ML070650490: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(StriderTol Bot change)
 
(2 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML070650490
| number = ML070650490
| issue date = 07/15/2005
| issue date = 07/15/2005
| title = 07/13/2005 Big Rock Point - Rsrc Update, Part 2 of 2
| title = Rsrc Update, Part 2 of 2
| author name =  
| author name =  
| author affiliation = - No Known Affiliation
| author affiliation = - No Known Affiliation
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:00001"  
{{#Wiki_filter:00001"


----- ---------iZýFil GRAND OPENING!
iZý Fil GRAND OPENING!
Cos & Scheul Stats Pln Prp for Shtdw A.Y/ Bt IC -DFD&Euldn Finlysem F Fuel Shipment ISFSI Dismantlement Scedl Sttu*Sumta SceueSwes Fia Site Sure SE06 FE072 FuelShiped t DO MAY2 MA12 ISaS De oihd/rjc OC 1 OC 1 0S aCamplete 6cedl E E £nc Decon~~~ & SuvyItro ocee1 Sper Dismnlmn (5)Inero Co ceeD m lto98 Toa Vaiac 22 Esimt Comarso Bi Roc PoIin YO Doll -ar in Milin Inrmna SN $7. $7. 0 Cost Esimt Acta Remann Inrmna SN $7. $5. $2.Inrmna Securit Fundin Stau Deomisonn
-Reann CsS2.Difrec (fndn -esiae $2.7 II ,I~. ~-I 4


-V
Cos & Scheul Stats Pln    A Prp    for Shtdw Bt .Y/ IC-DFD Finlysem
                        &Euldn F
Fuel Shipment ISFSI Dismantlement


I T i
Scedl          Sttu
                                            *Sumta        SceueSwes Fia    Site                Sure                SE06      FE072 FuelShiped            t      DO            MAY2      MA12 ISaS    De            oihd/rjc                  OC    1  OC    1 0S aCamplete


Project Challenges" Improve safety culture and maintain schedule" Balance disposal cost vs schedule impact-Steam drum enclosure remediation
6cedl            E    E £nc Decon~~~
-Interior concrete between 599 and 585 levels-Radwaste vault" Send waste to Duratek at a steady pace r-I I I}}
            &    SuvyItro                  ocee1 Sper          Dismnlmn                                        (5)
Inero          Co          ceeD  m  lto98 Toa          Vaiac      22
 
Esimt                Comarso Bi      Roc        PoIin
            -ar YO    Doll          in  Milin Inrmna    SN              $7.                $7. 0 Cost
 
Esimt Acta Remann Inrmna        SN      $7.    $5.        $2.
Inrmna Securit
 
Fundin Stau Deomisonn        - Reann      CsS2.
Difrec      (fndn      -  esiae      $2.7
 
II ,I~. ~
          -I
 
4
 
- V
 
I T i
 
Project Challenges
" Improve safety culture and maintain schedule
" Balance disposal cost vs schedule impact
  - Steam drum enclosure remediation
  - Interior concrete between 599 and 585 levels
  - Radwaste vault
" Send waste to Duratek at a steady pace
 
r-I I
I}}

Latest revision as of 19:24, 13 March 2020

Rsrc Update, Part 2 of 2
ML070650490
Person / Time
Site: Big Rock Point File:Consumers Energy icon.png
Issue date: 07/15/2005
From:
- No Known Affiliation
To:
NRC/FSME
References
Download: ML070650490 (22)


Text

00001"

iZý Fil GRAND OPENING!

Cos & Scheul Stats Pln A Prp for Shtdw Bt .Y/ IC-DFD Finlysem

&Euldn F

Fuel Shipment ISFSI Dismantlement

Scedl Sttu

  • Sumta SceueSwes Fia Site Sure SE06 FE072 FuelShiped t DO MAY2 MA12 ISaS De oihd/rjc OC 1 OC 1 0S aCamplete

6cedl E E £nc Decon~~~

& SuvyItro ocee1 Sper Dismnlmn (5)

Inero Co ceeD m lto98 Toa Vaiac 22

Esimt Comarso Bi Roc PoIin

-ar YO Doll in Milin Inrmna SN $7. $7. 0 Cost

Esimt Acta Remann Inrmna SN $7. $5. $2.

Inrmna Securit

Fundin Stau Deomisonn - Reann CsS2.

Difrec (fndn - esiae $2.7

II ,I~. ~

-I

4

- V

I T i

Project Challenges

" Improve safety culture and maintain schedule

" Balance disposal cost vs schedule impact

- Steam drum enclosure remediation

- Interior concrete between 599 and 585 levels

- Radwaste vault

" Send waste to Duratek at a steady pace

r-I I

I