ML070650490
| ML070650490 | |
| Person / Time | |
|---|---|
| Site: | Big Rock Point File:Consumers Energy icon.png |
| Issue date: | 07/15/2005 |
| From: | - No Known Affiliation |
| To: | NRC/FSME |
| References | |
| Download: ML070650490 (22) | |
Text
00001"
iZý Fil GRAND OPENING!
Cos & Scheul Stats
Pln Prp for Shtdw A
.Y/
Bt IC -
DFD
&Euldn Finlysem F
Fuel Shipment ISFSI Dismantlement
Scedl Sttu
- Sumta SceueSwes Fia Site Sure SE06 FE072 FuelShiped t
DO MAY2 MA12 ISaS De oihd/rjc OC 1
OC 1
0S aCamplete
6cedl E
E
£nc Decon~~~
SuvyItro ocee1 Sper Dismnlmn (5)
Inero Co ceeD m
lto98 Toa Vaiac 22
Esimt Comarso Bi Roc PoIin YO Doll
-ar in Milin Inrmna SN
$7.
$7.
0 Cost
Esimt Acta Remann Inrmna SN
$7.
$5.
$2.
Inrmna Securit
Fundin Stau Deomisonn Reann CsS2.
Difrec (fndn esiae
$2.7
II
,I~.
~
-I
4
V
I T
i
Project Challenges
" Improve safety culture and maintain schedule
" Balance disposal cost vs schedule impact
- Steam drum enclosure remediation
- Interior concrete between 599 and 585 levels
- Radwaste vault
" Send waste to Duratek at a steady pace
r-I I
I