryst Cbonditions DELETED Amendment No..72,00 89* 44 2 129

ESFAS Instrumentation 3.3.2 Table 3.3.2-1 (page 6 of 6)

Engineered Safety Feature Actuation System Instrumentation APPLICABLE MODES OR OTHER SPECIFIED REQUIRED SURVEILLANCE ALLOWABLE FUNCTION CONDITIONS CHANNELS CONDITIONS REQUIREMENTS VALUE(a)

7. Automatic Switchover to Containment Sump
a. Automatic 1.2.3,4 2 trains C SR 3.3.2.2 NA Actuation Logic SR 3.3.2.4 and Actuation SR 3.3.2.6 Relays
b. Refueling 1.2.3,4 4 K SR 3.3.2.1 ý:31 glb%

Water Storage SR 3.3.2.5 instrument span Tank (RWST) SR 3.3.2.9 Level - Low SR 3.3.2. 10 Low Coincident with Refer to Function 1 (Safety Injection) for all initiation functions and requirements.

Safety Injection

8. ESFAS Interlocks
a. Reactor Trip, 1,2,3 1 per train, 2 F SR3.3.2.11 NA trains P-4
b. Pressurizer 1.2,3 3 L SR 3.3.2.5 :91975.2 psig Pressure, P-1Il SR 3.3.2.9 (Unit 1)
  • 51976.4 psig (Unit 2)

(a) The Allowable Value defines the limiting safety system setting. See the Bases for the Trip Setpoints.

(b) The Unit 1 RWST Level Low-Low Allowable Value will remain at > 43.9% instrument span until completion of Cycle

12. I COMANCHE PEAK - UNITS 1 AND 2 3334AedntN.2519 3.3-34 Amendment No. 42-5, M

ECCS - Operating 3.5.2

.SURVEILLANCE REQUIREMENTS (continued) _______

SURVEILLANCE FREQUENCY SR 3.5.2.6 Verify each ECCS pump starts automatically on an 18 months actual or simulated actuation signal.

SR 3.5.2.7 Verify, for each ECCS throttle valve listed below, each 18 months mechanical position stop is in the correct position.

Valve Number 8810OA 8810OB 8810C 8810OD 8822A 8822B 8822C 8822D 8816A 8816B 8816C 8816D SR 3.5.2.8 Verify, by visual inspection, each ECCS train 18 months containment sump suction inlet is not restricted by debris and the suction inlet strainers show no evidence of I structural distress or abnormal corrosion.

COMANCHE PEAK - UNITS 1 AND 2 3.-AmnetNo6412 3.5-7 Amendment No. 64, 129