Review Of The License Termination Plan Big Rock Point August 5, 2003

NRC Organization COMMISSION OEDO NRR NMSS OTHER REGIONS SFPO DWM OTHER DNMS DECOM BR HLW DCB EPAB 04/07/2005 11:33 AM 2

NRC Performance Goals

1. Maintain Safety, Protection of The Environment, And The Common Defense And Security.
2. Increase Public Confidence.
3. Make NRC Activities And Decisions More Effective, Efficient, And Realistic.
4. Reduce Unnecessary Regulatory Burden on Stakeholders.

04/07/2005 11:33 AM 3

Overview LTP Review Process Status of Review of BRP LTP Consumers Energy Decommissioning Plans for BRP Provide to stakeholders an opportunity to comment on the BRP LTP 04/07/2005 11:33 AM 4

Steps In The LTP Review

1. Acceptance Review
a. All Items In Standard Review Plan
b. Evaluation of Selected Sections
i. Land Use Scenarios ii. Residual Concentrations iii. Hydro-geology iv. Final Status Survey Plan
c. Issue Federal Register Notice
2. Technical Reviews 04/07/2005 11:33 AM 5

Steps In The LTP Review (cond)

3. Requests for Additional Information (RAI)
4. Safety and Environmental Reviews
5. Approve by license amendment
a. Publish Environmental Review
b. Issue Amendment Authorizing Implementation of LTP 04/07/2005 11:33 AM 6

Principal Areas Of Focus Release criteria for license termination.

Detailed final survey plans to demonstrate compliance with the criteria for license termination.

Material disposal.

04/07/2005 11:33 AM 7

Status Of BRP LTP Review LTP submitted April 1, 2003; Acceptance Review completed June 26, 2003 Technical reviews started July Federal Register Notice issued 29 July (68 FR 44550)

LTP Public Meeting 5 August 04/07/2005 11:33 AM 8

Planned Schedule For Review Expect requests for additional information (RAIs) about April 04 Complete safety and environmental reviews about end of CY 04, Announce by Federal Register Notice Issue License Amendment Spring 05 04/07/2005 11:33 AM 9

Spent Fuel Management Part 50 license to stay in effect until fuel is removed from site (about 2012)

Part 72 specifies general license requirements Region III inspects implementation of spent fuel storage system requirements 04/07/2005 11:33 AM 10

NRC Inspection Program Chris Miller, Chief Decommissioning Branch DNMS R III Bill Snell, Senior Inspector 04/07/2005 11:33 AM 11

M@NRC.GOV M@NRC.GOV 829-9633 Inspections

-829-9633 Overview Decommissioning Branch Makeup Goal of Inspections Types of inspections Lead inspector introduction 04/07/2005 11:33 AM 12

DECOMMISSIONING POWER REACTOR PURPOSE To establish the inspection policy and guidance for decommissioning power reactors 04/07/2005 11:33 AM 13

POWER REACTOR INSPECTION PROGRAM OBJECTIVES To obtain information through direct observation and verification of licensee activities to:

- to determine whether the decommissioning activities are being conducted safely

- verify that activities are in conformance with applicable regulatory requirements, licensee commitments, and management controls.

04/07/2005 11:33 AM 14

OBEJECTIVES CONTD To ensure that the licensees systems and techniques for decommissioning and license termination activities are adequate To identify declining trends in performance 04/07/2005 11:33 AM 15

POWER REACTOR INSPECTION PROGRAM INSPECTION PROCEDURES The inspection program is implemented through the use of inspection procedures Inspection procedures are implemented commensurate with licensee performance, site activities, and safety 04/07/2005 11:33 AM 16

POWER REACTOR INSPECTION PROGRAM MASTER INSPECTION PLANS A site-specific master inspection plan is developed for reactor power facilities undergoing decommissioning The following are factors that are considered when developing and 04/07/2005 11:33 AM 17

MASTER INSPECTION PLANS CONTD implementing a site-specific master inspection plan:

- Plant Design

- Plant Decommissioning Status

- Licensee Performance, Management, and Scheduling 04/07/2005 11:33 AM 18

MASTER INSPECTION PLANS CONTD The site-specific master inspection plans are periodically reviewed and adjusted to reflect inspection findings or changes in decommissioning activities 04/07/2005 11:33 AM 19

CORE INSPECTION PROCEDURES FOR BIG ROCK POINT Facility Management and Control 36801 Organization, Management & Cost Controls 37801 Safety Reviews, Design Changes, and Modifications 40801 Self-Assessment, Auditing, and Corrective Action 71801 Decommissioning Performance and Status Review 04/07/2005 11:33 AM 20

FOR BIG ROCK POINT CONTD ecommissioning Support Activities 2801 Maintenance and Surveillance adiological Safety 3750 Occupational Radiation Exposure 3801 Inspection of Final Surveys 4750 Radioactive Waste Treatment, and Effluent &

Environmental Monitoring 6750 Solid Radioactive Waste Management & Transportation of Radioactive Material 04/07/2005 11:33 AM 21

NRC Contact List Daniel Gillen Chief, Decommissioning Branch (301) 415-7295 dmg2@nrc.gov Claudia Craig Chief, Section B DCB (301) 415-6602 cmc1@nrc.gov James Shepherd Project Engineer, DCB (301) 415-6712 jcs2@nrc.gov William Snell Senior Inspector R III (630) 829-9871 wgs@nrc.gov 04/07/2005 11:33 AM 22