ML060790450: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 34: Line 34:


QF-1030-11 Rev. 2 (FP-T-SAT-30)
QF-1030-11 Rev. 2 (FP-T-SAT-30)
JPM RO-010-JP041, Start And Load The Diesel Generator, Rev. B JPM Number: RO-010-JP041 JPM Title: Start and Load the Diesel Generator Examinee:                                            Evaluator:
JPM RO-010-JP041, Start And Load The Diesel Generator, Rev. B JPM Number: RO-010-JP041 JPM
Job Title:                                               Date:
 
==Title:==
Start and Load the Diesel Generator Examinee:                                            Evaluator:
Job
 
==Title:==
Date:
Start Time                                          Finish Time PERFORMANCE RESULTS:                            SAT:                    UNSAT:
Start Time                                          Finish Time PERFORMANCE RESULTS:                            SAT:                    UNSAT:
COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).
COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).
Line 286: Line 292:
: 13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
: 13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
All questions/statements must be answered YES or the JPM is not valid for use. If all questions/statements are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation shall sign and date this form.
All questions/statements must be answered YES or the JPM is not valid for use. If all questions/statements are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation shall sign and date this form.
__________________________                  __________________________
Validation Personnel /Date                  Validation Personnel/Date Validation Personnel /Date                  Validation Personnel/Date Validation Personnel /Date                  Validation Personnel/Date Validation Personnel /Date                  Validation Personnel/Date Historical Record: (Optional)
Validation Personnel /Date                  Validation Personnel/Date
__________________________                  __________________________
Validation Personnel /Date                  Validation Personnel/Date
__________________________                  __________________________
Validation Personnel /Date                  Validation Personnel/Date
__________________________                  __________________________
Validation Personnel /Date                  Validation Personnel/Date Historical Record: (Optional)
Page 18 of 18
Page 18 of 18


Line 311: Line 310:


QF-1030-11 Rev. 2 (FP-T-SAT-30)
QF-1030-11 Rev. 2 (FP-T-SAT-30)
JPM RO-034-JP01A, Operate the RHR System in Split Train Mode, Rev. B JPM Number: RO-034-JP01A JPM Title: Operate the RHR System in Split Train Mode Examinee:                                            Evaluator:
JPM RO-034-JP01A, Operate the RHR System in Split Train Mode, Rev. B JPM Number: RO-034-JP01A JPM
Job Title:                                               Date:
 
==Title:==
Operate the RHR System in Split Train Mode Examinee:                                            Evaluator:
Job
 
==Title:==
Date:
Start Time                                          Finish Time PERFORMANCE RESULTS:                            SAT:                    UNSAT:
Start Time                                          Finish Time PERFORMANCE RESULTS:                            SAT:                    UNSAT:
COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).
COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).
Line 541: Line 546:
: 13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
: 13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
All questions/statements must be answered YES or the JPM is not valid for use. If all questions/statements are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation shall sign and date this form.
All questions/statements must be answered YES or the JPM is not valid for use. If all questions/statements are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation shall sign and date this form.
__________________________                  __________________________
Validation Personnel /Date                  Validation Personnel/Date Validation Personnel /Date                  Validation Personnel/Date Validation Personnel /Date                  Validation Personnel/Date Validation Personnel /Date                  Validation Personnel/Date Historical Record: (Optional)
Validation Personnel /Date                  Validation Personnel/Date
__________________________                  __________________________
Validation Personnel /Date                  Validation Personnel/Date
__________________________                  __________________________
Validation Personnel /Date                  Validation Personnel/Date
__________________________                  __________________________
Validation Personnel /Date                  Validation Personnel/Date Historical Record: (Optional)
Page 15 of 15
Page 15 of 15


Line 567: Line 565:


QF-1030-11 Rev. 2 (FP-T-SAT-30)
QF-1030-11 Rev. 2 (FP-T-SAT-30)
JPM RO-036-JP01A, Respond to High Reactor Coolant Activity, Rev. E JPM Number: RO-036-JP01A JPM Title: Respond to High Reactor Coolant Activity Examinee:                                            Evaluator:
JPM RO-036-JP01A, Respond to High Reactor Coolant Activity, Rev. E JPM Number: RO-036-JP01A JPM
Job Title:                                               Date:
 
==Title:==
Respond to High Reactor Coolant Activity Examinee:                                            Evaluator:
Job
 
==Title:==
Date:
Start Time                                          Finish Time PERFORMANCE RESULTS:                            SAT:                    UNSAT:
Start Time                                          Finish Time PERFORMANCE RESULTS:                            SAT:                    UNSAT:
COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).
COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).
Line 695: Line 699:
: 13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
: 13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
All questions/statements must be answered YES or the JPM is not valid for use. If all questions/statements are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation shall sign and date this form.
All questions/statements must be answered YES or the JPM is not valid for use. If all questions/statements are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation shall sign and date this form.
__________________________                  __________________________
Validation Personnel /Date                  Validation Personnel/Date Validation Personnel /Date                  Validation Personnel/Date Validation Personnel /Date                  Validation Personnel/Date Validation Personnel /Date                  Validation Personnel/Date Historical Record: (Optional)
Validation Personnel /Date                  Validation Personnel/Date
__________________________                  __________________________
Validation Personnel /Date                  Validation Personnel/Date
__________________________                  __________________________
Validation Personnel /Date                  Validation Personnel/Date
__________________________                  __________________________
Validation Personnel /Date                  Validation Personnel/Date Historical Record: (Optional)
Page 9 of 9
Page 9 of 9


Line 720: Line 717:


QF-1030-11 Rev. 2 (FP-T-SAT-30)
QF-1030-11 Rev. 2 (FP-T-SAT-30)
JPM RO-036-JP22B Drain the PRT to the CVC HUT Rev. A JPM Number: RO-036-JP22B JPM Title: Drain the PRT to the CVC HUT Examinee:                                            Evaluator:
JPM RO-036-JP22B Drain the PRT to the CVC HUT Rev. A JPM Number: RO-036-JP22B JPM
Job Title:                                               Date:
 
==Title:==
Drain the PRT to the CVC HUT Examinee:                                            Evaluator:
Job
 
==Title:==
Date:
Start Time                                          Finish Time PERFORMANCE RESULTS:                            SAT:                    UNSAT:
Start Time                                          Finish Time PERFORMANCE RESULTS:                            SAT:                    UNSAT:
COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).
COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).
Line 839: Line 842:
: 13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
: 13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
All questions/statements must be answered YES or the JPM is not valid for use. If all questions/statements are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation shall sign and date this form.
All questions/statements must be answered YES or the JPM is not valid for use. If all questions/statements are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation shall sign and date this form.
__________________________                  __________________________
Validation Personnel /Date                  Validation Personnel/Date Validation Personnel /Date                  Validation Personnel/Date Validation Personnel /Date                  Validation Personnel/Date Validation Personnel /Date                  Validation Personnel/Date Historical Record: (Optional)
Validation Personnel /Date                  Validation Personnel/Date
__________________________                  __________________________
Validation Personnel /Date                  Validation Personnel/Date
__________________________                  __________________________
Validation Personnel /Date                  Validation Personnel/Date
__________________________                  __________________________
Validation Personnel /Date                  Validation Personnel/Date Historical Record: (Optional)
Page 9 of 9
Page 9 of 9


Line 865: Line 861:


QF-1030-11 Rev. 2 (FP-T-SAT-30)
QF-1030-11 Rev. 2 (FP-T-SAT-30)
RO-036-JP26A, Transfer from Manual to Automatic Pressure Control, Rev. C JPM Number: RO-036-JP26A JPM Title: Transfer from Manual to Automatic Pressure Control Examinee:                                            Evaluator:
RO-036-JP26A, Transfer from Manual to Automatic Pressure Control, Rev. C JPM Number: RO-036-JP26A JPM
Job Title:                                               Date:
 
==Title:==
Transfer from Manual to Automatic Pressure Control Examinee:                                            Evaluator:
Job
 
==Title:==
Date:
Start Time                                          Finish Time PERFORMANCE RESULTS:                            SAT:                    UNSAT:
Start Time                                          Finish Time PERFORMANCE RESULTS:                            SAT:                    UNSAT:
COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).
COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).
Line 973: Line 975:
: 13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
: 13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
All questions/statements must be answered YES or the JPM is not valid for use. If all questions/statements are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation shall sign and date this form.
All questions/statements must be answered YES or the JPM is not valid for use. If all questions/statements are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation shall sign and date this form.
__________________________                  __________________________
Validation Personnel /Date                  Validation Personnel/Date Validation Personnel /Date                  Validation Personnel/Date Validation Personnel /Date                  Validation Personnel/Date Validation Personnel /Date                  Validation Personnel/Date Historical Record: (Optional)
Validation Personnel /Date                  Validation Personnel/Date
__________________________                  __________________________
Validation Personnel /Date                  Validation Personnel/Date
__________________________                  __________________________
Validation Personnel /Date                  Validation Personnel/Date
__________________________                  __________________________
Validation Personnel /Date                  Validation Personnel/Date Historical Record: (Optional)
Page 9 of 9
Page 9 of 9


Line 998: Line 993:


QF-1030-11 Rev. 2 (FP-T-SAT-30)
QF-1030-11 Rev. 2 (FP-T-SAT-30)
JPM RO-048-JP041, Loss of Intermediate Range Instrumentation with failure of Reactor Trip Signal, Rev. A JPM Number: RO-048-JP041 JPM Title: Loss of Intermediate Range Instrumentation with failure of Reactor Trip Signal Examinee:                                            Evaluator:
JPM RO-048-JP041, Loss of Intermediate Range Instrumentation with failure of Reactor Trip Signal, Rev. A JPM Number: RO-048-JP041 JPM
Job Title:                                               Date:
 
==Title:==
Loss of Intermediate Range Instrumentation with failure of Reactor Trip Signal Examinee:                                            Evaluator:
Job
 
==Title:==
Date:
Start Time                                          Finish Time PERFORMANCE RESULTS:                            SAT:                    UNSAT:
Start Time                                          Finish Time PERFORMANCE RESULTS:                            SAT:                    UNSAT:
COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).
COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).
Line 1,152: Line 1,153:
: 13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
: 13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
All questions/statements must be answered YES or the JPM is not valid for use. If all questions/statements are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation shall sign and date this form.
All questions/statements must be answered YES or the JPM is not valid for use. If all questions/statements are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation shall sign and date this form.
__________________________                  __________________________
Validation Personnel /Date                  Validation Personnel/Date Validation Personnel /Date                  Validation Personnel/Date Validation Personnel /Date                  Validation Personnel/Date Validation Personnel /Date                  Validation Personnel/Date Historical Record: (Optional)
Validation Personnel /Date                  Validation Personnel/Date
__________________________                  __________________________
Validation Personnel /Date                  Validation Personnel/Date
__________________________                  __________________________
Validation Personnel /Date                  Validation Personnel/Date
__________________________                  __________________________
Validation Personnel /Date                  Validation Personnel/Date Historical Record: (Optional)
Page 11 of 11
Page 11 of 11


Line 1,180: Line 1,174:


QF-1030-11 Rev. 2 (FP-T-SAT-30)
QF-1030-11 Rev. 2 (FP-T-SAT-30)
JPM RO-049-JP03A, Perform a Dropped Rod Recovery, Rev. A JPM Number: RO-049-JP03A JPM Title: Perform A Dropped Rod Recovery Examinee:                                            Evaluator:
JPM RO-049-JP03A, Perform a Dropped Rod Recovery, Rev. A JPM Number: RO-049-JP03A JPM
Job Title:                                               Date:
 
==Title:==
Perform A Dropped Rod Recovery Examinee:                                            Evaluator:
Job
 
==Title:==
Date:
Start Time                                          Finish Time PERFORMANCE RESULTS:                            SAT:                    UNSAT:
Start Time                                          Finish Time PERFORMANCE RESULTS:                            SAT:                    UNSAT:
COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).
COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).
Line 1,350: Line 1,350:
: 1. Place Control Rod Bank Selector to MAN.
: 1. Place Control Rod Bank Selector to MAN.
: 2. Record the (Bank Overlap) Ramp Start Value from Remote Function RD114, Bank Overlap Counter:
: 2. Record the (Bank Overlap) Ramp Start Value from Remote Function RD114, Bank Overlap Counter:
__________.
: 3. Go to RUN.
: 3. Go to RUN.
: 4. Insert the malfunction below to drop rod K7.
: 4. Insert the malfunction below to drop rod K7.
Line 1,407: Line 1,406:
: 13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
: 13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
All questions/statements must be answered YES or the JPM is not valid for use. If all questions/statements are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation shall sign and date this form.
All questions/statements must be answered YES or the JPM is not valid for use. If all questions/statements are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation shall sign and date this form.
__________________________                  __________________________
Validation Personnel /Date                  Validation Personnel/Date Validation Personnel /Date                  Validation Personnel/Date Validation Personnel /Date                  Validation Personnel/Date Validation Personnel /Date                  Validation Personnel/Date Historical Record: Updated to latest revision of A-CRD-49.
Validation Personnel /Date                  Validation Personnel/Date
__________________________                  __________________________
Validation Personnel /Date                  Validation Personnel/Date
__________________________                  __________________________
Validation Personnel /Date                  Validation Personnel/Date
__________________________                  __________________________
Validation Personnel /Date                  Validation Personnel/Date Historical Record: Updated to latest revision of A-CRD-49.
Page 16 of 16
Page 16 of 16


Line 1,433: Line 1,425:


QF-1030-11 Rev. 2 (FP-T-SAT-30)
QF-1030-11 Rev. 2 (FP-T-SAT-30)
JPM RO-E01-JP031, Stop SI Pumps During Post-LOCA Cooldown, Rev. A JPM Number: RO-E01-JP031 JPM Title: Stop SI Pumps During Post-LOCA Cooldown Examinee:                                            Evaluator:
JPM RO-E01-JP031, Stop SI Pumps During Post-LOCA Cooldown, Rev. A JPM Number: RO-E01-JP031 JPM
Job Title:                                               Date:
 
==Title:==
Stop SI Pumps During Post-LOCA Cooldown Examinee:                                            Evaluator:
Job
 
==Title:==
Date:
Start Time                                          Finish Time PERFORMANCE RESULTS:                            SAT:                    UNSAT:
Start Time                                          Finish Time PERFORMANCE RESULTS:                            SAT:                    UNSAT:
COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).
COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).
Line 1,616: Line 1,614:
: 13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
: 13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
All questions/statements must be answered YES or the JPM is not valid for use. If all questions/statements are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation shall sign and date this form.
All questions/statements must be answered YES or the JPM is not valid for use. If all questions/statements are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation shall sign and date this form.
__________________________                  __________________________
Validation Personnel /Date                  Validation Personnel/Date Validation Personnel /Date                  Validation Personnel/Date Validation Personnel /Date                  Validation Personnel/Date Validation Personnel /Date                  Validation Personnel/Date Historical Record: (Optional)
Validation Personnel /Date                  Validation Personnel/Date
__________________________                  __________________________
Validation Personnel /Date                  Validation Personnel/Date
__________________________                  __________________________
Validation Personnel /Date                  Validation Personnel/Date
__________________________                  __________________________
Validation Personnel /Date                  Validation Personnel/Date Historical Record: (Optional)
Page 12 of 12}}
Page 12 of 12}}

Latest revision as of 07:40, 14 March 2020

As-Submitted Systems-Simulator Jpms for the Kewaunee Initial Examination - November 2005
ML060790450
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 11/14/2005
From: Palagi B
NRC/RGN-III/DRS/OLB
To:
References
50-305/05-301 50-305/05-301
Download: ML060790450 (99)


Text

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JOB PERFORMANCE MEASURE (JPM)

SITE: Kewaunee Power Station JPM TITLE: Start And Load The Diesel Generator JPM NUMBER: RO-010-JP041 REV. B RELATED PRA Diesel Generator is ranked number 1 system in PRA Importance.

INFORMATION:

TASK NUMBER(S) / 0100040101 TASK TITLE(S): Startup Diesel Generator A(B)

K/A NUMBERS: 064A4.06 RO value 3.9 / SRO value 3.9 APPLICABLE METHOD OF TESTING:

Discussion: Simulate/walkthrough: Perform: X EVALUATION LOCATION: In-Plant: Control Room:

Simulator: X Other:

Lab:

Time for Completion: 25 Minutes Time Critical: No Alternate Path / Faulted: Yes TASK APPLICABILITY: RO, SRO Additional signatures may be added as needed.

Developed by:

Instructor Date Validated by:

Validation Instructor Date (See JPM Validation Checklist, Attachment 1)

Approved by:

Training Supervisor Date Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File Page 1 of 18

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM RO-010-JP041, Start And Load The Diesel Generator, Rev. B JPM Number: RO-010-JP041 JPM

Title:

Start and Load the Diesel Generator Examinee: Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS: SAT: UNSAT:

COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

Page 2 of 18

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM RO-010-JP041, Start And Load The Diesel Generator, Rev. B JPM BRIEFING/TURNOVER Add required site specific JPM briefing material here:

i.e., This section is read once for the entire package of JPMs. It is not required to review this section for every JPM being performed in the package. The initial conditions and initiating cue(s)/tasks to be performed should be read and then provided to the examinee.

If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.

Read to Examinee:

You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.

EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

Note to Instructor:

1. Human Performance attributes should be visible. The student may use obvious STAR and or request Peer Checks.
2. If peer checks are requested, the Instructor should reply - Peer Check Acknowledged. The instructor will acknowledge use of the human performance tool and not validate the proper component manipulation.

This should be explained to the student at this time.

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

INITIAL CONDITIONS:

1. You are the Balance Of Plant Operator.
2. Diesel Generator A is OPERABLE.
3. Diesel Generator B is INOPERABLE, and is being started for an hour run at-load in accordance with N-DGM-10B, Diesel Generator B Manual Operation.
4. N-DGM-10B has been completed up through step 4.1.10, just prior to starting.
5. An EO is standing by at DG B.

INITIATING CUES (IF APPLICABLE):

The CRS directs you to start and load Diesel Generator B to 2600 KW beginning at step 4.1.11 of N-DGM-10B.

Page 3 of 18

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM RO-010-JP041, Start And Load The Diesel Generator, Rev. B JPM PERFORMANCE INFORMATION Required Materials: N-DGM-10B, Rev. O General

References:

Task Standards:

Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e. the examinee looks or asks for the indication).

NOTE: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.

Performance Step: 1 Refer to N-DGM-10B, Diesel Generator B Manual Operation Critical: No Standard: Refer to N-DGM-10B, Diesel Generator B Manual Operation.

Evaluator Note: The operator may choose to review the initial conditions, precautions and limitations and performed steps of the procedure prior to proceeding.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 2 4.1.11.a Critical: No Announce start of Diesel Generator B.

Standard: Plant announcement of DG B start made using Gaitronics.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Page 4 of 18

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM RO-010-JP041, Start And Load The Diesel Generator, Rev. B Performance Step: 3 4.1.11.b Critical: Yes Start Diesel Generator B.

Standard: Diesel Generator B running with Diesel Engine B control switch RED light ON, GREEN light OFF.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 4 4.1.11.b.1 Critical: No Record time Diesel Generator B started.

Standard: Current time listed in space provided at step 4.1.11.b.1 in N-DGM-10B.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 5 4.1.12.

Critical: No Locally verify SW-301B, Service Water from D/G B Heat Exchanger, open.

Standard: Direct EO to verify SW-301B is open.

Evaluator Cue: SW-301B is open.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 6 4.1.13.a Critical: No Verify Diesel Engine red indicating light ON.

Standard: Diesel Engine B control switch RED light ON.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Page 5 of 18

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM RO-010-JP041, Start And Load The Diesel Generator, Rev. B Performance Step: 7 4.1.13.b Critical: No Verify Diesel Generator B Speed of 450-500 rpm.

Standard: Diesel Generator B Speed (4462004) indication between 450 and 500 rpm.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 8 4.1.13.c Critical: No Verify Status Light, DIESEL B ON, ON.

Standard: Status Light, DIESEL B ON, (44910-0105) ON.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 9 4.1.13.d Critical: No Verify Status Light, DG B ROOM VENT FAN ON, ON.

Standard: Status Light, DG B ROOM VENT FAN ON, (44910-0106) ON.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 10 4.1.13.e Critical: No Verify Status Light, DG ROOM B DAMPER OPEN, ON.

Standard: Status Light, DG ROOM B DAMPER OPEN, (44910-0107) ON.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Page 6 of 18

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM RO-010-JP041, Start And Load The Diesel Generator, Rev. B Performance Step: 11 4.1.14 Critical: No Inspect Diesel Generator B for any abnormal conditions.

Standard: Direct EO to inspect DG B for abnormal conditions.

Evaluator Cue: Conditions are normal.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 12 4.1.15 Critical: No Run Diesel Generator at low idle speed for 3 minutes.

Standard: Diesel Generator B has run at low idle speed for at least 3 minutes.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 13 4.1.16 Critical: No Adjust Diesel Generator B speed to 900 rpm with Speed Control switch.

Standard: Diesel Generator B Speed (4462004) indicates between 890 and 950 rpm.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 14 4.1.17 Critical: Yes Position Diesel Generator B Governor Mode Selector switch to AUTO.

Standard: Diesel Generator B Governor Mode Selector is in AUTO position.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Page 7 of 18

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM RO-010-JP041, Start And Load The Diesel Generator, Rev. B Performance Step: 15 4.1.18 Critical: No Verify annunciator DIESEL GEN B GOV IN MAN (47093-E) OFF.

Standard: Annunciator 47093-E is reset .

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 16 4.1.19.a Critical: No Notify Energy Supply and Control Diesel Generator will be paralleled to grid.

Standard: Telephone call made to ES&C informing of paralleling DG.

Evaluator Cue: Energy Supply and Control acknowledges message.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 17 4.1.19.b Critical: Yes Position Bkr 1-603, DG B to Bus 6 43 switch to MAN.

Standard: Bkr 1-603 is in MAN position.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 18 4.1.19.c Critical: No Verify annunciator BUS 6 SOURCE BKR 43 SW IN MAN (47093-K) is ON.

Standard: Acknowledge annunciator 47093-K.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Page 8 of 18

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM RO-010-JP041, Start And Load The Diesel Generator, Rev. B Performance Step: 19 4.1.19.d Critical: Yes Locally perform:

1. Position Parallel-Unit switch to PARALLEL.
2. Set Governor Speed Droop to 30.

Standard: Contact EO to perform steps 4.1.19.d.1 and 4.1.19.d.2.

Evaluator Note: The Booth Operator will actuate Trigger 1 to set switch and droop knob to proper position.

Evaluator Cue: Parallel-Unit switch is in PARALLEL and Speed Droop is set to 30.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 20 4.1.19.e Critical: Yes Position Bkr 1-603 Sync switch to ON.

Standard: Bkr 1-603 Sync switch is in ON position.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 21 4.1.19.f Critical: No Adjust Diesel Generator voltage with Voltage Control switch until Incoming A-C Volts matches Running A-C Volts.

Standard: Incoming Volts reads within +/- 2 volts of Running Volts.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Page 9 of 18

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM RO-010-JP041, Start And Load The Diesel Generator, Rev. B Performance Step: 22 4.1.19.g Critical: No Adjust Diesel Generator speed with Speed Control switch until synchroscope rotates slowly in the FAST direction.

Standard: Synchroscope pointer is rotating in the clockwise direction at 4 to 6 rpm.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 23 4.1.19.h Critical: No Repeat steps 4.1.19.f and 4.1.19.g to ensure Incoming A-C Volts is matched with Running A-C Volts and diesel is slightly higher in frequency.

Standard: a. Incoming Volts reads within +/- 2 volts of Running Volts.

b. Synchroscope pointer is rotating in the clockwise direction at 4 to 6 rpm.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 24 4.1.19.i.1 Critical: Yes With synchroscope rotating in clockwise direction, parallel Diesel Generator with Bus 1-6. At 9 oclock close and hold Bkr control switch.

Standard: Bkr 1-603 closed.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Page 10 of 18

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM RO-010-JP041, Start And Load The Diesel Generator, Rev. B Performance Step: 25 4.1.19.i.1.A Critical: No When breaker closes OR synchroscope pointer passes 12 oclock, THEN RELEASE Bkr 1-603 control switch.

Standard: Bkr 1-603 control switch released.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 26 4.1.19.i.1.B Critical: No Record time Bkr 1-603 closed.

Standard: Current time listed in space provided at step 4.1.19.i.1.B in N-DGM-10B.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 27 4.1.19.i.2 Critical: No Verify only red indicating light ON and release Bkr 1-603 control switch.

Standard: Bkr 1-603 is in Normal After-Close position with RED light only lit.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 28 4.1.20 Critical: Yes Increase Diesel Generator Kilowatts incrementally with Speed Control switch until required load is reached.

Standard: Diesel Generator Kilowatts (4462103) increasing toward 1000 KW.

Evaluator Note: The DG will trip on entered Malfunction, triggered to actuate when DG B load exceeds 1000 KW.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Page 11 of 18

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM RO-010-JP041, Start And Load The Diesel Generator, Rev. B Performance Step: 29 4.1.21 Critical: No Raise Kilovars proportionally by adjusting Voltage Control switch. (see Figure 1)

Standard: KVARs (4462104) maintained out of TEST and AVIOD REGION on N-DGM-10B, Figure 1.

Evaluator Note: Figure 1 attached page 14.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 30 4.1.22 Critical: No Position Bkr 1-603 Sync switch to OFF.

Standard: Bkr 1-603 Sync switch in OFF.

Evaluator Note: This step may NOT be performed if DG B KW reaches or exceeds 1000 KW.

Step 4.1.22.a provides for Independent Verification that synch switch for Bkr 1-603 is OFF. IF conditions allow or require the CUE is provided below.

Evaluator Cue: Second Operator has provided Independent verification Bkr 1-603 Synch switch is OFF.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 31 Respond to actuated annunciators:

Critical: No 1. DIESEL GEN B MECH LOCKOUT (47091-E)

2. DIESEL GEN B ABNORMAL (47091-F)

Standard: Refer to Alarm Response Sheets for 47091-E and 47091-F.

Evaluator Note: The DG B trip malfunction will automatically actuate when DG B load goes above 1000 KW.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Page 12 of 18

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM RO-010-JP041, Start And Load The Diesel Generator, Rev. B Performance Step: 32 Alarm Response Sheet 47091-E, Recommended Action 1 Critical: Yes 1. Open Bkr 1-603 DG B to Bus 6.

Standard: Bkr 1-603 open. (May be taken to PULLOUT position.)

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 33 Alarm Response Sheet 47091-E, Recommended Action 2 Critical: No 2. Refer to Tech Spec 3.7.

Alarm Response Sheet 47091-F, Recommended Action 1

1. Notify NAO of alarming condition.

Standard: Inform CRS/Crew of Diesel Generator B trip and need to address Tech Spec

3.7. Performance

SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues: After Operator informs CRS/Crew of DG B trip: This completes this JPM.

Stop Time:

Page 13 of 18

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM RO-010-JP041, Start And Load The Diesel Generator, Rev. B Page 14 of 18

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM RO-010-JP041, Start And Load The Diesel Generator, Rev. B SIMULATOR SET UP:

Simulator Setup Instructions:

If necessary, reset the simulator to any At-Power Power IC, then perform the following:

1. Go to RUN.
2. Ensure the malfunction is listed for loss of Diesel Generator B on Event Trigger 5.
3. Ensure EVENT is listed for Event Trigger 5.
4. Place DG B Governor Mode Selector to MAN.
5. Acknowledge annunciator 47093-E.
6. HOLD DG B Speed Control switch to LOWER for at least 3 minutes. Ensure a copy of N-DGM-10B, Diesel Generator B Manual Operation, is stamped/dated, and marked up through step 4.1.10.

(Position DG B SPEED CONTROL switch to LOWER)

7. (If required) When directed (at step 4.1.12) to check SW-301B, Service Water from D/G B Heat Exchanger, open, REPORT valve is open.
8. (If required) When directed (at step 4.1.14) to inspect D/G B for abnormal conditions, REPORT all conditions normal.
9. When directed (at Step 4.1.19.d) to locally position Parallel-Unit switch to PARALLEL and set Governor Speed Droop to 30, Actuate TRIGGER 1 to actuate Remote Function EG106 for Diesel B Droop & Parallel Setting to 30 & PAR.

EVENT NUMBER EVENT FILE NAME EVENT LOGIC EVENT WORD STATEMENT DESCRIPTION 1 (TRIGGER 1) N/A N/A Remote Function EG106

[Performance Step 19] places local controls in PAR and droop set to 30.

2 (TRIGGER 5) N/A EGE0352A >= 1000 Actuates when D/G B load

[Performance Step 28-30] reaches 1000 KW.

AUTOMATIC Will enter malfunction EG05B Loss of EDG 1B SIMULATOR MALFUNCTIONS:

TIME MALFUNCTION MALFUNCTION ET DELAY f. SERV RAMP I. SEV.

No. TITLE Step EG05B Loss of 5 0 N/A N/A N/A (Trigger 5 AUTOMATIC)

Emergency DG (1B)

SIMULATOR OVERRIDES; TIME OVERRIDE OVERRIDE ET DELAY VALUE RAMP ID. DESCRIPTION N/A N/A N/A N/A N/A N/A N/A Page 15 of 18

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM RO-010-JP041, Start And Load The Diesel Generator, Rev. B SIMULATOR REMOTE FUNCTIONS:

TIME REMOTE REMOTE FUNCTION TITLE VALUE RAMP FUNCTION NO.

Step EG106 Diesel B Droop & Parallel Setting 30&PAR N/A (TRIGGER 1)

Page 16 of 18

QF-1030-11 Rev. 2 (FP-T-SAT-30)

TURNOVER SHEET INITIAL CONDITIONS:

1. You are the Balance Of Plant Operator.
2. Diesel Generator A is OPERABLE.
3. Diesel Generator B is INOPERABLE, and is being started for an hour run at-load in accordance with N-DGM-10B, Diesel Generator B Manual Operation.
4. N-DGM-10B has been completed up through step 4.1.10, just prior to starting.
5. An EO is standing by at DG B.

INITIATING CUES (IF APPLICABLE):

The CRS directs you to start and load Diesel Generator B to 2600 KW beginning at step 4.1.11 of N-DGM-10B Page 17 of 18

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM RO-010-JP041, Start And Load The Diesel Generator, Rev. B ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1. Are all items on the signature page filled in correctly?
2. Has the JPM been reviewed and validated by SMEs?
3. Can the required conditions for the JPM be appropriately established in the simulator if required?
4. Does the performance steps accurately reflect trainees actions in accordance with plant procedures?
5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
6. Has the completion time been established based on validation data or incumbent experience?
7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
8. Is the Licensee level appropriate for the task being evaluated if required?
9. Is the K/A appropriate to the task and to the licensee level if required?
10. Have the performance steps been identified and typed (Critical /

Sequence / Time Critical) appropriately?

11. Have all special tools and equipment needed to perform the task been identified and made available to the trainee?
12. Are all references identified, current, accurate, and available to the trainee?
13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

All questions/statements must be answered YES or the JPM is not valid for use. If all questions/statements are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation shall sign and date this form.

Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Historical Record: (Optional)

Page 18 of 18

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JOB PERFORMANCE MEASURE (JPM)

SITE: Kewaunee Power Station JPM TITLE: Operate the RHR System in Split Train Mode JPM NUMBER: RO-034-JP01A REV. B RELATED PRA N/A INFORMATION:

TASK NUMBER(S) / 0340010401 TASK TITLE(S): Operate the RHR System in Split Train Mode K/A NUMBERS: E03EA1.3 RO Value 3.7 / SRO Value 4.1 APPLICABLE METHOD OF TESTING:

Discussion: Simulate/walkthrough: Perform: X EVALUATION LOCATION: In-Plant: Control Room:

Simulator: X Other:

Lab:

Time for Completion: 25 Minutes Time Critical: No Alternate Path / Faulted: No TASK APPLICABILITY: RO, SRO Additional signatures may be added as needed.

Developed by:

Instructor Date Validated by:

Validation Instructor Date (See JPM Validation Checklist, Attachment 1)

Approved by:

Training Supervisor Date Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File Page 1 of 15

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM RO-034-JP01A, Operate the RHR System in Split Train Mode, Rev. B JPM Number: RO-034-JP01A JPM

Title:

Operate the RHR System in Split Train Mode Examinee: Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS: SAT: UNSAT:

COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

Page 2 of 15

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM RO-034-JP01A, Operate the RHR System in Split Train Mode, Rev. B JPM BRIEFING/TURNOVER Add required site specific JPM briefing material here:

i.e., This section is read once for the entire package of JPMs. It is not required to review this section for every JPM being performed in the package. The initial conditions and initiating cue(s)/tasks to be performed should be read and then provided to the examinee.

If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.

Read to Examinee:

You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.

EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

Note to Instructor:

1. Human Performance attributes should be visible. The student may use obvious STAR and or request Peer Checks.
2. If peer checks are requested, the Instructor should reply - Peer Check Acknowledged. The instructor will acknowledge use of the human performance tool and not validate the proper component manipulation.

This should be explained to the student at this time.

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

INITIAL CONDITIONS:

1. You are the Reactor Operator.
2. The plant is recovering from a Small Break LOCA.
3. The crew is performing the steps of ES-1.2, Post-LOCA Cooldown and Depressurization and are placing RHR in service per A-RHR-34B, Residual Heat Removal Split-Train Mode.
4. Steps 4.1 through 4.4 of A-RHR-34B have been completed.

INITIATING CUES (IF APPLICABLE):

  • The CRS directs you to continue alignment of RHR for Split-Train operation starting at step 4.5 and place Train A of RHR in service for cooldown.

Page 3 of 15

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM RO-034-JP01A, Operate the RHR System in Split Train Mode, Rev. B JPM PERFORMANCE INFORMATION Required Materials: A-RHR-34B, Rev. H General

References:

Task Standards: RHR Suction and Hx Outlet Temperature trending up for RHR warmup.

Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e. the examinee looks or asks for the indication).

NOTE: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.

Performance Step: 1 Refer to A-RHR-34B Critical: No Standard: Refer to A-RHR-34B Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 2 A-RHR-34B Step 4.5 Critical: Yes Stop RHR Pump A Standard: RHR Pump A C/S placed in the Normal After Stop position. Verify:

  • Green light ON
  • Red light OFF Performance: SATISFACTORY UNSATISFACTORY Comments:

Page 4 of 15

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM RO-034-JP01A, Operate the RHR System in Split Train Mode, Rev. B Performance Step: 3 A-RHR-34B Step 4.6.1 Critical: Yes Align Local Manual Valves:

  • RHR-4B, RHR Pump 1B Inlet Isolation, CLOSED
  • RHR-10A, Cross-Connect Valve, OPEN
  • RHR-100A, Heat Exchanger Bypass Line, OPEN Standard: Directs NAO to position Local Manual Valves to the following positions:
  • RHR-4B CLOSED
  • RHR-10A OPEN
  • RHR-100A OPEN Evaluator Note: The BOOTH OPERATOR will actuate TRIGGER 2 for the Remote Functions that align the valves in this step.

Evaluator Cue: As AO when contacted, perform actions as directed (Actuate Trigger 2 to enter Remote Functions). Report back:

  • RHR-4B is closed
  • RHR-10A is open
  • RHR-100A is open Performance: SATISFACTORY UNSATISFACTORY Comments:

Page 5 of 15

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM RO-034-JP01A, Operate the RHR System in Split Train Mode, Rev. B Performance Step: 4 A-RHR-34B Step 4.6.2 Critical: Yes Align Control Room Valves:

  • RHR-8A, RHR Flow Control HX A Outlet, CLOSED
  • RHR-101, RHR Flow Control Bypass, OPEN/MANUAL
  • SI-300A, RWST Supply To RHR Pump A, CLOSED
  • SI-302A, RHR Pump A Injection To Reactor Vessel, CLOSED
  • SI-302B, RHR Pump B Injection To Reactor Vessel, OPEN Standard: Control Room Valves aligned as follows:
  • RHR-8A Closed by taking dial fully counter-clockwise position to indicate 100%.
  • RHR-101 Open/Manual by taking the pot to the fully clockwise position and lower gauge to indicate 100%.
  • SI-300A Closed with Green light ON and Red light OFF.
  • SI-302A Closed with Green light ON and Red light OFF.
  • SI-302B Open with Red light ON and Green light OFF Evaluator Note: SI-302B is NOT operated; and therefore, is NOT part of the critical actions of this step.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 5 A-RHR-34B Step 4.7.1 Critical: No Verify RCS pressure < 400 psig Standard: RCS pressure less than 400 psig on Wide Range RCS pressure on WR pressure recorder 42556 or NR pressure indication PI-420 (413013).

Performance: SATISFACTORY UNSATISFACTORY Comments:

Page 6 of 15

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM RO-034-JP01A, Operate the RHR System in Split Train Mode, Rev. B Performance Step: 6 A-RHR-34B Step 4.7.2 Critical: No Verify charging and letdown in service.

Standard: Charging and letdown in service:

  • Letdown alignment checked.
  • Charging alignment checked with Charging Pumps running.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 7 A-RHR-34B Step 4.7.3 Critical: No Verify RHR Suct and Outl Temperature Recorder, Energized.

Standard: RHR Suction and Outlet Temperature Recorder is energized.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 8 A-RHR-34B Step 4.7.4 Critical: Yes OPEN CC-400A, Component Cooling To RHR Hx A Standard: CC-400A Open with Red light ON and Green light OFF.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 9 A-RHR-34B Step 4.7.5 Critical: No OPEN LD-60, RHR to CVCS Letdown Line.

Standard: LD-60 Open with Red light ON and Green light OFF.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Page 7 of 15

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM RO-034-JP01A, Operate the RHR System in Split Train Mode, Rev. B Performance Step: 10 A-RHR-34B Step 4.7.5 Critical: No VERIFY RHR Pump A Disch Press (PI-629) increases to equal Letdown Hx Outlet Pressure (PI-135)

Standard: RHR Pump A discharge pressure PI-629 and Letdown HX Outlet pressure PI-135 approximately equal.

Evaluator Note: PI-135 pressure may read up to 100 psig less than PI-629. If LD-10 is taken fully closed and PI-135 reads below PI-629, the operator may raise question about continuing. If so the CUE below should be used.

Evaluator Cue: Pressure readings are noted, Continue with actions.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 11 A-RHR-34B Step 4.7.6 Critical: No ADJUST LD-10, Letdown Cont Pressure Controller, to increase Letdown Hx Outlet Pressure (PI-135) to match RCS NR Pressure (PI-420).

Standard: Adjust LD-10 controller until pressures indicated on PI-135 and PI-420 are approximately equal.

Evaluator Note: PI-135 pressure may read up to 100 psig less than PI-629. If LD-10 is taken fully closed and PI-135 reads below PI-629, the operator may raise question about continuing. If so the CUE below should be used.

Evaluator Cue: Pressure readings are noted, Continue with actions.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Page 8 of 15

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM RO-034-JP01A, Operate the RHR System in Split Train Mode, Rev. B Performance Step: 12 A-RHR-34B Step 4.7.7.1 - 4.7.7.4 Critical: Yes OPEN following:

  • RHR-1A, RCS Loop A Supply to RHR Pumps
  • RHR-2A, RCS Loop A Supply to RHR Pumps
  • RHR-1B, RCS Loop B Supply to RHR Pumps
  • RHR-2B, RCS Loop B Supply to RHR Pumps Standard:
  • RHR-1A Open with Red light ON and Green light OFF.
  • RHR-2A Open with Red light ON and Green light OFF.
  • RHR-1B Open with Red light ON and Green light OFF.
  • RHR-2B Open with Red light ON and Green light OFF.

Evaluator Note: At least one set of these valves (RHR-1A and RHR-2A OR RHR-1B and RHR-2B) must be open to provide and adequate suction path to RHR Pump A.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 13 A-RHR-34B Step 4.7.8 Critical: No POSITION RHR-101/CV-31116, RHR Flow Bypass, to 10% OPEN.

Standard: RHR-101 Potentiometer adjusted to approximately 10% (open).

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 14 A-RHR-34B Step 4.7.9 Critical: No POSITION LD-10 Controller to MAN in preparation for pressure increase due to starting RHR Pump A Standard: LD-10 positioned to the MAN position.

Evaluator Note: LD-10 will already be in MANUAL controlling letdown pressure.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Page 9 of 15

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM RO-034-JP01A, Operate the RHR System in Split Train Mode, Rev. B Performance Step: 15 A-RHR-34B Step 4.7.10 CAUTION Critical: No Do NOT exceed 600 psig at RHR pump discharge as indicated on RHR Pump A Disch Press (PI-629). WHEN RHR pumps are running, this corresponds to approximately 425 psig RCS pressure.

Standard: CAUTION is read and examinee notes pressure indications to observe -

PI-629 and wide range RCS pressure indicators.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 16 A-RHR-34B Step 4.7.10 Critical: Yes START RHR Pump A Standard: RHR Pump A running with Red light ON and Green light OFF. (Pump amps may also be checked.)

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 17 VERIFY RHR Pump Pit Fan Coil Unit A, ON.

Critical: No Standard: RHR Pump Pit Fan Coil Unit A verified running with Red light lit.

(Status light lit on SI ACTIVE Status Panel (44910-0303) may also be checked.)

Performance: SATISFACTORY UNSATISFACTORY Comments:

Page 10 of 15

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM RO-034-JP01A, Operate the RHR System in Split Train Mode, Rev. B Performance Step: 18 A-RHR-34B Step 4.7.11 Critical: Yes ADJUST LD-10 to establish approximately 80 gpm Letdown Hx Outlet Flow.

Standard: LD-10 adjusted to establish approximately 80 gpm Letdown Hx outlet flow.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 19 A-RHR-34B Step 4.7.12 Critical: Yes THROTTLE OPEN RHR-101 to gradually increase RHR Heat Exchanger Outlet Temp (green pen) to within 50°F of RHR Pumps Suction Temperature (red pen) on RHR Suct & Outl Temperature Recorder.

Standard:

  • RHR-101 throttled open above 10%.
  • RHR Heat Exchanger Outlet temperature rising toward RHR Suction temperature on RHR Suct & Outl Temperature Recorder.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues: When RHR Suction and Hx Outlet Temperature trending up for RHR warmup, CUE:

THIS JPM IS COMPLETE Stop Time:

Page 11 of 15

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM RO-034-JP01A, Operate the RHR System in Split Train Mode, Rev. B SIMULATOR SET UP:

Simulator Setup Instructions:

If necessary, reset the simulator IC-18, Ready to enter RHR, then perform the following:

1. Enter Remote Functions
2. Go to RUN.
3. Align electrical Buses to RAT (except Bus 5 aligned to TAT)
4. Close Containment Vent valves.
5. Place SI Pump control switches in After Stop (from PULLOUT).
6. Open the SI Injection valves, SI-11A/B and SI-9A/B.
7. Open the RHR Injection valves, SI-302A/B.
8. Open RWST Supply to RHR Pump A(B) valves, SI-300A/B.
9. Throttle AFW-2A and AFW-2B to 70%.
10. Actuate SI.
11. Enter RCS LOCA (Malfunction RC04)

NOTE: The values for RC04 may be raised to SEVERITY LEVEL = 4 temporarily to allow Containment pressure to reach 4 psig.

When sequencing is complete:

12. Reset SI.
13. Reset Containment Isolation.
14. Place T/D AFW Pump control switch to PULLOUT.
15. Close SI Accumulator Isolation Valves SI-20A & B.
16. Place both RXCP Control Switches in PULLOUT.
17. Place both Przr Spray valves in MAN and CLOSE.
18. Stop both Diesel Generators and place control switches in AUTO.
19. Start two charging pumps with suction aligned to RWST.
20. Establish charging flow with Charging Pump demand between 75% and 90%.

NOTE: When containment pressure reaches 4 psig AND PRZR level is offscale low, then reduce malfunction RC04 to Severity Value=0 to allow RCS level and pressure recovery.

When Przr level is recovered to between 40 and 60%:

21. Place SI Pump A in PULLOUT and DANGER TAG control switch. (Out of Service)
22. Modify malfunction RC04 to Severity Value= 0.23 to 0.275 stabilize Przr level.
23. Establish letdown with LD-4A/B/C open.
24. Open CVC-211 and CVC-212 to establish seal return flow
25. When VCT level is between 40% and 70%, OPEN CVC-1 and CLOSE CVC-301
26. Stabilize conditions with RCS pressure between 150 and 300 psig, and RCS loop temperatures (Cold Leg) less than 320ºF.

After JPM has begun:

NOTE: The Remote Functions for operation of RHR-4A and RHR-4B are reversed in the Simulator code. An SFR exist to document this. The Remote Function RH112 will close valve RHR-4B.

27. Actuate TRIGGER 2 when directed to perform local actions of Step 4.6.1.

Page 12 of 15

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM RO-034-JP01A, Operate the RHR System in Split Train Mode, Rev. B EVENT NUMBER EVENT FILE NAME EVENT LOGIC EVENT WORD STATEMENT DESCRIPTION 1 (TRIGGER 1) N/A N/A Actuates malfunction RC04A at initial severity 2 (TRIGGER 2) N/A N/A Actuates Remote

[Performance Step 3] Functions for RHR alignment step 4.6.1 SIMULATOR MALFUNCTIONS:

TIME MALFUNCTION MALFUNCTION ET DELAY f. SERV RAMP I. SEV.

No. TITLE 0:01 RC04A RCS Loop 1 Cold 1 N/A 1.0 N/A N/A (Adjust as Leg LOCA necessary per directions)

SIMULATOR OVERRIDES; TIME OVERRIDE OVERRIDE ET DELAY VALUE RAMP ID. DESCRIPTION N/A N/A N/A N/A N/A N/A N/A SIMULATOR REMOTE FUNCTIONS:

TIME REMOTE REMOTE FUNCTION TITLE VALUE RAMP FUNCTION NO.

Preload SI115 SI-11A Breaker ON N/A SI116 SI-11B Breaker ON N/A SI117 SI-20A Breaker ON N/A SI118 SI-20B Breaker ON N/A SI119 SI-09A Breaker ON N/A SI120 SI-09B Breaker ON N/A RH118 RHR-299A Breaker OFF N/A RH107 RHR-1A/2A Brkr - Rack Out IN N/A RH106 RHR-11 Brkr - Rack Out IN N/A RH108 RHR-1B/2B Brkr - Rack Out IN N/A TRIGGER 2 RH112 RHR Pump 1A Suction Valve CLOSE N/A (RHR-4A) [Actually operates RHR-4B]

TRIGGER 2 RH104 RHR HX 1A Outlet X-CONN OPEN N/A (RHR-10A)

TRIGGER 2 RH102 RHR HX 1A Inlet X-CONN (RHR- OPEN 100A)

Page 13 of 15

QF-1030-11 Rev. 2 (FP-T-SAT-30)

TURNOVER SHEET INITIAL CONDITIONS:

1. You are the Reactor Operator.
2. The plant is recovering from a Small Break LOCA.
3. The crew is performing the steps of ES-1.2, Post-LOCA Cooldown and Depressurization and are placing RHR in service per A-RHR-34B, Residual Heat Removal Split-Train Mode.
4. Steps 4.1 through 4.4 of A-RHR-34B have been completed.

INITIATING CUES (IF APPLICABLE):

  • The CRS directs you to continue alignment of RHR for Split-Train operation starting at step 4.5 and place Train A of RHR in service for cooldown.

Page 14 of 15

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM RO-034-JP01A, Operate the RHR System in Split Train Mode, Rev. B ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1. Are all items on the signature page filled in correctly?
2. Has the JPM been reviewed and validated by SMEs?
3. Can the required conditions for the JPM be appropriately established in the simulator if required?
4. Does the performance steps accurately reflect trainees actions in accordance with plant procedures?
5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
6. Has the completion time been established based on validation data or incumbent experience?
7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
8. Is the Licensee level appropriate for the task being evaluated if required?
9. Is the K/A appropriate to the task and to the licensee level if required?
10. Have the performance steps been identified and typed (Critical /

Sequence / Time Critical) appropriately?

11. Have all special tools and equipment needed to perform the task been identified and made available to the trainee?
12. Are all references identified, current, accurate, and available to the trainee?
13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

All questions/statements must be answered YES or the JPM is not valid for use. If all questions/statements are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation shall sign and date this form.

Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Historical Record: (Optional)

Page 15 of 15

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JOB PERFORMANCE MEASURE (JPM)

SITE: Kewaunee Power Station JPM TITLE: Respond to High Reactor Coolant Activity JPM NUMBER: RO-036-JP01A REV. A RELATED PRA N/A INFORMATION:

TASK NUMBER(S) / 0360010401 / Respond to High Reactor Coolant Activity TASK TITLE(S):

K/A NUMBERS: 076AA2.02 RO value 2.8 / SRO value 3.4 APPLICABLE METHOD OF TESTING:

Discussion: Simulate/walkthrough: Perform: X EVALUATION LOCATION: In-Plant: Control Room:

Simulator: X Other:

Lab:

Time for Completion: 10 Minutes Time Critical: No Alternate Path / Faulted: No TASK APPLICABILITY: RO, SRO Additional signatures may be added as needed.

Developed by:

Instructor Date Validated by:

Validation Instructor Date (See JPM Validation Checklist, Attachment 1)

Approved by:

Training Supervisor Date Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File Page 1 of 9

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM RO-036-JP01A, Respond to High Reactor Coolant Activity, Rev. E JPM Number: RO-036-JP01A JPM

Title:

Respond to High Reactor Coolant Activity Examinee: Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS: SAT: UNSAT:

COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

Page 2 of 9

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM RO-036-JP01A, Respond to High Reactor Coolant Activity, Rev. E JPM BRIEFING/TURNOVER Add required site specific JPM briefing material here:

i.e., This section is read once for the entire package of JPMs. It is not required to review this section for every JPM being performed in the package. The initial conditions and initiating cue(s)/tasks to be performed should be read and then provided to the examinee.

If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.

Read to Examinee:

You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.

EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

Note to Instructor:

1. Human Performance attributes should be visible. The student may use obvious STAR and or request Peer Checks.
2. If peer checks are requested, the Instructor should reply - Peer Check Acknowledged. The instructor will acknowledge use of the human performance tool and not validate the proper component manipulation.

This should be explained to the student at this time.

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

INITIAL CONDITIONS:

1. You are the Operator At The Controls.
2. Annunciator 47011-B, RADIATION INDICATION HIGH is in alarm.
3. The crew has addressed the annunciator response and completed the actions of A-RM-45, Abnormal Radiation Monitoring System.
4. Radiation Protection has confirmed the R-9, Letdown Monitor, reading is valid.
5. The crew is performing the actions of A-RC-36A, High Reactor Coolant Activity.
6. The CVC cation demineralizer and the deborating demineralizer are not in service.

INITIATING CUES (IF APPLICABLE):

The CRS directs you to perform step 4.3 of A-RC-36A, Operate CVC mixed bed demineralizers at maximum flow rate (80 gpm) per N-CVC-35B, Charging and Volume Control.

Page 3 of 9

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM RO-036-JP01A, Respond to High Reactor Coolant Activity, Rev. E JPM PERFORMANCE INFORMATION Required Materials: N-CVC-35B, Rev. AN General

References:

A-RC-36A, Rev. J Task Standards: Charging and letdown flow have been adjusted to 80 gpm.

Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e. the examinee looks or asks for the indication).

NOTE: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.

Performance Step: 1 REFER to N-CVC-35B, "Charging and Volume Control", to increase Critical: No Charging and Letdown flow rate to 80 gpm.

Standard: REFER to N-CVC-35B step 4.2.

Evaluator Note: Operator will be provided with copy of A-RC-36A and may refer to the procedure for step direction (Step 4.3).

This is NOT required since the initiating cue also provided the direction of the step.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 2 Step 4.2.1 (Step 4.1.1.c)

Critical: No VERIFY Charging Pumps are capable of providing required flow.

Standard: Red light lit for two Charging Pumps.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Page 4 of 9

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM RO-036-JP01A, Respond to High Reactor Coolant Activity, Rev. E Performance Step: 3 Step 4.2.1 Critical: No PLACE or VERIFY all Charging Pumps in MANUAL.

Standard: Charging Control Pump Speed controllers in MANUAL.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 4 Step 4.2.1 (Step 4.1.2.b)

Critical: Yes ADJUST the Charging Control-Pump Speed controllers until Chg Flow to approximately twice the initial value.

Standard: Charging flow reads between 40 and 60 gpm on FI-128, CHG FLOW to REGEN HX.

Evaluator Note: Total charging flow is the value on FI-128 and the value of seal injection flow minus #1 seal leakoff flow for both RXCPs.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 5 Step 4.2.1 (Step 4.1.2.h.1.)

Critical: Yes Establish 80 gpm letdown flow.

Standard: Red light ON, green light OFF for LD-4B.

Evaluator Note: The operator may also select to place the 80-gpm orifice in service alone by closing LD-4A and opening LD-4C ONLY. This is not expected but is also acceptable.

The operator is expected to check letdown flow on MCC meter FI-134, Letdown HX Outlet Flow.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Page 5 of 9

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM RO-036-JP01A, Respond to High Reactor Coolant Activity, Rev. E Performance Step: 6 Step 4.2.1 (Step 4.1.2.h.2)

Critical: No ADJUST LD-10 to establish Letdown Hx Outlet Pressure at 245-255 psig.

Standard: Letdown HX Outlet pressure on PI-135 between 245 and 255 psig Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 7 Step 4.2.1 (Step 4.1.2.i)

Critical: No ADJUST CC-302 to establish Letdown Hx Outlet Temperature at 105-130ºF.

Standard: Letdown HX Outlet temperature on TI-130 between 105ºF and 130ºF.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues: None expected. Charging and letdown flow have been adjusted to 80 gpm.

If desired, CUE: This completes this JPM.

Stop Time:

Page 6 of 9

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM RO-036-JP01A, Respond to High Reactor Coolant Activity, Rev. E SIMULATOR SET UP:

Simulator Setup Instructions:

If necessary, reset the simulator to any at-power IC, then perform the following:

1. Go to RUN.
2. Insert the malfunction to ramp R-9 Letdown Radiation Monitor to ~ 4.0E+2 over 5 minutes.
3. When radiation monitor alarms actuate, acknowledge the alarm. (NOTE: High Alarm at 3.0E+2)
4. FREEZE (SNAP an IC, if desired).
5. Ensure a copy of A-RC-36A is available and has had the stepwise placekeeping marked for steps 4.1 and 4.2.
6. Make sure that a copy of N-CVC-35B is available for use. NOTE: The copy will be provided if the operator initiates use of the plastic copy of N-CVC-35B EVENT NUMBER EVENT FILE NAME EVENT LOGIC EVENT WORD STATEMENT DESCRIPTION N/A N/A N/A N/A SIMULATOR MALFUNCTIONS:

TIME MALFUNCTION MALFUNCTION ET DELAY f. SERV RAMP I. SEV.

No. TITLE T=0 RM02I Area Radiation N/A 0 58 5:00 49 Monitor Failure (3.5E+2) (8.5E+1)

(R-9)

SIMULATOR OVERRIDES; TIME OVERRIDE OVERRIDE ET DELAY VALUE RAMP ID. DESCRIPTION N/A N/A N/A N/A N/A N/A N/A SIMULATOR REMOTE FUNCTIONS:

TIME REMOTE REMOTE FUNCTION TITLE VALUE RAMP FUNCTION NO.

N/A N/A N/A N/A N/A Page 7 of 9

QF-1030-11 Rev. 2 (FP-T-SAT-30)

TURNOVER SHEET INITIAL CONDITIONS:

1. You are the Operator At The Controls.
2. Annunciator 47011-B, RADIATION INDICATION HIGH is in alarm.
3. The crew has addressed the annunciator response and completed the actions of A-RM-45, Abnormal Radiation Monitoring System.
4. Radiation Protection has confirmed the R-9, Letdown Monitor, reading is valid.
5. The crew is performing the actions of A-RC-36A, High Reactor Coolant Activity.
6. The CVC cation demineralizer and the deborating demineralizer are not in service.

INITIATING CUES (IF APPLICABLE):

The CRS directs you to perform step 4.3 of A-RC-36A, Operate CVC mixed bed demineralizers at maximum flow rate (80 gpm) per N-CVC-35B, Charging and Volume Control.

Page 8 of 9

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM RO-036-JP01A, Respond to High Reactor Coolant Activity, Rev. A ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1. Are all items on the signature page filled in correctly?
2. Has the JPM been reviewed and validated by SMEs?
3. Can the required conditions for the JPM be appropriately established in the simulator if required?
4. Does the performance steps accurately reflect trainees actions in accordance with plant procedures?
5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
6. Has the completion time been established based on validation data or incumbent experience?
7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
8. Is the Licensee level appropriate for the task being evaluated if required?
9. Is the K/A appropriate to the task and to the licensee level if required?
10. Have the performance steps been identified and typed (Critical /

Sequence / Time Critical) appropriately?

11. Have all special tools and equipment needed to perform the task been identified and made available to the trainee?
12. Are all references identified, current, accurate, and available to the trainee?
13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

All questions/statements must be answered YES or the JPM is not valid for use. If all questions/statements are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation shall sign and date this form.

Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Historical Record: (Optional)

Page 9 of 9

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JOB PERFORMANCE MEASURE (JPM)

SITE: Kewaunee Power Station JPM TITLE: Drain the PRT to the CVC HUT JPM NUMBER: RO-036-JP22B REV. A RELATED PRA N/A INFORMATION:

TASK NUMBER(S) / 0360220101 TASK TITLE(S): Respond to a High Water Level in the PRT K/A NUMBERS: 007A1.01 RO value 2.9 / SRO value 3.1 APPLICABLE METHOD OF TESTING:

Discussion: Simulate/walkthrough: Perform: X EVALUATION LOCATION: In-Plant: Control Room:

Simulator: X Other:

Lab:

Time for Completion: 10 Minutes Time Critical: No Alternate Path / Faulted: No TASK APPLICABILITY: RO, SRO Additional signatures may be added as needed.

Developed by:

Instructor Date Validated by:

Validation Instructor Date (See JPM Validation Checklist, Attachment 1)

Approved by:

Training Supervisor Date Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File Page 1 of 9

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM RO-036-JP22B Drain the PRT to the CVC HUT Rev. A JPM Number: RO-036-JP22B JPM

Title:

Drain the PRT to the CVC HUT Examinee: Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS: SAT: UNSAT:

COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

Page 2 of 9

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM RO-036-JP22B Drain the PRT to the CVC HUT Rev. A JPM BRIEFING/TURNOVER Add required site specific JPM briefing material here:

i.e., This section is read once for the entire package of JPMs. It is not required to review this section for every JPM being performed in the package. The initial conditions and initiating cue(s)/tasks to be performed should be read and then provided to the examinee.

If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.

Read to Examinee:

You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.

EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

Note to Instructor:

1. Human Performance attributes should be visible. The student may use obvious STAR and or request Peer Checks.
2. If peer checks are requested, the Instructor should reply - Peer Check Acknowledged. The instructor will acknowledge use of the human performance tool and not validate the proper component manipulation.

This should be explained to the student at this time.

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

INITIAL CONDITIONS:

1. You are the Operator At The Controls.
2. PRT level has risen 78%.

INITIATING CUES (IF APPLICABLE):

Restore PRT level in accordance with N-RC-36B, Section 4.3.

Page 3 of 9

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM RO-036-JP22B Drain the PRT to the CVC HUT Rev. A JPM PERFORMANCE INFORMATION Required Materials: N-RC-36B, Rev. Q General

References:

None Task Standards: PRT level is restored to between 71.5 % and 76%.

Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e. the examinee looks or asks for the indication).

NOTE: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.

Performance Step: 1 Refer to N-RC-36B, Pressurizer Relief Tank Operation.

Critical: No Standard: Refers to N-RC-36B, section 4.3.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 2 N-RC-36B, step 4.3.1: OPEN RC-507/CV-31134, Rx Clnt Drain Pump Disch Critical: Yes Header Isol.

Standard: RC-507 open with red light lit.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Page 4 of 9

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM RO-036-JP22B Drain the PRT to the CVC HUT Rev. A Performance Step: 3 N-RC-36B, step 4.3.2: OPEN RC-508/CV-31135, Rx Clnt Drain Pump Disch Critical: Yes Header Isol.

Standard: RC-508 open with red light lit.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 4 N-RC-36B, step 4.3.3: OPEN PR-40/CV-31257, Przr Relief Tank Drain Critical: Yes (Item1) Isolation.

Standard: 1. PR-40 open with red light lit.

2. Checks PRT level lowering on LI-442 OR contacts AO to verify RCDT Pump A running. (Item #2 is NOT Critical)

Evaluator Note: Examinee should read NOTE prior to step, and recognize that RC-503-1, RCDT to Rx Clnt Drain Pumps will close and RCDT Pump A will auto start when PR-40 is opened.

Evaluator Cue: As AO report RCDT Pump A running.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 5 N-RC-36B, step 4.3.4: CYCLE PR-40 as necessary to maintain PRT Critical: No pressure 1.0-7.0 psig.

Standard: PRT pressure is maintained within 1.0-7.0 psig by operation of PR-40.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Page 5 of 9

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM RO-036-JP22B Drain the PRT to the CVC HUT Rev. A Performance Step: 6 N-RC-36B, step 4.3.5.a : WHEN PRT level reaches 72%, THEN PERFORM Critical: Yes (3 & 4) the following:

CLOSE PR-40.

Standard: 1. PRT level is monitored on LI-442.

2. PR-40 control switch is taken closed when level is at or below 72%.

(STAR)

3. PR-40 closed with green light lit.
4. PRT level is between 71.5% and 76%.
5. Reset alarm 47043-B.

Evaluator Note: 71.5% is the value for the LOW LEVEL Alarm (47043-B SER 960) and 76% is the value for the HIGH LEVEL Alarm (47043-B SER 595). Any level between these setpoints is within the normal operating band for the PRT.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 7 N-RC-36B, step 4.3.5.b: CLOSE RC-507.

Critical: No Standard: RC-507 closed with green light lit.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 8 N-RC-36B, step 4.3.5.c: CLOSE RC-508.

Critical: No Standard: RC-508 closed with green light lit.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues: If required, Acknowledge report of completion of N-RC-36B, section 4.3.

Stop Time:

Page 6 of 9

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM RO-036-JP22B Drain the PRT to the CVC HUT Rev. A SIMULATOR SET UP:

Simulator Setup Instructions:

If necessary, reset the simulator to any IC as appropriate, then perform the following:

1. Go to RUN.
2. Open MU-1010-1 and MU-1012 to initiate fill of PRT.
3. When annunciator 47043-B, PRESSURIZER RELIEF TANK ABNORMAL, actuates on high level, then close MU-1012.
4. Close MU-1010-1 EVENT NUMBER EVENT FILE NAME EVENT LOGIC EVENT WORD STATEMENT DESCRIPTION N/A N/A N/A N/A SIMULATOR MALFUNCTIONS:

TIME MALFUNCTION MALFUNCTION ET DELAY f. SERV RAMP I. SEV.

No. TITLE N/A N/A N/A N/A N/A N/A N/A N/A SIMULATOR OVERRIDES; TIME OVERRIDE OVERRIDE ET DELAY VALUE RAMP ID. DESCRIPTION N/A N/A N/A N/A N/A N/A N/A SIMULATOR REMOTE FUNCTIONS:

TIME REMOTE REMOTE FUNCTION TITLE VALUE RAMP FUNCTION NO.

N/A N/A N/A N/A N/A Page 7 of 9

QF-1030-11 Rev. 2 (FP-T-SAT-30)

TURNOVER SHEET INITIAL CONDITIONS:

1. You are the Operator At The Controls.
2. PRT level has risen 78%.

INITIATING CUES (IF APPLICABLE):

Restore PRT level in accordance with N-RC-36B, Section 4.3.

Page 8 of 9

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM RO-036-JP22B Drain the PRT to the CVC HUT Rev. A ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1. Are all items on the signature page filled in correctly?
2. Has the JPM been reviewed and validated by SMEs?
3. Can the required conditions for the JPM be appropriately established in the simulator if required?
4. Does the performance steps accurately reflect trainees actions in accordance with plant procedures?
5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
6. Has the completion time been established based on validation data or incumbent experience?
7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
8. Is the Licensee level appropriate for the task being evaluated if required?
9. Is the K/A appropriate to the task and to the licensee level if required?
10. Have the performance steps been identified and typed (Critical /

Sequence / Time Critical) appropriately?

11. Have all special tools and equipment needed to perform the task been identified and made available to the trainee?
12. Are all references identified, current, accurate, and available to the trainee?
13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

All questions/statements must be answered YES or the JPM is not valid for use. If all questions/statements are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation shall sign and date this form.

Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Historical Record: (Optional)

Page 9 of 9

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JOB PERFORMANCE MEASURE (JPM)

SITE: Kewaunee Power Station JPM TITLE: Transfer from Manual to Automatic Pressure Control JPM NUMBER: RO-036-JP26A REV. C RELATED PRA N/A INFORMATION:

TASK NUMBER(S) / 0360260101 / Operate the Pressurizer Pressure Control System to Control TASK TITLE(S): Pressure during a Heatup K/A NUMBERS: 010A4.01 RO value 3.7 / SRO value 3.5 APPLICABLE METHOD OF TESTING:

Discussion: Simulate/walkthrough: Perform:

EVALUATION LOCATION: In-Plant: Control Room:

Simulator: X Other:

Lab:

Time for Completion: 6 Minutes Time Critical: No Alternate Path / Faulted: No TASK APPLICABILITY: RO, SRO Additional signatures may be added as needed.

Developed by:

Instructor Date Validated by:

Validation Instructor Date (See JPM Validation Checklist, Attachment 1)

Approved by:

Training Supervisor Date Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File Page 1 of 9

QF-1030-11 Rev. 2 (FP-T-SAT-30)

RO-036-JP26A, Transfer from Manual to Automatic Pressure Control, Rev. C JPM Number: RO-036-JP26A JPM

Title:

Transfer from Manual to Automatic Pressure Control Examinee: Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS: SAT: UNSAT:

COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

Page 2 of 9

QF-1030-11 Rev. 2 (FP-T-SAT-30)

RO-036-JP26A, Transfer from Manual to Automatic Pressure Control, Rev. C JPM BRIEFING/TURNOVER Add required site specific JPM briefing material here:

i.e., This section is read once for the entire package of JPMs. It is not required to review this section for every JPM being performed in the package. The initial conditions and initiating cue(s)/tasks to be performed should be read and then provided to the examinee.

If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.

Read to Examinee:

You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.

EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

Note to Instructor:

1. Human Performance attributes should be visible. The student may use obvious STAR and or request Peer Checks.
2. If peer checks are requested, the Instructor should reply - Peer Check Acknowledged. The instructor will acknowledge use of the human performance tool and not validate the proper component manipulation.

This should be explained to the student at this time.

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

INITIAL CONDITIONS:

1. You are the Operator At The Controls.
2. I&C has just completed work on pressure transmitters and requests that the PRZR pressure master controller be returned to AUTO. No Operations Post Maintenance Testing is required.

INITIATING CUES (IF APPLICABLE):

The Control Room Supervisor directs you to return the Pressurizer pressure control to automatic per N-RC-36C, step 4.3.1.g through l.

Page 3 of 9

QF-1030-11 Rev. 2 (FP-T-SAT-30)

RO-036-JP26A, Transfer from Manual to Automatic Pressure Control, Rev. C JPM PERFORMANCE INFORMATION Required Materials: N-RC-36C, Rev. AB General

References:

Task Standards: PRZR Spray Control Master Controller in AUTO and verified working properly.

Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e. the examinee looks or asks for the indication).

NOTE: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.

Performance Step: 1 Refer to N-RC-36C, steps 4.3.1.g through l.

Critical: No Standard: Refer to N-RC-36C, steps 4.3.1.g through l.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 2 N-RC-36C, step 4.3.1.g Critical: Yes ADJUST Master controller setpoint dial until the deviation meter nulls.

Standard: Deviation meter reading at center (nulled).

Performance: SATISFACTORY UNSATISFACTORY Comments:

Page 4 of 9

QF-1030-11 Rev. 2 (FP-T-SAT-30)

RO-036-JP26A, Transfer from Manual to Automatic Pressure Control, Rev. C Performance Step: 3 N-RC-36C, step 4.3.1.h Critical: No VERIFY Master Controller setpoint matches pressurizer pressure channel selected for control.

Standard: Master Controller setpoint is checked to verify it matches the reading on the pressurizer pressure channel selected for control (PI-431).

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 4 N-RC-36C, step 4.3.1.i Critical: Yes POSITION AUTO-BAL-MAN switch to MAN-BAL.

Standard: AUTO-BAL-MAN switch is placed in the MAN-BAL position.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 5 N-RC-36C, step 4.3.1.j Critical: No VERIFY deviation meter is centered.

Standard: Deviation meter is checked in the center position.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 6 N-RC-36C, step 4.3.1.k Critical: Yes POSITION AUTO-BAL-MAN switch to AUTO.

Standard: AUTO-BAL-MAN switch is placed in the AUTO position.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Page 5 of 9

QF-1030-11 Rev. 2 (FP-T-SAT-30)

RO-036-JP26A, Transfer from Manual to Automatic Pressure Control, Rev. C Performance Step: 7 N-RC-36C, step 4.3.1.l Critical: No VERIFY pressurizer spray valves and heater control working properly to maintain PRZR pressure.

Standard: PRZR pressure is monitored for a short time to verify spray valves and heater control working properly.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues: None. Condition is PRZR Spray Control Master Controller in AUTO and verified working properly.

If desired, CUE: This completes this JPM.

Stop Time:

Page 6 of 9

QF-1030-11 Rev. 2 (FP-T-SAT-30)

RO-036-JP26A, Transfer from Manual to Automatic Pressure Control, Rev. C SIMULATOR SET UP:

Simulator Setup Instructions:

If necessary, reset the simulator to any At-Power Power IC, then perform the following:

1. Go to RUN.
2. Place PRZR Pressure Master Controller in MAN.
3. Adjust the setpoint dial until the upper meter indicates between 70 and 80% of scale (right to left).

EVENT NUMBER EVENT FILE NAME EVENT LOGIC EVENT WORD STATEMENT DESCRIPTION N/A N/A N/A N/A SIMULATOR MALFUNCTIONS:

TIME MALFUNCTION MALFUNCTION ET DELAY f. SERV RAMP I. SEV.

No. TITLE N/A N/A N/A N/A N/A N/A N/A N/A SIMULATOR OVERRIDES; TIME OVERRIDE OVERRIDE ET DELAY VALUE RAMP ID. DESCRIPTION N/A N/A N/A N/A N/A N/A N/A SIMULATOR REMOTE FUNCTIONS:

TIME REMOTE REMOTE FUNCTION TITLE VALUE RAMP FUNCTION NO.

N/A N/A N/A N/A N/A Page 7 of 9

QF-1030-11 Rev. 2 (FP-T-SAT-30)

TURNOVER SHEET INITIAL CONDITIONS:

1. You are the Operator At The Controls.
2. I&C has just completed work on pressure transmitters and requests that the PRZR pressure master controller be returned to AUTO. No Operations Post Maintenance Testing is required.

INITIATING CUES (IF APPLICABLE):

The Control Room Supervisor directs you to return the Pressurizer pressure control to automatic per N-RC-36C, step 4.3.1.g through l.

Page 8 of 9

QF-1030-11 Rev. 2 (FP-T-SAT-30)

RO-036-JP26A, Transfer from Manual to Automatic Pressure Control, Rev. C ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1. Are all items on the signature page filled in correctly?
2. Has the JPM been reviewed and validated by SMEs?
3. Can the required conditions for the JPM be appropriately established in the simulator if required?
4. Does the performance steps accurately reflect trainees actions in accordance with plant procedures?
5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
6. Has the completion time been established based on validation data or incumbent experience?
7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
8. Is the Licensee level appropriate for the task being evaluated if required?
9. Is the K/A appropriate to the task and to the licensee level if required?
10. Have the performance steps been identified and typed (Critical /

Sequence / Time Critical) appropriately?

11. Have all special tools and equipment needed to perform the task been identified and made available to the trainee?
12. Are all references identified, current, accurate, and available to the trainee?
13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

All questions/statements must be answered YES or the JPM is not valid for use. If all questions/statements are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation shall sign and date this form.

Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Historical Record: (Optional)

Page 9 of 9

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JOB PERFORMANCE MEASURE (JPM)

SITE: Kewaunee Power Station JPM TITLE: Loss of Intermediate Range Instrumentation with failure of Reactor Trip Signal JPM NUMBER: RO-048-JP041 REV. A RELATED PRA N/A INFORMATION:

TASK NUMBER(S) / 0480040401 TASK TITLE(S): Respond to a Failure of Intermediate Range Instrumentation K/A NUMBERS: 033AA2.07 RO value 3.9 / SRO value 4.2 APPLICABLE METHOD OF TESTING:

Discussion: Simulate/walkthrough: Perform: X EVALUATION LOCATION: In-Plant: Control Room:

Simulator: X Other:

Lab:

Time for Completion: 7 Minutes Time Critical: No Alternate Path / Faulted: Yes TASK APPLICABILITY: RO, SRO Additional signatures may be added as needed.

Developed by:

Instructor Date Validated by:

Validation Instructor Date (See JPM Validation Checklist, Attachment 1)

Approved by:

Training Supervisor Date Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File Page 1 of 11

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM RO-048-JP041, Loss of Intermediate Range Instrumentation with failure of Reactor Trip Signal, Rev. A JPM Number: RO-048-JP041 JPM

Title:

Loss of Intermediate Range Instrumentation with failure of Reactor Trip Signal Examinee: Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS: SAT: UNSAT:

COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

Page 2 of 11

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM RO-048-JP041, Loss of Intermediate Range Instrumentation with failure of Reactor Trip Signal, Rev. A JPM BRIEFING/TURNOVER Add required site specific JPM briefing material here:

i.e., This section is read once for the entire package of JPMs. It is not required to review this section for every JPM being performed in the package. The initial conditions and initiating cue(s)/tasks to be performed should be read and then provided to the examinee.

If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.

Read to Examinee:

You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.

EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

Note to Instructor:

1. Human Performance attributes should be visible. The student may use obvious STAR and or request Peer Checks.
2. If peer checks are requested, the Instructor should reply - Peer Check Acknowledged. The instructor will acknowledge use of the human performance tool and not validate the proper component manipulation.

This should be explained to the student at this time.

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

INITIAL CONDITIONS:

1. You are the Reactor Operator.
2. Reactor Startup is in progress with in accordance with N-CRD-49B, Reactor Startup.
3. Reactor is critical at approximately 8.6 x 10-4%.
4. Step 27.d.4 was initiated with the Critical Data being recorded on Data Sheet 1.
5. Intermediate Range Nuclear Instrument channel N-35 has just failed low.
6. A-NI-48, Abnormal Nuclear Instrumentation, has been entered and the actions through Step 4 have been completed.

INITIATING CUES (IF APPLICABLE):

The CRS directs you to perform Step 5 of A-NI-48, Abnormal Nuclear Instrumentation.

Page 3 of 11

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM RO-048-JP041, Loss of Intermediate Range Instrumentation with failure of Reactor Trip Signal, Rev. A JPM PERFORMANCE INFORMATION Required Materials: A-NI-48, Rev. X General

References:

N-CRD-49B, Reactor Startup Task Standards: The reactor is tripped and E-0 is entered.

Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e. the examinee looks or asks for the indication).

NOTE: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.

Performance Step: 1 Refers to A-NI-48.

Critical: No Standard: Goes to Step 5 of A-NI-48 Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 2 A-NI-48, Step 5 Critical: No Check Intermediate Range Channels - BOTH OPERABLE.

Standard: Determine N-35 has failed.

Evaluator Note: Information that channel N-35 has failed low is provided in Initial Conditions.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Page 4 of 11

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM RO-048-JP041, Loss of Intermediate Range Instrumentation with failure of Reactor Trip Signal, Rev. A Performance Step: 3 A-NI-48, Step 5.a Contingency Action Critical: Yes On Comparator And Rate drawer Start Up Rate section, position Channel Selector switch to an operable Source OR Intermediate Range channel.

Standard: Channel Selector switch is positioned to N36.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 4 A-NI-48, Step 5.b Contingency Action Critical: Yes IF a single Intermediate Range channel is inoperable, THEN position Level Trip switch for failed channel to BYPASS.

Standard: LEVEL TRIP switch for N35 is placed in BYPASS.

Evaluator Note: After the operator has placed the LEVEL TRIP switch in BYPASS and acknowledged the associated annunciator (47033-L), the Booth Operator will enter Malfunction NI03B with a Severity Value of 100 to cause N-36 channel to fail high, and generate a reactor trip signal.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 5 Reactor trip should have occurred and did not.

Critical: No Standard: Report reactor trip signal and failure of reactor trip breakers to open Evaluator Note: Indications that trip should have occurred but did not:

  • IR N36 Drawer 84005 indicator above 100%.
  • IR N36 Drawer 84005 HIGH LEVEL TRIP bistable lit.
  • MCC panel N-36B % Power meter above 102%.

Evaluator Cue: As CRS, acknowledge report(s) and action(s) to be taken.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Page 5 of 11

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM RO-048-JP041, Loss of Intermediate Range Instrumentation with failure of Reactor Trip Signal, Rev. A Performance Step: 6 Manually trip the reactor.

Critical: Yes Standard: Reactor tripped. (Reactor Trip pushbutton pressed.)

Evaluator Note: Indications of trip:

  • Rod Position Indicators at ZERO.
  • Rod Bottom Lights lit.
  • Source Range flux decreasing.
  • Source Range SUR negative.

The reactor trip will be generated by the action of depressing the REACTOR TRIP pushbutton. The simulator may display a delay in opening the reactor trip breakers due to processing time for removal of the Malfunction overriding the reactor trip breakers closed.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 7 E-0, Step 1 Critical: No GO TO E-0 and perform immediate actions for reactor trip:

  • All Rod Position Indicators less than or equal to 7.5 steps.
  • All Rod Bottom Lights LIT.
  • Neutron Flux Decreasing.

Standard: Reactor trip is verified.

Evaluator Note: Other Immediate Actions exist for E-0 (Turbine Trip, AC Power, SI Status) but are not part of this JPM. Proceed to TERMINATING CUE below when actions for confirming the reactor trip are complete.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues: When Step 1 of E-0 is complete with reactor trip verified, CUE: This completes this JPM.

Stop Time:

Page 6 of 11

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM RO-048-JP041, Loss of Intermediate Range Instrumentation with failure of Reactor Trip Signal, Rev. A Page 7 of 11

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM RO-048-JP041, Loss of Intermediate Range Instrumentation with failure of Reactor Trip Signal, Rev. A SIMULATOR SET UP:

Simulator Setup Instructions:

If necessary, reset the simulator to Reactor Critical, Power at ~10E-3, BOL (e.g., IC-6), then perform the following:

1. Place Control Rod Bank Selector to MAN.
2. Go to RUN.
3. Insert Reactor Trip Breaker Failure to Open malfunction.
4. Insert TRIGGER 2 to delete RD11 malfunction when the Reactor Trip pushbutton is pressed.
5. Insert the malfunction to fail N-35 Intermediate Range Channel LOW
6. Verify N-35 drawer and MCC panel indications at bottom of scale.
7. Ensure a copy of N-CRD-49B, Reactor Startup, is stamped/dated, and marked up through step 27.d.3.

(ANNOUNCE Reactor critical via Gai-tronics.)

8. Ensure a copy of N-CRD-49B, Data Sheet 1 is provided with data filled in for page 1 and page 2 up to Actual Critical Data section.
9. Ensure a copy of A-NI-48 is available and has had the stepwise placekeeping marked through step 4, (all without any Contingency Actions required).
10. Enter Malfunction to fail Intermediate Range channel N36 when operator has completed step 5.c CONTINGENCY ACTION of A-NI-48.

EVENT NUMBER EVENT FILE NAME EVENT LOGIC EVENT WORD STATEMENT DESCRIPTION 1 (TRIGGER 1) N/A N/A Malfunction NI03B fails the

[Performance Step 5] IR channel N36 high.

2 (TRIGGER 2) N/A HWZRPTRSL==1 Actuates when the MCC

[Performance Step 7] Reactor Trip pushbutton is AUTOMATIC pushed.

Command: DMF RD11 Removes the malfunction preventing the reactor trip breakers from opening.

SIMULATOR MALFUNCTIONS:

TIME MALFUNCTION MALFUNCTION ET DELAY f. SERV RAMP I. SEV.

No. TITLE T=0 RD11 Reactor Trip N/A 0 N/A N/A N/A Breakers Fail to Open on Trip Signal T=0 NI03A Intermediate N/A 0 1.1 N/A N/A Range Channel Failure (N35)

Step 5 NI03B Intermediate 1 0 100 N/A 50 Range Channel Failure (N36)

Page 8 of 11

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM RO-048-JP041, Loss of Intermediate Range Instrumentation with failure of Reactor Trip Signal, Rev. A SIMULATOR OVERRIDES; TIME OVERRIDE OVERRIDE ET DELAY VALUE RAMP ID. DESCRIPTION N/A N/A N/A N/A N/A N/A N/A SIMULATOR REMOTE FUNCTIONS:

TIME REMOTE REMOTE FUNCTION TITLE VALUE RAMP FUNCTION NO.

N/A N/A N/A N/A N/A Page 9 of 11

QF-1030-11 Rev. 2 (FP-T-SAT-30)

TURNOVER SHEET INITIAL CONDITIONS:

1. You are the Reactor Operator.
2. Reactor Startup is in progress with in accordance with N-CRD-49B, Reactor Startup.
3. Reactor is critical at approximately 8.6 x 10-4%.
4. Step 27.d.4 was initiated with the Critical Data being recorded on Data Sheet 1.
5. Intermediate Range Nuclear Instrument channel N-35 has just failed low.
6. A-NI-48, Abnormal Nuclear Instrumentation, has been entered and the actions through Step 4 have been completed.

INITIATING CUES (IF APPLICABLE):

The CRS directs you to perform Step 5 of A-NI-48, Abnormal Nuclear Instrumentation.

Page 10 of 11

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM RO-048-JP041, Loss of Intermediate Range Instrumentation with failure of Reactor Trip Signal, Rev. A ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1. Are all items on the signature page filled in correctly?
2. Has the JPM been reviewed and validated by SMEs?
3. Can the required conditions for the JPM be appropriately established in the simulator if required?
4. Does the performance steps accurately reflect trainees actions in accordance with plant procedures?
5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
6. Has the completion time been established based on validation data or incumbent experience?
7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
8. Is the Licensee level appropriate for the task being evaluated if required?
9. Is the K/A appropriate to the task and to the licensee level if required?
10. Have the performance steps been identified and typed (Critical /

Sequence / Time Critical) appropriately?

11. Have all special tools and equipment needed to perform the task been identified and made available to the trainee?
12. Are all references identified, current, accurate, and available to the trainee?
13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

All questions/statements must be answered YES or the JPM is not valid for use. If all questions/statements are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation shall sign and date this form.

Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Historical Record: (Optional)

Page 11 of 11

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JOB PERFORMANCE MEASURE (JPM)

SITE: Kewaunee Power Station JPM TITLE: Perform A Dropped Rod Recovery JPM NUMBER: RO049JP03A REV. A RELATED PRA Control Rod is ranked number 10 system in PRA Importance.

INFORMATION:

TASK NUMBER(S) / 0490030501 / Respond to a Dropped Rod TASK TITLE(S):

K/A NUMBERS: 003A1.02 RO Value 3.6, SRO Value 3.4 1APPLICABLE METHOD OF TESTING:

Discussion: Simulate/walkthrough: Perform: X EVALUATION LOCATION: In-Plant: Control Room:

Simulator: X Other:

Lab:

Time for Completion: 45 Minutes Time Critical: No Alternate Path / Faulted: No TASK APPLICABILITY:

Additional signatures may be added as needed.

Developed by:

Instructor Date Validated by:

Validation Instructor Date (See JPM Validation Checklist, Attachment 1)

Approved by:

Training Supervisor Date Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File Page 1 of 16

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM RO-049-JP03A, Perform a Dropped Rod Recovery, Rev. A JPM Number: RO-049-JP03A JPM

Title:

Perform A Dropped Rod Recovery Examinee: Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS: SAT: UNSAT:

COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

Page 2 of 16

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM RO-049-JP03A, Perform a Dropped Rod Recovery, Rev. A JPM BRIEFING/TURNOVER Add required site specific JPM briefing material here:

i.e., This section is read once for the entire package of JPMs. It is not required to review this section for every JPM being performed in the package. The initial conditions and initiating cue(s)/tasks to be performed should be read and then provided to the examinee.

If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.

Read to Examinee:

You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.

EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

Note to Instructor:

1. Human Performance attributes should be visible. The student may use obvious STAR and or request Peer Checks.
2. If peer checks are requested, the Instructor should reply - Peer Check Acknowledged. The instructor will acknowledge use of the human performance tool and not validate the proper component manipulation.

This should be explained to the student at this time.

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

INITIAL CONDITIONS:

1. You are the Reactor Operator.
2. The plant is at 20% power.
3. Rod K7 has dropped into the core.
4. Repairs have been completed for Rod K7.
5. The actions of A-CRD-49, Abnormal Rod Control System Operations, have been completed through Step 7 Contingency Action 2.a).

INITIATING CUES (IF APPLICABLE):

  • Reactor Engineering has advised the recovery of rod K7 should be performed by moving the rod in 10 step increments in 30-second intervals.
  • The Control Room Supervisor directs you to recover and realign Rod K7 to its bank position, by completing Attachment A of A-CRD-49.
  • A second operator has been assigned to maintain Tave using RCS boron concentration control.
  • I&C is standing by in the Control Rod Drive Equipment Room and the Relay Rack Room.
  • You are at Step A.1 of Attachment A of Procedure A-CRD-49.

Page 3 of 16

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM RO-049-JP03A, Perform a Dropped Rod Recovery, Rev. A JPM PERFORMANCE INFORMATION Required Materials: A-CRD-49, Rev. N {marked up through Step 7 Contingency Action 2.a)}

Key 933 General

References:

Task Standards: Rod K7 is withdrawn and aligned within its bank at 139 steps withdrawn.

Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e. the examinee looks or asks for the indication).

NOTE: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.

Performance Step: 1 Step A.1 Critical: No Verify cause of rod misalignment has been determined and corrected.

Standard: Determine rod is repaired as given in the initial conditions.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Page 4 of 16

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM RO-049-JP03A, Perform a Dropped Rod Recovery, Rev. A Performance Step: 2 Step A.2 Critical: No Monitor Power Range nuclear instrumentation.

Standard: Monitor NI channels N41 - N44 indication before and during rod withdrawal.

Evaluator Note: Acceptable indications include MCC Panel indicators 4122601 through 4122604, and/or NI Drawer A meters 84002, 84006, 84008, 84014.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 3 Step A.3 Critical: No (CAS) IF Quadrant Power Tilt Ratio does NOT respond as expected by Reactor Engineering at any time during realignment actions, THEN STOP control rod motion AND return rod or bank to its original position.

Standard: Monitor QPTR before and during rod withdrawal.

Evaluator Note: There should be no adverse change throughout the recovery.

Acceptable indications include MCC Panel indicators 4122701 through 4122704, Recorders 42571 through 42574, and/or PPCS Computer alarms.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 4 Step A.4.1 Critical: Yes Align misaligned rods to their associated Bank Step Position:

Position Control Rod Bank Selector to affected bank position.

Standard: Rod Bank Selector Switch is in CBD position.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Page 5 of 16

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM RO-049-JP03A, Perform a Dropped Rod Recovery, Rev. A Performance Step: 5 Step A.4.2 Critical: No Record affected Group Step Counter: ____________ steps Standard: Record Control Bank D Group 1 Step Position value 139.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 6 Step A.4.3 Critical: Yes Position Lift Coil Disconnect switches for all rods in affected bank, EXCEPT misaligned rod(s), to ROD DISCONNECTED.

Standard: Lift Coil Disconnect switches for rods G-3, C-7 and G-11 in ROD DISCONNECTED position.

Evaluator Note: The Rod Disconnect Switches are located in the small panel on the north wall just outside the Simulator control room north door.

The ROD DISCONNECTED position is in the UP direction.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 7 Step A.4.4 Critical: No Record misaligned rods actual position: ____________ steps

a. Using IRPI system as a guide to determine rod position.
b. IF retrieving a dropped rod, THEN actual position is zero steps.

Standard: Record K-7 position value ZERO (0) steps.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Page 6 of 16

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM RO-049-JP03A, Perform a Dropped Rod Recovery, Rev. A Performance Step: 8 Step A.4.5 Critical: Yes Change affected Group Step Counter to misaligned rods actual position as recorded in Step A.4.4 above.

Standard: Control Bank D Group 1 Step Position reads 000.

Evaluator Note: The UP, DOWN or RESET buttons on the Control Bank D Group1 Step Position indicator are used to changed the indication.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 9 Step A.4.6 Critical: Yes IF misaligned rod is in a Control Bank, THEN reset associated P/A converter to misaligned rods actual position recorded in Step A.4.4 above.

Standard: I&C contacted and directed to reset the Control Bank D P/A converter.

Evaluator Note: The Booth Operator will enter Remote Function RD107 Control Bank D P/A Converter with a Remote Value 000 to reset the P/A converter. (The Remote Function will then be DELETED to allow proper operation.)

Evaluator Cue: As I&C, Acknowledge request with repeat back, and then report action completed.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Page 7 of 16

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM RO-049-JP03A, Perform a Dropped Rod Recovery, Rev. A Performance Step: 10 Step A.4.7 Critical: No Reset affected Bank Step Position on PPCS as follows:

a. On Main Menu, click on PPCS Functions.
b. On PPCS Functions, click on Operator Entry.
c. On Operator Entry Menu, click on Rod Bank Position Update.
d. On Rod Bank Position Update, enter misalign rods actual position recorded in Step A.4.4 in the New Position for the affected bank.
e. On Rod Bank Position Update, click Apply.

Standard: Bank D Position input as 000 on PPCS Rod Bank Position Update screen on PPCS.

Evaluator Note: The PPCS computer will not replace the current value for the bank position. Apply the CUE below.

Evaluator Cue: The value for Bank D reads 000 Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 11 Step A.4.8 Critical: Yes Withdraw OR insert misaligned rod(s) to Group Step Counter position recorded in Step A.4.2 above with an appropriate boration/dilution to compensate for Tavg.

Standard: Rod K-7 withdrawn to Control Bank D Group 1 Step Position value 139.

Evaluator Note: As per Initial Cues:

  • A second operator will borate to maintain Tave. (The Booth Operator will accomplish this by modifying RCS boron concentration using Remote Function RC119.)
  • The directions from Reactor Engineering should be used as a guideline for rod recovery. (Moving the rod in 10 step increments in 30-second intervals.)

Performance: SATISFACTORY UNSATISFACTORY Comments:

Page 8 of 16

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM RO-049-JP03A, Perform a Dropped Rod Recovery, Rev. A Performance Step: 12 Step A.4.9 Critical: No Verify P/A converter equals Group Step Counter position recorded in Step A.4.2 above.

Standard: Check Control Bank D P/A converter reading at 139.

Evaluator Cue: As I&C report, Control Bank D P/A Converter reads 139 (or number of steps rod was withdrawn).

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 13 Step A.4.10 Critical: Yes Position Lift Coil Disconnects switches for all rods in affected bank to ROD CONNECTED.

Standard: Lift Coil Disconnect switches for rods G-3, C-7, G-11 and K-7 in ROD CONNECTED position.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Page 9 of 16

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM RO-049-JP03A, Perform a Dropped Rod Recovery, Rev. A Performance Step: 14 Step A.4.11.a.1 Critical: No Request I&C to perform the following in the Control Rod Drive Logic Cabinet:

1. IF affected bank has one group OR both Group Step Counters in affected bank are equal, THEN set Master Cycler to 4 counts.

Standard: I&C contacted and directed to reset the Master Cycler to 4 counts Evaluator Note: The operator may question why TLA-1 is still lit after rod recovery.

This is due to the PPCS not resetting to 000 when the operator inputs the value. The second CUE below covers this condition.

Evaluator Cue: As I&C, Acknowledge request to reset Master Cycler and report Master Cycler reset.

TLA-1 is reset.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 15 Step A.4.11.b.3 Critical: Yes Request I&C to perform the following in the Control Rod Drive Logic Cabinet:

  • IF Control Bank D rods are NOT fully inserted, THEN set Bank Overlap Unit to counts determined by adding Control Bank D step position and Bank Overlap Setpoint switch S5 steps.

Standard: I&C contacted and directed to reset the Bank Overlap Unit (BOU).

Evaluator Note: The Bank Overlap Setpoint switch S5 setting is normally 378. (Adding expected current Bank D position of 139 gives BOU setting of 517.

Evaluator Cue: As I&C, acknowledge request and report Bank Overlap counts set to 517.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Page 10 of 16

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM RO-049-JP03A, Perform a Dropped Rod Recovery, Rev. A Performance Step: 16 Step A.5 Critical: No Repeat Step A.4 as necessary to realign all rods.

Standard: Determine all rods are now aligned.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 17 Step A.6 Critical: Yes Position Control Rod Bank Selector to MAN.

Standard: Control Rod Bank selector switch in MAN position.

Evaluator Note: Tave-Tref meter (412130) and/or Tave-Tref recorder (42544) should be checked to ensure values are within 1.5ºF.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 18 Step A.7 Critical: No IF POWER RANGE NEGATIVE RATE CHANNEL ALERT (47032-J) is lit, THEN on affected Power Range Channel drawer, press Rate Trip Reset pushbutton.

Standard: Determine NI Rate Trips are reset.

Evaluator Note: Rate Trip condition should be verified by checking bistable lights (Positive and Negative) on each Power Range NI Drawer A NOT lit, and/or checking annunciators 47032-J and 47032-K NOT lit.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Page 11 of 16

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM RO-049-JP03A, Perform a Dropped Rod Recovery, Rev. A Performance Step: 19 Step A.8 Critical: No Perform SP-49-075 to verify movement of realigned rod(s).

Standard: Report requirement to perform SP-49-075 Evaluator Cue: As CRS, acknowledge report and report SP-49-075 completed satisfactorily.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 20 Step A.9 Critical: No If Reactor Engineering requires verification of power distribution, then request Reactor Engineering perform incore flux map.

Standard: Report requirement to contact Reactor Engineering.

Evaluator Cue: As CRS, Acknowledge and report Reactor Engineering does NOT need to perform flux map.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues: When Attachment A is complete, CUE: THIS JPM IS COMPLETE.

Stop Time:

Page 12 of 16

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM RO-049-JP03A, Perform a Dropped Rod Recovery, Rev. A SIMULATOR SET UP:

NOTE: On Core 27, insertion of the drop rod does not result in generation of a reactor trip signal; however, this may also be block by inserting Malfunction RD11 to prevent the reactor trip breakers from opening.

Simulator Setup Instructions:

If necessary, reset the simulator to 20% Power, BOL (e.g., IC-9), then perform the following:

1. Place Control Rod Bank Selector to MAN.
2. Record the (Bank Overlap) Ramp Start Value from Remote Function RD114, Bank Overlap Counter:
3. Go to RUN.
4. Insert the malfunction below to drop rod K7.
5. Verify K7 position is ZERO and then DELETE malfunction RD0521.
6. Ensure any negative rate trip is RESET on all four power range NI drawers.
7. Incrementally reduce RCS boron concentration to approximately 2100 ppm, using the indicated Remote Function.
8. Verify that Tave and Tref are approximately equal. (+/- 0.5ºF).
9. Stabilize the plant, acknowledge and reset all annunciators.
10. FREEZE (SNAP an IC, if desired).
11. Ensure rod disconnect box is locked and the Evaluator has the key
12. Ensure a copy of A-CRD-49 is available and has had the stepwise placekeeping marked through step 7, Contingency Action 2.a).
13. During the performance of the JPM the Booth Operator will need to use the following Remote Functions when directed per Performance Step:
a. As AO, RD107, Control Bank D P-A Converter (Step A.4.6). Delete RF after reset.
b. As Extra NCO, RC119, Set RCS, Pzr, VCT Boron To Same Concentration (Step A.4.8) incrementally increase as rod is withdrawn to keep Tave-Tref matched. [Original boron 2116]
c. As I&C, RD115, Master Cycler Reset To 4 Counts (Step A.4.11). Delete RF after entry.

EVENT NUMBER EVENT FILE NAME EVENT LOGIC EVENT WORD STATEMENT DESCRIPTION N/A N/A N/A N/A SIMULATOR MALFUNCTIONS:

TIME MALFUNCTION MALFUNCTION ET DELAY f. SERV RAMP I. SEV.

No. TITLE T=0 RD0521 Dropped Rod-K7 N/A 0 N/A N/A N/A SIMULATOR OVERRIDES; TIME OVERRIDE OVERRIDE ET DELAY VALUE RAMP ID. DESCRIPTION N/A N/A N/A N/A N/A N/A N/A Page 13 of 16

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM RO-049-JP03A, Perform a Dropped Rod Recovery, Rev. A SIMULATOR REMOTE FUNCTIONS:

TIME REMOTE REMOTE FUNCTION TITLE VALUE RAMP FUNCTION NO.

T=0 RC119 Set RCS, Pzr, VCT Boron To Same 2116 (initial Use Concentration value) MODIFY after entry Step A.4.6 RD107 Control Bank D P-A Converter 0.00 DELETE after entry Step A.4.8 RC119 Set RCS, Pzr, VCT Boron To Same INCREASE Use Concentration MODIFY Step A.4.11 RD115 Master Cycler Reset To 4 Counts RESET, DELETE then after entry NORMAL Page 14 of 16

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM RO-049-JP03A, Perform a Dropped Rod Recovery, Rev. A TURNOVER SHEET INITIAL CONDITIONS:

1. You are the Reactor Operator.
2. The plant is at 20% power.
3. Rod K7 has dropped into the core.
4. Repairs have been completed for Rod K7.
5. The actions of A-CRD-49, Abnormal Rod Control System Operations, have been completed through Step 7 Contingency Action 2.a).

INITIATING CUES (IF APPLICABLE):

  • Reactor Engineering has advised the recovery of rod K7 should be performed by moving the rod in 10 step increments in 30-second intervals.
  • The Control Room Supervisor directs you to recover and realign Rod K7 to its bank position, by completing Attachment A of A-CRD-49.
  • A second operator has been assigned to maintain Tave using RCS boron concentration control.
  • I&C is standing by in the Control Rod Drive Equipment Room and the Relay Rack Room.
  • You are at Step A.1 of Attachment A of Procedure A-CRD-49.

Page 15 of 16

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM RO-049-JP03A, Perform a Dropped Rod Recovery, Rev. A ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1. Are all items on the signature page filled in correctly?
2. Has the JPM been reviewed and validated by SMEs?
3. Can the required conditions for the JPM be appropriately established in the simulator if required?
4. Does the performance steps accurately reflect trainees actions in accordance with plant procedures?
5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
6. Has the completion time been established based on validation data or incumbent experience?
7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
8. Is the Licensee level appropriate for the task being evaluated if required?
9. Is the K/A appropriate to the task and to the licensee level if required?
10. Have the performance steps been identified and typed (Critical /

Sequence / Time Critical) appropriately?

11. Have all special tools and equipment needed to perform the task been identified and made available to the trainee?
12. Are all references identified, current, accurate, and available to the trainee?
13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

All questions/statements must be answered YES or the JPM is not valid for use. If all questions/statements are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation shall sign and date this form.

Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Historical Record: Updated to latest revision of A-CRD-49.

Page 16 of 16

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JOB PERFORMANCE MEASURE (JPM)

SITE: Kewaunee Power Station JPM TITLE: Stop SI Pumps During Post-LOCA Cooldown JPM NUMBER: RO-E01-JP031 REV. A RELATED PRA N/A INFORMATION:

TASK NUMBER(S) / E010030501 TASK TITLE(S): Perform a Post-LOCA Cooldown and Depressurization 009EA2.34 RO Value 3.6 / SRO Value 4.2 K/A NUMBERS:

E03EA2.2 RO Value 3.5 / SRO Value 4.1 APPLICABLE METHOD OF TESTING:

Discussion: Simulate/walkthrough: Perform: X EVALUATION LOCATION: In-Plant: Control Room:

Simulator: X Other:

Lab:

Time for Completion: 15 Minutes Time Critical: No Alternate Path / Faulted: Yes TASK APPLICABILITY: RO, SRO Additional signatures may be added as needed.

Developed by:

Instructor Date Validated by:

Validation Instructor Date (See JPM Validation Checklist, Attachment 1)

Approved by:

Training Supervisor Date Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File Page 1 of 12

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM RO-E01-JP031, Stop SI Pumps During Post-LOCA Cooldown, Rev. A JPM Number: RO-E01-JP031 JPM

Title:

Stop SI Pumps During Post-LOCA Cooldown Examinee: Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS: SAT: UNSAT:

COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

Page 2 of 12

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM RO-E01-JP031, Stop SI Pumps During Post-LOCA Cooldown, Rev. A JPM BRIEFING/TURNOVER Add required site specific JPM briefing material here:

i.e., This section is read once for the entire package of JPMs. It is not required to review this section for every JPM being performed in the package. The initial conditions and initiating cue(s)/tasks to be performed should be read and then provided to the examinee.

If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.

Read to Examinee:

You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.

EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

Note to Instructor:

1. Human Performance attributes should be visible. The student may use obvious STAR and or request Peer Checks.
2. If peer checks are requested, the Instructor should reply - Peer Check Acknowledged. The instructor will acknowledge use of the human performance tool and not validate the proper component manipulation.

This should be explained to the student at this time.

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

INITIAL CONDITIONS:

1. The plant has experienced a small break LOCA.
2. The crew has completed through step 11 of ES-1.2, Post-LOCA Cooldown and Depressurization.

INITIATING CUES (IF APPLICABLE):

  • The CRS has directed you to complete step 12 of ES-1.2.

Page 3 of 12

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM RO-E01-JP031, Stop SI Pumps During Post-LOCA Cooldown, Rev. A JPM PERFORMANCE INFORMATION Required Materials: ES-1.2, Rev. Q, Step 12 (page 8)

General

References:

None Task Standards: Both SI Pumps have been secured in AUTO and one RHR Pump is running in injection mode Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e. the examinee looks or asks for the indication).

NOTE: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.

Performance Step: 1 Refer to ES-1.2, Step 12.

Critical: No Standard: Refer to ES-1.2, Step 12.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 2 ES-1.2 Step 12.a Critical: No Check If One SI Pump Should Be Stopped: Any SI Pump - RUNNING.

Standard: Determine both SI pumps running.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Page 4 of 12

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM RO-E01-JP031, Stop SI Pumps During Post-LOCA Cooldown, Rev. A Performance Step: 3 ES-1.2 step 12.b Critical: No Determine required RCS subcooling from table.

Standard: Determine required subcooling is 46ºF.

Evaluator Note: Examinee should determine two Charging Pumps are running, One RXCP is running, both SI Pumps are running and ADVERSE Containment conditions do not exist. Using the Chart, this gives a 46ºF subcooling value.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 4 ES-1.2 step 12.c Critical: No RCS subcooling based on Core Exit TCs - GREATER THAN REQUIRED SUBCOOLING.

Standard: Check RCS subcooling on ICCMS or PPCS is greater than 46ºF.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 5 ES-1.2 step 12.d Critical: No PRZR level - GREATER THAN 19% [42% FOR ADVERSE CONTAINMENT].

Standard: Checks PRZR level above 19% on LI-426, 427 or 428.

Evaluator Note: Examinee should determine ADVERSE Containment conditions do not exist and apply the lower value.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Page 5 of 12

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM RO-E01-JP031, Stop SI Pumps During Post-LOCA Cooldown, Rev. A Performance Step: 6 ES-1.2 step 12.d Critical: Yes Stop one SI Pump.

Standard: Stop one SI Pump and place in AUTO.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 7 ES-1.2 step 12.f Critical: No GO TO Step 12.a.

Standard: Return to Step 12.a.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 8 ES-1.2 Step 12.a Critical: No Check If One SI Pump Should Be Stopped: Any SI Pump - RUNNING.

Standard: Determine one SI pumps running.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 9 ES-1.2 step 12.b Critical: No Determine required RCS subcooling from table.

Standard: Determine required action is to use STEP 12.c CONTINGENCY.

Evaluator Note: Examinee should determine two Charging Pumps are running, One RXCP is running, one SI Pump is running. Using the Chart, this directs the use of the CONTINGENCY ACTIONS for STEP 12.c.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Page 6 of 12

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM RO-E01-JP031, Stop SI Pumps During Post-LOCA Cooldown, Rev. A Performance Step: 10 ES-1.2 step 12.c CONTINGENCY ACTIONS Critical: No IF RCS hot leg temperatures greater than 330°F, THEN GO TO Step 17.

Standard: Check wide-range RCS Hot Leg temperatures are checked below 330ºF.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 11 ES-1.2 step 12.c CONTINGENCY ACTIONS Critical: Yes IF RCS hot leg temperatures less than 330°F, THEN start one RHR Pump in SI mode.

Standard: Start RHR Pump A or RHR Pump B.

Check RED light lit and amps indicated for running pump.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 12 ES-1.2 step 12.d Critical: No PRZR level - GREATER THAN 19% [42% FOR ADVERSE CONTAINMENT].

Standard: Check PRZR level above 19% on LI-426, 427 or 428.

Evaluator Note: Examinee should determine ADVERSE Containment conditions do not exist and apply the lower value.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 13 ES-1.2 step 12.d Critical: Yes Stop one SI Pump.

Standard: Stop running SI Pump and place in AUTO.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Page 7 of 12

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM RO-E01-JP031, Stop SI Pumps During Post-LOCA Cooldown, Rev. A Performance Step: 14 ES-1.2 step 12.f Critical: No GO TO Step 12.a.

Standard: Return to Step 12.a.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 15 ES-1.2 Step 12.a Critical: No Check If One SI Pump Should Be Stopped: Any SI Pump - RUNNING.

Standard: Determine NO SI pumps running.

Evaluator Note: Examinee should transition to Step 12.a CONTINGENCY ACTIONS.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 13 ES-1.2 Step 12.a CONTINGENCY ACTIONS Critical: N IF RHR Pump running in SI mode AND injection flow is indicated, THEN GO TO Step 17.

Standard: Operator verifies RHR pump running but NO injection flow indicated on F-626 or F928.

Reports direction to GO TO Step 13.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues: When RHR Pump is running and examinee reports need for transition from Step12, CUE: THIS JPM IS COMPLETE.

Stop Time:

Page 8 of 12

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM RO-E01-JP031, Stop SI Pumps During Post-LOCA Cooldown, Rev. A SIMULATOR SET UP:

Simulator Setup Instructions:

If necessary, reset the simulator IC-18, Ready to enter RHR, then perform the following:

1. Enter Remote Functions
2. Go to RUN.
3. Align electrical Buses to RAT (except Bus 5 aligned to TAT)
4. Close Containment Vent valves.
5. Place SI Pump control switches in After Stop (from PULLOUT).
6. Open the SI Injection valves, SI-11A/B and SI-9A/B.
7. Open the RHR Injection valves, SI-302A/B.
8. Open RWST Supply to RHR Pump A(B) valves, SI-300A/B.
9. Throttle AFW-2A and AFW-2B to 70%.
10. Actuate SI.
11. Enter RCS LOCA (Malfunction RC04)

NOTE: The values for RC04 may be raised to SEVERITY LEVEL = 4 temporarily to allow Containment pressure to reach 4 psig.

When sequencing is complete:

12. Reset SI.
13. Reset Containment Isolation.
14. Place T/D AFW Pump control switch to PULLOUT.
15. Close SI Accumulator Isolation Valves SI-20A & B.
16. Place both RXCP Control Switches in PULLOUT.
17. Place both Przr Spray valves in MAN and CLOSE.
18. Stop both Diesel Generators and place control switches in AUTO.
19. Start two charging pumps with suction aligned to RWST.
20. Establish charging flow with Charging Pump demand between 75% and 90%.

NOTE: When containment pressure reaches 4 psig AND PRZR level is offscale low, then reduce malfunction RC04 to Severity Value=0 to allow RCS level and pressure recovery.

When Przr level is recovered to between 40 and 60%:

21. Modify malfunction RC04 to Severity Value= 0.25 to 0.275 stabilize Przr level.
22. Place BOTH RHR Pump control switches to AUTO after-stop.
23. Turn Przr heaters OFF.
24. Open CC-400A to RHR A Hx.
25. Open CVC-211 and CVC-212 to establish seal return flow.
26. Reduce Charging Pump demand to approximately 25% on both Pumps.
27. Start RXCP B.
28. Stabilize conditions with RCS pressure between 150 and 300 psig, and RCS loop temperatures (Cold Leg) less than 320ºF.

After JPM has begun:

29. When each SI Pump is stopped, adjust malfunction RC04 severity value as necessary to keep Przr level relatively stable.

NOTE: Typical severity value for the leak is 0.275, reduced to 0.22 when first SI pump is stopped, and reduced to 0.03 when second SI Pump is stopped (with both Charging Pumps running at 90%

demand).

Page 9 of 12

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM RO-E01-JP031, Stop SI Pumps During Post-LOCA Cooldown, Rev. A EVENT NUMBER EVENT FILE NAME EVENT LOGIC EVENT WORD STATEMENT DESCRIPTION 1 (TRIGGER 1) N/A N/A Actuates malfunction RC04A at initial severity SIMULATOR MALFUNCTIONS:

TIME MALFUNCTION MALFUNCTION ET DELAY f. SERV RAMP I. SEV.

No. TITLE 0:01 RC04A RCS Loop 1 Cold 1 N/A 1.0 N/A N/A (Adjust as Leg LOCA necessary per directions)

SIMULATOR OVERRIDES; TIME OVERRIDE OVERRIDE ET DELAY VALUE RAMP ID. DESCRIPTION N/A N/A N/A N/A N/A N/A N/A SIMULATOR REMOTE FUNCTIONS:

TIME REMOTE REMOTE FUNCTION TITLE VALUE RAMP FUNCTION NO.

Preload SI115 SI-11A Breaker ON N/A SI116 SI-11B Breaker ON N/A SI117 SI-20A Breaker ON N/A SI118 SI-20B Breaker ON N/A SI119 SI-09A Breaker ON N/A SI120 SI-09B Breaker ON N/A Page 10 of 12

QF-1030-11 Rev. 2 (FP-T-SAT-30)

TURNOVER SHEET INITIAL CONDITIONS:

1. The plant has experienced a small break LOCA.
2. The crew has completed through step 11 of ES-1.2, Post-LOCA Cooldown and Depressurization.

INITIATING CUES (IF APPLICABLE):

The CRS has directed you to complete step 12 of ES-1.2.

Page 11 of 12

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM RO-E01-JP031, Stop SI Pumps During Post-LOCA Cooldown, Rev. A ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1. Are all items on the signature page filled in correctly?
2. Has the JPM been reviewed and validated by SMEs?
3. Can the required conditions for the JPM be appropriately established in the simulator if required?
4. Does the performance steps accurately reflect trainees actions in accordance with plant procedures?
5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
6. Has the completion time been established based on validation data or incumbent experience?
7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
8. Is the Licensee level appropriate for the task being evaluated if required?
9. Is the K/A appropriate to the task and to the licensee level if required?
10. Have the performance steps been identified and typed (Critical /

Sequence / Time Critical) appropriately?

11. Have all special tools and equipment needed to perform the task been identified and made available to the trainee?
12. Are all references identified, current, accurate, and available to the trainee?
13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

All questions/statements must be answered YES or the JPM is not valid for use. If all questions/statements are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation shall sign and date this form.

Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Historical Record: (Optional)

Page 12 of 12