Review Of The License Termination Plan Big Rock Point August 5, 2003 August 5, 2003
04/07/2005 11:33 AM 04/07/2005 11:33 AM 22 NRC Organization NRC Organization OEDO NRR NMSS OTHER REGIONS SFPO DWM OTHER HLW DCB EPAB DNMS DECOM BR COMMISSION
04/07/2005 11:33 AM 04/07/2005 11:33 AM 33 NRC Performance Goals NRC Performance Goals 1.
1.
Maintain Safety, Protection of The Maintain Safety, Protection of The Environment, And The Common Environment, And The Common Defense And Security.
Defense And Security.
2.
Increase Public Confidence.
3.
Make NRC Activities And Decisions More Effective, Efficient, And Realistic.
4.
4.
Reduce Unnecessary Regulatory Reduce Unnecessary Regulatory Burden on Stakeholders.
Burden on Stakeholders.
04/07/2005 11:33 AM 04/07/2005 11:33 AM 44 Overview Overview
LTP Review Process LTP Review Process
Status of Review of BRP LTP Status of Review of BRP LTP
Consumers Energy Consumers Energy Decommissioning Plans for BRP Decommissioning Plans for BRP
Provide to stakeholders an Provide to stakeholders an opportunity to comment on the opportunity to comment on the BRP LTP BRP LTP
04/07/2005 11:33 AM 04/07/2005 11:33 AM 55 Steps In The LTP Review 1.
- 1. Acceptance Review Acceptance Review a.
- a. All Items In Standard Review Plan All Items In Standard Review Plan b.
- b. Evaluation of Selected Sections Evaluation of Selected Sections i.i.
Land Use Scenarios Land Use Scenarios ii.
ii. Residual Concentrations Residual Concentrations iii.
iii. Hydro Hydro--geology geology iv.
iv. Final Status Survey Plan Final Status Survey Plan c.
- c. Issue Federal Register Notice Issue Federal Register Notice 2.
- 2. Technical Reviews Technical Reviews
04/07/2005 11:33 AM 04/07/2005 11:33 AM 66 Steps In The LTP Review (cond) 3.
- 3. Requests for Additional Requests for Additional Information (RAI)
Information (RAI) 4.
- 4. Safety and Environmental Safety and Environmental Reviews Reviews 5.
- 5. Approve by license amendment Approve by license amendment a.
- a. Publish Environmental Review Publish Environmental Review b.
- b. Issue Amendment Authorizing Issue Amendment Authorizing Implementation of LTP Implementation of LTP
04/07/2005 11:33 AM 04/07/2005 11:33 AM 77 Principal Areas Of Focus Principal Areas Of Focus
Release criteria for license Release criteria for license termination.
termination.
Detailed final survey plans to Detailed final survey plans to demonstrate compliance with the demonstrate compliance with the criteria for license termination.
criteria for license termination.
Material disposal.
Material disposal.
04/07/2005 11:33 AM 04/07/2005 11:33 AM 88 Status Of BRP LTP Review Status Of BRP LTP Review
LTP submitted April 1, 2003; LTP submitted April 1, 2003; Acceptance Review completed Acceptance Review completed June 26, 2003 June 26, 2003
Technical reviews started July Technical reviews started July
Federal Register Notice issued 29 July Federal Register Notice issued 29 July (68 FR 44550)
LTP Public Meeting 5 August LTP Public Meeting 5 August
04/07/2005 11:33 AM 04/07/2005 11:33 AM 99 Planned Schedule For Review Planned Schedule For Review
Expect requests for additional Expect requests for additional information (RAIs) about April 04 information (RAIs) about April 04
Complete safety and environmental Complete safety and environmental reviews about end of CY 04, reviews about end of CY 04, Announce by Federal Register Notice Announce by Federal Register Notice
Issue License Amendment Spring 05 Issue License Amendment Spring 05
04/07/2005 11:33 AM 04/07/2005 11:33 AM 10 10 Spent Fuel Management Spent Fuel Management
Part 50 license to stay in effect until Part 50 license to stay in effect until fuel is removed from site (about 2012) fuel is removed from site (about 2012)
Part 72 specifies general license Part 72 specifies general license requirements requirements
Region III inspects implementation of Region III inspects implementation of spent fuel storage system requirements spent fuel storage system requirements
04/07/2005 11:33 AM 04/07/2005 11:33 AM 11 11 NRC Inspection Program NRC Inspection Program
Chris Miller, Chief Chris Miller, Chief Decommissioning Branch Decommissioning Branch DNMS DNMS R III R III
Bill Snell, Senior Inspector Bill Snell, Senior Inspector
04/07/2005 11:33 AM 04/07/2005 11:33 AM 12 12 Chris Miller CGM@NRC.GOV 630-829-9633 Chris Miller CGM@NRC.GOV 630-829-9633 Inspections Inspections Overview Overview
Decommissioning Branch Makeup Decommissioning Branch Makeup
Goal of Inspections Goal of Inspections
Types of inspections Types of inspections
Lead inspector introduction Lead inspector introduction
04/07/2005 11:33 AM 04/07/2005 11:33 AM 13 13 DECOMMISSIONING DECOMMISSIONING POWER REACTOR POWER REACTOR PURPOSE PURPOSE
To establish the inspection policy and To establish the inspection policy and guidance for decommissioning power guidance for decommissioning power reactors reactors
04/07/2005 11:33 AM 04/07/2005 11:33 AM 14 14 DECOMMISSIONING DECOMMISSIONING POWER REACTOR POWER REACTOR INSPECTION PROGRAM INSPECTION PROGRAM OBJECTIVES OBJECTIVES
To obtain information through direct To obtain information through direct observation and verification of licensee observation and verification of licensee activities to:
activities to:
-- to determine whether the decommissioning to determine whether the decommissioning activities are being conducted safely activities are being conducted safely
-- verify that activities are in conformance with verify that activities are in conformance with applicable regulatory requirements, licensee applicable regulatory requirements, licensee commitments, and management controls.
commitments, and management controls.
04/07/2005 11:33 AM 04/07/2005 11:33 AM 15 15 OBEJECTIVES CONTD OBEJECTIVES CONTD
To ensure that the licensees systems To ensure that the licensees systems and techniques for decommissioning and techniques for decommissioning and license termination activities are and license termination activities are adequate adequate
To identify declining trends in To identify declining trends in performance performance
04/07/2005 11:33 AM 04/07/2005 11:33 AM 16 16 DECOMMISSIONING DECOMMISSIONING POWER REACTOR POWER REACTOR INSPECTION PROGRAM INSPECTION PROGRAM INSPECTION PROCEDURES INSPECTION PROCEDURES
The inspection program is implemented The inspection program is implemented through the use of inspection procedures through the use of inspection procedures
Inspection procedures are implemented Inspection procedures are implemented commensurate with licensee performance, commensurate with licensee performance, site activities, and safety site activities, and safety
04/07/2005 11:33 AM 04/07/2005 11:33 AM 17 17 DECOMMISSIONING DECOMMISSIONING POWER REACTOR POWER REACTOR INSPECTION PROGRAM INSPECTION PROGRAM MASTER INSPECTION PLANS MASTER INSPECTION PLANS
A site A site--specific master inspection plan specific master inspection plan is developed for reactor power is developed for reactor power facilities undergoing decommissioning facilities undergoing decommissioning
The following are factors that are The following are factors that are considered when developing and considered when developing and
04/07/2005 11:33 AM 04/07/2005 11:33 AM 18 18 MASTER INSPECTION MASTER INSPECTION PLANS CONTD PLANS CONTD
implementing a site implementing a site--specific master specific master inspection plan:
inspection plan:
-- Plant Design Plant Design
-- Plant Decommissioning Status Plant Decommissioning Status
-- Licensee Performance, Management, Licensee Performance, Management, and Scheduling and Scheduling
04/07/2005 11:33 AM 04/07/2005 11:33 AM 19 19 MASTER INSPECTION MASTER INSPECTION PLANS CONTD PLANS CONTD
The site The site--specific master inspection specific master inspection plans are periodically reviewed and plans are periodically reviewed and adjusted to reflect inspection findings adjusted to reflect inspection findings or changes in decommissioning or changes in decommissioning activities activities
04/07/2005 11:33 AM 04/07/2005 11:33 AM 20 20 CORE INSPECTION PROCEDURES CORE INSPECTION PROCEDURES FOR BIG ROCK POINT FOR BIG ROCK POINT Facility Management and Control Facility Management and Control 36801 36801 Organization, Management & Cost Controls Organization, Management & Cost Controls 37801 37801 Safety Reviews, Design Changes, and Safety Reviews, Design Changes, and Modifications Modifications 40801 40801 Self Self--Assessment, Auditing, and Corrective Action Assessment, Auditing, and Corrective Action 71801 71801 Decommissioning Performance and Status Review Decommissioning Performance and Status Review
04/07/2005 11:33 AM 04/07/2005 11:33 AM 21 21 CORE INSPECTION PROCEDURES CORE INSPECTION PROCEDURES FOR BIG ROCK POINT CONTD FOR BIG ROCK POINT CONTD Decommissioning Support Activities Decommissioning Support Activities 62801 62801 Maintenance and Surveillance Maintenance and Surveillance Radiological Safety Radiological Safety 83750 83750 Occupational Radiation Exposure Occupational Radiation Exposure 83801 83801 Inspection of Final Surveys Inspection of Final Surveys 84750 84750 Radioactive Waste Treatment, and Effluent &
Radioactive Waste Treatment, and Effluent &
Environmental Monitoring Environmental Monitoring 86750 86750 Solid Radioactive Waste Management & Transportation Solid Radioactive Waste Management & Transportation of Radioactive Material of Radioactive Material
04/07/2005 11:33 AM 04/07/2005 11:33 AM 22 22 NRC Contact List NRC Contact List Daniel Gillen Daniel Gillen Chief, Decommissioning Branch Chief, Decommissioning Branch (301) 415 (301) 415--7295 7295 dmg2@nrc.gov dmg2@nrc.gov Claudia Craig Claudia Craig Chief, Section B DCB Chief, Section B DCB (301) 415 (301) 415--6602 6602 cmc1@nrc.gov cmc1@nrc.gov James Shepherd James Shepherd Project Engineer, DCB Project Engineer, DCB (301) 415 (301) 415--6712 6712 jcs2@nrc.gov jcs2@nrc.gov William Snell William Snell Senior Inspector Senior Inspector R III R III (630) 829 (630) 829--9871 9871 wgs@nrc.gov wgs@nrc.gov